J-2_Work_Items.pdf
PDF 11 MB Posted
- Attached to
- Ship repair maintenance
- Solicitation number
- N6817119R0013
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amend_5.pdf | ||
| 0503_A_MISC_PIPING_REPAIRS_(VRR_18-044,_19-047,_19-045)_R_20_SEPT_2019.pdf | ||
| AMEND_04.pdf | ||
| 0511_A_E-BOILERS_GROOM.pdf | ||
| J-1_Contractor_Price_Breakdown_R_20_SEPT_2019.xlsx | XLSX spreadsheet | |
| Amend_03.pdf | ||
| Amend_02.pdf | ||
| N6817119R0013_RFP_AMENDMENT_1.pdf | ||
| J-1_Contractor_Price_Breakdown.xlsx | XLSX spreadsheet | |
| N6817119R0013_RFP.pdf | ||
| J-3_GFM_Report.XLSX | XLSX spreadsheet | |
| N6817119R0013_N6817119R0013_Pre_sol_notice.docx | DOCX document | |
| N6817119R0013_MTW_Pre-sol_Notice.docx | DOCX document |
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
WI Title WI WI
INTENT SCOPE GEN REQUIREMENTS DEFINITIONS 1 NSP
TECHNICAL AND MANUFACTURER REPRESENTATIVES 2 NSP
APPROACH, BERTH, AND MOORING REQUIREMENTS 3 NSP
TESTING AND QUALITY ASSURANCE 4 NSP
ELECTRICAL SAFETY PROCEDURE REQUIREMENTS 5 NSP
HEAVY WEATHER PLAN 6 NSP
COLD WEATHER PLAN 7 NSP
FURNISH OFFICE FOR OMT REV OCONUS 10 A
GENERAL SERVICES FOR SHIP REV OCONUS 11 A
TELEPHONE SERVICES REV OCONUS 12 A
PROJECT PLANNING AND PRODUCTION STATUS MONITORING REPORTS 13 A
WEIGHT MOMENT REPORT REV 14 A
ILS GFM REV 15 A
FIRE PROTECTION AND SHIPS SAFETY PROGRAM 16 A
HANDLING SHIPS STORES REV 17 A
DELIVERY AND REDELIVERY 18 A
SHIPBOARD ACCESS 19 A
GAS FREE CERTIFICATES 20 A
CLEAN AND GAS FREE TANKS VOIDS AND COFFERDAMS 21 A
MACHINERY SPACE TURN-OVER DOCK TRIALS AND SEA TRIALS 22 A
HAZARDOUS WASTE DISPOSAL 23 A
CONTINUATION OF SERVICES 30 B
FORCE PROTECTION REV JULY2018 40 A
TANK SOUNDING TUBES REPAIRS AND CALIBRATIONS (VRR 19-028, 19-044) 101 A
IBS STRUCTURAL MODIFICATIONS 102 A
WATERTIGHT CLOSURE MAINTENANCE (Non-Weatherdeck) 103 A
CREW & TROOP GALLEY MODS (T-ALT 17-013) 104 A
SAIL REPAIR LOCKER MODS, Rev B (T-ALT 17-004R) 106 A
DECK STEEL REPAIR NIXIE EQUIPMENT ROOM (VRR 19-0019) (ABS) 107 A
DECK STEEL REPAIRS CREW AND TROOP GALLEY (VRR 18-0068) (ABS) 108 A
DECK STEEL REPAIRS TXV ROOM (VRR 19-0025) (ABS) 109 A
DECK STEEL REPAIRS WASTE PROCESSOR ROOM (VRR 18-0035) (ABS) 110 A
DECK STEEL REPAIRS 3-108-5-L (VRR 19-056) (ABS) 111 A
DUMBWAITER REPAIRS 112 A
CARGO ELEVATOR REPAIRS (ABS) 113 A
ULTRASONIC GAUGING (UT) 120 B
SAP ROOM BULKHEAD & DOOR REPLACMENT (VRR 17-068, T-ALT 18-007 ) 121 B
ABS SPECIAL SURVEY - TANK INSPECTION (Non-Tanker) 154 A
FLIGHT DECK PRESERVATION (NAVAIR) 156 A
WEATHERDECK WATERTIGHT CLOSURE INSPECTION 162 A
FLIGHT DECK SAFETY NET INSPECTION (NAVAIR) 163 A
BOILER SLIDING FOOT (VRR 19-048) 201 A
BOILER SAFETY VALVES (ABS) 202 A
BOILER SURVEY (VRR 18-034, 15-042) (ABS) 203 A
BOILER MOUNTS- 5YR (ABS) 204 A
BOILER UPTAKE RENEWAL (VRR 18-004) 205 A
BOILER 1B DESUPERHEATER FLANGE REPLACEMENT (VRR 18-013) (ABS) 206 A
BOILER TUBE CLEANING AND INSPECTION (ABS) 207 A
STEAM PIPING-UT GAUGING AND HYDROSTATIC TEST (ABS) 208 A
HP-LP AND RED GEAR ALIGNMENT CHECK (ABS) 209 A
ENGINE ROOM ASBESTOS ABATEMENT (VRR 16-159) 210 A
AIRFLOW SENSOR STRMS FWD FR 18 (T-ALT 17-012R) 301 A
FORCED DRAFT BLOWER MOTOR OVERHAULS (VRR 19-036) (ABS) 302 A
IBS POWER AND LIGHTING MODS 303 A
MT WHITNEY (LCC 20) FY20 ROH/DD
1A SSTG STATOR CLEAN DIP BAKE 304 A
Movement of VCS UPS to AP 305 A
UPS AND BATTERY INSPECT LOAD TEST 306 A
MISCELLANEOUS MOTOR OVERHAULS 310 B
SWITCHBOARD CLEANING 351 A
MOTOR CONTROL CENTER CLEANING 352 A
THERMOGRAPHIC SURVEY (1YR) 353 A
EDG GENERATOR INSPECTION 354 A
IBS GENERAL SYSTEM MODS 401 A
IBS COMMUNICATION SYSTEMS MODS 402 A
IBS CONSOLE MODIFICATIONS 403 A
IBS NAVIGATION SYSTEMS MODS 404 A
IBS Console - VCS Equipment Install 405 A Steering System VCS Upgrade 406 A VCS Industrial Support 407 A
ANNUAL RADIO COMMUNICATION EQUIPMENT CERTIFICATION (ABS) 455 A
OWS - ANNUAL (VRR 19-037) (ABS) 501 A
OVERHAUL 1C MFP (VRR 19-029) (ABS) 502 A
MISC PIPING REPAIRS (VRR 18-044, 19-047, 19-045) 503 A
SSEDG Exhaust Pipe Expansion Joint Open, Inspect and Clean 504 A
STEERING SYSTEM SERVICE-5YR (ABS) 505 A
WATERMIST SYSTEM TESTING - 2YR Periodicity (T-ALT 18-026R) 506 A
STEAM PIPING REPAIRS (VRR18-123, 19-030) (ABS) 507 A
IBS STEERING SYSTEM UPGRADE (ABS) 508 A
MAIN ENGINE LO PURIFIER STEAM HEATER (VRR19-023) 509 A
INFERIOR INSULATION REMOVAL AND RE-INSULATION, FIRE RM (VRR 18-042) 510 A
STEAM VALVES, O&I (ABS) 512 A
1A SSTG TURBINE AND RED GR (VRR 17-001) (ABS) 513 A
LPAC OVERHAULS (VRR 19-052) 514 A
HOTEL STEAM VALVE REPLACEMENT (VRR 19-026, T-ALT 18-021) (ABS) 515 A
MAIN CIRC PUMP GOVERNOR (VRR 19-055) 516 A
SCBA ANNUAL INSPECTION (ABS) 562 A
SCBA COMPRESSOR AND FILLING STATION INSPECTION AND MAINT (ABS) 563 A
FIXED GAS FIRE EXTINGUISHING SYSTEM (ABS) 565 A
FIXED FOAM SYSTEM, SCSI (ABS) 567 A
FIRE SMOKE DETECTION ALARM SYSTEMS 569 A
PORTABLE EXTINGUISHERS 570 A
FIRE SMOKE DAMPER SERVICE (ABS) 571 A
DEEP FAT FRYER GRILL AND RANGE HOOD FIRE EXTINGUISHING SYSTEM (ABS572 A
FIREHOSES SERVICING (ABS) 573 A
FIRE DOORS AND SHUTTERS (1YR) 574 A
HELO TOWER WINDOW REPLACEMENT (VRR 18-135) 601 A
PRC DECK REPLACEMENT with AMTICA (VRR 19-040, 19-000, 19-057 602 A
ELECTRICAL SAFETY MATTING RENEWAL (VRR 18-038) 603 A
REMOVE AND REPLACE PRC & TERRAZZO (VRR 18-055 19-051, 19-053, 19-059) 604 A
DOMESTIC REEFER BOX CLEANING (VRR 18-0143) 605 A
STEERING GEAR DECK GRATING (VRR 19-027, T-ALT 18-022R) 606 A
RESCUE BOAT DAVITS INSPECTIONS (ABS) 607 A
ACCOM LADDER INSPECT AND TEST (5 YR) (ABS) 658 A
DEEP FAT FRYER INSPECTION 662 A
PILOT BOARDING AND EMB LADDERS (5YR) 668 A
LMMT INSTALLATION (TALT 18-029R) 701 A
SMQ-11 INSTALLATION 20 Jan 2020 702 A NAVSSI Installation 3 Jun 2019 703 A MK-38 (ROCS) Installation 3 Jun 2019 704 A
INSULATION AND LAGGING REPAIR (VRR 19-024) 801 A
