J-2_Work_Items.pdf

PDF 11 MB Posted

Attached to
Ship repair maintenance
Solicitation number
N6817119R0013
Issued by

View the file

Other files

File Type Posted
Amend_5.pdf PDF
0503_A_MISC_PIPING_REPAIRS_(VRR_18-044,_19-047,_19-045)_R_20_SEPT_2019.pdf PDF
AMEND_04.pdf PDF
0511_A_E-BOILERS_GROOM.pdf PDF
J-1_Contractor_Price_Breakdown_R_20_SEPT_2019.xlsx XLSX spreadsheet
Amend_03.pdf PDF
Amend_02.pdf PDF
N6817119R0013_RFP_AMENDMENT_1.pdf PDF
J-1_Contractor_Price_Breakdown.xlsx XLSX spreadsheet
N6817119R0013_RFP.pdf PDF
J-3_GFM_Report.XLSX XLSX spreadsheet
N6817119R0013_N6817119R0013_Pre_sol_notice.docx DOCX document
N6817119R0013_MTW_Pre-sol_Notice.docx DOCX document
Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

WI Title WI WI

INTENT SCOPE GEN REQUIREMENTS DEFINITIONS 1 NSP

TECHNICAL AND MANUFACTURER REPRESENTATIVES 2 NSP

APPROACH, BERTH, AND MOORING REQUIREMENTS 3 NSP

TESTING AND QUALITY ASSURANCE 4 NSP

ELECTRICAL SAFETY PROCEDURE REQUIREMENTS 5 NSP

HEAVY WEATHER PLAN 6 NSP

COLD WEATHER PLAN 7 NSP

FURNISH OFFICE FOR OMT REV OCONUS 10 A

GENERAL SERVICES FOR SHIP REV OCONUS 11 A

TELEPHONE SERVICES REV OCONUS 12 A

PROJECT PLANNING AND PRODUCTION STATUS MONITORING REPORTS 13 A

WEIGHT MOMENT REPORT REV 14 A

ILS GFM REV 15 A

FIRE PROTECTION AND SHIPS SAFETY PROGRAM 16 A

HANDLING SHIPS STORES REV 17 A

DELIVERY AND REDELIVERY 18 A

SHIPBOARD ACCESS 19 A

GAS FREE CERTIFICATES 20 A

CLEAN AND GAS FREE TANKS VOIDS AND COFFERDAMS 21 A

MACHINERY SPACE TURN-OVER DOCK TRIALS AND SEA TRIALS 22 A

HAZARDOUS WASTE DISPOSAL 23 A

CONTINUATION OF SERVICES 30 B

FORCE PROTECTION REV JULY2018 40 A

TANK SOUNDING TUBES REPAIRS AND CALIBRATIONS (VRR 19-028, 19-044) 101 A

IBS STRUCTURAL MODIFICATIONS 102 A

WATERTIGHT CLOSURE MAINTENANCE (Non-Weatherdeck) 103 A

CREW & TROOP GALLEY MODS (T-ALT 17-013) 104 A

SAIL REPAIR LOCKER MODS, Rev B (T-ALT 17-004R) 106 A

DECK STEEL REPAIR NIXIE EQUIPMENT ROOM (VRR 19-0019) (ABS) 107 A

DECK STEEL REPAIRS CREW AND TROOP GALLEY (VRR 18-0068) (ABS) 108 A

DECK STEEL REPAIRS TXV ROOM (VRR 19-0025) (ABS) 109 A

DECK STEEL REPAIRS WASTE PROCESSOR ROOM (VRR 18-0035) (ABS) 110 A

DECK STEEL REPAIRS 3-108-5-L (VRR 19-056) (ABS) 111 A

DUMBWAITER REPAIRS 112 A

CARGO ELEVATOR REPAIRS (ABS) 113 A

ULTRASONIC GAUGING (UT) 120 B

SAP ROOM BULKHEAD & DOOR REPLACMENT (VRR 17-068, T-ALT 18-007 ) 121 B

ABS SPECIAL SURVEY - TANK INSPECTION (Non-Tanker) 154 A

FLIGHT DECK PRESERVATION (NAVAIR) 156 A

WEATHERDECK WATERTIGHT CLOSURE INSPECTION 162 A

FLIGHT DECK SAFETY NET INSPECTION (NAVAIR) 163 A

BOILER SLIDING FOOT (VRR 19-048) 201 A

BOILER SAFETY VALVES (ABS) 202 A

BOILER SURVEY (VRR 18-034, 15-042) (ABS) 203 A

BOILER MOUNTS- 5YR (ABS) 204 A

BOILER UPTAKE RENEWAL (VRR 18-004) 205 A

BOILER 1B DESUPERHEATER FLANGE REPLACEMENT (VRR 18-013) (ABS) 206 A

BOILER TUBE CLEANING AND INSPECTION (ABS) 207 A

STEAM PIPING-UT GAUGING AND HYDROSTATIC TEST (ABS) 208 A

HP-LP AND RED GEAR ALIGNMENT CHECK (ABS) 209 A

ENGINE ROOM ASBESTOS ABATEMENT (VRR 16-159) 210 A

AIRFLOW SENSOR STRMS FWD FR 18 (T-ALT 17-012R) 301 A

FORCED DRAFT BLOWER MOTOR OVERHAULS (VRR 19-036) (ABS) 302 A

IBS POWER AND LIGHTING MODS 303 A

MT WHITNEY (LCC 20) FY20 ROH/DD

1A SSTG STATOR CLEAN DIP BAKE 304 A

Movement of VCS UPS to AP 305 A

UPS AND BATTERY INSPECT LOAD TEST 306 A

MISCELLANEOUS MOTOR OVERHAULS 310 B

SWITCHBOARD CLEANING 351 A

MOTOR CONTROL CENTER CLEANING 352 A

THERMOGRAPHIC SURVEY (1YR) 353 A

EDG GENERATOR INSPECTION 354 A

IBS GENERAL SYSTEM MODS 401 A

IBS COMMUNICATION SYSTEMS MODS 402 A

IBS CONSOLE MODIFICATIONS 403 A

IBS NAVIGATION SYSTEMS MODS 404 A

IBS Console - VCS Equipment Install 405 A Steering System VCS Upgrade 406 A VCS Industrial Support 407 A

