RFP Attachment 4 - Prime Pricing Model.xlsx

XLSX spreadsheet 185 KB Posted

Attached to
8(a) Incubator - Programmatic, Engineering and Logistics Support
Solicitation number
N65236-17-R-0002
Issued by

View the file

Other files

Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

INSTRUCTIONS

GENERAL INSTRUCTIONS AND INFORMATION

PRIME CONTRACTOR PRICING MODEL

CONTRACT VEHICLE:N65236-17-R-0002
PR NUMBER:N65236-17-R-0002
TITLE:8(a) Incubator
PRICIING MODEL VERSION:1.0
CONTRACT SPECIALIST:Alan Bates(843) 218-5108alan.bates@navy.mil

RESTRICTION ON DISCLOSURE AND USE OF DATA

This proposal includes data that shall not be disclosed outside the Government and shall not be duplicated, used, or disclosed--in whole or in part--for any purpose other than to evaluate this proposal. If, however, a contract is awarded to this offeror as a result of - or in connection with - the submission of this data, the Government shall have the right to duplicate, use, or disclose the data to the extent provided in the resulting contract.

This restriction does not limit the Government's right to use information contained in this proposal if it is obtained from another source without restriction. All data in this proposal are subject to this restriction.

ASSUMPTIONS:
This template assumes the following:
- Allocation base for FRINGE is unburdended labor
- Allocation base for OH is unburdened labor + FRINGE
- Allocation base for G&A is unburdened labor + FRINGE + OH
DIRECTIONS
1.)IGNORE any hidden columns or rows
2.)Populate ONLY cells highlighted yellow
3.)Populate indirect rates on CONTRACTOR DATA INPUT worksheet

- If applicable, modify descriptions (names) for FRINGE and OH pools to match with offeror's accounting practices.

- If additional pools are needed, add row to either FRINGE or OH section of CONTRACTOR DATA INPUT worksheet.

4.) Explain basis for indirect rates in space provided on CONTRACTOR DATA INPUT worksheet (column I).

Assumptions have been made by the Government that may not match with offeror's accounting practices.

5.) Select a FRINGE and OH pool (column F & G) on RATES worksheet.

If government allocation base assumptions do NOT match with offeror's accounting practices, modify the formulas in FRINGE, OH, and G&A columns. Document any and all changes on CONTRACTOR DATA INPUT worksheet

6.)Populate labor rates on RATES worksheet (column K).
7.)If offeror's labor category job titles are different from those in the solicitation, document on the OTHER LABOR DATA sheet.
8.)If labor rates are calculated by using any value other than 2,080 hours per year, document number of hours per year used to calculate the hourly rate for each labor category on OTHER LABOR DATA sheet.
9.)Transmit entire Pricing Model in EXCEL format (complete with active formulas) along with supporting narrative to Government in accordance with solicitation instructions.
HELPFUL HINTS & REMINDERS
1.)Be sure to change formulas on RATES worksheet if application base differentiates from Government assumption.
2.)Notify the contracting specialist if there are any questions or problems relating to Pricing Model.

&"Times New Roman,Regular"&F &"Times New Roman,Regular"&A &"Times New Roman,Regular"&P of &N

By checking this box you are verifying that you have read the instructions

CONTRACTOR DATA INPUT

SECTION 1 - Header Information
Contractor Name:
CAGE:
Contractor Proposal #:
Proposal Date:
Valid until:

SECTION 2 - Loading Factors

ESCALATIONBASEOPTION
1OPTION
2OPTION
3OPTION
ESCALATION - PROFESSIONAL0.00%0.00%0.00%0.00%Direct Labor
ESCALATION - SCLS0.00%0.00%0.00%0.00%Direct Labor
FRINGEBASEOPTION
1OPTION
2OPTION
3OPTION
4Allocation Base
<FRINGE #1>0.00%0.00%0.00%0.00%0.00%Direct Labor
<FRINGE #2>0.00%0.00%0.00%0.00%0.00%Direct Labor
<FRINGE #3>0.00%0.00%0.00%0.00%0.00%Direct Labor
<FRINGE #4>0.00%0.00%0.00%0.00%0.00%Direct Labor
<FRINGE #5>0.00%0.00%0.00%0.00%0.00%Direct Labor
OVERHEADBASEOPTION
1OPTION
2OPTION
3OPTION
4Allocation Base
<OH #1>0.00%0.00%0.00%0.00%0.00%Direct Labor + Fringe
<OH #2>0.00%0.00%0.00%0.00%0.00%Direct Labor + Fringe
<OH #3>0.00%0.00%0.00%0.00%0.00%Direct Labor + Fringe
<OH #4>0.00%0.00%0.00%0.00%0.00%Direct Labor + Fringe
<OH #5>0.00%0.00%0.00%0.00%0.00%Direct Labor + Fringe
G&A and OTHER BURDENSBASEOPTION
1OPTION
2OPTION
3OPTION
4Allocation Base
G&A Rate on Prime Labor0.00%0.00%0.00%0.00%0.00%Direct labor + Fringe + Overhead
G&A on Prime ODCs0.00%0.00%0.00%0.00%0.00%Prime ODCs
FEE
FEE on LABOR and ODCs0.00%

