0511_A_E-BOILERS_GROOM.pdf

PDF 81 KB Posted

Attached to
Ship repair maintenance
Solicitation number
N6817119R0013
Issued by

About this file

0511_A_E-BOILERS_GROOM.pdf

View the file

Other files

File Type Posted
Amend_5.pdf PDF
0503_A_MISC_PIPING_REPAIRS_(VRR_18-044,_19-047,_19-045)_R_20_SEPT_2019.pdf PDF
AMEND_04.pdf PDF
J-1_Contractor_Price_Breakdown_R_20_SEPT_2019.xlsx XLSX spreadsheet
Amend_03.pdf PDF
Amend_02.pdf PDF
N6817119R0013_RFP_AMENDMENT_1.pdf PDF
J-1_Contractor_Price_Breakdown.xlsx XLSX spreadsheet
N6817119R0013_RFP.pdf PDF
J-2_Work_Items.pdf PDF
J-3_GFM_Report.XLSX XLSX spreadsheet
N6817119R0013_N6817119R0013_Pre_sol_notice.docx DOCX document
N6817119R0013_MTW_Pre-sol_Notice.docx DOCX document
Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MT WHITNEY (LCC 20)

AUXILIARY MACHINERY

ITEM NO. 0511 CATEGORY "A" 27 MAY 2019

ELECTRONIC BOILERS GROOM & TEST (ABS) KEGLEY, WILLIAM

0511 - 1 -

1.0 ABSTRACT

1.1 The purpose of this item is to inspect, groom, and adjust the VAPOR Electronic Boilers #1 and #2.

2.0 REFERENCES:

2.1 Electric-Steam-Boiler-Manual-2015, MTW

3.0 ITEM LOCATION/DESCRIPTION

3.1 Quantity: Two (2) Boilers (E-Boilers)

3.2 Description/manufacturer’s Data: STR Model, RESISTO-FLO Electric Boilers

4.0 GOVERNMENT FURNISHED EQUIPMENT/MATERIAL/SERVICES: None

7.0 STATEMENT OF WORK REQUIRED:

7.1 Contractor shall accomplish the inspections, normal maintenance, and testing of the two (2) electric boilers in accordance with all the requirements in reference 2.1. This includes testing of safety valves, hydrostatic testing, cleaning the boilers, etc.

7.2 Contractor is to provide the services of an OEM Authorized VAPOR Field Service representative to accomplish the inspections and maintenance of both auxiliary boilers. The OEM contact info is:

Vapor Power International LLC 551 S County Line Road, Franklin Park, Il 60115 Phone: 630-694-5500. Fax: 630-694-2230

7.3 The ASME approved safety valves(s), supplied with the boilers should be factory set at or below the design pressure of the boiler as stated on the boiler nameplate.

7.4 Conduct an operational test of all shutdown and safety devices in the presence of the MSCREP.

7.5 Conduct and operational test of the No. 1 E-Boiler for 12 hours. Repeat the same operational test for the No. 2 E-Boiler. The OEM Technical Representative shall be in attendance for both tests.

7.6 Provide a report of all inspections including all future repair recommendations, if any.