N6660414R0921_RFP.pdf

PDF 1 MB Posted

Attached to
Mk 48 Heavyweight Torpedo Alternator and Regulator
Solicitation number
N6660414R0921
Issued by

About this file

Request for Proposal

View the file

Other files

Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CODE

(Hour)

PAGE(S)

until 02:00 PM local time 09 May 2014

X

A

X B

X C X D

EX

X

G

F 97 - 106

107 - 126

X H 127 - 134 lisa.labelle@navy .mil

RATING PAGE OF PAGES

7. ISSUED BY

(Date)

IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.

Previous Edition is Unusable 33-134 STANDARD FORM 33 (REV. 9-97)

Prescribed by GSA

FAR (48 CFR) 53.214(c)

1 134

(If other than Item 7)

15A. NAME 16. NAME AND TITLE OF PERSON AUTHORIZED TO

AND

ADDRESS

SIGN OFFER (Type or print)

OF

OFFEROR

AMENDMENT NO. DATE

15B. TELEPHONE NO (Include area code) 17. SIGNATURE15C. CHECK IF REMITTANCE ADDRESS

IS DIFFERENT FROM ABOVE - ENTER

SUCH ADDRESS IN SCHEDULE.

18. OFFER DATE

1. THIS CONTRACT IS A RATED ORDER

UNDER DPAS (15 CFR 700)

2. CONTRACT NO.

N66604 8. ADDRESS OFFER TO

See Item 7

9. Sealed offers in original and 6 copies for furnishing the supplies or services in the Schedule will be received at the place specified in Item 8, or if handcarried, in the depository located in

CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and

Handcarried not authorized conditions contained in this solicitation.

10. FOR INFORMATION

CALL:

A. NAME (NO COLLECT CALLS)

LISA M. LABELLE 401-832-7087

11. TABLE OF CONTENTS

SOLICITATION/ CONTRACT FORM

SUPPLIES OR SERVICES AND PRICES/ COSTS

1 - 2

3 - 41

X I CONTRACT CLAUSES

DESCRIPTION/ SPECS./ WORK STATEMENT X

PACKAGING AND MARKING

42 - 50

51 - 54

J LIST OF ATTACHMENTS

INSPECTION AND ACCEPTANCE

DELIVERIES OR PERFORMANCE

55 - 60

61 - 62 X K

REPRESENTATIONS, CERTIFICATIONS AND

OTHER STATEMENTS OF OFFERORS

CONTRACT ADMINISTRATION DATA 63 - 69 X

SPECIAL CONTRACT REQUIREMENTS

OFFER (Must be fully completed by offeror) 70 - 74 X M

L INSTRS., CONDS., AND NOTICES TO OFFERORS

EVALUATION FACTORS FOR AWARD

NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.

is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.

13. DISCOUNT FOR PROMPT PAYMENT

(See Section I, Clause No. 52.232-8)

14. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments

AMENDMENT NO. DATE

to the SOLICITATION for offerors and related documents numbered and dated):

FACILITY

12. In compliance with the above, the undersigned agrees, if this offer is accepted within calendar days (60 calendar days unless a different period

SOLICITATION, OFFER AND AWARD

X

(X) SEC. DESCRIPTION (X) SEC. DESCRIPTION PAGE(S)

PART I - THE SCHEDULE

26. NAME OF CONTRACTING OFFICER (Type or print) 27. UNITED STATES OF AMERICA 28. AWARD DATE

EMAIL:TEL: (Signature of Contracting Officer)

CODE CODE

B. TELEPHONE (Include area code) C. E-MAIL ADDRESS

AWARD (To be completed by Government)

19. ACCEPTED AS TO ITEMS NUMBERED 20. AMOUNT 21. ACCOUNTING AND APPROPRIATION

22. AUTHORITY FOR USING OTHER THAN FULL AND OPEN COMPETITION:

10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)

23. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

24. ADMINISTERED BY (If other than Item 7) CODE 25. PAYMENT WILL BE MADE BY CODE

PART IV - REPRESENTATIO NS AND INSTRUCTIO NS

PART III - LIST O F DO CUMENTS, EXHIBITS AND O THER ATTACHMENTS

75 - 94

PART II - CO NTRACT CLAUSES

NAVAL UNDERSEA WARFARE CTR. DIV., NPT.

LISA M LABELLE, CODE 5912

COMMERCIAL ACQUISITION DEPARTMENT

1176 HOWELL STREET, BLDG. 1258

NEWPORT RI 02841

401-832-7087

401-832-4820FAX:

TEL:

FAX:

TEL:

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

SOLICITATION

95 - 96

6. REQUISITION/PURCHASE NO.5. DATE ISSUED

28 Mar 2014

4. TYPE OF SOLICITATION

SEALED BID (IFB)

NEGOTIATED (RFP)

[ X ]

3. SOLICITATION NO.

N66604-14-R-0921

Section A - Solicitation/Contract Form

NOTES TO OFFERORS

1. Contract Line Items (CLINs) 0051 – 0060 Intentionally Left Blank.

2. CLINs 0071, 0073, 0075, 0077, 0079 are ODC/Travel CLINs for CLINs 0061, 0063, 0065, 0067, 0069.

(1)

3. Offerors shall complete Section B and the Pricing Table included as Exhibit C.

(2)

4. Section F Delivery and Performance Information is included as Exhibit B.

5. Page 69 is blank.

6. All offers must be made valid through 30 Sep 2014.

(3)

7. All technical questions in response to the soliciation must be submitted to Lisa McKeon by 25 Apr 2014.

(4)

8. To receive the Specifications/Drawings/Technical Data Package (TDP)/GFI Package review the Contract

Security Classification Specification, DD Form 254 and send the following information to lisa.mckeon@navy.mil:

Company Name

Company Address

Cage Code

Point of Contact, include telephone number

Security Point of Contact, include telephone number

Classified Information Address

Offerors with the required Clearance will receive two CDs under separate coverage: 1 Classified CD and 1

Unclassified CD.

mailto:lisa.mckeon@navy.mil

Section B - Supplies or Services and Prices

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 5 Each MK 48 Alternator - First Article

CPFF

MK 48 Alternator First Article Units in accordance with Statement of Work, Attachment 1.