ANNUAL RADIO COMMUNICATION EQUIPMENT CERTIFICATION (ABS) 455 A

OWS - ANNUAL (VRR 19-037) (ABS) 501 A

OVERHAUL 1C MFP (VRR 19-029) (ABS) 502 A

MISC PIPING REPAIRS (VRR 18-044, 19-047, 19-045) 503 A

SSEDG Exhaust Pipe Expansion Joint Open, Inspect and Clean 504 A

STEERING SYSTEM SERVICE-5YR (ABS) 505 A

WATERMIST SYSTEM TESTING - 2YR Periodicity (T-ALT 18-026R) 506 A

STEAM PIPING REPAIRS (VRR18-123, 19-030) (ABS) 507 A

IBS STEERING SYSTEM UPGRADE (ABS) 508 A

MAIN ENGINE LO PURIFIER STEAM HEATER (VRR19-023) 509 A

INFERIOR INSULATION REMOVAL AND RE-INSULATION, FIRE RM (VRR 18-042) 510 A

STEAM VALVES, O&I (ABS) 512 A

1A SSTG TURBINE AND RED GR (VRR 17-001) (ABS) 513 A

LPAC OVERHAULS (VRR 19-052) 514 A

HOTEL STEAM VALVE REPLACEMENT (VRR 19-026, T-ALT 18-021) (ABS) 515 A

MAIN CIRC PUMP GOVERNOR (VRR 19-055) 516 A

SCBA ANNUAL INSPECTION (ABS) 562 A

SCBA COMPRESSOR AND FILLING STATION INSPECTION AND MAINT (ABS) 563 A

FIXED GAS FIRE EXTINGUISHING SYSTEM (ABS) 565 A

FIXED FOAM SYSTEM, SCSI (ABS) 567 A

FIRE SMOKE DETECTION ALARM SYSTEMS 569 A

PORTABLE EXTINGUISHERS 570 A

FIRE SMOKE DAMPER SERVICE (ABS) 571 A

DEEP FAT FRYER GRILL AND RANGE HOOD FIRE EXTINGUISHING SYSTEM (ABS572 A

FIREHOSES SERVICING (ABS) 573 A

FIRE DOORS AND SHUTTERS (1YR) 574 A

HELO TOWER WINDOW REPLACEMENT (VRR 18-135) 601 A

PRC DECK REPLACEMENT with AMTICA (VRR 19-040, 19-000, 19-057 602 A

ELECTRICAL SAFETY MATTING RENEWAL (VRR 18-038) 603 A

REMOVE AND REPLACE PRC & TERRAZZO (VRR 18-055 19-051, 19-053, 19-059) 604 A

DOMESTIC REEFER BOX CLEANING (VRR 18-0143) 605 A

STEERING GEAR DECK GRATING (VRR 19-027, T-ALT 18-022R) 606 A

RESCUE BOAT DAVITS INSPECTIONS (ABS) 607 A

ACCOM LADDER INSPECT AND TEST (5 YR) (ABS) 658 A

DEEP FAT FRYER INSPECTION 662 A

PILOT BOARDING AND EMB LADDERS (5YR) 668 A

LMMT INSTALLATION (TALT 18-029R) 701 A

SMQ-11 INSTALLATION 20 Jan 2020 702 A NAVSSI Installation 3 Jun 2019 703 A MK-38 (ROCS) Installation 3 Jun 2019 704 A

INSULATION AND LAGGING REPAIR (VRR 19-024) 801 A

Fan Room 03-72-0-Q Equipment & Steel Repairs 802 A Fan Room 02-74-1-Q Equipment & Steel Repairs 803 A Fan Room 01-76-1-Q Equipment & Steel Repairs 804 A Fan Room 2-19-0-Q Equipment Repairs 805 A Fan Room 2-52-6-Q Equipment & Steel Repairs 806 A Fan Room 2-76-3-Q Equipment & Steel Repairs 807 A Fan Room 2-109-4-Q Equipment Repairs 808 A Fan Room 2-121-1-Q Equipment Repairs 809 A Fan Room 2-146-2-Q Equipment Repairs 810 A Fan Room 3-28-1-Q Equipment & Steel Repairs 811 A Fan Room 3-48-2-Q Equipment Repairs 812 A Fan Room 3-98-5-Q Equipment Repairs 813 A Fan Room 3-28-1-Q Equipment & Steel Repairs 814 A Fan Room 1-62-4-Q Modifications (T-ALT 17-009) 815 A Fan Room 6-50-2-Q TXV Room Mods (T-ALT 17-006) 816 A

FAN ROOM ASBESTOS ABATEMENT 817 A

VENT DUCT REPAIRS (VRR 19-050) 818 A

GALLEY VENT AND GAYLORD HOOD CLEANING 851 A

ANNUAL LAUNDRY EXHAUST VENT CLEANING 852 A

ACCOMMODATION SPACE VENT CLEANING 853 A

DRYDOCKING AND UNDOCKING VESSEL (ABS) 901 A

STERN TUBE SHAFT REMOVAL (ABS) 902 A

PROPELLER AND PROPELLER SHAFT EXCHANGE (ABS) 904 A

BILGE KEEL 906 A

RUDDER REMOVAL 907 A

UNDERWATER SPEED LOG 908 A

STERN TUBE COATING rev1 909 A

ICCP REPLACEMENT (T-ALT 18-033R) 910 A

UW HULL PRESERVATION (Full blast Cat B) 930 B

DRYDOCKING AND UNDOCKING VESSEL (ABS) 951 B

ANCHOR CHAINS AND LOCKERS (ABS) 953 A

RUDDER AND STERN FRAME EXAMINATION (ABS) 954 A

OVERHAULING SEA VALVES (ABS) 956 A

UNDERWATER HULL PAINTING SPOT BLAST 960 A

FREEBOARD PRESERVATION 961 A

SEA CHEST AND MARINE GROWTH PROTECTION (2.5 YEAR) 963 A

SW EXPANSION JOINTS (VRR 19-039) 964 A

SHAFT ALIGNMENT AND BEARING REACTION CHECKS (2.5 YEAR) (ABS) 966 A

USS MOUNT WHITNEY

(LCC‐20)

GENERALREQUIREMENTSPR#N4044419RCMW001
18MAY2016

ITEM NO.001 Category “NSP” MSC/N75/REV MAY 16

INTENT, SCOPE, GENERAL REQUIREMENTS, AND DEFINITIONS

001‐1

1. ABSTRACT

1.1. This item describes the intent, scope, general requirements, and definitions that apply to this Work Package.

2. REFERENCES

2.1. MSC Drawing 803‐7081122, Military Sealift Command General Technical Requirements (GTRs)

2.2. Enclosures: None

3. ITEM LOCATION/DESCRIPTION:

3.1. Aspects of the ship and shore support facilities as described in the work package.

4. GOVERNMENT FURNISHED MATERIAL/EQUIPMENT/SERVICE: None

5. NOTES: None

6. QUALITY ASSURANCE REQUIREMENTS: None Additional

7. STATEMENT OF WORK REQUIRED

7.1. SCOPE

7.1.1. This Work Package, accompanying contract, and contract guidance drawings define the scope of work to be performed.

7.1.2. Incaseofadifferenceorconflictbetweenthereferencedcontractguidancedrawings
andtheworkitems,theworkitemsshallgovern.Anyomissionsfromthedrawings,or
fromthisworkpackage,ofdetailsorworkthatisnecessarytofulfilltheintentofthis
workpackageorthatiscustomarilyperformedintheindustry,donotrelievethe
contractorfromhis/herobligationtoperformsuchwork.

7.1.3. Prepare working drawings, submit them to the MSCREP and Regulatory Bodies for

approval,andaccomplishworkinaccordancewiththeworkingdrawingsasapproved.
Workingdrawingsshallbeapprovedpriortocommencementofanyworkrequiring
suchdrawings.Submitaworkingdrawingschedule.MSCREPshallprovidedrawing
numbersasrequestedbythecontractor.

USS MOUNT WHITNEY

(LCC‐20)

GENERALREQUIREMENTSPR#N4044419RCMW001
18MAY2016

ITEM NO.001 Category “NSP” MSC/N75/REV MAY 16

INTENT, SCOPE, GENERAL REQUIREMENTS, AND DEFINITIONS

001‐2

7.1.4. Provide labor and materials necessary to complete work items in the Work Package.

Rigandunrig,connectanddisconnectstageandun‐stage,andremove,replace,and
relocateanyinterferencenecessarytoaccomplisheachworkitemintheWork
Package.UnlessspecificallyidentifiedasGFE/GFM,equipment,material,andlabor
shallbeContractorfurnished.

7.1.5. Perform inspections, tests, and trials to demonstrate total compliance with the Work

Package requirements.

