7._Attch_4_SubHDR_Inventory_Spare_Parts_List_04122019.pdf
PDF 69 KB Posted
- Attached to
- Submarine High Data Rate (SubHDR) Antenna Pedestal Group (APG) Repairs, Supplies and Services
- Solicitation number
- N6660419R0355
About this file
This document contains an inventory list of spare parts and related pricing and delivery information for the Submarine High Data Rate (SubHDR) Antenna Pedestal Group required by the Naval Undersea Warfare Center Division Newport, Rhode Island. Key details include 115 line items for spare parts and components for the SubHDR system with national stock numbers, descriptions, unit pricing for quantities 1-5 and 6-10, and objective and threshold delivery timeframes after order placement. The delivery timeframes range from 4 to 98 weeks depending on the item. This inventory list is Attachment 4 to solicitation N6660419R0355, which seeks repairs, supplies, and engineering technical services for the SubHDR Antenna Pedestal Group through a new five-year indefinite delivery, indefinite quantity contract with both fixed price and cost reimbursement contract line items. The total estimated level of effort for the engineering services is 91,000 hours.
Sol. Att. SubHDR Inventory Spare Parts List
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 7._Attch_4_SubHDR_Inventory_Spare_Parts_List_04122019.XLSX | XLSX spreadsheet | |
| N6660419R03550001.pdf | ||
| 9._Attch6_Incidental_Govt_Property_04122019.doc | DOC document | |
| 4._Attch_1_DD254.pdf | ||
| N6660419R0355.pdf | ||
| 2._Exhibit_A_CDRL_DD1423-1_FFP.pdf | ||
| 8._Attch_5_RI_WD_2015-4089_Rev_9_dtd_12-26-2018.pdf | ||
| 5._Attch_2_GFP_Module_Attachment.pdf | ||
| 3._Exhibit_B_CDRL_DD1423-1_CPFF.pdf | ||
| 6._Attch_3_PBRST.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N66604-19-R-0355 Attachment #4 - SubHDR Spares Inventory List PR 1300621248
ID # Part Number Description Year 1 Unit Price, QTY 1-5
Year 1 Unit Price, QTY 6-10
Year 2 Unit Price, QTY 1-5
Year 2 Unit Price, QTY 6-10
Year 3 Unit Price, QTY 1-5
Year 3 Unit Price, QTY 6-10
Year 4 Unit Price, QTY 1-5
Year 4 Unit Price, QTY 6-10
Year 5 Unit Price, QTY 1-5
Year 5 Unit Price, QTY 6-10
FOB
Government's
Objective
Delivery Date
After Date of
Delivery Order
Government's
Threshold
Delivery Date
After Date of
Delivery Order
1 40003 Motor, Cross-Elevation - brush blocks Origin 10 weeks 15 weeks
2 40953 Motor, Elevation - brush blocks Origin 10 weeks 15 weeks
3 41015 Motor, Train - brush blocks Origin 10 weeks 15 weeks
4 6481-354029-1 Resolver, Elevation Axis NESP Origin 27 weeks 40 weeks
5 G225024-2 Termination Waveguide Destination 10 weeks 15 weeks
7 G608321-1 Power Supply DC/DC Converter Destination 10 weeks 15 weeks
8 G608321-2 Power Supply DC/DC Converter Destination 10 weeks 15 weeks
9 G608321-3 Power Supply DC/DC Converter Destination 10 weeks 15 weeks
10 G649580-1 Bearing, Angular Contact, Duplex, Elevation Origin 15 weeks 23 weeks
11 G649581-1 Bearing, Radial Contact, Elevation Origin 15 weeks 23 weeks
12 G649582-1 Resolver, Frameless Origin 25 weeks 37 weeks
13 G649583-1 Bearing, Angular Contact, 10", Train Origin 15 weeks 23 weeks
14 G649584-1 Bearing, Angular Contact, 8", Train Origin 15 weeks 23 weeks
15 G649586-1 Bearing Tapered Roller Origin 15 weeks 23 weeks
16 G649640-1 Motor, Train Origin 20 weeks 30 weeks
17 G649666-1 Motor, Elevation Origin 20 weeks 30 weeks