Pursuant to paragraph (e) of Clauses 52.209-3 and 52.209-4, the First Article shall not be delivered as part of the production quantity.

FOB: Destination

ESTIMATED COST

FIXED FEE

TOTAL EST COST + FEE

0002 Lot DATA for Item 0001

Contract Data Requirement List (CDRLs) - See Exhibit A.

*NOT SEPARATELY PRICED*

NET AMT

0003 5 Each MK 48 Regulator - First Article

CPFF

MK 48 Regulator First Article Units in accordance with Statement of Work, Pursuant to paragraph (e) of Clauses 52.209-3 and 52.209-4, the First Article shall not be delivered as part of the production quantity.

0004 Lot DATA for Item 0003

0005 2 Each OPTION MK 48 Alternator - First Article

FFP

Pursuant to paragraph (e) of Clauses 52.209-3 and 52.209-4, the First Article shall not be delivered as part of the production quantity.

0006 Lot OPTION DATA for Item 0005

0007 2 Each OPTION MK 48 Alternator - First Article

FFP

0008 Lot OPTION DATA for Item 0007

0009 2 Each OPTION MK 48 Alternator - First Article

FFP

0010 Lot OPTION DATA for Item 0009

0011 2 Each OPTION MK 48 Alternator - First Article

FFP

0012 Lot OPTION DATA for Item 0011

0013 2 Each OPTION MK 48 Regulator - First Article

FFP

0014 Lot OPTION DATA for Item 0013

0015 2 Each OPTION MK 48 Regulator - First Article

FFP

0016 Lot OPTION DATA for Item 0015

0017 2 Each OPTION MK 48 Regulator - First Article

FFP

0018 Lot OPTION DATA for Item 0017

0019 2 Each OPTION MK 48 Regulator - First Article

FFP

0020 Lot OPTION DATA for Item 0019

0021 50 Each OPTION MK 48 Alternator (Run 1)

FFP

MK 48 Alternators in accordance with Statement of Work, Attachment 1.

Offerors must complete Exhibit C and provide pricing for Quantity Ranges: 10 -

20; 21 - 30; 31 - 40; 41 - 50. If this option is exercised, the Government will purchase the required quantity at the unit price proposed for that quantity.

0022 Lot OPTION DATA for Item 0021

0023 50 Each OPTION MK 48 Alternator (Run 2)

0024 Lot OPTION DATA for Item 0023

0025 50 Each OPTION MK 48 Alternator (Run 3)

0026 Lot OPTION DATA for Item 0025

0027 50 Each OPTION MK 48 Alternator (Run 4)

0028 Lot OPTION DATA for Item 0027

0029 50 Each OPTION MK 48 Alternator (Run 5)

0030 Lot OPTION DATA for Item 0029

0031 50 Each OPTION MK 48 Regulator (Run 1)

MK 48 Regulators in accordance with Statement of Work, Attachment 1.

0032 Lot OPTION DATA for Item 0031

0033 50 Each OPTION MK 48 Regulator (Run 2)

0034 Lot OPTION DATA for Item 0033

0035 50 Each OPTION MK 48 Regulator (Run 3)

0036 Lot OPTION DATA for Item 0035

0037 50 Each OPTION MK 48 Regulator (Run 4)

0038 Lot OPTION DATA for Item 0037

0039 50 Each OPTION MK 48 Regulator (Run 5)

0040 Lot OPTION DATA for Item 0039

0041 1 Lot OPTION Long Lead Material (Run 1)

FFP

Offerors must complete Exhibit C and provide pricing for Quantity Ranges: 10 -

20; 21 - 30; 31 - 40; 41 - 50. If this option is exercised, the Government will

0042 Lot OPTION DATA for Item 0041

0043 1 Lot OPTION Long Lead Material (Run 2)

FFP

Offerors must complete Exhibit C and provide pricing for Quantity Ranges: 10 -

20; 21 - 30; 31 - 40; 41 - 50. If this option is exercised, the Government will

0044 Lot OPTION DATA for Item 0043

0045 1 Lot OPTION Long Lead Material (Run 3)

FFP

Offerors must complete Exhibit C and provide pricing for Quantity Ranges: 10 -

20; 21 - 30; 31 - 40; 41 - 50. If this option is exercised, the Government will

0046 Lot OPTION DATA for Item 0045

0047 1 Lot OPTION Long Lead Material (Run 4)

FFP

Offerors must complete Exhibit C and provide pricing for Quantity Ranges: 10 -

20; 21 - 30; 31 - 40; 41 - 50. If this option is exercised, the Government will

0048 Lot OPTION DATA for Item 0047

0049 1 Lot OPTION Long Lead Material (Run 5)

FFP

Offerors must complete Exhibit C and provide pricing for Quantity Ranges: 10 -

20; 21 - 30; 31 - 40; 41 - 50. If this option is exercised, the Government will

0050 Lot OPTION DATA for Item 0049

0061 Job OPTION Engineering Services (Year 1)

CPFF

Engineering Services in accordance with Statement of Work, Attachment 1.

Estimated Number of Hours: 2,000

Estimated Period of Performance: 1 September 2014 - 31 August 2015

0062 Lot OPTION DATA for Item 0061

0063 Job OPTION Engineering Services (Year 2)

Estimated Number of Hours: 4,000

Estimated Period of Performance: 1 September 2015 - 31 August 2016

0064 Lot OPTION DATA for Item 0063

0065 Job OPTION Engineering Services (Year 3)

Estimated Period of Performance: 1 September 2016 - 31 August 2017

0066 Lot OPTION DATA for Item 0065

0067 Job OPTION Engineering Services (Year 4)

Estimated Period of Performance: 1 September 2017 - 31 August 2018

0068 Lot OPTION DATA for Item 0067

0069 Job OPTION Engineering Services (Year 5)

Estimated Period of Performance: 1 September 2018 - 31 August 2019

0070 Lot OPTION DATA for Item 0069

0071 Job OPTION Engineering Services Travel/ODC (Year 1)

COST

Engineering Services Travel in accordance with Statement of Work, Attachment

1.