CONTRACTOR CHANGES TO THE PRICING MODEL AND PROPOSAL EXPLANATIONS

SUMMARY

Contract Number:N65236-17-R-0002
RFP Number:N65236-17-R-0002
Task Name:8(a) Incubator
Contractor Name:
Contractor Proposal #:
Proposal Date:
Valid until:
LABOR0001
PRIME CONTRACTOR LABOR COSTS
PRIME LABOR HRs:152,121.0
PRIME UNBURDENED LABOR COST$ - 0
PRIME FRINGE LABOR COST$ - 0
PRIME OH LABOR COST$ - 0
PRIME G&A LABOR COST$ - 0
SUBTOTAL PRIME LABOR:$ - 0
FEE PRIME LABOR:$ - 0
TOTAL PRIME LABOR + FEE:$ - 0
OTHER DIRECT COSTS0001
PRIME CONTRACTOR ODC COSTS
- MATERIAL:$ 36,000.00
- TRAVEL:$ 225,000.00
- MISCELLANEOUS ODCs:$ 36,000.00
- Additional ODC - (if applicable):$ - 0
SUBTOTAL PRIME ODCs:$ 297,000.00
PRIME G&A on PRIME ODCs:$ - 0
TOTAL PRIME ODCs (including G&A):$ 297,000.00
FEE on ODCs:$ - 0
TOTAL ODCs + FEE:$ - 0
TOTAL0001
GRAND TOTAL COST (LABOR + ODCs):$ 297,000.00
GRAND TOTAL FEE:$ - 0
FCCM (if applicable):$ - 0
GRAND TOTAL:$ 297,000.00

&"Times New Roman,Bold"&16&A&"Times New Roman,Regular"&10

&"Times New Roman,Regular"&F &A&"Times New Roman,Regular"Source Selection Information
See FAR 2.101 and 3.104&"Times New Roman,Regular"&P of &N