7.2. UNIVERSAL REQUIREMENTS

7.2.1. Within the scope of this Work Package, complete each work item in accordance with appropriate General Technical Requirements (GTRs) as found in Reference 2.1.

7.2.2. WhereaworkitemhasspecialrequirementsthatdifferfromtheGTRs,the
requirementsoftheworkitemshallgovern.Wheretherearenospecialrequirements
invoked,thentheGTRsshallgovern.

7.2.3. Work items and Contract Guidance Drawings provided by the Government to the

Contractordonotfullydescribeallworkrequiredtomeetregulatoryrequirements.
TheContractorshallensurethatworkcomplieswithregulatoryrequirementsin
accordancewithReference2.1,GTRNo.1.Thecostofmeetingregulatory
requirementsshallbebornebytheContractor.TheContractorshallberesponsiblefor
schedulingofABSsurveysandthecostandschedulingofallotherregulatoryservices.
TheGovernmentshallbearthecostsofABSshipsurveys.Whereaworkitemrequires
thecontractortodevelopworkingdrawingsandobtainABSreviewandapprovalof
thoseworkingdrawings,thecontractorshallbearthesecosts.

7.2.4. Where a work item does not invoke any particular GTR, it is the responsibility of the

Contractor to identify and perform in accordance with relevant GTRs.

7.2.5. The Contractor shall obtain all necessary compliance and approval certificates and documents and submit them to the MSCREP. This includes but is not limited to:

a. Originalstampeddocumentsofeachapproveddrawingforworkperformed
duringtheavailability.

USS MOUNT WHITNEY

(LCC‐20)

GENERALREQUIREMENTSPR#N4044419RCMW001
18MAY2016

ITEM NO.001 Category “NSP” MSC/N75/REV MAY 16

INTENT, SCOPE, GENERAL REQUIREMENTS, AND DEFINITIONS

001‐3

b. Originalstampeddocumentsofeachregulatorytestandinspectionperformed
duringtheavailability.
c. AchronologicalfileofallcorrespondencebetweentheContractor(orsub‐
contractor)andallregulatorybodies.
d. Prepareandsubmitreports,drawings,andotherdocumentsrequiredperthe
aboveparagraphsinaccordancewiththeContractDataRequirementsList

(CDRL).

7.3 DEFINITIONS

7.3.1 Definitions.Thefollowingtermsinalphabeticalordershallhavemeaningsas
indicatedbelow:
7.3.1.1 AdministrativeContractingOfficer(ACO)‐IdentifiestheMilitarySealift
Command(MSC)designatedContractingOfficerlocatedonsiteattheContractor’s

facility.

7.3.1.2 Article‐meansaseparatelyletteredpartofaworkitemoftheWork
Package.Articlesindifferentitemsmaybearthesamenumber;hence,toidentifyan
articlecompletely,theitemofwhichitisapartmustbespecified.
7.3.1.3 As‐original‐meansaconditionmeetingtheoriginalsystemand
manufacturer’sdesign.
7.3.1.4 As‐Found‐meanstheconditionwhichwasfounduponcloseinspectionby
anindividualwithknowledgeontheitem(s)inquestion.Itisintendedthatthe
observationswillfindallrelativeconditions,boththoserequiringrepairsandthose
not.Thecontractorwillreportallconditions,normalanddegraded.Whenreporting
AsFoundconditiontheinformationshallbestated,clearly,concisely,andwith
enoughdetailsoastoallowforpreparationofaworkstatementandestimate.
Includeannotatedsketches,graphs,andphotographswhennecessarytomakea
reportclearlyunderstandabletotheMSCREP.Identifyactualreadings/dimensions
taken.WhenaWorkItemdoesnotrequireareport,andoneisdeterminedtobe
necessaryinordertoproduceareliableorcompleterepair,submitonelegiblecopy,
inhardcopyorelectronicmedia,ofareportwithsupportingdataasearlyas

USS MOUNT WHITNEY

(LCC‐20)

GENERALREQUIREMENTSPR#N4044419RCMW001
18MAY2016

ITEM NO.001 Category “NSP” MSC/N75/REV MAY 16

INTENT, SCOPE, GENERAL REQUIREMENTS, AND DEFINITIONS

001‐4

possibleinthecontractperiod.Thegoalistohaverequiredworkcompletedwithin
theoriginalcontractperiod.
7.3.1.5 AsReleased‐meanstheconditionoftheitemthatexistsattimeitis
returnedtothegovernment.Includeannotatedsketches,graphs,andphotographs
whennecessarytomakeareportclearlyunderstandabletotheMSCREP.Identify
actualreadings/dimensionstaken.Itshallincludeasummaryofcorrectiveactions
madebythecontractorandlistanyknowndegradedconditions.
7.3.1.6 CategoryAmeansadefinitizedworkitemforwhichafirmfixedpricehas
beenestablishedandwillbeexecutedduringtheperiodofperformanceand
includedinthebasecontract.
7.3.1.7 CategoryBmeansadefinitizedworkitemwhichidentifiesadditional
repairs,labor,materialsorservices,wherebyaunitizedpriceortotalpricehasbeen
establishedandmay,ormaynotbeinvokedduringtheperiodofperformanceofthe
contractbytheMSCContractingOfficer.
7.3.1.8 CFEandCFM‐identifyContractorFurnishedEquipment(CFE)and
ContractorFurnishedMaterial(CFM),andareusedinterchangeably.

7.3.1.9 COMSC ‐ identifies the Commander, Military Sealift Command.

7.3.1.10 COR‐ContractingOfficer’sRepresentative.Generally,thePrinciple
PortEngineer(PPE)isassignedastheCORforshipyardavailabilities.
7.3.1.11 ContractingOfficer‐identifiestheContractingOfficerforMilitary
SealiftCommand(MSC),FleetIndustrialSupportCenter(FISC)orNavalRegional
ContractCenter(NRSS).
7.3.1.12 Contractor‐identifiestheshipyardholdingtheprimecontractfor
theworkspecifiedinthisWorkPackage.
7.3.1.13 Delivery‐isthecorrectcontractualtermforthepointintimewhen
thecontractoracceptstheshipintohiscustody.Thepointwheretheshipis
deliveredisstatedinthe"DELIVERYANDREDELIVERY"StandardWorkItem‐018
asitisdependentonsteaming,towing,etc.

USS MOUNT WHITNEY

(LCC‐20)

GENERALREQUIREMENTSPR#N4044419RCMW001
18MAY2016

ITEM NO.001 Category “NSP” MSC/N75/REV MAY 16

INTENT, SCOPE, GENERAL REQUIREMENTS, AND DEFINITIONS

001‐5

7.3.1.14 DetachorDisconnect‐meanstodisconnectallattachmentstothe
unittoenabletheunittobemoved.Attachmentpointsshallbetagged,identified,
blanked,andprotectedtofacilitatereinstallation.Workitemsdonotnecessarily
identifyinterferences,andtheContractorisresponsiblefortheidentificationand
resolutionofinterferencesaffectingadetachmentandsubsequentmovement.