The Government anticipates up to 2 people (i.e. 1 Engineer and 1 Technician) for up to 3 trips to Newport, RI, each trip is estimated to be up to 5 days.

*Applicable burdens may be applied, but NO fee may be applied to this CLIN*

Estimated Period of Performance: 1 September 2014 - 31 August 2015

0072 Lot OPTION DATA for Item 0071

0073 Job OPTION Engineering Services Travel/ODC (Year 2)

COST

Estimated Period of Performance: 1 September 2015 - 31 August 2016

0074 Lot OPTION DATA for Item 0073

0075 Job OPTION Engineering Services Travel/ODC (Year 3)

COST

Estimated Period of Performance: 1 September 2016 - 31 August 2017

0076 Lot OPTION DATA for Item 0075

0077 Job OPTION Engineering Services Travel/ODC (Year 4)

COST

Estimated Period of Performance: 1 September 2017 - 31 August 2018

0078 Lot OPTION DATA for Item 0077

0079 Job OPTION Engineering Services Travel/ODC (Year 5)

COST

Estimated Period of Performance: 1 September 2018 - 31 August 2019

0080 Lot OPTION DATA for Item 0079

CLAUSES INCORPORATED BY FULL TEXT

B12 SUPPLIES/SERVICES AND PRICES - CPFF COMPLETION (JAN 2012) (APPLICABLE TO

ITEMS 0001, 0003)

This contract has Cost Plus Fixed Fee (Completion Form) contract line items. The Contractor shall perform the work in accordance with the Statement of Work, (Attachment 1). For work performed hereunder, the Contractor shall be reimbursed in accordance with the provisions of the clauses herein entitled, Allowable Cost and Payment (FAR

52.216-7) and Fixed Fee (FAR 52.216-8).

B13 SUPPLIES/SERVICES AND PRICES - CPFF TERM (JAN 1999) (APPLICABLE TO ITEMS

0061, 0063, 0065, 0067, 0069)

This contract has Cost Plus Fixed Fee (Term) contract line items. The Contractor shall perform the work in accordance with the Statement of Work, (Attachment 1). For work performed hereunder, the Contractor shall be reimbursed in accordance with the provisions of the clauses herein entitled, Allowable Cost and Payment (FAR

52.216-7) and Fixed Fee (FAR 52.216-8).

HQ B-2-0007 LIMITATION OF COST OR LIMITATION OF FUNDS LANGUAGE (APPLICABLE TO

ITEMS: 0061, 0063, 0065, 0067, 0069)

The clause entitled "LIMITATION OF COST" (FAR 52.232-20) or "LIMITATION OF

FUNDS" (FAR 52.232-22), as appropriate, shall apply separately and independently to each separately identified estimated cost.

Fee Table

Labor

CLIN

Labor Hours

Estimate Cost

Fixed Fee Total Fee Rate Per Hour

Fee Percentage

0061 2,000

0063 4,000

0065 2,000

0067 2,000

0069 2,000

The offeror shall divide the proposed fixed fee for each CLIN by the quantity of labor hours indicated to complete the table.

HQ B-2-0014 PAYMENTS OF FEE(S) (COMPLETION) (NAVSEA) (MAY 1993) (APPLICABLE TO

ITEMS 0001, 0003)

(a) For purposes of this contract, "fee" means "target fee" in cost-plus-incentive-fee type contracts, "base fee" in cost-plus-award-fee type contracts, "fixed fee" in cost-plus-fixed fee type contracts for completion and phase type contracts.

(b) The Government shall make payments to the Contractor, subject to and in accordance with the clause in this contract entitled "FIXED FEE" (FAR 52.216-8) or "INCENTIVE

FEE", (FAR 52.216-10), as applicable. Such payments shall be equal to percent ( %) of the allowable cost of each invoice submitted by and payable to the

Contractor pursuant to the clause of this contract entitled "ALLOWABLE COST AND

PAYMENT" (FAR 52.216-7), subject to the withholding terms and conditions of the

"FIXED FEE" or "INCENTIVE FEE" clause, as applicable (percentage of fee is based on fee dollars divided by estimated cost dollars, including facilities capital cost of money).

Total fee(s) paid to the Contractor shall not exceed the fee amount(s) set forth in this contract.

(c) In the event of discontinuance of the work under this contract, or any specified phase of the contract, in accordance with the clause of this contract entitled "LIMITATION OF

FUNDS" (FAR 52.232-22) or "LIMITATION OF COST" (FAR 52.232-20), as applicable, the fee shall be equitably adjusted by mutual agreement to reflect the diminution of work. If the adjusted fee is less than the sum of all fee payments made to the Contractor under this contract, the Contractor shall repay the excess amount to the Government. If the adjusted fee exceeds all payments made to the Contractor under this contract, the Contractor shall be paid the additional amount, subject to the availability of funds. In no event shall the

Government be required to pay the Contractor any amount in excess of the funds obligated under this contract at the time of the discontinuance of work.

(d) Fee(s) withheld pursuant to the terms and conditions of this contract shall not be paid until the contract has been modified to reduce the fee(s) in accordance with paragraph (c) above, or until the Procuring Contracting Officer has advised the paying office in writing that no fee adjustment is required.

HQ B-2-0015 PAYMENTS OF FEE(S) (LEVEL OF EFFORT) (NAVSEA) (MAY

1993) (APPLICABLE TO ITEMS: 0061, 0063, 0065, 0067, 0069)

(a) For purposes of this contract, "fee" means "target fee" in cost-plus-incentive-fee type contracts, "base fee" in cost-plus-award-fee type contracts, or "fixed fee" in cost-plus-fixed-fee type contracts for level of effort type contracts.

(b) The Government shall make payments to the Contractor, subject to and in accordance with the clause in this contract entitled "FIXED FEE" (FAR 52.216-8) or "INCENTIVE

FEE", (FAR 52.216-10), as applicable. Such payments shall be equal to percent ( %) of the allowable cost of each invoice submitted by and payable to the

Contractor pursuant to the clause of this contract entitled "ALLOWABLE COST AND

PAYMENT" (FAR 52.216-7), subject to the withholding terms and conditions of the

"FIXED FEE" or "INCENTIVE FEE" clause, as applicable (percentage of fee is based on fee dollars divided by estimated cost dollars, including facilities capital cost of money).