SUMMARY

RATES

BASE

TYPELABOR CATEGORYLOCATIONSITEFRINGE
POOLOH
POOLRG
HoursOT
HoursRATEFRINGEOHG&ARG

BURDENED

RATE OT

BURDENED

RATE TOTAL

COST

1.)ProfessionalAeronautical Information SpecialistCharleston, SCContractor1,090-$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
2.)ProfessionalAirfield Operations SpecialistCharleston, SCContractor1,090-$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
3.)ProfessionalEngineer/Scientist 1Charleston, SCContractor2,162-$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
4.)ProfessionalEngineer/Scientist 2Charleston, SCContractor3,271-$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
5.)ProfessionalEngineer/Scientist 3Charleston, SCContractor3,271-$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
6.)ProfessionalEngineer/Scientist 4Charleston, SCContractor4,380-$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
7.)ProfessionalEngineer/Scientist 5Charleston, SCContractor4,380-$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
8.)ProfessionalFlight Procedures Specialist 1Charleston, SCContractor1,090-$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
9.)ProfessionalFlight Procedures Specialist 2Charleston, SCContractor1,090-$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
10.)ProfessionalFlight Procedures Specialist 3Charleston, SCContractor1,090-$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
11.)ProfessionalIntelligence SpecialistCharleston, SCContractor1,090-$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
12.)ProfessionalEngineer/Scientist InternCharleston, SCContractor2,162-$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
13.)ProfessionalLogistician InternCharleston, SCContractor1,090-$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
14.)ProfessionalManagement Analyst InternCharleston, SCContractor1,090-$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
15.)ProfessionalLogistician 1Charleston, SCContractor1,090-$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
16.)ProfessionalLogistician 2Charleston, SCContractor2,162-$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
17.)ProfessionalLogistician 3Charleston, SCContractor3,271-$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
18.)ProfessionalLogistician 4Charleston, SCContractor3,271-$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
19.)ProfessionalLogistician 5Charleston, SCContractor3,271-$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
20.)ProfessionalManagement Analyst 1Charleston, SCContractor1,090-$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
21.)ProfessionalManagement Analyst 2Charleston, SCContractor3,271-$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
22.)ProfessionalManagement Analyst 3Charleston, SCContractor3,271-$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
23.)ProfessionalManagement and Program Specialist 1Charleston, SCContractor545-$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
24.)ProfessionalManagement and Program Specialist 2Charleston, SCContractor1,090-$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
25.)ProfessionalManagement and Program Specialist 3Charleston, SCContractor1,090-$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
26.)ProfessionalManagement ConsultantCharleston, SCContractor2,162-$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
27.)ProfessionalManagement Consultant (Senior)Charleston, SCContractor3,271-$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
28.)ProfessionalOperations SpecialistCharleston, SCContractor1,090-$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
29.)ProfessionalOperations Specialist (Senior)Charleston, SCContractor1,090-$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
30.)ProfessionalProgram ManagerCharleston, SCContractor1,920-$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
31.)ProfessionalProject ManagerCharleston, SCContractor2,914-$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
32.)ProfessionalSafety Specialist 1Charleston, SCContractor1,090-$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
33.)ProfessionalSafety Specialist 2Charleston, SCContractor1,090-$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
34.)ProfessionalSafety Specialist 3Charleston, SCContractor1,090-$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
35.)ProfessionalSafety Specialist 4Charleston, SCContractor1,090-$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
36.)ProfessionalSecurity Specialist 1Charleston, SCContractor545-$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
37.)ProfessionalSecurity Specialist 2Charleston, SCContractor1,090-$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
38.)ProfessionalSecurity Specialist 3Charleston, SCContractor545-$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
39.)ProfessionalSecurity Specialist 4Charleston, SCContractor545-$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
40.)ProfessionalSubject Matter Expert (SME) 1Charleston, SCContractor1,090-$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
41.)ProfessionalSubject Matter Expert (SME) 2Charleston, SCContractor2,162-$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
42.)ProfessionalSubject Matter Expert (SME) 3Charleston, SCContractor3,271-$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
43.)ProfessionalSubject Matter Expert (SME) 4Charleston, SCContractor3,271-$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
44.)ProfessionalSubject Matter Expert (SME) 5Charleston, SCContractor2,162-$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
45.)ProfessionalTechnical Analyst 1Charleston, SCContractor1,090-$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
46.)ProfessionalTechnical Analyst 2Charleston, SCContractor1,090-$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
47.)ProfessionalTechnical Analyst 3Charleston, SCContractor1,090-$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
48.)ProfessionalTechnical Analyst 4Charleston, SCContractor2,162-$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
49.)ProfessionalTechnical Writer/Editor 1Charleston, SCContractor545-$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
50.)ProfessionalTechnical Writer/Editor 2Charleston, SCContractor545-$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
51.)ProfessionalTechnical Writer/Editor 3Charleston, SCContractor1,090-$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
52.)ProfessionalTechnical Writer/Editor 4Charleston, SCContractor1,090-$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
53.)ProfessionalTraining Specialist 1Charleston, SCContractor545-$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
54.)ProfessionalTraining Specialist 2Charleston, SCContractor545-$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
55.)ProfessionalTraining Specialist 3Charleston, SCContractor545-$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
56.)ProfessionalTraining Specialist 4Charleston, SCContractor1,090-$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
57.)ProfessionalWeather ForecasterCharleston, SCContractor1,090-$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
58.)ProfessionalAeronautical Information SpecialistCharleston, SCGovernment1,090-$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
59.)ProfessionalAirfield Operations SpecialistCharleston, SCGovernment1,090-$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
60.)ProfessionalEngineer/Scientist 1Charleston, SCGovernment545-$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
61.)ProfessionalEngineer/Scientist 2Charleston, SCGovernment1,090-$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
62.)ProfessionalEngineer/Scientist 3Charleston, SCGovernment1,090-$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
63.)ProfessionalEngineer/Scientist 4Charleston, SCGovernment1,090-$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
64.)ProfessionalEngineer/Scientist 5Charleston, SCGovernment1,090-$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
65.)ProfessionalFlight Procedures Specialist 1Charleston, SCGovernment1,090-$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
66.)ProfessionalFlight Procedures Specialist 2Charleston, SCGovernment1,090-$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
67.)ProfessionalFlight Procedures Specialist 3Charleston, SCGovernment1,090-$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
68.)ProfessionalIntelligence SpecialistCharleston, SCGovernment1,090-$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
69.)ProfessionalEngineer/Scientist InternCharleston, SCGovernment1,090-$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
70.)ProfessionalLogistician InternCharleston, SCGovernment545-$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
71.)ProfessionalManagement Analyst InternCharleston, SCGovernment1,090-$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
72.)ProfessionalLogistician 1Charleston, SCGovernment545-$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
73.)ProfessionalLogistician 2Charleston, SCGovernment1,090-$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
74.)ProfessionalLogistician 3Charleston, SCGovernment2,162-$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
75.)ProfessionalLogistician 4Charleston, SCGovernment1,090-$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
76.)ProfessionalLogistician 5Charleston, SCGovernment1,090-$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
77.)ProfessionalManagement Analyst 1Charleston, SCGovernment1,090-$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
78.)ProfessionalManagement Analyst 2Charleston, SCGovernment1,090-$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
79.)ProfessionalManagement Analyst 3Charleston, SCGovernment1,090-$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
80.)ProfessionalManagement and Program Specialist 1Charleston, SCGovernment545-$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
81.)ProfessionalManagement and Program Specialist 2Charleston, SCGovernment1,090-$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
82.)ProfessionalManagement and Program Specialist 3Charleston, SCGovernment545-$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
83.)ProfessionalManagement ConsultantCharleston, SCGovernment1,090-$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
84.)ProfessionalManagement Consultant (Senior)Charleston, SCGovernment2,162-$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
85.)ProfessionalOperations SpecialistCharleston, SCGovernment545-$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
86.)ProfessionalOperations Specialist (Senior)Charleston, SCGovernment1,090-$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
87.)ProfessionalProgram ManagerCharleston, SCGovernment1,920-$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
88.)ProfessionalProject ManagerCharleston, SCGovernment2,162-$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
89.)ProfessionalSafety Specialist 1Charleston, SCGovernment545-$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
90.)ProfessionalSafety Specialist 2Charleston, SCGovernment1,090-$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
91.)ProfessionalSafety Specialist 3Charleston, SCGovernment545-$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
92.)ProfessionalSafety Specialist 4Charleston, SCGovernment545-$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
93.)ProfessionalSecurity Specialist 1Charleston, SCGovernment545-$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
94.)ProfessionalSecurity Specialist 2Charleston, SCGovernment545-$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
95.)ProfessionalSecurity Specialist 3Charleston, SCGovernment1,090-$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
96.)ProfessionalSecurity Specialist 4Charleston, SCGovernment1,090-$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
97.)ProfessionalSubject Matter Expert (SME) 1Charleston, SCGovernment545-$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
98.)ProfessionalSubject Matter Expert (SME) 2Charleston, SCGovernment1,090-$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
99.)ProfessionalSubject Matter Expert (SME) 3Charleston, SCGovernment1,090-$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
100.)ProfessionalSubject Matter Expert (SME) 4Charleston, SCGovernment545-$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
101.)ProfessionalSubject Matter Expert (SME) 5Charleston, SCGovernment545-$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
102.)ProfessionalTechnical Analyst 1Charleston, SCGovernment1,090-$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
103.)ProfessionalTechnical Analyst 2Charleston, SCGovernment2,162-$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
104.)ProfessionalTechnical Analyst 3Charleston, SCGovernment1,090-$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
105.)ProfessionalTechnical Analyst 4Charleston, SCGovernment1,090-$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
106.)ProfessionalTechnical Writer/Editor 1Charleston, SCGovernment545-$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
107.)ProfessionalTechnical Writer/Editor 2Charleston, SCGovernment545-$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
108.)ProfessionalTechnical Writer/Editor 3Charleston, SCGovernment1,090-$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
109.)ProfessionalTechnical Writer/Editor 4Charleston, SCGovernment545-$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
110.)ProfessionalTraining Specialist 1Charleston, SCGovernment545-$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
111.)ProfessionalTraining Specialist 2Charleston, SCGovernment545-$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
112.)ProfessionalTraining Specialist 3Charleston, SCGovernment1,090-$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
113.)ProfessionalTraining Specialist 4Charleston, SCGovernment545-$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
114.)ProfessionalWeather ForecasterCharleston, SCGovernment1,090-$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
152,121$ - 0