7.3.1.15 Extend ‐ See install definition.

7.3.1.16 GeneralTechnicalRequirements(GTRs)‐definesthestandardsof
performanceforworkbeingperformedbyContractors.
7.3.1.17 GFEandGFM‐identifyGovernmentFurnishedEquipment(GFE)and
GovernmentFurnishedMaterial(GFM),andareusedinterchangeably.
7.3.1.18 HAZWASTE–HazardouswastesarethoseRCRAidentifiesinoneof
fourhazardouswastelists(F‐list–40CFR261.31,K‐list–40CFR261.32,P‐list40
CFR262.32,orU‐list40CFR261.32),orexhibitsatleastoneoffourcharacteristics–
ignitability,corrosionpotential,reactivityortoxicityasdefinedin40CFRPart261,
SubpartC.
7.3.1.19 Install,Extend,andModify‐meansthattheContractorshallprovide
thepieceofequipment,material,orsystemtobeinstalledandshallprovidethe
materials,structuralsupports,andlabortoattach,connect,andtesttheequipment
orsystemtoeffectafinishedfullyoperationalinstallationcompleteinallaspects.In

addition:

a. Whennewmaterialorequipmentisnotspecifiedbytype,
thematerialorequipmentshallbeidenticaltotheexisting.
WheninstallisusedwithreferencetoGFE,conditionsofthe
abovedefinitionexcepttherequirementtoprovidethepiece
ofequipmentareapplicable.

b. Work items do not necessarily identify interferences and the

Contractorisresponsiblefortheidentificationandresolution
ofinterferencesaffectingtheinstallationbytemporarily
removing,reinstalling,orrelocatinginterferences.The
Contractorshalltemporarilyremove,permanentlyrelocate,
alter,andrerouteallinterferences,including,butnotlimited

USS MOUNT WHITNEY

(LCC‐20)

GENERALREQUIREMENTSPR#N4044419RCMW001
18MAY2016

ITEM NO.001 Category “NSP” MSC/N75/REV MAY 16

INTENT, SCOPE, GENERAL REQUIREMENTS, AND DEFINITIONS

001‐6

to,ductwork,piping,wire‐ways,fixtures,insulation,joiner
linings,equipment,furniture,etc.,tofacilitatefinishedfully
operationalinstallationsandmodificationscoveredbythis
WorkPackage.Intheeventthatpiping,ductwork,
equipment,linings,etc.,mustbetemporarilyremovedto
facilitateinstallationofnewormodifiedwork,theContractor
shallsubsequentlyreinstallsameinanasoriginalcondition.
Thisincludesbutisnotlimitedtopaintingofsteel,restoring
floorcoveringsandjoinerwork,painting,replacingitems
andequipmentremovedforaccess,pluggingwiringandpipe
penetrations,andrestoringallotherdisturbedareasto
matchthesurroundingareas.Disturbedcoatingshallbe

repaired.

7.3.1.20 Interference‐meansanyobject(s),equipment(s),system(s),or
component(s)thatmustbetemporarilyremovedandreinstalled,relocated,
modifiedordesignedaroundtofacilitatetheinstallationofnewormodified
equipmentorsystems.
7.3.1.21 LaborandMaterials‐meanslabor,materials,plantfacilities,
supervision,services,equipment,andanyotherresourcesrequiredtoaccomplish
thespecifiedwork.
7.3.1.22 Manifests‐aretheofficialshippingdocumentformsoriginatedand
signedbythegenerators,transporters,andoperatorsofthehazardouswaste
disposalfacilityasrequiredbyFederal,state,orlocalregulations.

7.3.1.23 MSC Drawing ‐ means Contract Guidance Drawing.

7.3.1.24 MSCRepresentative(MSCREP)‐identifiesthegovernment’s
ContractingOfficeTechnicalrepresentative(CORorCOTR)locatedonsiteatthe
Contractor’sFacility,andassignedtoworkwiththeAdministrativeContracting
Officer(ACO).
7.3.1.25 MSCREPapproval‐indicatesonlythatthegeneralmethodof
constructionanddetailingaspresentedbytheContractorappeartobesatisfactory
andwillnotrelievetheContractoroftheresponsibilityofanyerror.

USS MOUNT WHITNEY

(LCC‐20)

GENERALREQUIREMENTSPR#N4044419RCMW001
18MAY2016

ITEM NO.001 Category “NSP” MSC/N75/REV MAY 16

INTENT, SCOPE, GENERAL REQUIREMENTS, AND DEFINITIONS

001‐7

7.3.1.26 Modify ‐ See Install definition.

7.3.1.27 NDT‐Non‐DestructiveTesting.Non‐destructivetestingshallbe
accomplishedtosatisfyABSandUSCGrequirementsforallweldrepairs,hullinserts
orstructuralinstallations.Testingshallutilizecurrentlycalibratedequipmentand
certificatedtestingpersonnel.
7.3.1.28 NoneadditionalorNone‐meansthattherearenoadditional
requirementsbeyondthosecontainedintheGTRsandWorkItemsthatmakeupthe
WorkPackage.WherespecificrequirementsaresetforthinArticles6.0,7.0or8.0
ofaworkitem,suchrequirementsareinadditiontothoserequirementslistedin
theGTRsandworkitemsthatmakeuptheWorkPackage.
7.3.1.29 NotSeparatelyPriced(NSP)‐isaworkitemwhichdefinesthe
requirements,standardsandconditionsforwhichthecontractorshallmeetand
adheretoduringtheperiodofperformance.NSPWorkItemsarenotbiddableitems
anddonotrepresentacosttothegovernment.
7.3.1.30 Orequal‐meansthatcomponents,materialsorequipmentshallbe
equivalentintermsofperformance(flowrate,pressure,heattransfer
characteristics,etc.),servicesrequired(power,coolingwater,HVAC,etc.),
compatibilitywithinterrelatedsystemsandarrangements,andsupportabilityover
theservicelifeofthecomponentsorequipment.Inthecaseofcomponent,material
orequipmentsubstitutionforthoseitemsnotedintheContractGuidanceDrawings
orWorkPackage,theContractorshallsubmitawrittenrequestdelineatingthe
designandperformancedataonboththespecifiedandsubstitutedpieceof
equipmentforMSCREPapprovalandifapproved.TheContractorshalltakefull
contractualandtechnicalresponsibilityforensuringinstallationofthecomponents,
materialsorequipmentarecompatibilitywiththeinterrelatedsystems.
7.3.1.31 QualifiedWelders‐Welders,whethercontractororsubcontractor
provided,shallholdqualificationdocumentationfromAmericanBureauofShipping
(ABS),andUnitedStatesCoastGuard(USCG)forthematerialtobewelded.Welding
proceduresshallbeapprovedbytheABSSurveyorfortheparticularapplications.
7.3.1.32 Redelivery‐Thetermredeliverymeansthepointintimethatthe
MSCREPacceptstheshipbackfromtheContractor.