18 G649686-1 Resolver Mount Housing Origin 20 weeks 30 weeks
19 G649688-1 Motor, Cross-Elevation Origin 20 weeks 30 weeks
20 G649692-1 Housing XL RJ Mount Origin 20 weeks 30 weeks
21 G649700-2 Transmit Reject Filter Origin 10 weeks 15 weeks
22 G651064-2 TRANSFORMER,HIGH VOLTAGE Destination 40 weeks 60 weeks
23 G651065-2 TRANSFORMER,HIGH VOLTAGE Destination 40 weeks 60 weeks
24 G651578-1 Power Module, H-Bridge Destination 40 weeks 60 weeks
25 G651580-1 DIVIDER ASSEMBLY Destination 40 weeks 60 weeks
26 G651582-1 JUMPER,SCULPTED Destination 40 weeks 60 weeks
27 G651591-2 Rectifier bridge Destination 40 weeks 60 weeks
28 G706046-3 Coupler, Direction Destination 10 weeks 15 weeks
29 G706047-3 Attenuator, Elec Destination 10 weeks 15 weeks
30 G706049-2 Filter, Bandpass Destination 10 weeks 15 weeks
31 G706050-2 Amplifier, RF Destination 40 weeks 60 weeks
32 G706051-2 Amplifier, RF-LNA Origin 52 weeks 78 weeks
33 G706052-1 Low Noise Amp, X-Band Destination 40 weeks 60 weeks
34 G706054-2 Isolator, RF Destination 40 weeks 60 weeks
35 G706065-3 Switch, RF (Logus Switch) Destination 15 weeks 23 weeks
36 G706065-4 Switch, RF (Logus Switch) Destination 15 weeks 23 weeks
37 G706072-2 Detector, RF same as DT7011P Destination 40 weeks 60 weeks
38 G706309-1 Detector, RF (Q-band) Destination 40 weeks 60 weeks
39 G706348-1 Upconverter, Q-Band (QUC) Destination 52 weeks 78 weeks
40 G706616-1 Motor, Antenna Origin 40 weeks 60 weeks
41 G706617-1 Bearing, Antenna Origin 10 weeks 15 weeks
42 G706650-1 Sensor, thermal Destination 65 weeks 98 weeks
43 G707095-1 Polarizer, Q-Band, Train Origin 15 weeks 23 weeks
44 G708689-1 Slip Ring, Resolver, Train Origin 10 weeks 15 weeks
45 G709913-3 Attenuator, Detector Destination 40 weeks 60 weeks
46 G709914-3 Coupler, Direction Destination 40 weeks 60 weeks
47 G709916-2 Circulator, Power Destination 40 weeks 60 weeks
48 G709917-4 Attenuator Detector Destination 40 weeks 60 weeks
49 G709936-1 Cable Assembly, Special Purpose, W2 Origin 10 weeks 15 weeks
50 G709937-1 Cable Assembly, Special Purpose, W1 Origin 10 weeks 15 weeks
51 G709941-1 Cable Assembly, Special Purpose W4 Origin 10 weeks 15 weeks
52 G710339-50 Subreflector, 5" Origin 10 weeks 15 weeks
53 G710340-50 Main Reflector Origin 10 weeks 15 weeks
54 G710753-50 Feedome Origin 10 weeks 15 weeks
55 G733360-1 Motor Mount Housing Origin 10 weeks 15 weeks
56 Deleted (Reserved) N/A N/A N/A
57 Deleted (Reserved) N/A N/A N/A
58 Deleted (Reserved) N/A N/A N/A
59 Deleted (Reserved) N/A N/A N/A
60 Deleted (Reserved) N/A N/A N/A
61 G745252-50 Purge Valve Housing Destination 15 weeks 23 weeks
62 G745262-1 Hermetic Connector Origin 10 weeks 15 weeks
63 G745292-2 Switch, 2:1 RF Trans. Line Coaxial Destination 40 weeks 60 weeks
64 G745324-1 Waveguide Assembly Destination 10 weeks 15 weeks
65 G745324-10 Waveguide Assembly Destination 10 weeks 15 weeks
66 G745324-3 Waveguide Assembly Destination 10 weeks 15 weeks
67 G745324-6 Waveguide Assembly Destination 10 weeks 15 weeks
68 G745324-7 Waveguide Assembly Destination 10 weeks 15 weeks
69 G745324-8 Waveguide Assembly Destination 10 weeks 15 weeks
70 G745324-9 Waveguide Assembly Destination 10 weeks 15 weeks
71 G745325-1 Waveguide Assy, X-band Destination 15 weeks 23 weeks
72 G745325-2 Waveguide Assy, X-band Destination 15 weeks 23 weeks