Fan Room 03-72-0-Q Equipment & Steel Repairs 802 A Fan Room 02-74-1-Q Equipment & Steel Repairs 803 A Fan Room 01-76-1-Q Equipment & Steel Repairs 804 A Fan Room 2-19-0-Q Equipment Repairs 805 A Fan Room 2-52-6-Q Equipment & Steel Repairs 806 A Fan Room 2-76-3-Q Equipment & Steel Repairs 807 A Fan Room 2-109-4-Q Equipment Repairs 808 A Fan Room 2-121-1-Q Equipment Repairs 809 A Fan Room 2-146-2-Q Equipment Repairs 810 A Fan Room 3-28-1-Q Equipment & Steel Repairs 811 A Fan Room 3-48-2-Q Equipment Repairs 812 A Fan Room 3-98-5-Q Equipment Repairs 813 A Fan Room 3-28-1-Q Equipment & Steel Repairs 814 A Fan Room 1-62-4-Q Modifications (T-ALT 17-009) 815 A Fan Room 6-50-2-Q TXV Room Mods (T-ALT 17-006) 816 A
FAN ROOM ASBESTOS ABATEMENT 817 A
VENT DUCT REPAIRS (VRR 19-050) 818 A
GALLEY VENT AND GAYLORD HOOD CLEANING 851 A
ANNUAL LAUNDRY EXHAUST VENT CLEANING 852 A
ACCOMMODATION SPACE VENT CLEANING 853 A
DRYDOCKING AND UNDOCKING VESSEL (ABS) 901 A
STERN TUBE SHAFT REMOVAL (ABS) 902 A
PROPELLER AND PROPELLER SHAFT EXCHANGE (ABS) 904 A
BILGE KEEL 906 A
RUDDER REMOVAL 907 A
UNDERWATER SPEED LOG 908 A
STERN TUBE COATING rev1 909 A
ICCP REPLACEMENT (T-ALT 18-033R) 910 A
UW HULL PRESERVATION (Full blast Cat B) 930 B
DRYDOCKING AND UNDOCKING VESSEL (ABS) 951 B
ANCHOR CHAINS AND LOCKERS (ABS) 953 A
RUDDER AND STERN FRAME EXAMINATION (ABS) 954 A
OVERHAULING SEA VALVES (ABS) 956 A
UNDERWATER HULL PAINTING SPOT BLAST 960 A
FREEBOARD PRESERVATION 961 A
SEA CHEST AND MARINE GROWTH PROTECTION (2.5 YEAR) 963 A
SW EXPANSION JOINTS (VRR 19-039) 964 A
SHAFT ALIGNMENT AND BEARING REACTION CHECKS (2.5 YEAR) (ABS) 966 A
USS MOUNT WHITNEY
(LCC‐20)
| GENERAL | REQUIREMENTS | PR | #N4044419RCMW001 | |||
| 18 | MAY | 2016 |
ITEM NO.001 Category “NSP” MSC/N75/REV MAY 16
INTENT, SCOPE, GENERAL REQUIREMENTS, AND DEFINITIONS
001‐1
1. ABSTRACT
1.1. This item describes the intent, scope, general requirements, and definitions that apply to this Work Package.
2. REFERENCES
2.1. MSC Drawing 803‐7081122, Military Sealift Command General Technical Requirements (GTRs)
2.2. Enclosures: None
3. ITEM LOCATION/DESCRIPTION:
3.1. Aspects of the ship and shore support facilities as described in the work package.
4. GOVERNMENT FURNISHED MATERIAL/EQUIPMENT/SERVICE: None
5. NOTES: None
6. QUALITY ASSURANCE REQUIREMENTS: None Additional
7. STATEMENT OF WORK REQUIRED
7.1. SCOPE
7.1.1. This Work Package, accompanying contract, and contract guidance drawings define the scope of work to be performed.
| 7.1.2. In | case | of | a | difference | or | conflict | between | the | referenced | contract | guidance | drawings | ||||
| and | the | work | items, | the | work | items | shall | govern. | Any | omissions | from | the | drawings, | or | ||
| from | this | work | package, | of | details | or | work | that | is | necessary | to | fulfill | the | intent | of | this |
| work | package | or | that | is | customarily | performed | in | the | industry, | do | not | relieve | the | |||
| contractor | from | his/her | obligation | to | perform | such | work. |
7.1.3. Prepare working drawings, submit them to the MSCREP and Regulatory Bodies for
| approval, | and | accomplish | work | in | accordance | with | the | working | drawings | as | approved. |
| Working | drawings | shall | be | approved | prior | to | commencement | of | any | work | requiring |
| such | drawings. | Submit | a | working | drawing | schedule. | MSCREP | shall | provide | drawing | |
| numbers | as | requested | by | the | contractor. |
USS MOUNT WHITNEY
(LCC‐20)
| GENERAL | REQUIREMENTS | PR | #N4044419RCMW001 | |||
| 18 | MAY | 2016 |
ITEM NO.001 Category “NSP” MSC/N75/REV MAY 16
INTENT, SCOPE, GENERAL REQUIREMENTS, AND DEFINITIONS
001‐2
7.1.4. Provide labor and materials necessary to complete work items in the Work Package.
| Rig | and | unrig, | connect | and | disconnect | stage | and | un‐stage, | and | remove, | replace, | and |
| relocate | any | interference | necessary | to | accomplish | each | work | item | in | the | Work | |
| Package. | Unless | specifically | identified | as | GFE/GFM, | equipment, | material, | and | labor | |||
| shall | be | Contractor | furnished. |
7.1.5. Perform inspections, tests, and trials to demonstrate total compliance with the Work
Package requirements.
7.2. UNIVERSAL REQUIREMENTS
7.2.1. Within the scope of this Work Package, complete each work item in accordance with appropriate General Technical Requirements (GTRs) as found in Reference 2.1.
| 7.2.2. Where | a | work | item | has | special | requirements | that | differ | from | the | GTRs, | the | |
| requirements | of | the | work | item | shall | govern. | Where | there | are | no | special | requirements | |
| invoked, | then | the | GTRs | shall | govern. |
7.2.3. Work items and Contract Guidance Drawings provided by the Government to the
| Contractor | do | not | fully | describe | all | work | required | to | meet | regulatory | requirements. | |||
| The | Contractor | shall | ensure | that | work | complies | with | regulatory | requirements | in | ||||
| accordance | with | Reference | 2.1, | GTR | No. | 1. | The | cost | of | meeting | regulatory | |||
| requirements | shall | be | borne | by | the | Contractor. | The | Contractor | shall | be | responsible | for | ||
| scheduling | of | ABS | surveys | and | the | cost | and | scheduling | of | all | other | regulatory | services. | |
| The | Government | shall | bear | the | costs | of | ABS | ship | surveys. | Where | a | work | item | requires |
| the | contractor | to | develop | working | drawings | and | obtain | ABS | review | and | approval | of | ||
| those | working | drawings, | the | contractor | shall | bear | these | costs. |
7.2.4. Where a work item does not invoke any particular GTR, it is the responsibility of the
Contractor to identify and perform in accordance with relevant GTRs.