USS MOUNT WHITNEY

(LCC‐20)

GENERALREQUIREMENTSPR#N4044419RCMW001
18MAY2016

ITEM NO.001 Category “NSP” MSC/N75/REV MAY 16

INTENT, SCOPE, GENERAL REQUIREMENTS, AND DEFINITIONS

001‐8

7.3.1.33 Refurbish‐meanstotemporarilyremove,disassemble,clean,
inspect,andsubmitanas‐foundconditionreport;further,uponapprovalofthe
MSCREP,thecontractorshalllubricate,reassembletheunit,equipmentorsystem,
setandadjustinaccordancewithmanufacturer'sspecifications,testtheunit,
equipment,orsystemtodemonstrateproperfunctiontothemanufacturer's
specifications,andsubmitanas‐releasedconditionreport.Thereinstalled
refurbishedunit,equipment,orsystemshallbefullyoperationalandcompleteinall
aspects.Newscrews,bolts,nuts,washers,gaskets,packing,pins,keys,seals,valve
stems,bearings,o‐rings,andshimsshallbeusedwhenreassemblingand
reinstallingtheunit,equipment,orsystem.Additionalinformationconcerningthe
locationofequipmentrefurbishment,specialprocessestobeusedinthe
refurbishment,andadditionalpartstobereplacedduringrefurbishmentshallbeas
specifiedintheindividualworkitems.
7.3.1.34 Reinstall‐meansthattheContractorshallprovidelaborand
materialtoinstallapieceofequipment,material,orsystemaftertheequipment,
material,orsystemwastemporarilyremoved,relocated,modified,orrefurbished.
Therequirementsofaninstallationassetforthinparagraphs7.3.1.19,7.3.1.19.a,
and7.3.1.19.babovewithregardtocompleteness,operation,testing,the
identificationandresolutionofinterference’s,etc.alsoapplytoareinstallation.
7.3.1.35 Relocate‐meanstoprovidelaborandmaterialstodetachtheunit,
equipment,orsystemandtoreinstallthesameunit,equipment,orsystematanew
ormodifiedlocation.Therequirementsofaninstallationassetforthinparagraphs
7.3.1.19,7.3.1.19.a,and7.3.1.19.babovewithregardtocompleteness,operation,
testing,theidentificationandresolutionofinterferences,etc.alsoapplyto

relocation.

7.3.1.36 RemoveorRipout‐meanstoprovidelaborandmaterialsto
disconnect,detach,andtransfertheunit,equipment,materials,orsysteminits
entiretyofftheshipasspecifiedintheGTR.Supports,stuffingtubes,collars,and
otherappurtenancesshallberemovedbyburning,chipping,orcuttingwhenaWork
Itemrequiresmachinery,piping,wiring,ducting,structure,outfitting,joiner,or
equipmentremoval.Areasaffectedbyremovals/ripoutsshallberestoredasset
forthinparagraph7.3.1.19.b:
a. WhentheWorkPackagerequirestheremovalofmachinery,
piping,wiring,ducting,structure,outfitting,joiner,or
equipmentremoval,supports,stuffingtubes,collars,and

USS MOUNT WHITNEY

(LCC‐20)

GENERALREQUIREMENTSPR#N4044419RCMW001
18MAY2016

ITEM NO.001 Category “NSP” MSC/N75/REV MAY 16

INTENT, SCOPE, GENERAL REQUIREMENTS, AND DEFINITIONS

001‐9

otherappurtenancesshallberemovedbyburning,chipping,
orcutting,stubs,roughspots,andothersurfaceirregularities
shallbegroundsmoothandflushwithadjacentsurfaces.
Oncetaskedworkintheaffectedareaiscomplete,theareas
affectedbytheremovalshallberestoredtothecondition
beforetheremovalaction.Thisincludesbutisnotlimitedto
paintingofsteel,restoringfloorcoveringsandjoinerwork,
painting,replacingitemsandequipmentremovedforaccess,
pluggingwiringandpipepenetrations,andrestoringall
otherdisturbedareastomatchthesurroundingareas.
Disturbedcoatingsshallberepairedtomatchthe
surroundingarea.

b. After removing the machinery, piping, wiring, ducting,

structure,outfitting,joiner,orequipmentremoval,supports,
stuffingtubes,collars,orotherappurtenances,watertightor
firezoneboundariesshallbereestablished.Holesinoiltight,
watertight,andgastightboundariesandstructural
bulkheadsshallbeblankedwithflushinsertsproviding
structuralintegrityandtightnessequaltothatwhichthey
replace.Holesinnon‐structuralsteelandsteeljoiner
bulkheadsmaybeblankedwithlappedplates.

c. When the electrical wiring requiring removal joins a circuit

thatisnotbeingremoved(i.e.atajunctionbox),the
electricalwiringorcableshallbeentirelyremovedtothe
junctionpoint.Allotherattachmentsincludingbutnot
limitedtofasteners,supports,andbracketsshallbeentirely
removed.Whenelectriccableisdesignatedforremoval,it
shallbephysicallyandelectricallytracedtothepower
sourceandthecircuitde‐energizedbeforeremovingthe
cable.Whencableisremovedfrommultiplecableruns,the
remainingcablesshallbeboundandstrapped.
7.3.1.37 ReplaceorRenew‐meanstoremovetheunit,equipment,orsystems
includinginterferences,andtoinstallanewunit,equipment,orsystemwhichis
eitheridenticaltoorequaltothatwhichwasremoved;theinstallationshallinclude
butnotbelimitedtoanyhook‐ups,supports,andadapters,whicharerequiredto
effectafinishedfullyoperationalinstallationcompleteinallaspects.

USS MOUNT WHITNEY

(LCC‐20)

GENERALREQUIREMENTSPR#N4044419RCMW001
18MAY2016

ITEM NO.001 Category “NSP” MSC/N75/REV MAY 16

INTENT, SCOPE, GENERAL REQUIREMENTS, AND DEFINITIONS

001‐10

7.3.1.38 Restore‐meanstoperformthoseprocesses(includingbutnot
limitedtoweldbuild‐up,chromeplate,machine,grind,lap,NDT,etc.)whichare
requiredtoreturnacomponenttothemanufacturer’sspecificationsregarding
dimensions,tolerances,angles,surfacefinishandclearances.
7.3.1.39 Section‐meansmajorpartoftheWorkPackageandshallincludea
groupofrelatedworkitems.
7.3.1.40 Specification‐meanseitherasingleworkitemoracompletesetof
workitems.
7.3.1.41 Tagout‐meansaproceduretobothnotifypersonnelthattagged‐out
equipment,components,orsystemsareeitherisolatedornotinanormaloperating
conditionandtopreventinjurytopersonnel,improperoperation,ordamagetothe
tagged‐outequipment,components,orsystems.
7.3.1.42 TemporaryInstallationorTemporarilyInstall‐meanstoprovide
laborandmaterialstoinstalltheunit,material,equipmentorsystemtocompletely
providethefunctiondescribedintheindividualWorkItem,andtoremovethesame
unit,material,equipmentorsystempriortoredeliveryofvesselortosatisfactorily
meettherequirementsoftheindividualWorkItem(s).Alltherequirementsofan
installationandremovalsetforthinparagraphs7.3.1.19,7.3.1.19.a,7.3.1.19.b,and
7.3.1.33withregardtocompleteness,operation,testing,theidentificationand
resolutionofinterferences,disconnection,detachmentandtransferoftheunit,
material,equipment,orsysteminitsentiretyofftheshipasspecifiedintheGTR
applytoatemporaryinstallationandsubsequentremoval.
7.3.1.43 TemporaryRemovalorTemporaryRemove‐meanstoprovidelabor
andmaterialtodisconnectandmovetheunit,equipment,orsystemfromitsinitial
location,andtoreinstallthesameunit,equipment,orsystemeitherinthesame
locationorelsewhereontheshipasdescribedintheWorkPackage.Allthe
requirementsofaninstallationassetforthinparagraphs7.3.1.19,7.3.1.19.a,and
7.3.1.19.bwithregardtocompleteness,operation,testing,theidentificationand
resolutionofinterferences,etc.alsoapplytoatemporaryremovaland

reinstallation.

7.3.1.44 Workitemoritem‐meansaseparatelynumberedpartoftheWork
Packagedescribingadiscreteportionoftheworktobeaccomplished.