Total fee(s) paid to the Contractor shall not exceed the fee amount(s) set forth in this contract.

(c) The fee(s) specified in SECTION B, and payment thereof, is subject to adjustment pursuant to paragraph (g) of the special contract requirement entitled "LEVEL OF

EFFORT." If the fee(s) is reduced and the reduced fee(s) is less than the sum of all fee payments made to the Contractor under this contract, the Contractor shall repay the excess amount to the Government. If the final adjusted fee exceeds all fee payments made to the contractor under this contract, the Contractor shall be paid the additional amount, subject to the availability of funds. In no event shall the Government be required to pay the Contractor any amount in excess of the funds obligated under this contract at the time of the discontinuance of work.

(d) Fee(s) withheld pursuant to the terms and conditions of this contract shall not be paid until the contract has been modified to reduce the fee(s) in accordance with the "LEVEL OF

EFFORT" special contract requirement, or until the Procuring Contracting Officer has advised the paying office in writing that no fee adjustment is required.

HQ B-2-0020 TRAVEL COSTS - ALTERNATE I (NAVSEA) (DEC 2005)

(a) Except as otherwise provided herein, the Contractor shall be reimbursed for its reasonable actual travel costs in accordance with FAR 31.205-46. The costs to be reimbursed shall be those costs accepted by the cognizant DCAA.

(b) Reimbursable travel costs include only that travel performed from the Contractor's facility to the worksite, in and around the worksite, and from the worksite to the

Contractor's facility.

(c) Relocation costs and travel costs incident to relocation are allowable to the extent provided in FAR 31.205-35; however, Contracting Officer approval shall be required prior to incurring relocation expenses and travel costs incident to relocation.

(d) The Contractor shall not be reimbursed for the following daily local travel costs:

(i) travel at U.S. Military Installations where Government transportation is available,

(ii) travel performed for personal convenience/errands, including commuting to and from work, and

(iii) travel costs incurred in the replacement of personnel when such replacement is accomplished for the Contractor's or employee's convenience.

HQ B-2-0023 CONTRACT SUMMARY FOR PAYMENT OFFICE (COST/

FIXED PRICE) (FEB 1997) (APPLICABLE TO ALL CLINS)

This contract includes the following mixture of cost reimbursement and fixed price line items:

Item Type *

0001, 0003, 0061, 0063, 0065, 0067, 0069

0071, 0073, 0075, 0077, 0079

COST

only

0005, 0007, 0009, 0011, 0013, 0015, 0017, 0019, 0021, 0023, 0025, 0027, 0029, 0031, 0033, 0035, 0037, 0039, 0041, 0043, 0045, 0047, 0049

0002, 0004, 0006, 0008, 0010, 0012, 0014, 0016, 0018, 0020, 0022, 0024, 0026, 0028, 0030, 0032, 0034, 0036, 0038, 0040, 0042, 0044, 0046, 0048, 0050, 0062, 0064, 0066, 0068, 0070, 0072, 0074, 0076, 0078, 0080

NSP

CPFF – Cost Plus Fixed Fee

FFP – Firm Fixed Price

NSP – Not Separately Priced

Section C - Descriptions and Specifications

C11 STATEMENT OF WORK (JAN 2012)

Services are to be performed in accordance with the Statement of Work, Attachment #1.

C16 COST AND PERFORMANCE REPORTING (OCT 2012) (APPLICABLE TO ITEMS: 0001, 0003,

0061, 0063, 0065, 0067, 0069)

(a) The Contractor agrees to upload the Contractor's Funds and Man-hour Expenditure Reports in the Electronic

Cost Reporting and Financial Tracking (eCRAFT) System and submit the Contractor’s Performance Report on the day and for the same timeframe the contractor submits an invoice into Wide Area Workflow (WAWF). Compliance with this requirement is a material requirement of this contract. Failure to comply with this requirement may result in contract termination.

(b) The Contractor's Funds and Man-hour Expenditure Report reports contractor expenditures for labor, materials, travel, subcontractor usage, and other contract charges.

(c) The Contractor's Performance Report indicates the progress of work and the status of the program and of all assigned tasks. It informs the Government of existing or potential problem areas.

(1) Access:

a) eCRAFT: Reports are uploaded through the Electronic Cost Reporting and Financial Tracking

(eCRAFT) System Periodic Report Utility (EPRU). The EPRU spreadsheet and user manual can be obtained at: http://www.navsea.navy.mil/nuwc/newport/contracts/default.aspx under eCRAFT information.

The eCRAFT e-mail address for report submission is: Ecraft.nuwc.npt.fct@navy.mil . If you have problems uploading reports, please see the Frequently Asked Questions at the site address above.

b) WAWF: See SectionG – Clause HQ G-2-0009 and 252.232-7006.

(2) Format.

a) eCRAFT: Data shall be reported in a format acceptable to the Electronic Cost Reporting and Financial

Tracking System (eCraft) as defined in the EPRU manual.

b) Contractor’s Performance Report: The pages shall be sequentially numbered. All attachments shall be identified and referenced in the text of the report. The report shall be prepared in the contractor's format and shall be legible and suitable for reproduction. Electronic submission is mandatory.

(3) Scope and Content. Costs incurred under this contract/task order are to be segregated at the lowest level of performance, either task, subtask or Technical Instruction (TI), rather than on a total task contract/order basis.

http://www.navsea.navy.mil/nuwc/newport/contracts/default.aspx mailto:Ecraft.nuwc.npt.fct@navy.mil

a) eCRAFT: Supporting documentation in eCRAFT shall include summaries of work charged during the period covered.

b) Contractor’s Performance Report:

(i) Provide a front cover sheet that indicates the contractor's name and address, the contract number, the system or program nomenclature, the report date, the reporting period, the report title and a serial number for the report, the security classification, the name and address of the person who prepared the report, and the name of the issuing Government activity (Naval Undersea Warfare Center Division, Newport).

(ii) Report contract schedule status. Describe the progress made against milestones during the reporting period.

