0511_A_E-BOILERS_GROOM.pdf
PDF 81 KB Posted
- Attached to
- Ship repair maintenance
- Solicitation number
- N6817119R0013
About this file
0511_A_E-BOILERS_GROOM.pdf
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amend_5.pdf | ||
| 0503_A_MISC_PIPING_REPAIRS_(VRR_18-044,_19-047,_19-045)_R_20_SEPT_2019.pdf | ||
| AMEND_04.pdf | ||
| J-1_Contractor_Price_Breakdown_R_20_SEPT_2019.xlsx | XLSX spreadsheet | |
| Amend_03.pdf | ||
| Amend_02.pdf | ||
| N6817119R0013_RFP_AMENDMENT_1.pdf | ||
| J-1_Contractor_Price_Breakdown.xlsx | XLSX spreadsheet | |
| N6817119R0013_RFP.pdf | ||
| J-2_Work_Items.pdf | ||
| J-3_GFM_Report.XLSX | XLSX spreadsheet | |
| N6817119R0013_N6817119R0013_Pre_sol_notice.docx | DOCX document | |
| N6817119R0013_MTW_Pre-sol_Notice.docx | DOCX document |
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MT WHITNEY (LCC 20)
AUXILIARY MACHINERY
ITEM NO. 0511 CATEGORY "A" 27 MAY 2019
ELECTRONIC BOILERS GROOM & TEST (ABS) KEGLEY, WILLIAM
0511 - 1 -
1.0 ABSTRACT
1.1 The purpose of this item is to inspect, groom, and adjust the VAPOR Electronic Boilers #1 and #2.
2.0 REFERENCES:
2.1 Electric-Steam-Boiler-Manual-2015, MTW
3.0 ITEM LOCATION/DESCRIPTION
3.1 Quantity: Two (2) Boilers (E-Boilers)
3.2 Description/manufacturer’s Data: STR Model, RESISTO-FLO Electric Boilers
4.0 GOVERNMENT FURNISHED EQUIPMENT/MATERIAL/SERVICES: None
7.0 STATEMENT OF WORK REQUIRED:
7.1 Contractor shall accomplish the inspections, normal maintenance, and testing of the two (2) electric boilers in accordance with all the requirements in reference 2.1. This includes testing of safety valves, hydrostatic testing, cleaning the boilers, etc.
7.2 Contractor is to provide the services of an OEM Authorized VAPOR Field Service representative to accomplish the inspections and maintenance of both auxiliary boilers. The OEM contact info is:
Vapor Power International LLC 551 S County Line Road, Franklin Park, Il 60115 Phone: 630-694-5500. Fax: 630-694-2230
7.3 The ASME approved safety valves(s), supplied with the boilers should be factory set at or below the design pressure of the boiler as stated on the boiler nameplate.
7.4 Conduct an operational test of all shutdown and safety devices in the presence of the MSCREP.
7.5 Conduct and operational test of the No. 1 E-Boiler for 12 hours. Repeat the same operational test for the No. 2 E-Boiler. The OEM Technical Representative shall be in attendance for both tests.
7.6 Provide a report of all inspections including all future repair recommendations, if any.