USS MOUNT WHITNEY

(LCC‐20)

GENERALREQUIREMENTSPR#N4044419RCMW001
18MAY2016

ITEM NO.001 Category “NSP” MSC/N75/REV MAY 16

INTENT, SCOPE, GENERAL REQUIREMENTS, AND DEFINITIONS

001‐11

7.3.1.45 WorkPackage‐meanstheentirewrittenportionofthecontract
includingtheMasterShipRepairAgreement,thecontractprovisions,workitems,
andtheGTRs.

8. GENERAL CONDITIONS

8.1. The following conditions apply to each work item in this Work Package, and are intended to outline the minimum acceptable quality of material, workmanship, and practice.

8.1.1. Wherelaws,regulations,requirements,orcommercialstandardsarereferredto
herein,thelatestrevisionthatisineffectonthedateofthesolicitationshallbe

applicable.

8.1.2. TheContractorshallbeheldresponsiblefortheprotectionofexistingandnewly
installedequipmentandmaterials.AnyequipmentthatisdamagedbytheContractor
shallbereplaced,repaired,orrestoredattheContractor’sexpenseasdirectedbythe

MSCREP.

8.1.3. Materials and workmanship shall be subject to inspection and approval of the MSCREP

atalltimes.Workmanshipandmaterialsfoundtobedefectiveornotinconformity
withgoodmarinepractice,regulatoryrequirements,orthisWorkPackageandits
associatedapproveddrawingsshallbecauseforrejectionandremovalatthe
Contractor’sexpense.

8.1.4. Prepare and submit reports, drawings, and other documents required by the Work

Package in accordance with the Contract Data Requirements List (CDRL).

8.1.5. Equipment,furnishings,andmaterialsremoved,includingscrap,exceptthose
specifiedforrelocationorotherwisedesignatedbyMSCREP,aretobedisposedofby
theContractoratthecontractor’sexpense,exceptformaterialrequiringdisposalasa
hazardouswaste,whichshallbedisposedofinaccordancewithWorkItemtitled,
HazardousWasteDisposalataContractor’sFacility.

8.1.6. Install suitable protective devices on equipment, which presents a hazard to

personnel.Thesemaybecarrierguardsorotherapproveddevicesandshallpreclude
personnelinjury.Examplesofequipmentwhichrequireprotectivedevicesarethose
whichcontainexposedrotatingparts,fanblades,belts,pulleys,flywheels,wirerope
reels,etc.

USS MOUNT WHITNEY

(LCC‐20)

GENERALREQUIREMENTSPR#N4044419RCMW001
18MAY2016

ITEM NO.001 Category “NSP” MSC/N75/REV MAY 16

INTENT, SCOPE, GENERAL REQUIREMENTS, AND DEFINITIONS

001‐12

8.1.7. Design,workmanship,equipment,andmaterialsmustconformtoUSCoastGuard
regulations,COLREGS,NavigationandVesselInspectionCirculars(NVIC),and
associateddocumentsincorporatedbyReferenceintheaforementionedformarine
inspection,andrulessetforthbytheAmericanBureauofShipping,U.S.PublicHealth
Service(USPHS)Regulations,IMO,SOLAS,IEEE45andANSIA17.1(forelevators).
UnlessspecificallyapprovedbytheMSCREP,Contractorfurnishedequipmentand
materialsshallbenew.NewmaterialsandContractorfurnishedequipmentmusthave
traceablematerialdocumentation.ThecostsofABSshipsurveywillbebornebythe
Government.Thecostofotherregulatoryserviceexpensesshallbebornebythe

contractor.

8.1.8. Conductmeggerinsulationresistancetest(phasetophaseandphasetoground)on
newpowercableinstallationsandonexistingdisconnectedandreusedpower

cables.

8.1.9. Bond/groundequipmentwhichismodifiedorinstalledbythisWorkPackage.All
bondingandbondingstrapsshallbeincompliancewithproceduresandpractices
delineatedbyregulatoryandprofessionalagenciesandorganizationstoincludeABS
RulesforShipbuilding,andIEEErequirements.
8.1.10. Whereripoutsleaveopeningsinstructures,decks,orshellplating,suitable
insertplatesorreinforcedstructuresofequalmaterialshallbeinstalledtoclosethe

openings.

8.2. Hazardous Material:

8.2.1. All material shall be asbestos and PCB free. If material that contains asbestos or PCB is

inadvertentlyspecifiedonaContractGuidanceDrawingorotherdocument,the
Contractorshallsubstituteanequivalentnon‐asbestosornon‐PCBmaterialandnotify
theMSCREPinwritingpriortomakinganychanges.Thiswillnotresultinany
adjustmentstotheContract.

8.2.2. All paint and coatings shall be lead free. Coal tar and coatings containing organic tin or

zincchromateshallnotbeused.Ifthesematerialshavebeeninadvertentlyspecified,
theContractorshallsubstituteanequivalentleadfree,tarfree,etc.paintorcoating
andnotifytheMSCREPwithoutanyadjustmentoftheContract.

8.2.3. The contractor may find materials aboard the ship which are hazardous to health.

Theseinclude,butarenotlimitedto,asbestos,coatingscontainingleadcompounds
andzincchromate,andventilationgasketsandelectricalcablecontainingPCBs.Inthe

USS MOUNT WHITNEY

(LCC‐20)

GENERALREQUIREMENTSPR#N4044419RCMW001
18MAY2016

ITEM NO.001 Category “NSP” MSC/N75/REV MAY 16

INTENT, SCOPE, GENERAL REQUIREMENTS, AND DEFINITIONS

001‐13

eventthathazardousmaterialsareidentified,thecontractorshallnotifytheMSCREP
immediatelyandinwriting.

USS MOUNT WHITNEY

(LCC‐20)

GENERALREQUIREMENTSPR#N4044419RCMW001
17July,2019
ITEMNO.002CATEGORY“NSP”MSC/SWI/N75/PPE

TECHNICAL AND MANUFACTURER REPRESENTATIVES

002‐1

1. ABSTRACT

1.1. This item sets general requirements for technical and manufacturer’s representatives.

2. REFERENCES/ENCLOSURES: None

3. ITEM LOCATION/DESCRIPTION

3.1. Location/Quantity

3.1.1. As contained within the individual work items.

4. GOVERNMENT FURNISHED EQUIPMENT/MATERIAL/SERVICES: None

5. NOTES

5.1. ThecontractorandallsubcontractorsregardlessoftiershallconsulttheGeneral
TechnicalRequirements(GTR)item024,todetermineapplicabilitytothisitem.In
performanceofworkitemsinthispackage,thecontractorandallsubcontractors
regardlessoftiermustcomplywiththerequirementsofGTR024,wherespecifiedinan
individualworkitem.
5.2. Theworkitem(s)specification(s)containedinthesolicitationmayindicateormaynot
indicatethatGovernmentFurnishedTechnicalRepresentative(s)willbeonsite.Without
regardtoGFStechnicalrepresentativesbeingidentifiedintheworkitem(s)
specification(s)theserequirementsshallapply.
5.3. Forthepurposeofthissolicitation,thetermsmanufacturer’srepresentative,technical
representative,techrep,oranyvariantthereofshallbeconstruedtobesynonymous.

6. QUALITY ASSURANCE REQUIREMENTS

6.1. As contained within the individual work items.

7. STATEMENT OF WORK

7.1. Theworkitemspecification(s)containedinthesolicitationmayrequirethecontractorto
furnishtechnicalrepresentatives,ormayindicateormaynotindicatethatGovernment
furnishedtechnicalrepresentative(s)willbeonsite.Whenanysuchinstancesare
indicatedintheworkitemspecification(s)thefollowingshallapply:

7.2. Contractor furnished technical representatives:

7.2.1. Thecontractorshallfurnishtheservicesonlyofanoriginalequipment
manufacturer's(OEM),OEMauthorized,orMSCapprovedqualifiedindependent
technicalrepresentative(s)asspecifiedintheindividualworkitem.
7.2.1.1. Thecontractor,inordertoobtainMSCapprovalforanOEMauthorized
technicalrepresentativeshallprovideacopyofavalidmanufacturer's
authorizationletterwithdateofissue,name,address,andtelephone
numberforverification.