7.2.5. The Contractor shall obtain all necessary compliance and approval certificates and documents and submit them to the MSCREP. This includes but is not limited to:
| a. Original | stamped | documents | of | each | approved | drawing | for | work | performed |
| during | the | availability. |
USS MOUNT WHITNEY
(LCC‐20)
| GENERAL | REQUIREMENTS | PR | #N4044419RCMW001 | |||
| 18 | MAY | 2016 |
ITEM NO.001 Category “NSP” MSC/N75/REV MAY 16
INTENT, SCOPE, GENERAL REQUIREMENTS, AND DEFINITIONS
001‐3
| b. Original | stamped | documents | of | each | regulatory | test | and | inspection | performed |
| during | the | availability. |
| c. A | chronological | file | of | all | correspondence | between | the | Contractor | (or | sub‐ |
| contractor) | and | all | regulatory | bodies. |
| d. Prepare | and | submit | reports, | drawings, | and | other | documents | required | per | the |
| above | paragraphs | in | accordance | with | the | Contract | Data | Requirements | List |
(CDRL).
7.3 DEFINITIONS
| 7.3.1 Definitions. | The | following | terms | in | alphabetical | order | shall | have | meanings | as |
| indicated | below: |
| 7.3.1.1 Administrative | Contracting | Officer | (ACO) | ‐ | Identifies | the | Military | Sealift | |
| Command | (MSC) | designated | Contracting | Officer | located | onsite | at | the | Contractor’s |
facility.
| 7.3.1.2 Article | ‐ | means | a | separately | lettered | part | of | a | work | item | of | the | Work | |
| Package. | Articles | in | different | items | may | bear | the | same | number; | hence, | to | identify | an | |
| article | completely, | the | item | of | which | it | is | a | part | must | be | specified. |
| 7.3.1.3 As‐original | ‐ | means | a | condition | meeting | the | original | system | and |
| manufacturer’s | design. |
| 7.3.1.4 As‐Found | ‐ | means | the | condition | which | was | found | upon | close | inspection | by | |||||
| an | individual | with | knowledge | on | the | item(s) | in | question. | It | is | intended | that | the | |||
| observations | will | find | all | relative | conditions, | both | those | requiring | repairs | and | those | |||||
| not. | The | contractor | will | report | all | conditions, | normal | and | degraded. | When | reporting | |||||
| As | Found | condition | the | information | shall | be | stated, | clearly, | concisely, | and | with | |||||
| enough | detail | so | as | to | allow | for | preparation | of | a | work | statement | and | estimate. | |||
| Include | annotated | sketches, | graphs, | and | photographs | when | necessary | to | make | a | ||||||
| report | clearly | understandable | to | the | MSCREP. | Identify | actual | readings/dimensions | ||||||||
| taken. | When | a | Work | Item | does | not | require | a | report, | and | one | is | determined | to | be | |
| necessary | in | order | to | produce | a | reliable | or | complete | repair, | submit | one | legible | copy, | |||
| in | hard | copy | or | electronic | media, | of | a | report | with | supporting | data | as | early | as |
USS MOUNT WHITNEY
(LCC‐20)
| GENERAL | REQUIREMENTS | PR | #N4044419RCMW001 | |||
| 18 | MAY | 2016 |
ITEM NO.001 Category “NSP” MSC/N75/REV MAY 16
INTENT, SCOPE, GENERAL REQUIREMENTS, AND DEFINITIONS
001‐4
| possible | in | the | contract | period. | The | goal | is | to | have | required | work | completed | within |
| the | original | contract | period. |
| 7.3.1.5 As | Released‐ | means | the | condition | of | the | item | that | exists | at | time | it | is |
| returned | to | the | government. | Include | annotated | sketches, | graphs, | and | photographs | ||||
| when | necessary | to | make | a | report | clearly | understandable | to | the | MSCREP. | Identify | ||
| actual | readings/dimensions | taken. | It | shall | include | a | summary | of | corrective | actions | |||
| made | by | the | contractor | and | list | any | known | degraded | conditions. |
| 7.3.1.6 Category | A | means | a | definitized | work | item | for | which | a | firm | fixed | price | has |
| been | established | and | will | be | executed | during | the | period | of | performance | and | ||
| included | in | the | base | contract. |
| 7.3.1.7 Category | B | means | a | definitized | work | item | which | identifies | additional | |||||
| repairs, | labor, | materials | or | services, | whereby | a | unitized | price | or | total | price | has | been | |
| established | and | may, | or | may | not | be | invoked | during | the | period | of | performance | of | the |
| contract | by | the | MSC | Contracting | Officer. |
| 7.3.1.8 CFE | and | CFM | ‐ | identify | Contractor | Furnished | Equipment | (CFE) | and |
| Contractor | Furnished | Material | (CFM), | and | are | used | interchangeably. |
7.3.1.9 COMSC ‐ identifies the Commander, Military Sealift Command.
| 7.3.1.10 COR | ‐ | Contracting | Officer’s | Representative. | Generally, | the | Principle | |||
| Port | Engineer | (PPE) | is | assigned | as | the | COR | for | shipyard | availabilities. |
| 7.3.1.11 Contracting | Officer | ‐ | identifies | the | Contracting | Officer | for | Military | ||
| Sealift | Command | (MSC), | Fleet | Industrial | Support | Center | (FISC) | or | Naval | Regional |
| Contract | Center | (NRSS). |
| 7.3.1.12 Contractor | ‐ | identifies | the | shipyard | holding | the | prime | contract | for |
| the | work | specified | in | this | Work | Package. |
| 7.3.1.13 Delivery | ‐ | is | the | correct | contractual | term | for | the | point | in | time | when | ||
| the | contractor | accepts | the | ship | into | his | custody. | The | point | where | the | ship | is | |
| delivered | is | stated | in | the | "DELIVERY | AND | REDELIVERY" | Standard | Work | Item‐018 | ||||
| as | it | is | dependent | on | steaming, | towing, | etc. |
USS MOUNT WHITNEY
(LCC‐20)
| GENERAL | REQUIREMENTS | PR | #N4044419RCMW001 | |||
| 18 | MAY | 2016 |
ITEM NO.001 Category “NSP” MSC/N75/REV MAY 16
INTENT, SCOPE, GENERAL REQUIREMENTS, AND DEFINITIONS
001‐5
| 7.3.1.14 Detach | or | Disconnect | ‐ | means | to | disconnect | all | attachments | to | the | ||||
| unit | to | enable | the | unit | to | be | moved. | Attachment | points | shall | be | tagged, | identified, | |
| blanked, | and | protected | to | facilitate | reinstallation. | Work | items | do | not | necessarily | ||||
| identify | interferences, | and | the | Contractor | is | responsible | for | the | identification | and | ||||
| resolution | of | interferences | affecting | a | detachment | and | subsequent | movement. |
7.3.1.15 Extend ‐ See install definition.
| 7.3.1.16 General | Technical | Requirements | (GTRs) | ‐ | defines | the | standards | of |
| performance | for | work | being | performed | by | Contractors. |
| 7.3.1.17 GFE | and | GFM | ‐ | identify | Government | Furnished | Equipment | (GFE) | and |
| Government | Furnished | Material | (GFM), | and | are | used | interchangeably. |
| 7.3.1.18 HAZWASTE | – | Hazardous | wastes | are | those | RCRA | identifies | in | one | of | |||||
| four | hazardous | waste | lists | (F‐list | – | 40 | CFR | 261.31, | K‐list | – | 40 | CFR | 261.32, | P‐list | 40 |
| CFR | 262.32, | or | U‐list | 40 | CFR | 261.32), | or | exhibits | at | least | one | of | four | characteristics | – |
| ignitability, | corrosion | potential, | reactivity | or | toxicity | as | defined | in | 40 | CFR | Part | 261, | |||
| Subpart | C. |
| 7.3.1.19 Install, | Extend, | and | Modify | ‐ | means | that | the | Contractor | shall | provide | ||||
| the | piece | of | equipment, | material, | or | system | to | be | installed | and | shall | provide | the | |
| materials, | structural | supports, | and | labor | to | attach, | connect, | and | test | the | equipment | |||
| or | system | to | effect | a | finished | fully | operational | installation | complete | in | all | aspects. | In |
addition:
| a. When | new | material | or | equipment | is | not | specified | by | type, | |
| the | material | or | equipment | shall | be | identical | to | the | existing. | |
| When | install | is | used | with | reference | to | GFE, | conditions | of | the |
| above | definition | except | the | requirement | to | provide | the | piece | ||
| of | equipment | are | applicable. |
b. Work items do not necessarily identify interferences and the
| Contractor | is | responsible | for | the | identification | and | resolution | |
| of | interferences | affecting | the | installation | by | temporarily | ||
| removing, | reinstalling, | or | relocating | interferences. | The | |||
| Contractor | shall | temporarily | remove, | permanently | relocate, | |||
| alter, | and | reroute | all | interferences, | including, | but | not | limited |
USS MOUNT WHITNEY
(LCC‐20)
| GENERAL | REQUIREMENTS | PR | #N4044419RCMW001 | |||
| 18 | MAY | 2016 |
ITEM NO.001 Category “NSP” MSC/N75/REV MAY 16
INTENT, SCOPE, GENERAL REQUIREMENTS, AND DEFINITIONS
001‐6
| to, | ductwork, | piping, | wire‐ways, | fixtures, | insulation, | joiner | ||||
| linings, | equipment, | furniture, | etc., | to | facilitate | finished | fully | |||
| operational | installations | and | modifications | covered | by | this | ||||
| Work | Package. | In | the | event | that | piping, | ductwork, | |||
| equipment, | linings, | etc., | must | be | temporarily | removed | to | |||
| facilitate | installation | of | new | or | modified | work, | the | Contractor | ||
| shall | subsequently | reinstall | same | in | an | as | original | condition. | ||
| This | includes | but | is | not | limited | to | painting | of | steel, | restoring |
| floor | coverings | and | joiner | work, | painting, | replacing | items | |||
| and | equipment | removed | for | access, | plugging | wiring | and | pipe | ||
| penetrations, | and | restoring | all | other | disturbed | areas | to | |||
| match | the | surrounding | areas. | Disturbed | coating | shall | be |
repaired.