74 G759041-50 Polarizer, Antenna Origin 15 weeks 23 weeks
75 G759706-1 Rotary Joint, Rect., Q-band Origin 20 weeks 30 weeks
76 G759706-2 Rotary Joint, Rect., Q-band Origin 20 weeks 30 weeks
77 G759712-1 Cable Assembly, W5 Origin 15 weeks 23 weeks
78 G759817-50 Waveguide, Elevation to Feed Origin 15 weeks 23 weeks
79 G759818-50 Waveguide, Cross Level to Elevation Origin 15 weeks 23 weeks
80 G759819-50 Waveguide, Train to Cross Level Origin 15 weeks 23 weeks
81 G760112-2 RF Coax Cable Assy Origin 15 weeks 23 weeks
N66604-19-R-0355 Attachment #4 - SubHDR Spares Inventory List PR 1300621248
ID # Part Number Description Year 1 Unit Price, QTY 1-5
Year 1 Unit Price, QTY 6-10
Year 2 Unit Price, QTY 1-5
Year 2 Unit Price, QTY 6-10
Year 3 Unit Price, QTY 1-5
Year 3 Unit Price, QTY 6-10
Year 4 Unit Price, QTY 1-5
Year 4 Unit Price, QTY 6-10
Year 5 Unit Price, QTY 1-5
Year 5 Unit Price, QTY 6-10
FOB
Government's
Objective
Delivery Date
After Date of
Delivery Order
Government's
Threshold
Delivery Date
After Date of
Delivery Order
82 G760112-3 Cable Origin 15 weeks 23 weeks
83 G760112-4 RF Coax Cable Assy Origin 15 weeks 23 weeks
84 G760112-5 Cable Origin 15 weeks 23 weeks
85 G768063-1 Waveguide Assy, blind mate Origin 52 weeks 78 weeks
86 G768063-2 Waveguide Assy, Blind Mate System Origin 20 weeks 30 weeks
87 G768683-1 Downconverter, RF, K-Band/SHF Destination 20 weeks 30 weeks
88 G772281-1 Cable Assembly Semi Rigid W8 Destination 20 weeks 30 weeks
89 G772281-10 Cable Assembly Semi Rigid Destination 20 weeks 30 weeks
90 G772281-11 Cable Assembly Semi Rigid Destination 20 weeks 30 weeks
91 G772281-2 Cable Assembly Semi Rigid Destination 20 weeks 30 weeks
92 G772281-3 Cable Assembly Semi Rigid Destination 20 weeks 30 weeks
93 G772281-5 Cable Assembly Semi Rigid Destination 20 weeks 30 weeks
94 G772281-6 Cable Assembly Semi Rigid Destination 20 weeks 30 weeks
95 G772281-7 Cable Assembly Semi Rigid Destination 20 weeks 30 weeks
96 G772281-8 Cable Assembly Semi Rigid Destination 20 weeks 30 weeks
97 G775155-1 Power Module, Downchopper Destination 52 weeks 78 weeks
98 G780682-1 Wiring Harness Destination 10 weeks 15 weeks
99 H291476-1 Attenuator, FXD, W/G Destination 10 weeks 15 weeks
100 H293283-1 Filter, WR42 Origin 10 weeks 15 weeks
101 H309225-1 Cable Assembly, RF, WR-B Destination 10 weeks 15 weeks
102 H309225-2 Cable Assembly, RF, WR-A Destination 10 weeks 15 weeks
103 H309225-3 Cable Assembly, RF, WR-C Destination 10 weeks 15 weeks
104 H312937-3 Capacitor Destination 10 weeks 15 weeks
105 H313929-1 Connector, EMI Filter Destination 10 weeks 15 weeks
106 H388850-1 Blockconverter, GBS Low noise Outboard Origin 10 weeks 15 weeks
107 H388851-1 Filter Origin 10 weeks 15 weeks
108 H388852-1 Oscillator (PLDRO) Origin 20 weeks 30 weeks
109 H389894-1 Connector System Elect. Origin 10 weeks 15 weeks
110 H389894-2 Connector System Elect. Destination 10 weeks 15 weeks
111 H403349-1 Cable Assembly W6 Origin 10 weeks 15 weeks
112 H407277-1 Rotary Joint Tri Channel Origin 10 weeks 15 weeks
113 G745212-2 Connector, Receptacle Destination 10 weeks 15 weeks
114 Deleted (Reserved) N/A N/A N/A
115 G745227 Radome (NEW) Origin 52 weeks 78 weeks
116 MP35N STAINLESS STEEL BOLTS Destination 6 weeks 9 weeks
117 02-02500BG01 Natrasorb 900 Desiccant, Destination 4 weeks 6 weeks
File details come from the government source that posted it. Updated .