(iii) Report any significant changes to the contractor's organization or methods of operation, to the project management network, or to the milestone chart, including the addition/deletion of any subcontractors and key personnel

(iv) Report problem areas affecting technical, scheduling, or cost elements. Provide background and recommendations for solutions. Report results (positive or negative) obtained related to previously identified problem areas, with conclusions and recommendations.

(v) Report all trips and significant results. This shall be a full breakdown, including locations, names of the people who travelled, and costs.

(vi) Report all significant communications and any commitments made thereby. Include all non-contractual communications, such as technical instructions, e-mails, telephone conversations, etc.

(vii) Report Engineering Change Proposal (ECP) status. Identify all ECPs by status, i.e., proposed, approved and implemented.

(viii) Report plans for activities during the following reporting period.

(ix) Include appendices for any necessary tables, references, photographs, illustrations, charts, etc.

(4) Submission and Approval.

a) The contractor shall submit their reports on the same day and for the same timeframe the contractor submits an invoice into WAWF. The amounts shall be same. eCRAFT Approval will be indicated by e-mail notification from eCraft.

b) Distribution Statement. Distribution Statement B: Distribution to U.S. Government agencies only;

Proprietary Information; (date data generated). Other requests for this document shall be referred to

NUWCDIVNPT Code 59.

(d) The contractor shall not provide other funds, man-hour, or status reporting without the prior written approval of the contracting officer.

C25 ACCESS TO GOVERNMENT SITE (OCT 2009)

(a) Contractor personnel shall comply with all current badging and security procedures required to gain access to any Government site. Access to Naval Undersea Warfare Center Division, Newport sites may only be gained by obtaining a badge (either permanent or temporary) from the security office. Compliance with SECNAV M-5510.30, Section 9-20, FACILITY ACCESS DETERMINATION (FAD) PROGRAM is specifically required. Badges shall be issued only after completion of SF85P available at: http://www.opm.gov/forms/index.asp

Contractor personnel requiring a Common Access Card, access to controlled unclassified information (CUI) and/or user level access to DoN or DoD networks and information systems, system security and network defense systems, or to system resources providing visual access and/or ability to input, delete or otherwise manipulate sensitive information without control to identify and deny sensitive information, are required to have a favorably adjudicated

NACLC.

The Contractor shall ensure that Contractor personnel employed on any Government site become familiar with and obey Activity regulations. Contractor personnel shall not enter restricted areas unless required to do so and until cleared for such entry. The Contractor shall request permission to interrupt any activity roads or utility services in writing a minimum of 15 calendar days prior to the date of interruption. Contractor personnel shall wear personal protective equipment in designated areas. All contractor equipment shall be conspicuously marked for identification.

The contractor shall strictly adhere to Federal Occupational Safety and Health Agency (OSHA) Regulations, Environmental Protection Agency (EPA) Regulations, and all applicable state and local requirements.

(b) The contractor shall ensure that each contractor employee reads the pamphlet entitled, “Occupational Safety and

Health Information for Contractors” prior to commencing performance at any NUWCDIVNPT site. This document is available under “Contractor Info” at: http://www.navsea.navy.mil/nuwc/newport/docs/Forms/AllItems.aspx

(c) The contractor shall ensure that each contractor employee reads the document entitled, “NUWC Environmental

Policy” prior to commencing performance at any NUWCDIVNPT site. This document is available at:

http://www.navsea.navy.mil/nuwc/newport/docs/EMS_EnvPolicy1.pdf

(d) The contractor shall ensure that each contractor employee who is resident at any NUWCDIVNPT site completes

ISO 14001 Awareness training within 30 days of commencing performance at that site. This training is available on the ISO 14001 webpage on the NUWCDIVNPT Intranet and is also available on the NUWC Division Newport

Internet site. This document is available at:

http://www.navsea.navy.mil/nuwc/newport/docs/External%20ISO14001_2009%20Training.pdf

(e) The contractor shall remove from the Government site any individual whose presence is deemed by the

Commander, NUWCDIVNPT, to be contrary to the public interest or inconsistent with the best interests of national security.

http://www.opm.gov/forms/index.asp http://www.navsea.navy.mil/nuwc/newport/docs/Forms/AllItems.aspx http://www.navsea.navy.mil/nuwc/newport/docs/EMS_EnvPolicy1.pdf http://www.navsea.navy.mil/nuwc/newport/docs/External%20ISO14001_2009%20Training.pdf

C26 INFORMATION ASSURANCE – UNCLASSIFIED DOD INFORMATION ON NON-DOD

INFORMATION SYSTEMS (JUL 2012)

(a) The Contractor shall ensure that unclassified DoD information it receives or produces in support of DoD activities is protected according to the information safeguards described in DoD Instruction 8582.01 – Security of

Unclassified DoD Information on Non-DoD Information Systems, which is available at the following web address:

http://www.dtic.mil/whs/directives/corres/pdf/858201p.pdf

(b) Upon request by the Government, the Contractor shall provide documentation demonstrating the safeguards the contractor has implemented to ensure the security of unclassified DoD Information.

(c) Contractor personnel that have not been briefed on DoD Instruction 8582.01 – Security of Unclassified DoD

Information on Non-DoD Information Systems shall be denied access contractor systems that contain unclassified

DoD information.

(d) Subcontracts. If the Contractor issues any subcontracts in which the subcontractor will have access to unclassified DoD information, the Contractor shall include this clause.

C57 EXCEPTION FROM ELECTRONIC AND INFORMATION TECHNOLOGY ACCESSIBILITY

REQUIREMENTS (JUN 2001)

(a) The Government has determined that this procurement is an exception to the Electronic and Information

Technology (EIT) Accessibility Standards (36 C.F.R. § 1194).

(b) Notwithstanding that an exception exists, the Contractor may furnish items or services provided under this contract that comply with the EIT Accessibility Standards (36 C.F.R. § 1194).