| 7.3.1.20 Interference | ‐ | means | any | object(s), | equipment(s), | system(s), | or | ||||
| component(s) | that | must | be | temporarily | removed | and | reinstalled, | relocated, | |||
| modified | or | designed | around | to | facilitate | the | installation | of | new | or | modified |
| equipment | or | systems. |
| 7.3.1.21 Labor | and | Materials | ‐ | means | labor, | materials, | plant | facilities, | |
| supervision, | services, | equipment, | and | any | other | resources | required | to | accomplish |
| the | specified | work. |
| 7.3.1.22 Manifests | ‐ | are | the | official | shipping | document | forms | originated | and | |
| signed | by | the | generators, | transporters, | and | operators | of | the | hazardous | waste |
| disposal | facility | as | required | by | Federal, | state, | or | local | regulations. |
7.3.1.23 MSC Drawing ‐ means Contract Guidance Drawing.
| 7.3.1.24 MSC | Representative | (MSCREP) | ‐ | identifies | the | government’s | ||||
| Contracting | Office | Technical | representative | (COR | or | COTR) | located | onsite | at | the |
| Contractor’s | Facility, | and | assigned | to | work | with | the | Administrative | Contracting | |
| Officer | (ACO). |
| 7.3.1.25 MSCREP | approval | ‐ | indicates | only | that | the | general | method | of | ||
| construction | and | detailing | as | presented | by | the | Contractor | appear | to | be | satisfactory |
| and | will | not | relieve | the | Contractor | of | the | responsibility | of | any | error. |
USS MOUNT WHITNEY
(LCC‐20)
| GENERAL | REQUIREMENTS | PR | #N4044419RCMW001 | |||
| 18 | MAY | 2016 |
ITEM NO.001 Category “NSP” MSC/N75/REV MAY 16
INTENT, SCOPE, GENERAL REQUIREMENTS, AND DEFINITIONS
001‐7
7.3.1.26 Modify ‐ See Install definition.
| 7.3.1.27 NDT | ‐ | Non‐Destructive | Testing. | Non‐destructive | testing | shall | be | |||||
| accomplished | to | satisfy | ABS | and | USCG | requirements | for | all | weld | repairs, | hull | inserts |
| or | structural | installations. | Testing | shall | utilize | currently | calibrated | equipment | and | |||
| certificated | testing | personnel. |
| 7.3.1.28 None | additional | or | None | ‐ | means | that | there | are | no | additional | ||||
| requirements | beyond | those | contained | in | the | GTRs | and | Work | Items | that | make | up | the | |
| Work | Package. | Where | specific | requirements | are | set | forth | in | Articles | 6.0, | 7.0 | or | 8.0 | |
| of | a | work | item, | such | requirements | are | in | addition | to | those | requirements | listed | in | |
| the | GTRs | and | work | items | that | make | up | the | Work | Package. |
| 7.3.1.29 Not | Separately | Priced | (NSP) | ‐ | is | a | work | item | which | defines | the | |||
| requirements, | standards | and | conditions | for | which | the | contractor | shall | meet | and | ||||
| adhere | to | during | the | period | of | performance. | NSP | Work | Items | are | not | biddable | items | |
| and | do | not | represent | a | cost | to | the | government. |
| 7.3.1.30 Or | equal | ‐ | means | that | components, | materials | or | equipment | shall | be | ||||
| equivalent | in | terms | of | performance | (flow | rate, | pressure, | heat | transfer | |||||
| characteristics, | etc.), | services | required | (power, | cooling | water, | HVAC, | etc.), | ||||||
| compatibility | with | interrelated | systems | and | arrangements, | and | supportability | over | ||||||
| the | service | life | of | the | components | or | equipment. | In | the | case | of | component, | material | |
| or | equipment | substitution | for | those | items | noted | in | the | Contract | Guidance | Drawings | |||
| or | Work | Package, | the | Contractor | shall | submit | a | written | request | delineating | the | |||
| design | and | performance | data | on | both | the | specified | and | substituted | piece | of | |||
| equipment | for | MSCREP | approval | and | if | approved. | The | Contractor | shall | take | full | |||
| contractual | and | technical | responsibility | for | ensuring | installation | of | the | components, | |||||
| materials | or | equipment | are | compatibility | with | the | interrelated | systems. |
| 7.3.1.31 Qualified | Welders | ‐ | Welders, | whether | contractor | or | subcontractor | ||||||
| provided, | shall | hold | qualification | documentation | from | American | Bureau | of | Shipping | ||||
| (ABS), | and | United | States | Coast | Guard | (USCG) | for | the | material | to | be | welded. | Welding |
| procedures | shall | be | approved | by | the | ABS | Surveyor | for | the | particular | applications. |
| 7.3.1.32 Redelivery | ‐ | The | term | redelivery | means | the | point | in | time | that | the |
| MSCREP | accepts | the | ship | back | from | the | Contractor. |
USS MOUNT WHITNEY
(LCC‐20)
| GENERAL | REQUIREMENTS | PR | #N4044419RCMW001 | |||
| 18 | MAY | 2016 |
ITEM NO.001 Category “NSP” MSC/N75/REV MAY 16
INTENT, SCOPE, GENERAL REQUIREMENTS, AND DEFINITIONS
001‐8
| 7.3.1.33 Refurbish | ‐ | means | to | temporarily | remove, | disassemble, | clean, | ||||||
| inspect, | and | submit | an | as‐found | condition | report; | further, | upon | approval | of | the | ||
| MSCREP, | the | contractor | shall | lubricate, | reassemble | the | unit, | equipment | or | system, | |||
| set | and | adjust | in | accordance | with | manufacturer's | specifications, | test | the | unit, | |||
| equipment, | or | system | to | demonstrate | proper | function | to | the | manufacturer's | ||||
| specifications, | and | submit | an | as‐released | condition | report. | The | reinstalled | |||||
| refurbished | unit, | equipment, | or | system | shall | be | fully | operational | and | complete | in | all | |
| aspects. | New | screws, | bolts, | nuts, | washers, | gaskets, | packing, | pins, | keys, | seals, | valve | ||
| stems, | bearings, | o‐rings, | and | shims | shall | be | used | when | reassembling | and | |||
| reinstalling | the | unit, | equipment, | or | system. | Additional | information | concerning | the | ||||
| location | of | equipment | refurbishment, | special | processes | to | be | used | in | the | |||
| refurbishment, | and | additional | parts | to | be | replaced | during | refurbishment | shall | be | as | ||
| specified | in | the | individual | work | items. |
| 7.3.1.34 Reinstall | ‐ | means | that | the | Contractor | shall | provide | labor | and | |||
| material | to | install | a | piece | of | equipment, | material, | or | system | after | the | equipment, |
| material, | or | system | was | temporarily | removed, | relocated, | modified, | or | refurbished. | |||
| The | requirements | of | an | installation | as | set | forth | in | paragraphs | 7.3.1.19, | 7.3.1.19.a, | |
| and | 7.3.1.19.b | above | with | regard | to | completeness, | operation, | testing, | the | |||
| identification | and | resolution | of | interference’s, | etc. | also | apply | to | a | reinstallation. |
| 7.3.1.35 Relocate | ‐ | means | to | provide | labor | and | materials | to | detach | the | unit, | |||
| equipment, | or | system | and | to | reinstall | the | same | unit, | equipment, | or | system | at | a | new |
| or | modified | location. | The | requirements | of | an | installation | as | set | forth | in | paragraphs | ||
| 7.3.1.19, | 7.3.1.19.a, | and | 7.3.1.19.b | above | with | regard | to | completeness, | operation, | |||||
| testing, | the | identification | and | resolution | of | interferences, | etc. | also | apply | to |
relocation.