OTHER LABOR DATA

Note: Complete this section ONLY if proposed rates are calculated using other than 2,080 hours per year.
Was Uncompensated OT used to calculate the professional labor rates?
UNCOMPENSATED OVERTIME CALCULATION
PROFESSIONAL CATEGORYOFFEROR'S LABOR CATEGORYLABOR RATE
(1)ADJUSTED HOURLY RATE
(2)EFFECTIVE HRs

(3)

1.)Aeronautical Information Specialist=
2.)Airfield Operations Specialist=
3.)Engineer/Scientist 1=
4.)Engineer/Scientist 2=
5.)Engineer/Scientist 3=
6.)Engineer/Scientist 4=
7.)Engineer/Scientist 5=
8.)Flight Procedures Specialist 1=
9.)Flight Procedures Specialist 2=
10.)Flight Procedures Specialist 3=
11.)Intelligence Specialist=
12.)Engineer/Scientist Intern=
13.)Logistician Intern=
14.)Management Analyst Intern=
15.)Logistician 1=
16.)Logistician 2=
17.)Logistician 3=
18.)Logistician 4=
19.)Logistician 5=
20.)Management Analyst 1=
21.)Management Analyst 2=
22.)Management Analyst 3=
23.)Management and Program Specialist 1=
24.)Management and Program Specialist 2=
25.)Management and Program Specialist 3=
26.)Management Consultant=
27.)Management Consultant (Senior)=
28.)Operations Specialist=
29.)Operations Specialist (Senior)=
30.)Program Manager=
31.)Project Manager=
32.)Safety Specialist 1=
33.)Safety Specialist 2=
34.)Safety Specialist 3=
35.)Safety Specialist 4=
36.)Security Specialist 1=
37.)Security Specialist 2=
38.)Security Specialist 3=
39.)Security Specialist 4=
40.)Subject Matter Expert (SME) 1=
41.)Subject Matter Expert (SME) 2=
42.)Subject Matter Expert (SME) 3=
43.)Subject Matter Expert (SME) 4=
44.)Subject Matter Expert (SME) 5=
45.)Technical Analyst 1=
46.)Technical Analyst 2=
47.)Technical Analyst 3=
48.)Technical Analyst 4=
49.)Technical Writer/Editor 1=
50.)Technical Writer/Editor 2=
51.)Technical Writer/Editor 3=
52.)Technical Writer/Editor 4=
53.)Training Specialist 1=
54.)Training Specialist 2=
55.)Training Specialist 3=
56.)Training Specialist 4=
57.)Weather Forecaster=
UNCOMPENSATED OT POLICY