HQ C-1-0001 ITEM(S) - DATA REQUIREMENTS (NAVSEA) (SEP 1992)

The data to be furnished hereunder shall be prepared in accordance with the Contract Data

Requirements List, DD Form 1423, Exhibit(s) A, attached hereto.

http://www.dtic.mil/whs/directives/corres/pdf/858201p.pdf

HQ C-2-0008 ASSIGNMENT AND USE OF NATIONAL STOCK NUMBERS

(NAVSEA) (MAY 1993)

To the extent that National Stock Numbers (NSNs) or preliminary NSNs are assigned by the Government for the identification of parts, pieces, items, subassemblies or assemblies to be furnished under this contract, the Contractor shall use such NSNs or preliminary

NSNs in the preparation of provisioning lists, package labels, packing lists, shipping containers and shipping documents as required by applicable specifications, standards or

Data item Descriptions of the contract or as required by orders for spare and repair parts.

The cognizant Government Contract Administration Office shall be responsible for providing the Contractor such NSNs or preliminary NSNs which may be assigned and which are not already in possession of the Contractor.

HQ C-2-0009 ASSIGNMENT OF SERIAL NUMBER(S) (NAVSEA) (SEP 1990)

The Contractor shall request serial number assignment, in writing, from the Cognizant

Technical Program Office, with a copy to the cognizant Contract Administration Office.

The request for serial number assignment shall contain the following minimum information:

(a) Contract number;

(b) Assigned line item number and description;

(c) Assigned type designation;

(d) Assigned model number;

(e) Top drawing number and ID (List of Drawings) number;

(f) Exact quantity for which serial numbers are being requested, including preproduction samples required by the contract; and

(g) National Stock Number

HQ C-2-0012 CONFIGURATION MANAGEMENT (NAVSEA) (APR 2004)

(a) Baseline Definition - For configuration control purposes, all contractual documentation in effect at the time of contract award shall constitute the Contract Baseline which shall be considered incorporated in the baseline documentation.

(b) General Requirement - (1) The Contractor shall maintain a Configuration Control Program to assure that all detail level work being performed under this contract is in compliance with appropriate baseline documentation.

The Contractor shall prepare a Configuration Management Plan in accordance with the requirements of the contract for approval by the Government.

(2) Whenever a situation arises wherein the Contractor cannot comply with a baseline document, or whenever intent of such documentation is significantly changed by detail level documentation, the Contractor shall submit change documents to modify baseline documents to resolve the conflict or to allow non-compliance.

Whenever the cost of implementing a proposed change is less than the threshold requiring certified cost or pricing data, the Contractor shall provide documentation explaining the nature of related costs as shown on the change document. Whenever the contract cost changes by an amount greater than the threshold requiring certified cost or pricing data, the Contractor shall complete such cost and pricing data as the Contracting Officer shall require detailing all related costs, and attach it to the change document. Requirements for cost and pricing data shall be determined by the gross amount of the change unless otherwise directed by the contracting officer. Change documentation shall be submitted to the Contracting Officer in accordance with the Contract Data Requirements List

(CDRL), and as described in paragraphs (c) through (f) below.

(c) Engineering Change Proposals (ECPs) - ECPs shall be prepared in accordance with the approved configuration management plan and the requirements of the contract. DI-CMAN-80639C approved 30 Sep 2000 and MIL-

HDBK-61A of 7 Feb 2001 apply. An ECP should be submitted whenever the detail level physical configuration, material quality, operational or functional performance of equipment or installed systems will not be in compliance with baseline design-related documents (Specifications, Contract Drawings, etc.), and a change to the baseline document is considered an appropriate means of resolving a design-related issue. Documentation shall be developed in sufficient detail to enable Government review and evaluation of the merits of the proposed change, including cost and scheduling impact, ship class impact, and consequences if disapproved. All existing drawings and technical manuals impacted by the change shall be listed along with a brief narrative explanation of needed changes to incorporate the ECP if approved. Weight and moment data incidental to the change shall be provided. The

Contractor shall also prepare applicable baseline document insert sheets, with specific word changes or proposed re-write, to facilitate baseline documentation changes.

(d) Non-Engineering Change Proposals (NECPs) – An NECP should be submitted whenever necessary to document administrative, procedural, scheduling, or documentation changes that do not directly impact the physical configuration of the equipment. The NECP shall explain the nature of the problem, identify the applicable baseline document (i.e., Contract Data Requirement List (CDRL), Contract Clause, etc.) and provide a detailed explanation justifying the proposed course of action desired to resolve the problem. Insert sheets for applicable documents shall also be attached to facilitate change action in the event the Non-Engineering Change Proposal (NECP) is approved.

(e) Deviations and Waivers - In the event that a baseline design-related document requirement cannot be met, and a change to the baseline document is considered inappropriate, the Contractor shall submit a Request for Deviation

(RFD) or Request for Waiver (RFW), as applicable. DI-CMAN-80640C approved 30 Sep 2000 and MIL-HDBK-

61A of 7 Feb 2001 apply. The explanation of "need for deviation" should provide detailed justification and consequences of approval, to include technical details explaining the degree of non-compliance or effect on ship equipment or system operation constraints. In a similar manner, a waiver shall document an "as built" configuration that departs from baseline documentation and should include any proposed corrections or modifications to better meet the intent of the baseline document.

(f) Equitable Adjustments for Change Documentation Preparations - For its effort expended in preparing ECPs, NECPs, Deviations and Waivers, the Contractor shall receive equitable adjustment under the following circumstances:

(1) In the event the Contractor, on its own initiative, and without written request from the Contracting

Officer, develops a change document that is later disapproved by the Government, the Contractor shall bear the cost of this effort.

(2) To avoid such loss, and at its option, the Contractor may submit a "preliminary" document that outlines intent, but without detailed supporting documentation and request the Contracting Officer's approval for expenditure of effort to complete the detailed supporting documentation. In the event the Contracting Officer denies this request, the Contractor will bear the cost of development of the "preliminary" document, and shall make no further effort to complete detailed supporting documentation.

(3) In the event the Contracting Officer approves the Contractor's request to develop supporting documentation, the Contractor shall be equitably compensated for its effort for both the "preliminary" and "final" documentation, regardless of whether or not the change document is later approved.

(4) In the event the Contracting Officer requests in writing that the Contractor develop change documentation, the effort expended by the Contractor in developing such documentation shall be subject to equitable adjustment, regardless of whether or not the change document is later approved.