| 7.3.1.36 Remove | or | Ripout | ‐ | means | to | provide | labor | and | materials | to | |||||
| disconnect, | detach, | and | transfer | the | unit, | equipment, | materials, | or | system | in | its | ||||
| entirety | off | the | ship | as | specified | in | the | GTR. | Supports, | stuffing | tubes, | collars, | and | ||
| other | appurtenances | shall | be | removed | by | burning, | chipping, | or | cutting | when | a | Work | |||
| Item | requires | machinery, | piping, | wiring, | ducting, | structure, | outfitting, | joiner, | or | ||||||
| equipment | removal. | Areas | affected | by | removals/ripouts | shall | be | restored | as | set | |||||
| forth | in | paragraph | 7.3.1.19.b: |
| a. When | the | Work | Package | requires | the | removal | of | machinery, |
| piping, | wiring, | ducting, | structure, | outfitting, | joiner, | or | ||
| equipment | removal, | supports, | stuffing | tubes, | collars, | and |
USS MOUNT WHITNEY
(LCC‐20)
| GENERAL | REQUIREMENTS | PR | #N4044419RCMW001 | |||
| 18 | MAY | 2016 |
ITEM NO.001 Category “NSP” MSC/N75/REV MAY 16
INTENT, SCOPE, GENERAL REQUIREMENTS, AND DEFINITIONS
001‐9
| other | appurtenances | shall | be | removed | by | burning, | chipping, | |||
| or | cutting, | stubs, | rough | spots, | and | other | surface | irregularities | ||
| shall | be | ground | smooth | and | flush | with | adjacent | surfaces. | ||
| Once | tasked | work | in | the | affected | area | is | complete, | the | areas |
| affected | by | the | removal | shall | be | restored | to | the | condition | |
| before | the | removal | action. | This | includes | but | is | not | limited | to |
| painting | of | steel, | restoring | floor | coverings | and | joiner | work, | ||
| painting, | replacing | items | and | equipment | removed | for | access, | |||
| plugging | wiring | and | pipe | penetrations, | and | restoring | all | |||
| other | disturbed | areas | to | match | the | surrounding | areas. | |||
| Disturbed | coatings | shall | be | repaired | to | match | the | |||
| surrounding | area. |
b. After removing the machinery, piping, wiring, ducting,
| structure, | outfitting, | joiner, | or | equipment | removal, | supports, | |||
| stuffing | tubes, | collars, | or | other | appurtenances, | watertight | or | ||
| fire | zone | boundaries | shall | be | reestablished. | Holes | in | oil | tight, |
| watertight, | and | gas | tight | boundaries | and | structural | |||
| bulkheads | shall | be | blanked | with | flush | inserts | providing | ||
| structural | integrity | and | tightness | equal | to | that | which | they | |
| replace. | Holes | in | non‐structural | steel | and | steel | joiner | ||
| bulkheads | may | be | blanked | with | lapped | plates. |
c. When the electrical wiring requiring removal joins a circuit
| that | is | not | being | removed | (i.e. | at | a | junction | box), | the |
| electrical | wiring | or | cable | shall | be | entirely | removed | to | the | |
| junction | point. | All | other | attachments | including | but | not | |||
| limited | to | fasteners, | supports, | and | brackets | shall | be | entirely | ||
| removed. | When | electric | cable | is | designated | for | removal, | it | ||
| shall | be | physically | and | electrically | traced | to | the | power | ||
| source | and | the | circuit | de‐energized | before | removing | the | |||
| cable. | When | cable | is | removed | from | multiple | cable | runs, | the | |
| remaining | cables | shall | be | bound | and | strapped. |
| 7.3.1.37 Replace | or | Renew | ‐ | means | to | remove | the | unit, | equipment, | or | systems | ||
| including | interferences, | and | to | install | a | new | unit, | equipment, | or | system | which | is | |
| either | identical | to | or | equal | to | that | which | was | removed; | the | installation | shall | include |
| but | not | be | limited | to | any | hook‐ups, | supports, | and | adapters, | which | are | required | to |
| effect | a | finished | fully | operational | installation | complete | in | all | aspects. |
USS MOUNT WHITNEY
(LCC‐20)
| GENERAL | REQUIREMENTS | PR | #N4044419RCMW001 | |||
| 18 | MAY | 2016 |
ITEM NO.001 Category “NSP” MSC/N75/REV MAY 16
INTENT, SCOPE, GENERAL REQUIREMENTS, AND DEFINITIONS
001‐10
| 7.3.1.38 Restore | ‐ | means | to | perform | those | processes | (including | but | not | |||
| limited | to | weld | build‐up, | chrome | plate, | machine, | grind, | lap, | NDT, | etc.) | which | are |
| required | to | return | a | component | to | the | manufacturer’s | specifications | regarding | |||
| dimensions, | tolerances, | angles, | surface | finish | and | clearances. |
| 7.3.1.39 Section | ‐ | means | major | part | of | the | Work | Package | and | shall | include | a | ||
| group | of | related | work | items. |
| 7.3.1.40 Specification | ‐ | means | either | a | single | work | item | or | a | complete | set | of |
| work | items. |
| 7.3.1.41 Tag | out | ‐ | means | a | procedure | to | both | notify | personnel | that | tagged‐out | |
| equipment, | components, | or | systems | are | either | isolated | or | not | in | a | normal | operating |
| condition | and | to | prevent | injury | to | personnel, | improper | operation, | or | damage | to | the |
| tagged‐out | equipment, | components, | or | systems. |
| 7.3.1.42 Temporary | Installation | or | Temporarily | Install | ‐ | means | to | provide | ||||||
| labor | and | materials | to | install | the | unit, | material, | equipment | or | system | to | completely | ||
| provide | the | function | described | in | the | individual | Work | Item, | and | to | remove | the | same | |
| unit, | material, | equipment | or | system | prior | to | redelivery | of | vessel | or | to | satisfactorily | ||
| meet | the | requirements | of | the | individual | Work | Item(s). | All | the | requirements | of | an | ||
| installation | and | removal | set | forth | in | paragraphs | 7.3.1.19, | 7.3.1.19.a, | 7.3.1.19.b, | and | ||||
| 7.3.1.33 | with | regard | to | completeness, | operation, | testing, | the | identification | and | |||||
| resolution | of | interferences, | disconnection, | detachment | and | transfer | of | the | unit, | |||||
| material, | equipment, | or | system | in | its | entirety | off | the | ship | as | specified | in | the | GTR |
| apply | to | a | temporary | installation | and | subsequent | removal. |
| 7.3.1.43 Temporary | Removal | or | Temporary | Remove | ‐ | means | to | provide | labor | |||||
| and | material | to | disconnect | and | move | the | unit, | equipment, | or | system | from | its | initial | |
| location, | and | to | reinstall | the | same | unit, | equipment, | or | system | either | in | the | same | |
| location | or | elsewhere | on | the | ship | as | described | in | the | Work | Package. | All | the | |
| requirements | of | an | installation | as | set | forth | in | paragraphs | 7.3.1.19, | 7.3.1.19.a, | and | |||
| 7.3.1.19.b | with | regard | to | completeness, | operation, | testing, | the | identification | and | |||||
| resolution | of | interferences, | etc. | also | apply | to | a | temporary | removal | and |
reinstallation.
| 7.3.1.44 Work | item | or | item | ‐ | means | a | separately | numbered | part | of | the | Work |
| Package | describing | a | discrete | portion | of | the | work | to | be | accomplished. |
USS MOUNT WHITNEY
(LCC‐20)
| GENERAL | REQUIREMENTS | PR | #N4044419RCMW001 | |||
| 18 | MAY | 2016 |
ITEM NO.001 Category “NSP” MSC/N75/REV MAY 16
INTENT, SCOPE, GENERAL REQUIREMENTS, AND DEFINITIONS
001‐11
| 7.3.1.45 Work | Package | ‐ | means | the | entire | written | portion | of | the | contract |
| including | the | Master | Ship | Repair | Agreement, | the | contract | provisions, | work | items, |
| and | the | GTRs. |
8. GENERAL CONDITIONS
8.1. The following conditions apply to each work item in this Work Package, and are intended to outline the minimum acceptable quality of material, workmanship, and practice.
| 8.1.1. Where | laws, | regulations, | requirements, | or | commercial | standards | are | referred | to | ||||||
| herein, | the | latest | revision | that | is | in | effect | on | the | date | of | the | solicitation | shall | be |
applicable.
| 8.1.2. The | Contractor | shall | be | held | responsible | for | the | protection | of | existing | and | newly | |
| installed | equipment | and | materials. | Any | equipment | that | is | damaged | by | the | Contractor | ||
| shall | be | replaced, | repaired, | or | restored | at | the | Contractor’s | expense | as | directed | by | the |
MSCREP.