FORMULAS

FRINGE FORMULAOH FORMULAG&A FORMULAFRINGE FORMULAOH FORMULAG&A FORMULA
=IFERROR(K5*VLOOKUP($F5,FRINGE,2,FALSE),0)=IFERROR(SUM(K5,L5)*VLOOKUP($G5,OH,2,FALSE),0)=SUM(K5,L5,M5)*GA_PRIME_LABOR_1=IFERROR(K5*VLOOKUP($F5,FRINGE,2,FALSE),0)=IFERROR(SUM(K5,L5)*VLOOKUP($G5,OH,2,FALSE),0)=SUM(K5,L5,M5)*GA_PRIME_LABOR_1
=IFERROR(K6*VLOOKUP($F6,FRINGE,2,FALSE),0)=IFERROR(SUM(K6,L6)*VLOOKUP($G6,OH,2,FALSE),0)=SUM(K6,L6,M6)*GA_PRIME_LABOR_1=IFERROR(K6*VLOOKUP($F6,FRINGE,2,FALSE),0)=IFERROR(SUM(K6,L6)*VLOOKUP($G6,OH,2,FALSE),0)=SUM(K6,L6,M6)*GA_PRIME_LABOR_1
=IFERROR(K7*VLOOKUP($F7,FRINGE,2,FALSE),0)=IFERROR(SUM(K7,L7)*VLOOKUP($G7,OH,2,FALSE),0)=SUM(K7,L7,M7)*GA_PRIME_LABOR_1=IFERROR(K7*VLOOKUP($F7,FRINGE,2,FALSE),0)=IFERROR(SUM(K7,L7)*VLOOKUP($G7,OH,2,FALSE),0)=SUM(K7,L7,M7)*GA_PRIME_LABOR_1
=IFERROR(K8*VLOOKUP($F8,FRINGE,2,FALSE),0)=IFERROR(SUM(K8,L8)*VLOOKUP($G8,OH,2,FALSE),0)=SUM(K8,L8,M8)*GA_PRIME_LABOR_1=IFERROR(K8*VLOOKUP($F8,FRINGE,2,FALSE),0)=IFERROR(SUM(K8,L8)*VLOOKUP($G8,OH,2,FALSE),0)=SUM(K8,L8,M8)*GA_PRIME_LABOR_1
=IFERROR(K9*VLOOKUP($F9,FRINGE,2,FALSE),0)=IFERROR(SUM(K9,L9)*VLOOKUP($G9,OH,2,FALSE),0)=SUM(K9,L9,M9)*GA_PRIME_LABOR_1=IFERROR(K9*VLOOKUP($F9,FRINGE,2,FALSE),0)=IFERROR(SUM(K9,L9)*VLOOKUP($G9,OH,2,FALSE),0)=SUM(K9,L9,M9)*GA_PRIME_LABOR_1
=IFERROR(K10*VLOOKUP($F10,FRINGE,2,FALSE),0)=IFERROR(SUM(K10,L10)*VLOOKUP($G10,OH,2,FALSE),0)=SUM(K10,L10,M10)*GA_PRIME_LABOR_1=IFERROR(K10*VLOOKUP($F10,FRINGE,2,FALSE),0)=IFERROR(SUM(K10,L10)*VLOOKUP($G10,OH,2,FALSE),0)=SUM(K10,L10,M10)*GA_PRIME_LABOR_1
=IFERROR(K11*VLOOKUP($F11,FRINGE,2,FALSE),0)=IFERROR(SUM(K11,L11)*VLOOKUP($G11,OH,2,FALSE),0)=SUM(K11,L11,M11)*GA_PRIME_LABOR_1=IFERROR(K11*VLOOKUP($F11,FRINGE,2,FALSE),0)=IFERROR(SUM(K11,L11)*VLOOKUP($G11,OH,2,FALSE),0)=SUM(K11,L11,M11)*GA_PRIME_LABOR_1
=IFERROR(K12*VLOOKUP($F12,FRINGE,2,FALSE),0)=IFERROR(SUM(K12,L12)*VLOOKUP($G12,OH,2,FALSE),0)=SUM(K12,L12,M12)*GA_PRIME_LABOR_1=IFERROR(K12*VLOOKUP($F12,FRINGE,2,FALSE),0)=IFERROR(SUM(K12,L12)*VLOOKUP($G12,OH,2,FALSE),0)=SUM(K12,L12,M12)*GA_PRIME_LABOR_1
=IFERROR(K13*VLOOKUP($F13,FRINGE,2,FALSE),0)=IFERROR(SUM(K13,L13)*VLOOKUP($G13,OH,2,FALSE),0)=SUM(K13,L13,M13)*GA_PRIME_LABOR_1=IFERROR(K13*VLOOKUP($F13,FRINGE,2,FALSE),0)=IFERROR(SUM(K13,L13)*VLOOKUP($G13,OH,2,FALSE),0)=SUM(K13,L13,M13)*GA_PRIME_LABOR_1
=IFERROR(K14*VLOOKUP($F14,FRINGE,2,FALSE),0)=IFERROR(SUM(K14,L14)*VLOOKUP($G14,OH,2,FALSE),0)=SUM(K14,L14,M14)*GA_PRIME_LABOR_1=IFERROR(K14*VLOOKUP($F14,FRINGE,2,FALSE),0)=IFERROR(SUM(K14,L14)*VLOOKUP($G14,OH,2,FALSE),0)=SUM(K14,L14,M14)*GA_PRIME_LABOR_1
=IFERROR(K15*VLOOKUP($F15,FRINGE,2,FALSE),0)=IFERROR(SUM(K15,L15)*VLOOKUP($G15,OH,2,FALSE),0)=SUM(K15,L15,M15)*GA_PRIME_LABOR_1=IFERROR(K15*VLOOKUP($F15,FRINGE,2,FALSE),0)=IFERROR(SUM(K15,L15)*VLOOKUP($G15,OH,2,FALSE),0)=SUM(K15,L15,M15)*GA_PRIME_LABOR_1