(5) In the event the Contractor, on its own initiative, and without written request from the Government, develops a change document that is later approved by the Contracting Officer, the cost of developing such documentation shall be incorporated in the contract modification that implements the change.

(6) Failure to agree to such equitable adjustment in contract price shall constitute a dispute, and shall be adjudicated in accordance with the requirements of the clause entitled "DISPUTES" (FAR 52.233-1).

(g) Any cost reduction proposal submitted pursuant to the clause entitled "VALUE ENGINEERING" (FAR

52.248-1) shall be submitted as a Code V Engineering Change Proposal (VECP). DI-CMAN-80639C approved 30

Sep 2000 and MIL-HDBK-61A of 7 Feb 2001 apply. Information required by the "VALUE ENGINEERING" clause shall also be submitted as part of the change request.

HQ C-2-0014 CONTRACTOR'S PROPOSAL (NAVSEA) (MAR 2001)

(a) Performance of this contract by the Contractor shall be conducted and performed in accordance with detailed obligations to which the Contractor committed itself in

Proposal dated in response to NAVSEA

Solicitation No. N66604-14-R-0921 .

(b) The technical volume(s) of the Contractor's proposal is incorporated by reference and hereby made subject to the provisions of the "ORDER OF PRECEDENCE" (FAR 52.215-

8) clause of this contract. Under the "ORDER OF PRECEDENCE" clause, the technical volume of the Contractor's proposal referenced herein is hereby designated as item (f) of the clause, following "the specification" in the order of precedence.

HQ C-2-0032 INFORMATION AND DATA FURNISHED BY THE

GOVERNMENT - ALTERNATE II (NAVSEA) (SEP 2009)

(a) NAVSEA Form 4340/2 or Schedule C, as applicable, Government Furnished

Information, attached hereto, incorporates by listing or specific reference, all the data or information which the Government has provided or will provide to the Contractor except for

(1) The specifications set forth in Section C, and

(2) Government specifications, including drawings and other Government technical documentation which are referenced directly or indirectly in the specifications set forth in

Section C and which are applicable to this contract as specifications, and which are generally available and provided to Contractors or prospective Contractors upon proper request, such as Federal or Military Specifications, and Standard Drawings, etc.

(b) Except for the specifications referred to in subparagraphs (a)(1) and (2) above, the

Government will not be obligated to provide to the Contractor any specification, drawing, technical documentation or other publication which is not listed or specifically referenced in

NAVSEA Form 4340/2 or Schedule C, as applicable, notwithstanding anything to the contrary in the specifications, the publications listed or specifically referenced in NAVSEA

Form 4340/2 or Schedule C, as applicable, the clause entitled "GOVERNMENT

PROPERTY" (FAR 52.245-1) or "GOVERNMENT PROPERTY INSTALLATION

OPERATION SERVICES " (FAR 52.245-2), as applicable, or any other term or condition of this contract.

(c)(1) The Contracting Officer may at any time by written order:

(i) delete, supersede, or revise, in whole or in part, data listed or specifically referenced in NAVSEA Form 4340/2 or Schedule C, as applicable; or

(ii) add items of data or information to NAVSEA Form 4340/2 or Schedule C, as applicable; or

(iii) establish or revise due dates for items of data or information in NAVSEA

Form 4340/2 or Schedule C, as applicable.

(2) If any action taken by the Contracting Officer pursuant to subparagraph (c)(1) immediately above causes an increase or decrease in the costs of, or the time required for, performance of any part of the work under this contract, the contractor may be entitled to an equitable adjustment in the contract amount and delivery schedule in accordance with the procedures provided for in the "CHANGES" clause of this contract.

HQ C-2-0051 SPECIFICATIONS AND STANDARDS (NAVSEA) (AUG 1994)

(a) Definitions.

(i) A "zero-tier reference" is a specification, standard, or drawing that is cited in the contract (including its attachments).

(ii) A "first-tier reference" is either: (1) a specification, standard, or drawing cited in a zero-tier reference, or (2) a specification cited in a first-tier drawing.

(b) Requirements.

All zero-tier and first-tier references, as defined above, are mandatory for use. All lower tier references shall be used for guidance only.

HQ C-2-0059 UPDATING SPECIFICATIONS AND STANDARDS (NAVSEA)

(AUG 1994)

If, during the performance of this or any other contract, the contractor believes that any contract contains outdated or different versions of any specifications or standards, the contractor may request that all of its contracts be updated to include the current version of the applicable specification or standard. Updating shall not affect the form, fit or function of any deliverable item or increase the cost/price of the item to the Government. The contractor should submit update requests to the Procuring Contracting Officer with copies to the Administrative Contracting Officer and cognizant program office representative for approval. The contractor shall perform the contract in accordance with the existing specifications and standards until notified of approval/disapproval by the Procuring

Contracting Officer. Any approved alternate specifications or standards will be incorporated into the contract.

Section D - Packaging and Marking

D24 PROHIBITED PACKING MATERIALS (JAN 2012)

The use of asbestos, excelsior, newspaper or shredded paper (all types including waxed paper, computer paper and similar hygroscopic or non-neutral material) is prohibited. In addition, loose fill polystyrene is prohibited for shipboard use.

D3 DELIVER TO ADDRESS (AUG 2006)

All deliveries will be made to the following address and annotated with the “Mark For” information:

Items: 0001- 0004, 0005-0020, 0042, 0044, 0046, 0048, 0050, 0062, 0064, 0066, 0068, 0070, 0072, 0074, 0076, 0078, 0080

Receiving Officer, Naval Station Newport

47 Chandler Street

Newport, RI 02841-1716

Mark For: NUWC Division, Newport –

P.O.#: N66604- TBD

Attn: TBD

Items: 0021 – 0040

Naval Undersea Warfare Center

Division Keyport

610 Dowell Street

Keyport, WA 78345-7610

Mark For: NUWC Division, Keyport –

Contract #: N66604-TBD

Attn: TBD

HQ D-1-0001 DATA PACKAGING LANGUAGE

Data to be delivered by Integrated Digital Environment (IDE) or other electronic media shall be as specified in the contract.