8.1.3. Materials and workmanship shall be subject to inspection and approval of the MSCREP
| at | all | times. | Workmanship | and | materials | found | to | be | defective | or | not | in | conformity | |
| with | good | marine | practice, | regulatory | requirements, | or | this | Work | Package | and | its | |||
| associated | approved | drawings | shall | be | cause | for | rejection | and | removal | at | the | |||
| Contractor’s | expense. |
8.1.4. Prepare and submit reports, drawings, and other documents required by the Work
Package in accordance with the Contract Data Requirements List (CDRL).
| 8.1.5. Equipment, | furnishings, | and | materials | removed, | including | scrap, | except | those | |||||
| specified | for | relocation | or | otherwise | designated | by | MSCREP, | are | to | be | disposed | of | by |
| the | Contractor | at | the | contractor’s | expense, | except | for | material | requiring | disposal | as | a | |
| hazardous | waste, | which | shall | be | disposed | of | in | accordance | with | Work | Item | titled, | |
| Hazardous | Waste | Disposal | at | a | Contractor’s | Facility. |
8.1.6. Install suitable protective devices on equipment, which presents a hazard to
| personnel. | These | may | be | carrier | guards | or | other | approved | devices | and | shall | preclude | |
| personnel | injury. | Examples | of | equipment | which | require | protective | devices | are | those | |||
| which | contain | exposed | rotating | parts, | fan | blades, | belts, | pulleys, | flywheels, | wire | rope | ||
| reels, | etc. |
USS MOUNT WHITNEY
(LCC‐20)
| GENERAL | REQUIREMENTS | PR | #N4044419RCMW001 | |||
| 18 | MAY | 2016 |
ITEM NO.001 Category “NSP” MSC/N75/REV MAY 16
INTENT, SCOPE, GENERAL REQUIREMENTS, AND DEFINITIONS
001‐12
| 8.1.7. Design, | workmanship, | equipment, | and | materials | must | conform | to | US | Coast | Guard | ||||
| regulations, | COLREGS, | Navigation | and | Vessel | Inspection | Circulars | (NVIC), | and | ||||||
| associated | documents | incorporated | by | Reference | in | the | aforementioned | for | marine | |||||
| inspection, | and | rules | set | forth | by | the | American | Bureau | of | Shipping, | U.S. | Public | Health | |
| Service | (USPHS) | Regulations, | IMO, | SOLAS, | IEEE | 45 | and | ANSI | A17.1 | (for | elevators). | |||
| Unless | specifically | approved | by | the | MSCREP, | Contractor | furnished | equipment | and | |||||
| materials | shall | be | new. | New | materials | and | Contractor | furnished | equipment | must | have | |||
| traceable | material | documentation. | The | costs | of | ABS | ship | survey | will | be | borne | by | the | |
| Government. | The | cost | of | other | regulatory | service | expenses | shall | be | borne | by | the |
contractor.
| 8.1.8. Conduct | megger | insulation | resistance | test | (phase | to | phase | and | phase | to | ground) | on |
| new | power | cable | installations | and | on | existing | disconnected | and | reused | power |
cables.
| 8.1.9. Bond/ground | equipment | which | is | modified | or | installed | by | this | Work | Package. | All | |
| bonding | and | bonding | straps | shall | be | in | compliance | with | procedures | and | practices | |
| delineated | by | regulatory | and | professional | agencies | and | organizations | to | include | ABS | ||
| Rules | for | Shipbuilding, | and | IEEE | requirements. |
| 8.1.10. Where | ripouts | leave | openings | in | structures, | decks, | or | shell | plating, | suitable | |||
| insert | plates | or | reinforced | structures | of | equal | material | shall | be | installed | to | close | the |
openings.
8.2. Hazardous Material:
8.2.1. All material shall be asbestos and PCB free. If material that contains asbestos or PCB is
| inadvertently | specified | on | a | Contract | Guidance | Drawing | or | other | document, | the | |||||
| Contractor | shall | substitute | an | equivalent | non‐asbestos | or | non‐PCB | material | and | notify | |||||
| the | MSCREP | in | writing | prior | to | making | any | changes. | This | will | not | result | in | any | |
| adjustments | to | the | Contract. |
8.2.2. All paint and coatings shall be lead free. Coal tar and coatings containing organic tin or
| zinc | chromate | shall | not | be | used. | If | these | materials | have | been | inadvertently | specified, | |
| the | Contractor | shall | substitute | an | equivalent | lead | free, | tar | free, | etc. | paint | or | coating |
| and | notify | the | MSCREP | without | any | adjustment | of | the | Contract. |
8.2.3. The contractor may find materials aboard the ship which are hazardous to health.
| These | include, | but | are | not | limited | to, | asbestos, | coatings | containing | lead | compounds | ||
| and | zinc | chromate, | and | ventilation | gaskets | and | electrical | cable | containing | PCBs. | In | the |
USS MOUNT WHITNEY
(LCC‐20)
| GENERAL | REQUIREMENTS | PR | #N4044419RCMW001 | |||
| 18 | MAY | 2016 |
ITEM NO.001 Category “NSP” MSC/N75/REV MAY 16
INTENT, SCOPE, GENERAL REQUIREMENTS, AND DEFINITIONS
001‐13
| event | that | hazardous | materials | are | identified, | the | contractor | shall | notify | the | MSCREP |
| immediately | and | in | writing. |
USS MOUNT WHITNEY
(LCC‐20)
| GENERAL | REQUIREMENTS | PR | #N4044419RCMW001 | ||
| 17 | July, | 2019 | |||
| ITEM | NO. | 002 | CATEGORY | “NSP” | MSC/SWI/N75/PPE |
TECHNICAL AND MANUFACTURER REPRESENTATIVES
002‐1
1. ABSTRACT
1.1. This item sets general requirements for technical and manufacturer’s representatives.
2. REFERENCES/ENCLOSURES: None
3. ITEM LOCATION/DESCRIPTION
3.1. Location/Quantity
3.1.1. As contained within the individual work items.
4. GOVERNMENT FURNISHED EQUIPMENT/MATERIAL/SERVICES: None
5. NOTES
| 5.1. The | contractor | and | all | subcontractors | regardless | of | tier | shall | consult | the | General | |||
| Technical | Requirements | (GTR) | item | 024, | to | determine | applicability | to | this | item. | In | |||
| performance | of | work | items | in | this | package, | the | contractor | and | all | subcontractors | |||
| regardless | of | tier | must | comply | with | the | requirements | of | GTR | 024, | where | specified | in | an |
| individual | work | item. |
| 5.2. The | work | item(s) | specification(s) | contained | in | the | solicitation | may | indicate | or | may | not |
| indicate | that | Government | Furnished | Technical | Representative(s) | will | be | on | site. | Without | ||
| regard | to | GFS | technical | representatives | being | identified | in | the | work | item(s) | ||
| specification(s) | these | requirements | shall | apply. |
| 5.3. For | the | purpose | of | this | solicitation, | the | terms | manufacturer’s | representative, | technical | |
| representative, | techrep, | or | any | variant | thereof | shall | be | construed | to | be | synonymous. |