=IFERROR(K16*VLOOKUP($F16,FRINGE,2,FALSE),0)=IFERROR(SUM(K16,L16)*VLOOKUP($G16,OH,2,FALSE),0)=SUM(K16,L16,M16)*GA_PRIME_LABOR_1=IFERROR(K16*VLOOKUP($F16,FRINGE,2,FALSE),0)=IFERROR(SUM(K16,L16)*VLOOKUP($G16,OH,2,FALSE),0)=SUM(K16,L16,M16)*GA_PRIME_LABOR_1
=IFERROR(K17*VLOOKUP($F17,FRINGE,2,FALSE),0)=IFERROR(SUM(K17,L17)*VLOOKUP($G17,OH,2,FALSE),0)=SUM(K17,L17,M17)*GA_PRIME_LABOR_1=IFERROR(K17*VLOOKUP($F17,FRINGE,2,FALSE),0)=IFERROR(SUM(K17,L17)*VLOOKUP($G17,OH,2,FALSE),0)=SUM(K17,L17,M17)*GA_PRIME_LABOR_1
=IFERROR(K18*VLOOKUP($F18,FRINGE,2,FALSE),0)=IFERROR(SUM(K18,L18)*VLOOKUP($G18,OH,2,FALSE),0)=SUM(K18,L18,M18)*GA_PRIME_LABOR_1=IFERROR(K18*VLOOKUP($F18,FRINGE,2,FALSE),0)=IFERROR(SUM(K18,L18)*VLOOKUP($G18,OH,2,FALSE),0)=SUM(K18,L18,M18)*GA_PRIME_LABOR_1
=IFERROR(K19*VLOOKUP($F19,FRINGE,2,FALSE),0)=IFERROR(SUM(K19,L19)*VLOOKUP($G19,OH,2,FALSE),0)=SUM(K19,L19,M19)*GA_PRIME_LABOR_1=IFERROR(K19*VLOOKUP($F19,FRINGE,2,FALSE),0)=IFERROR(SUM(K19,L19)*VLOOKUP($G19,OH,2,FALSE),0)=SUM(K19,L19,M19)*GA_PRIME_LABOR_1
=IFERROR(K20*VLOOKUP($F20,FRINGE,2,FALSE),0)=IFERROR(SUM(K20,L20)*VLOOKUP($G20,OH,2,FALSE),0)=SUM(K20,L20,M20)*GA_PRIME_LABOR_1=IFERROR(K20*VLOOKUP($F20,FRINGE,2,FALSE),0)=IFERROR(SUM(K20,L20)*VLOOKUP($G20,OH,2,FALSE),0)=SUM(K20,L20,M20)*GA_PRIME_LABOR_1
=IFERROR(K21*VLOOKUP($F21,FRINGE,2,FALSE),0)=IFERROR(SUM(K21,L21)*VLOOKUP($G21,OH,2,FALSE),0)=SUM(K21,L21,M21)*GA_PRIME_LABOR_1=IFERROR(K21*VLOOKUP($F21,FRINGE,2,FALSE),0)=IFERROR(SUM(K21,L21)*VLOOKUP($G21,OH,2,FALSE),0)=SUM(K21,L21,M21)*GA_PRIME_LABOR_1
=IFERROR(K22*VLOOKUP($F22,FRINGE,2,FALSE),0)=IFERROR(SUM(K22,L22)*VLOOKUP($G22,OH,2,FALSE),0)=SUM(K22,L22,M22)*GA_PRIME_LABOR_1=IFERROR(K22*VLOOKUP($F22,FRINGE,2,FALSE),0)=IFERROR(SUM(K22,L22)*VLOOKUP($G22,OH,2,FALSE),0)=SUM(K22,L22,M22)*GA_PRIME_LABOR_1
=IFERROR(K23*VLOOKUP($F23,FRINGE,2,FALSE),0)=IFERROR(SUM(K23,L23)*VLOOKUP($G23,OH,2,FALSE),0)=SUM(K23,L23,M23)*GA_PRIME_LABOR_1=IFERROR(K23*VLOOKUP($F23,FRINGE,2,FALSE),0)=IFERROR(SUM(K23,L23)*VLOOKUP($G23,OH,2,FALSE),0)=SUM(K23,L23,M23)*GA_PRIME_LABOR_1
=IFERROR(K24*VLOOKUP($F24,FRINGE,2,FALSE),0)=IFERROR(SUM(K24,L24)*VLOOKUP($G24,OH,2,FALSE),0)=SUM(K24,L24,M24)*GA_PRIME_LABOR_1=IFERROR(K24*VLOOKUP($F24,FRINGE,2,FALSE),0)=IFERROR(SUM(K24,L24)*VLOOKUP($G24,OH,2,FALSE),0)=SUM(K24,L24,M24)*GA_PRIME_LABOR_1
=IFERROR(K25*VLOOKUP($F25,FRINGE,2,FALSE),0)=IFERROR(SUM(K25,L25)*VLOOKUP($G25,OH,2,FALSE),0)=SUM(K25,L25,M25)*GA_PRIME_LABOR_1=IFERROR(K25*VLOOKUP($F25,FRINGE,2,FALSE),0)=IFERROR(SUM(K25,L25)*VLOOKUP($G25,OH,2,FALSE),0)=SUM(K25,L25,M25)*GA_PRIME_LABOR_1