All unclassified data to be shipped shall be prepared for shipment in accordance with best commercial practice.

Classified reports, data, and documentation shall be prepared for shipment in accordance with National Industrial Security Program Operating Manual (NISPOM), DOD 5220.22-M dated 28 February 2006.

HQ D-1-0002 PACKAGING LANGUAGE (W/O MILITARY SPECIFICATIONS)

Item(s): 0001, 0003, 0005, 0007, 0009, 0011, 0013, 0015, 0017, 0019, 0021, 0023, 0025, 0027, 0029, 0031, 0033, 0035, 0037, and 0039 - The supplies furnished hereunder shall be packaged in accordance with best commercial practice.

HQ D-2-0002 PACKAGING LANGUAGE (W/OTHER THAN MIL-E-17555

REQUIREMENT)

For Level A packaging and Level A and Level B packing, use of polystyrene "loose-fill" material is prohibited for packaging and packing applications such as cushioning, filler, dunnage, etc.

For Level C packaging and packing and if specifications stated "Domestic shipment and early equipment installation of onboard repair parts", unless approved by the procuring activity (see 6.2 of the packaging specification), use of polystyrene "loose-fill" material for packaging and packing applications such as cushioning, filler, dunnage, etc. is prohibited.

When approved, unit packages and containers (interior and exterior) shall be marked or labeled as follows:

Contents cushioned, etc. with polystyrene "loose-fill" material. Not to be taken aboard ship. Remove and discard "loose-fill" before shipboard storage. If required, recushion, etc., with cellulosic material, bound fiber, fiberboard, transparent flexible cellular material, etc.

In Section 6, "Ordering Data" add "when polystyrene 'loose-fill' material is approved".

HQ D-2-0004 IDENTIFICATION MARKING OF PARTS (NAVSEA) (NOV 1996)

Identification marking of individual parts within the systems, equipments, assemblies, subassemblies, components, groups, sets or kits, and of spare and repair parts shall be done in accordance with applicable specifications and drawings. To the extent identification marking of such parts is not specified in applicable specifications or drawings, such marking shall be accomplished in accordance with the following:

(1) Parts shall be marked in accordance with generally accepted commercial practice.

(2) In cases where parts are so small as not to permit identification marking as provided above, such parts shall be appropriately coded so as to permit ready identification.

HQ D-2-0006 MARKING AND PACKING LIST(S) (NAVSEA) (NOV 1996)

(a) Marking. Shipments, shipping containers and palletized unit loads shall be marked in accordance with best commercial practice.

(b) Packing List(s). A packing list (DD Form 250 Material Inspection and Receiving Report may be used) identifying the contents of each shipment, shipping container or palletized unit load shall be provided by the Contractor with each shipment. When a contract line item identified under a single stock number includes an assortment of related items such as kit or set components, detached parts or accessories, installation hardware or material, the packing list(s) shall identify the assorted items.

Where assortment of related items is included in the shipping container, a packing list identifying the contents shall be furnished.

(c) Master Packing List. In addition to the requirements in paragraph (b) above, a master packing list shall be prepared where more than one shipment, shipping container or palletized unit load comprise the contract line item being shipped. The master packing list shall be attached to the number one container and so identified.

(d) Part Identification. All items within the kit, set, installation hardware or material shall be suitably segregated and identified within the unit pack(s) or shipping container by part number and/or national stock number.

HQ D-2-0008 MARKING OF REPORTS (NAVSEA) (SEP 1990)

All reports delivered by the Contractor to the Government under this contract shall prominently show on the cover of the report:

(1) name and business address of the Contractor

(2) contract number

(3) contract dollar amount

(4) whether the contract was competitively or non-competitively awarded

(5) sponsor:

(Name of Individual Sponsor)

(Name of Requiring Activity)

(City and State)

Section E - Inspection and Acceptance

INSPECTION AND ACCEPTANCE TERMS

Supplies/services will be inspected/accepted at:

CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY

0001 Destination Government Destination Government

0002 Destination Government Destination Government

0003 Destination Government Destination Government

0004 Destination Government Destination Government

0005 Destination Government Destination Government

0006 Destination Government Destination Government

0007 Destination Government Destination Government

0008 Destination Government Destination Government

0009 Destination Government Destination Government

0010 Destination Government Destination Government

0011 Destination Government Destination Government

0012 Destination Government Destination Government

0013 Destination Government Destination Government

0014 Destination Government Destination Government

0015 Destination Government Destination Government

0016 Destination Government Destination Government

0017 Destination Government Destination Government

0018 Destination Government Destination Government

0019 Destination Government Destination Government

0020 Destination Government Destination Government

0021 Origin Government Origin Government

0022 Destination Government Destination Government

0023 Origin Government Origin Government

0024 Destination Government Destination Government

0025 Origin Government Origin Government

0026 Destination Government Destination Government

0027 Origin Government Origin Government

0028 Destination Government Destination Government

0029 Origin Government Origin Government

0030 Destination Government Destination Government

0031 Origin Government Origin Government

0032 Destination Government Destination Government

0033 Origin Government Origin Government

0034 Destination Government Destination Government

0035 Origin Government Origin Government

0036 Destination Government Destination Government

0037 Origin Government Origin Government

0038 Destination Government Destination Government

0039 Origin Government Origin Government

0040 Destination Government Destination Government

0041 Origin Contractor Origin N/A

0042 Destination Government Destination Government

0043 Origin Contractor Origin N/A

0044 Destination Government Destination Government

0045 Origin Contractor Origin N/A

0046 Destination Government Destination Government

0047 Origin Contractor Origin N/A

0048 Destination Government Destination Government

0049 Origin Contractor Origin N/A

0050 Destination Government Destination Government

0061 Destination Government Destination Government

0062 Destination Government Destination Government

0063 Destination Government Destination Government

0064 Destination Government Destination Government

0065 Destination Government Destination Government

0066 Destination Government Destination Government

0067 Destination Government Destination Government

0068 Destination Government Destination Government

0069 Destination Government Destination Government

0070 Destination Government Destination Government

0071 Destination Government Destination Government

0072…