USS MOUNT WHITNEY

(LCC‐20)

GENERALREQUIREMENTSPR#N4044419RCMW001
17July,2019
ITEMNO.002CATEGORY“NSP”MSC/SWI/N75/PPE

TECHNICAL AND MANUFACTURER REPRESENTATIVES

002‐2

7.2.1.2. OEM‐authorizedservicetechniciansandtechnicalrepresentativesshall
berequiredtoproducepropertrainingandauthorization
documentationfromtheOEMassertingtheirqualificationtoperform
M&Rworkonthedesignatedequipment.Theyshallhavealltechnical
documentation,servicebulletinsandreach‐backtotheOEMengineering
departmenttoassess,diagnoseandproperlyaccomplishM&R.
7.2.1.3. Non‐OEMqualifiedtechnicalfieldserviceproviderswillberequiredto
havethefollowingqualifications.Thecontractormustsubmitevidence
thattheproposednon‐OEMtechnicalrepresentativepossessesallofthe
qualificationslistedbelow,subjecttoMSCREPreviewandapproval:
7.2.1.3.1. Atleastfiveyearsofdocumentedworkexperiencewhich
includesdocumentedformaltraininginafieldservice
organizationasanauthorizedmanufacturer'stechnical
representativeorfieldserviceproviderforthetypeof
equipmentorsystemsbeingserviced,repaired,installed,
modified,orrelocated.
7.2.1.3.2. Demonstratedcompetencyinanalyzingrepairrequirements
andmaintenanceandrepairprocessperformanceandmaking
recommendationsbaseduponas‐foundconditionresults
and/orperformanceanalysis.
7.2.1.3.3. Recentreferences(withinthelast3years)fromatleastthree
differentclientsforwhomservicewasprovidedasaqualified
technicalrepresentativeonthetypeofequipmentorsystems
beingserviced,repaired,installed,modified,orrelocated.
7.2.1.3.4. Abilitytoprocurepartsandaccesstomanufacturer's
drawings,technicalmanuals,technicalservicebulletins,and
specialtoolsfortheequipmentormachineryspecifiedinthe
workitem.Alternatively,thequalifiedtechnicalfieldservice
representativeshallhaveexpertknowledgeoftheequipment
orsystemandshallbeabletoprovidedetailedrepair
requirements,includingidentificationofpartsrequired,
sourcesforthoseparts,andstep‐by‐steprepairproceduresto
theshipyardandtheMSCREPtoreturntheequipmentforfull
operatingparameters.
7.2.2. Thetechrepsaretobeonsiteatalltimeswheneverthefollowingevolutionsare
performedtospecifiedequipmentorsystems:disconnection,removal,opening,
disassemblyinspection,takingofclearancereadings,maintenanceandrepair,
staticanddynamicbalancingtestsandadjustments,reassembly,shoptests,
reinstallation,commissioning,operatingtests,docktrials,andseatrials.

USS MOUNT WHITNEY

(LCC‐20)

GENERALREQUIREMENTSPR#N4044419RCMW001
17July,2019
ITEMNO.002CATEGORY“NSP”MSC/SWI/N75/PPE

TECHNICAL AND MANUFACTURER REPRESENTATIVES

002‐3

7.2.3. Thetechrepshallwitnessalloftheaboveidentifiedtasksandshallprepareall
reportsofdesign,asfoundandfinalreassemblydimensionsandclearances,as
foundconditionandrecommendedrepairs,shoptest,commissioningand
operationaltest,docktrialandseatrialresults.
7.2.4. Thetechrepshallwitnessandsignallreportsattestingtohispresenceand
witnessingofthetestandconcurringwiththeresultsforalltestsperformedby
thecontractororothersub‐contractors.
7.2.5. Thecontractorshallbepreparedtosubmitalistofalltechnicalrepresentatives
(bymanufacturername),intendedtobeemployedduringthecontract
performanceperiodtoMSCaspartoftheproposalsubmittedinresponsetothis

solicitation.

7.2.6. TheMSCREPmayrejectatechrepforfailuretoprovideanauthorizationletteror
verifiableproofofcompetence.
7.2.7. Thecontractor,inordertoobtainapprovalforanindependenttechrepshall
providecopiesoftraceablepastemploymenthistoryandcertificatesoftraining.
TheMSCREPmayrejectanindependenttechrepforunsatisfactoryqualification

proof.

7.2.8. Noworkonanyworkitemrequiringatechnicalrepresentativeshallstartuntil
theMSCREPapprovesthetechrepforthatitemandthetechrepisonsite.

7.3. Government furnished technical representatives:

7.3.1. TheGovernmentmayfurnishtheservicesofamanufacturer's,manufacturer's
authorizedornon‐OEMqualifiedtechnicalrepresentativetobeonsiteattheship
repairfacilityatrequiredtimesduringrepairstothespecifiedequipmentof

systems.

7.3.2. Intheeventthatthecontractorindicateseitherthroughwrittencorrespondence
orthecontractor’sproductionschedulethattheGovernment’stechnical
representativeisrequiredtobeon‐sitetosupportaproductionelement,and
subsequentlyfailstostartthesubjectworkitemontime,theMSCREPwillissuea
PSDPN(ProductionScheduleDelinquentProgressNotice)inaccordancewith
workitem013ofthisworkpackage.PSDPNsfoundtobetheresultofcontractor
delinquenciesthataffectthepresenceofaGovernmentfurnishedtechnical
representativewillresultinactionstorecouptheadditionalcostsforthesubject
Governmentfurnishedtechnicalrepresentative.
7.3.3. Thecontractorshallcoordinateandreiteratetheproductionscheduledatesfor
whentheGovernmenttechrepistobeonsiteviatheMSCREPinwritingseven(7)
calendardaysinadvanceoftheworkitem'sstart.

8. GENERAL REQUIREMENTS

8.1. None additional.

USS MOUNT WHITNEY

(LCC‐20)

GENERALREQUIREMENTSPR#N4044419RCMW001
20July,2018
ITEMNO.003CATEGORY“NSP”MSC/SWI/N75/PPE

APPROACH, BERTH, AND MOORING REQUIREMENTS

003‐1

1. ABSTRACT

1.1. Thisitemdescribestherequirementsforthecontractortoprovideforasafeand
navigableapproachroutetothecontractor’sfacility;asafeandsecureberth;andprovide
safeandsufficientmooringofthevessel.

2. REFERENCES/ENCLOSURES

2.1. References:

2.1.1. MIL. STD. MIL‐C‐28628D, of July 1991; Camels.

2.1.2. MIL. STD. MIL‐F‐29248, of 21 November 1986; Fenders, Marine, Foam Filled, Netless

2.1.3. MSC Drawing No. 845‐4458934 Rev U, General Arrangement Plan

2.1.4. MSC Drawing No. 520‐2491350, Mooring Arrangement

2.2. Enclosures:

2.2.1. NationalOceanographicandAtmosphericAdministration(NOAA)Definitionof
SoundingDatumandDiagramofChartedDepths

2.2.2. MSC Ship Notional Arrival Conditions

3. ITEM LOCATION/DESCRIPTION

3.1.1. Enclosure2.2.2providesvesselparticularsandnotionalarrivalconditions.This
informationshouldbeusedforthesolicitation/proposalprocess.Actualarrival
conditionsshallbeasagreedbetweenawardedcontractorandMSCREPandshall
beverifiedbytheshippriortoarrival.