=IFERROR(K26*VLOOKUP($F26,FRINGE,2,FALSE),0)=IFERROR(SUM(K26,L26)*VLOOKUP($G26,OH,2,FALSE),0)=SUM(K26,L26,M26)*GA_PRIME_LABOR_1=IFERROR(K26*VLOOKUP($F26,FRINGE,2,FALSE),0)=IFERROR(SUM(K26,L26)*VLOOKUP($G26,OH,2,FALSE),0)=SUM(K26,L26,M26)*GA_PRIME_LABOR_1
=IFERROR(K27*VLOOKUP($F27,FRINGE,2,FALSE),0)=IFERROR(SUM(K27,L27)*VLOOKUP($G27,OH,2,FALSE),0)=SUM(K27,L27,M27)*GA_PRIME_LABOR_1=IFERROR(K27*VLOOKUP($F27,FRINGE,2,FALSE),0)=IFERROR(SUM(K27,L27)*VLOOKUP($G27,OH,2,FALSE),0)=SUM(K27,L27,M27)*GA_PRIME_LABOR_1
=IFERROR(K28*VLOOKUP($F28,FRINGE,2,FALSE),0)=IFERROR(SUM(K28,L28)*VLOOKUP($G28,OH,2,FALSE),0)=SUM(K28,L28,M28)*GA_PRIME_LABOR_1=IFERROR(K28*VLOOKUP($F28,FRINGE,2,FALSE),0)=IFERROR(SUM(K28,L28)*VLOOKUP($G28,OH,2,FALSE),0)=SUM(K28,L28,M28)*GA_PRIME_LABOR_1
=IFERROR(K29*VLOOKUP($F29,FRINGE,2,FALSE),0)=IFERROR(SUM(K29,L29)*VLOOKUP($G29,OH,2,FALSE),0)=SUM(K29,L29,M29)*GA_PRIME_LABOR_1=IFERROR(K29*VLOOKUP($F29,FRINGE,2,FALSE),0)=IFERROR(SUM(K29,L29)*VLOOKUP($G29,OH,2,FALSE),0)=SUM(K29,L29,M29)*GA_PRIME_LABOR_1
=IFERROR(K30*VLOOKUP($F30,FRINGE,2,FALSE),0)=IFERROR(SUM(K30,L30)*VLOOKUP($G30,OH,2,FALSE),0)=SUM(K30,L30,M30)*GA_PRIME_LABOR_1=IFERROR(K30*VLOOKUP($F30,FRINGE,2,FALSE),0)=IFERROR(SUM(K30,L30)*VLOOKUP($G30,OH,2,FALSE),0)=SUM(K30,L30,M30)*GA_PRIME_LABOR_1
=IFERROR(K31*VLOOKUP($F31,FRINGE,2,FALSE),0)=IFERROR(SUM(K31,L31)*VLOOKUP($G31,OH,2,FALSE),0)=SUM(K31,L31,M31)*GA_PRIME_LABOR_1=IFERROR(K31*VLOOKUP($F31,FRINGE,2,FALSE),0)=IFERROR(SUM(K31,L31)*VLOOKUP($G31,OH,2,FALSE),0)=SUM(K31,L31,M31)*GA_PRIME_LABOR_1
=IFERROR(K32*VLOOKUP($F32,FRINGE,2,FALSE),0)=IFERROR(SUM(K32,L32)*VLOOKUP($G32,OH,2,FALSE),0)=SUM(K32,L32,M32)*GA_PRIME_LABOR_1=IFERROR(K32*VLOOKUP($F32,FRINGE,2,FALSE),0)=IFERROR(SUM(K32,L32)*VLOOKUP($G32,OH,2,FALSE),0)=SUM(K32,L32,M32)*GA_PRIME_LABOR_1
=IFERROR(K33*VLOOKUP($F33,FRINGE,2,FALSE),0)=IFERROR(SUM(K33,L33)*VLOOKUP($G33,OH,2,FALSE),0)=SUM(K33,L33,M33)*GA_PRIME_LABOR_1=IFERROR(K33*VLOOKUP($F33,FRINGE,2,FALSE),0)=IFERROR(SUM(K33,L33)*VLOOKUP($G33,OH,2,FALSE),0)=SUM(K33,L33,M33)*GA_PRIME_LABOR_1
=IFERROR(K34*VLOOKUP($F34,FRINGE,2,FALSE),0)=IFERROR(SUM(K34,L34)*VLOOKUP($G34,OH,2,FALSE),0)=SUM(K34,L34,M34)*GA_PRIME_LABOR_1=IFERROR(K34*VLOOKUP($F34,FRINGE,2,FALSE),0)=IFERROR(SUM(K34,L34)*VLOOKUP($G34,OH,2,FALSE),0)=SUM(K34,L34,M34)*GA_PRIME_LABOR_1
=IFERROR(K35*VLOOKUP($F35,FRINGE,2,FALSE),0)=IFERROR(SUM(K35,L35)*VLOOKUP($G35,OH,2,FALSE),0)=SUM(K35,L35,M35)*GA_PRIME_LABOR_1=IFERROR(K35*VLOOKUP($F35,FRINGE,2,FALSE),0)=IFERROR(SUM(K35,L35)*VLOOKUP($G35,OH,2,FALSE),0)=SUM(K35,L35,M35)*GA_PRIME_LABOR_1
=IFERROR(K36*VLOOKUP($F36,FRINGE,2,FALSE),0)=IFERROR(SUM(K36,L36)*VLOOKUP($G36,OH,2,FALSE),0)=SUM(K36,L36,M36)*GA_PRIME_LABOR_1=IFERROR(K36*VLOOKUP($F36,FRINGE,2,FALSE),0)=IFERROR(SUM(K36,L36)*VLOOKUP($G36,OH,2,FALSE),0)=SUM(K36,L36,M36)*GA_PRIME_LABOR_1