6. QUALITY ASSURANCE REQUIREMENTS
6.1. As contained within the individual work items.
7. STATEMENT OF WORK
| 7.1. The | work | item | specification(s) | contained | in | the | solicitation | may | require | the | contractor | to |
| furnish | technical | representatives, | or | may | indicate | or | may | not | indicate | that | Government | |
| furnished | technical | representative(s) | will | be | on | site. | When | any | such | instances | are | |
| indicated | in | the | work | item | specification(s) | the | following | shall | apply: |
7.2. Contractor furnished technical representatives:
| 7.2.1. The | contractor | shall | furnish | the | services | only | of | an | original | equipment |
| manufacturer's | (OEM), | OEM | authorized, | or | MSC | approved | qualified | independent | ||
| technical | representative(s) | as | specified | in | the | individual | work | item. |
| 7.2.1.1. The | contractor, | in | order | to | obtain | MSC | approval | for | an | OEM | authorized |
| technical | representative | shall | provide | a | copy | of | a | valid | manufacturer's | ||
| authorization | letter | with | date | of | issue, | name, | address, | and | telephone | ||
| number | for | verification. |
USS MOUNT WHITNEY
(LCC‐20)
| GENERAL | REQUIREMENTS | PR | #N4044419RCMW001 | ||
| 17 | July, | 2019 | |||
| ITEM | NO. | 002 | CATEGORY | “NSP” | MSC/SWI/N75/PPE |
TECHNICAL AND MANUFACTURER REPRESENTATIVES
002‐2
| 7.2.1.2. OEM‐authorized | service | technicians | and | technical | representatives | shall | |||||
| be | required | to | produce | proper | training | and | authorization | ||||
| documentation | from | the | OEM | asserting | their | qualification | to | perform | |||
| M&R | work | on | the | designated | equipment. | They | shall | have | all | technical | |
| documentation, | service | bulletins | and | reach‐back | to | the | OEM | engineering | |||
| department | to | assess, | diagnose | and | properly | accomplish | M&R. |
| 7.2.1.3. Non‐OEM | qualified | technical | field | service | providers | will | be | required | to |
| have | the | following | qualifications. | The | contractor | must | submit | evidence | |
| that | the | proposed | non‐OEM | technical | representative | possesses | all | of | the |
| qualifications | listed | below, | subject | to | MSCREP | review | and | approval: |
| 7.2.1.3.1. At | least | five | years | of | documented | work | experience | which |
| includes | documented | formal | training | in | a | field | service | |
| organization | as | an | authorized | manufacturer's | technical | |||
| representative | or | field | service | provider | for | the | type | of |
| equipment | or | systems | being | serviced, | repaired, | installed, | ||
| modified, | or | relocated. |
| 7.2.1.3.2. Demonstrated | competency | in | analyzing | repair | requirements | ||
| and | maintenance | and | repair | process | performance | and | making |
| recommendations | based | upon | as‐found | condition | results | ||
| and/or | performance | analysis. |
| 7.2.1.3.3. Recent | references | (within | the | last | 3 | years) | from | at | least | three |
| different | clients | for | whom | service | was | provided | as | a | qualified | |
| technical | representative | on | the | type | of | equipment | or | systems | ||
| being | serviced, | repaired, | installed, | modified, | or | relocated. |
| 7.2.1.3.4. Ability | to | procure | parts | and | access | to | manufacturer's | |||
| drawings, | technical | manuals, | technical | service | bulletins, | and | ||||
| special | tools | for | the | equipment | or | machinery | specified | in | the | |
| work | item. | Alternatively, | the | qualified | technical | field | service | |||
| representative | shall | have | expert | knowledge | of | the | equipment | |||
| or | system | and | shall | be | able | to | provide | detailed | repair | |
| requirements, | including | identification | of | parts | required, | |||||
| sources | for | those | parts, | and | step‐by‐step | repair | procedures | to | ||
| the | shipyard | and | the | MSCREP | to | return | the | equipment | for | full |
| operating | parameters. |
| 7.2.2. The | techreps | are | to | be | on | site | at | all | times | whenever | the | following | evolutions | are | |
| performed | to | specified | equipment | or | systems: | disconnection, | removal, | opening, | |||||||
| disassembly | inspection, | taking | of | clearance | readings, | maintenance | and | repair, | |||||||
| static | and | dynamic | balancing | tests | and | adjustments, | reassembly, | shop | tests, | ||||||
| reinstallation, | commissioning, | operating | tests, | dock | trials, | and | sea | trials. |
USS MOUNT WHITNEY
(LCC‐20)
| GENERAL | REQUIREMENTS | PR | #N4044419RCMW001 | ||
| 17 | July, | 2019 | |||
| ITEM | NO. | 002 | CATEGORY | “NSP” | MSC/SWI/N75/PPE |
TECHNICAL AND MANUFACTURER REPRESENTATIVES
002‐3
| 7.2.3. The | techrep | shall | witness | all | of | the | above | identified | tasks | and | shall | prepare | all |
| reports | of | design, | as | found | and | final | reassembly | dimensions | and | clearances, | as | ||
| found | condition | and | recommended | repairs, | shop | test, | commissioning | and | |||||
| operational | test, | dock | trial | and | sea | trial | results. |
| 7.2.4. The | techrep | shall | witness | and | sign | all | reports | attesting | to | his | presence | and | |
| witnessing | of | the | test | and | concurring | with | the | results | for | all | tests | performed | by |
| the | contractor | or | other | sub‐contractors. |
| 7.2.5. The | contractor | shall | be | prepared | to | submit | a | list | of | all | technical | representatives | |
| (by | manufacturer | name), | intended | to | be | employed | during | the | contract | ||||
| performance | period | to | MSC | as | part | of | the | proposal | submitted | in | response | to | this |
solicitation.
| 7.2.6. The | MSCREP | may | reject | a | techrep | for | failure | to | provide | an | authorization | letter | or |
| verifiable | proof | of | competence. |
| 7.2.7. The | contractor, | in | order | to | obtain | approval | for | an | independent | techrep | shall |
| provide | copies | of | traceable | past | employment | history | and | certificates | of | training. | |
| The | MSCREP | may | reject | an | independent | techrep | for | unsatisfactory | qualification |
proof.
| 7.2.8. No | work | on | any | work | item | requiring | a | technical | representative | shall | start | until | |
| the | MSCREP | approves | the | techrep | for | that | item | and | the | techrep | is | on | site. |
7.3. Government furnished technical representatives:
| 7.3.1. The | Government | may | furnish | the | services | of | a | manufacturer's, | manufacturer's | |||
| authorized | or | non‐OEM | qualified | technical | representative | to | be | on | site | at | the | ship |
| repair | facility | at | required | times | during | repairs | to | the | specified | equipment | of |
systems.
| 7.3.2. In | the | event | that | the | contractor | indicates | either | through | written | correspondence | |||||
| or | the | contractor’s | production | schedule | that | the | Government’s | technical | |||||||
| representative | is | required | to | be | on‐site | to | support | a | production | element, | and | ||||
| subsequently | fails | to | start | the | subject | work | item | on | time, | the | MSCREP | will | issue | a | |
| PSDPN | (Production | Schedule | Delinquent | Progress | Notice) | in | accordance | with | |||||||
| work | item | 013 | of | this | work | package. | PSDPNs | found | to | be | the | result | of | contractor | |
| delinquencies | that | affect | the | presence | of | a | Government | furnished | technical | ||||||
| representative | will | result | in | actions | to | recoup | the | additional | costs | for | the | subject | |||
| Government | furnished | technical | representative. |
| 7.3.3. The | contractor | shall | coordinate | and | reiterate | the | production | schedule | dates | for | |||||
| when | the | Government | techrep | is | to | be | on | site | via | the | MSCREP | in | writing | seven | (7) |
| calendar | days | in | advance | of | the | work | item's | start. |
8. GENERAL REQUIREMENTS
8.1. None additional.
USS MOUNT WHITNEY
(LCC‐20)
| GENERAL | REQUIREMENTS | PR | #N4044419RCMW001 | ||
| 20 | July, | 2018 | |||
| ITEM | NO. | 003 | CATEGORY | “NSP” | MSC/SWI/N75/PPE |
APPROACH, BERTH, AND MOORING REQUIREMENTS
003‐1
1. ABSTRACT
| 1.1. This | item | describes | the | requirements | for | the | contractor | to | provide | for | a | safe | and |
| navigable | approach | route | to | the | contractor’s | facility; | a | safe | and | secure | berth; | and | provide |
| safe | and | sufficient | mooring | of | the | vessel. |
2. REFERENCES/ENCLOSURES
2.1. References:
2.1.1. MIL. STD. MIL‐C‐28628D, of July 1991; Camels.
2.1.2. MIL. STD. MIL‐F‐29248, of 21 November 1986; Fenders, Marine, Foam Filled, Netless
2.1.3. MSC Drawing No. 845‐4458934 Rev U, General Arrangement Plan
2.1.4. MSC Drawing No. 520‐2491350, Mooring Arrangement
2.2. Enclosures:
| 2.2.1. National | Oceanographic | and | Atmospheric | Administration | (NOAA) | Definition | of |
| Sounding | Datum | and | Diagram | of | Charted | Depths |
2.2.2. MSC Ship Notional Arrival Conditions
3. ITEM LOCATION/DESCRIPTION
| 3.1.1. Enclosure | 2.2.2 | provides | vessel | particulars | and | notional | arrival | conditions. | This | ||
| information | should | be | used | for | the | solicitation/proposal | process. | Actual | arrival | ||
| conditions | shall | be | as | agreed | between | awarded | contractor | and | MSCREP | and | shall |
| be | verified | by | the | ship | prior | to | arrival. |
4. GOVERNMENT FURNISHED EQUIPMENT/MATERIAL/SERVICES: None
5. NOTES
| 5.1. The | contractor | and | all | subcontractors, | regardless | of | tier | must | consult | the | General | |
| Technical | Requirements | (GTR) | to | determine | applicability | to | this | work | item. | In | ||
| performance | of | this | work | item, | the | contractor | and | all | subcontractors | regardless | of | tier |
| must | comply | with | all | applicable | GTR | requirements. |
| 5.2. The | contractor | and | all | subcontractors, | regardless | of | tier | are | advised | to | review | other | work | |
| items | under | this | contract | to | determine | their | effect | on | the | work | required | under | this | work |
item.