4. GOVERNMENT FURNISHED EQUIPMENT/MATERIAL/SERVICES: None

5. NOTES

5.1. Thecontractorandallsubcontractors,regardlessoftiermustconsulttheGeneral
TechnicalRequirements(GTR)todetermineapplicabilitytothisworkitem.In
performanceofthisworkitem,thecontractorandallsubcontractorsregardlessoftier
mustcomplywithallapplicableGTRrequirements.
5.2. Thecontractorandallsubcontractors,regardlessoftierareadvisedtoreviewotherwork
itemsunderthiscontracttodeterminetheireffectontheworkrequiredunderthiswork

item.

5.3. The definitions of many terms used in this work item are found in Work Item 001.

6. QUALITY ASSURANCE REQUIREMENTS

6.1. None additional.

7. STATEMENT OF WORK

USS MOUNT WHITNEY

(LCC‐20)

GENERALREQUIREMENTSPR#N4044419RCMW001
20July,2018
ITEMNO.003CATEGORY“NSP”MSC/SWI/N75/PPE

APPROACH, BERTH, AND MOORING REQUIREMENTS

003‐2

7.1. Theshipmustbeprovidedasafeapproach,secureberth,andsafemooringatalltimes.
References2.1.1thru2.1.4areprovidedforguidance.

7.2. Approach:

7.2.1. Theshipshallbeprovidedanunobstructedapproachtothecontractor’sfacility
(primeorotherwiseproposedrented,leased,subcontractedlocation)wherethe
vesselwillbeberthedandmoored,foranypartoftheperformanceperiod.There
mustbenodangeroftheshipgroundingorcollidingwithanyoverhead
obstructionsduringtransit.Thisappliesfordeliverytothecontractor,redelivery
totheGovernment,andanyinter/intrafacilitytransits.
7.2.2. Duringanyshiptransitormovement,andconsistentwithship’sdraftconditionat
thetime;theshipshallremainafloatwithoutanydangerofgroundingandavoid
collidingwithanyoverheadobstructions.
7.2.2.1. Aminimumairdraftclearanceofnotlessthanten(10)feetshallbe
affordedbetweenthehighestverticalprojectionofthevesselatmean
highwater,allbridgesandanycablespassingabove/acrossthemarked
channelalongtheentireroute.
7.2.3. Thefollowingminimumclearances,withrespecttovesseldraft,shallbe
maintainedtominimizeprobabilityofgroundingandreducesiltbuildupin
piping.Thedatumforcharteddepthshallbemeanlowerlowwater(MLLW)per
enclosure2.2.1.ThecontractorshallincludeofficialNOAAorotherregulatory
agencyinformationontidalranges,periodicityandlengthoftideranges,
includingadiscussiononhowcontractor’sproposeduseoftideheightstosatisfy
transitrequirementsmayaffecttheshipyardavailabilityarrival/departuretimes
andthecompletescopeofwork:

7.2.3.1. Underway in confined waters (harbors) – 3 feet of charted depth.

7.2.3.2. Underwayininlandwaters–2feetplussquatofcharteddepth.(Note:
SquatvaluesonlyapplytoMSCtankervesselsliketheT‐AOclassships.
T‐AOsquattablesareavailableforplanning.)
7.2.3.3. Underwayinopenwater–2feetplussquatofcharteddepth.(Note:
SquatvaluesonlyapplytoMSCtankervesselsliketheT‐AOclassships.
T‐AOsquattablesareavailableforplanning.)
7.2.3.4. Duringdeadstickmaneuvering(pilotaboardandassistedbytugs)–2
feetofcharteddepth.
7.2.3.5. Fordry‐docking–12inchesoverthehighblock,sill,orhighest
projectionincludingtheeffectsoflist,trim,andhog/sag.
7.2.3.6. Piersideatacontractor’s(orsubcontractor’s)facility–3feetoffacility
soundingsurveydepth.Tidalrangesshallbeincludedtodemonstrate
adequateclearanceunderallconditions.

USS MOUNT WHITNEY

(LCC‐20)

GENERALREQUIREMENTSPR#N4044419RCMW001
20July,2018
ITEMNO.003CATEGORY“NSP”MSC/SWI/N75/PPE

APPROACH, BERTH, AND MOORING REQUIREMENTS

003‐3

7.2.4. Anavigationalmeeting/briefshallbeheld24hourspriortoarrival/departureof
thevessel.
7.2.4.1. TheconferenceshallbeattendedbyshipsforceandMSCREPproject
officepersonnelandthecontractor’ssupervisorypersonnelconcerned
withthearrival/departureevolution.Note:Thearrivalconferenceshall
beheldviaphoneconsothattheshipcanparticipateintheconference
remotelypriortoarrivalattheshipyard.Provideconferencecallphone
numberdetailsafterawardfortheremoteconference.
7.2.4.2. Navigationalbriefshallcoverarrivalanddeparture
date/time/tides/weather/waterdepths/tugandpilotservices/line
handlers,areasofconcern,etc.
7.2.5. ContractorsmustsubmitwiththeirproposalscopiesofallthelatestNOAAorUS
ArmyCorpsofEngineersornationallyrecognizedauthoritywaterwayapproach
chartstotheirfacility.Chartsaretoshowtheentirerouteoftransitfromthesea
buoytothecontractor’sfacility,orforproposedinter/intrafacilitytransits.
Chartsmustprovideadequatedemonstrationthatthecontractorhaspositively
determinedtheroute(s)providingsafevesseltransitandadequatewaterdepths
tomeettherequirementsof7.2.3above,includingapplicabletidalranges.
7.2.6. Contractorsmustsubmitanapproachchartwiththeirproposals.Theapproach
chartshallbeequaltotheberthingchartindimensionsandcontainthefollowing

data:

7.2.6.1. Contractorsshallfurnishcurrentdepthsoundingsfortheapproachto
thepierand/ordry‐dockfromthemainchannel.
7.2.6.2. Soundingsmustindicatethedepthsoverthefulllengthoftheapproach,
fromthepointinthenavigablechannelwherethecontractortakes
deliveryofthevesseltothepierand/ordrydockatamaximumofone
hundred(100)footintervals.Adequatebreadthofsoundingsshallbe
providedtodemonstratesufficientunderwaterclearanceforvessel
arrival,departureandanyrequiredturningevolutions.Approach
soundingsshallbeconsideredcurrentiftakenwithinthreehundredand
sixty‐five(365)dayspriortothedateofissueofthesolicitation.NOAA
chartsorexcerptsofsuchdocumentswillnotbeaccepted.
7.2.6.3. Officialdataontidalrangesfortheareacoveredbytheapproachcharts
shallalsobesubmittedwiththecontractor’sproposal.
7.2.6.4. Allinformationmustbereadilyavailabletoclearlycharttheprogressof
theshipfromarrivalattheporttosafemooringlocationordry‐dock.
Theshipmustbeprovidedsafeaccessandegresstoandfromthe
contractor’sproposedpierand/ordry‐dock.

7.3. Berth:

USS MOUNT WHITNEY

(LCC‐20)

GENERALREQUIREMENTSPR#N4044419RCMW001
20July,2018

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it.