5.3. The definitions of many terms used in this work item are found in Work Item 001.
6. QUALITY ASSURANCE REQUIREMENTS
6.1. None additional.
7. STATEMENT OF WORK
USS MOUNT WHITNEY
(LCC‐20)
| GENERAL | REQUIREMENTS | PR | #N4044419RCMW001 | ||
| 20 | July, | 2018 | |||
| ITEM | NO. | 003 | CATEGORY | “NSP” | MSC/SWI/N75/PPE |
APPROACH, BERTH, AND MOORING REQUIREMENTS
003‐2
| 7.1. The | ship | must | be | provided | a | safe | approach, | secure | berth, | and | safe | mooring | at | all | times. |
| References | 2.1.1 | thru | 2.1.4 | are | provided | for | guidance. |
7.2. Approach:
| 7.2.1. The | ship | shall | be | provided | an | unobstructed | approach | to | the | contractor’s | facility | ||
| (prime | or | otherwise | proposed | rented, | leased, | subcontracted | location) | where | the | ||||
| vessel | will | be | berthed | and | moored, | for | any | part | of | the | performance | period. | There |
| must | be | no | danger | of | the | ship | grounding | or | colliding | with | any | overhead | |
| obstructions | during | transit. | This | applies | for | delivery | to | the | contractor, | redelivery | |||
| to | the | Government, | and | any | inter/intra | facility | transits. |
| 7.2.2. During | any | ship | transit | or | movement, | and | consistent | with | ship’s | draft | condition | at | |
| the | time; | the | ship | shall | remain | afloat | without | any | danger | of | grounding | and | avoid |
| colliding | with | any | overhead | obstructions. |
| 7.2.2.1. A | minimum | air | draft | clearance | of | not | less | than | ten | (10) | feet | shall | be |
| afforded | between | the | highest | vertical | projection | of | the | vessel | at | mean | |||
| high | water, | all | bridges | and | any | cables | passing | above/across | the | marked | |||
| channel | along | the | entire | route. |
| 7.2.3. The | following | minimum | clearances, | with | respect | to | vessel | draft, | shall | be | ||||
| maintained | to | minimize | probability | of | grounding | and | reduce | silt | buildup | in | ||||
| piping. | The | datum | for | charted | depth | shall | be | mean | lower | low | water | (MLLW) | per | |
| enclosure | 2.2.1. | The | contractor | shall | include | official | NOAA | or | other | regulatory | ||||
| agency | information | on | tidal | ranges, | periodicity | and | length | of | tide | ranges, | ||||
| including | a | discussion | on | how | contractor’s | proposed | use | of | tide | heights | to | satisfy | ||
| transit | requirements | may | affect | the | shipyard | availability | arrival/departure | times | ||||||
| and | the | complete | scope | of | work: |
7.2.3.1. Underway in confined waters (harbors) – 3 feet of charted depth.
| 7.2.3.2. Underway | in | inland | waters | – | 2 | feet | plus | squat | of | charted | depth. | (Note: | |
| Squat | values | only | apply | to | MSC | tanker | vessels | like | the | T‐AO | class | ships. | |
| T‐AO | squat | tables | are | available | for | planning.) |
| 7.2.3.3. Underway | in | open | water | – | 2 | feet | plus | squat | of | charted | depth. | (Note: | |
| Squat | values | only | apply | to | MSC | tanker | vessels | like | the | T‐AO | class | ships. | |
| T‐AO | squat | tables | are | available | for | planning.) |
| 7.2.3.4. During | dead | stick | maneuvering | (pilot | aboard | and | assisted | by | tugs) | – | 2 |
| feet | of | charted | depth. |
| 7.2.3.5. For | dry‐docking | – | 12 | inches | over | the | high | block, | sill, | or | highest |
| projection | including | the | effects | of | list, | trim, | and | hog/sag. |
| 7.2.3.6. Pierside | at | a | contractor’s | (or | subcontractor’s) | facility | – | 3 | feet | of | facility |
| sounding | survey | depth. | Tidal | ranges | shall | be | included | to | demonstrate | ||
| adequate | clearance | under | all | conditions. |
USS MOUNT WHITNEY
(LCC‐20)
| GENERAL | REQUIREMENTS | PR | #N4044419RCMW001 | ||
| 20 | July, | 2018 | |||
| ITEM | NO. | 003 | CATEGORY | “NSP” | MSC/SWI/N75/PPE |
APPROACH, BERTH, AND MOORING REQUIREMENTS
003‐3
| 7.2.4. A | navigational | meeting/brief | shall | be | held | 24 | hours | prior | to | arrival/departure | of |
| the | vessel. |
| 7.2.4.1. The | conference | shall | be | attended | by | ships | force | and | MSCREP | project | ||
| office | personnel | and | the | contractor’s | supervisory | personnel | concerned | |||||
| with | the | arrival/departure | evolution. | Note: | The | arrival | conference | shall | ||||
| be | held | via | phonecon | so | that | the | ship | can | participate | in | the | conference |
| remotely | prior | to | arrival | at | the | shipyard. | Provide | conference | call | phone | ||
| number | details | after | award | for | the | remote | conference. |
| 7.2.4.2. Navigational | brief | shall | cover | arrival | and | departure |
| date/time/tides/weather/ | water | depths/ | tug | and | pilot | services/line |
| handlers, | areas | of | concern, | etc. |
| 7.2.5. Contractors | must | submit | with | their | proposals | copies | of | all | the | latest | NOAA | or | US | |||
| Army | Corps | of | Engineers | or | nationally | recognized | authority | waterway | approach | |||||||
| charts | to | their | facility. | Charts | are | to | show | the | entire | route | of | transit | from | the | sea | |
| buoy | to | the | contractor’s | facility, | or | for | proposed | inter/intra | facility | transits. | ||||||
| Charts | must | provide | adequate | demonstration | that | the | contractor | has | positively | |||||||
| determined | the | route(s) | providing | safe | vessel | transit | and | adequate | water | depths | ||||||
| to | meet | the | requirements | of | 7.2.3 | above, | including | applicable | tidal | ranges. |
| 7.2.6. Contractors | must | submit | an | approach | chart | with | their | proposals. | The | approach | |||
| chart | shall | be | equal | to | the | berthing | chart | in | dimensions | and | contain | the | following |
data:
| 7.2.6.1. Contractors | shall | furnish | current | depth | soundings | for | the | approach | to |
| the | pier | and/or | dry‐dock | from | the | main | channel. |
| 7.2.6.2. Soundings | must | indicate | the | depths | over | the | full | length | of | the | approach, | ||
| from | the | point | in | the | navigable | channel | where | the | contractor | takes | |||
| delivery | of | the | vessel | to | the | pier | and/or | drydock | at | a | maximum | of | one |
| hundred | (100) | foot | intervals. | Adequate | breadth | of | soundings | shall | be | ||||
| provided | to | demonstrate | sufficient | underwater | clearance | for | vessel | ||||||
| arrival, | departure | and | any | required | turning | evolutions. | Approach | ||||||
| soundings | shall | be | considered | current | if | taken | within | three | hundred | and | |||
| sixty‐five | (365) | days | prior | to | the | date | of | issue | of | the | solicitation. | NOAA | |
| charts | or | excerpts | of | such | documents | will | not | be | accepted. |
| 7.2.6.3. Official | data | on | tidal | ranges | for | the | area | covered | by | the | approach | charts |
| shall | also | be | submitted | with | the | contractor’s | proposal. |
| 7.2.6.4. All | information | must | be | readily | available | to | clearly | chart | the | progress | of | |
| the | ship | from | arrival | at | the | port | to | safe | mooring | location | or | dry‐dock. |
| The | ship | must | be | provided | safe | access | and | egress | to | and | from | the |
| contractor’s | proposed | pier | and/or | dry‐dock. |
7.3. Berth:
USS MOUNT WHITNEY
(LCC‐20)
| GENERAL | REQUIREMENTS | PR | #N4044419RCMW001 | ||
| 20 | July, | 2018 |