=IFERROR(K37*VLOOKUP($F37,FRINGE,2,FALSE),0)=IFERROR(SUM(K37,L37)*VLOOKUP($G37,OH,2,FALSE),0)=SUM(K37,L37,M37)*GA_PRIME_LABOR_1=IFERROR(K37*VLOOKUP($F37,FRINGE,2,FALSE),0)=IFERROR(SUM(K37,L37)*VLOOKUP($G37,OH,2,FALSE),0)=SUM(K37,L37,M37)*GA_PRIME_LABOR_1
=IFERROR(K38*VLOOKUP($F38,FRINGE,2,FALSE),0)=IFERROR(SUM(K38,L38)*VLOOKUP($G38,OH,2,FALSE),0)=SUM(K38,L38,M38)*GA_PRIME_LABOR_1=IFERROR(K38*VLOOKUP($F38,FRINGE,2,FALSE),0)=IFERROR(SUM(K38,L38)*VLOOKUP($G38,OH,2,FALSE),0)=SUM(K38,L38,M38)*GA_PRIME_LABOR_1
=IFERROR(K39*VLOOKUP($F39,FRINGE,2,FALSE),0)=IFERROR(SUM(K39,L39)*VLOOKUP($G39,OH,2,FALSE),0)=SUM(K39,L39,M39)*GA_PRIME_LABOR_1=IFERROR(K39*VLOOKUP($F39,FRINGE,2,FALSE),0)=IFERROR(SUM(K39,L39)*VLOOKUP($G39,OH,2,FALSE),0)=SUM(K39,L39,M39)*GA_PRIME_LABOR_1
=IFERROR(K40*VLOOKUP($F40,FRINGE,2,FALSE),0)=IFERROR(SUM(K40,L40)*VLOOKUP($G40,OH,2,FALSE),0)=SUM(K40,L40,M40)*GA_PRIME_LABOR_1=IFERROR(K40*VLOOKUP($F40,FRINGE,2,FALSE),0)=IFERROR(SUM(K40,L40)*VLOOKUP($G40,OH,2,FALSE),0)=SUM(K40,L40,M40)*GA_PRIME_LABOR_1
=IFERROR(K41*VLOOKUP($F41,FRINGE,2,FALSE),0)=IFERROR(SUM(K41,L41)*VLOOKUP($G41,OH,2,FALSE),0)=SUM(K41,L41,M41)*GA_PRIME_LABOR_1=IFERROR(K41*VLOOKUP($F41,FRINGE,2,FALSE),0)=IFERROR(SUM(K41,L41)*VLOOKUP($G41,OH,2,FALSE),0)=SUM(K41,L41,M41)*GA_PRIME_LABOR_1
=IFERROR(K42*VLOOKUP($F42,FRINGE,2,FALSE),0)=IFERROR(SUM(K42,L42)*VLOOKUP($G42,OH,2,FALSE),0)=SUM(K42,L42,M42)*GA_PRIME_LABOR_1=IFERROR(K42*VLOOKUP($F42,FRINGE,2,FALSE),0)=IFERROR(SUM(K42,L42)*VLOOKUP($G42,OH,2,FALSE),0)=SUM(K42,L42,M42)*GA_PRIME_LABOR_1
=IFERROR(K43*VLOOKUP($F43,FRINGE,2,FALSE),0)=IFERROR(SUM(K43,L43)*VLOOKUP($G43,OH,2,FALSE),0)=SUM(K43,L43,M43)*GA_PRIME_LABOR_1=IFERROR(K43*VLOOKUP($F43,FRINGE,2,FALSE),0)=IFERROR(SUM(K43,L43)*VLOOKUP($G43,OH,2,FALSE),0)=SUM(K43,L43,M43)*GA_PRIME_LABOR_1
=IFERROR(K44*VLOOKUP($F44,FRINGE,2,FALSE),0)=IFERROR(SUM(K44,L44)*VLOOKUP($G44,OH,2,FALSE),0)=SUM(K44,L44,M44)*GA_PRIME_LABOR_1=IFERROR(K44*VLOOKUP($F44,FRINGE,2,FALSE),0)=IFERROR(SUM(K44,L44)*VLOOKUP($G44,OH,2,FALSE),0)=SUM(K44,L44,M44)*GA_PRIME_LABOR_1
=IFERROR(K45*VLOOKUP($F45,FRINGE,2,FALSE),0)=IFERROR(SUM(K45,L45)*VLOOKUP($G45,OH,2,FALSE),0)=SUM(K45,L45,M45)*GA_PRIME_LABOR_1=IFERROR(K45*VLOOKUP($F45,FRINGE,2,FALSE),0)=IFERROR(SUM(K45,L45)*VLOOKUP($G45,OH,2,FALSE),0)=SUM(K45,L45,M45)*GA_PRIME_LABOR_1
=IFERROR(K46*VLOOKUP($F46,FRINGE,2,FALSE),0)=IFERROR(SUM(K46,L46)*VLOOKUP($G46,OH,2,FALSE),0)=SUM(K46,L46,M46)*GA_PRIME_LABOR_1=IFERROR(K46*VLOOKUP($F46,FRINGE,2,FALSE),0)=IFERROR(SUM(K46,L46)*VLOOKUP($G46,OH,2,FALSE),0)=SUM(K46,L46,M46)*GA_PRIME_LABOR_1
=IFERROR(K47*VLOOKUP($F47,FRINGE,2,FALSE),0)=IFERROR(SUM(K47,L47)*VLOOKUP($G47,OH,2,FALSE),0)=SUM(K47,L47,M47)*GA_PRIME_LABOR_1=IFERROR(K47*VLOOKUP($F47,FRINGE,2,FALSE),0)=IFERROR(SUM(K47,L47)*VLOOKUP($G47,OH,2,FALSE),0)=SUM(K47,L47,M47)*GA_PRIME_LABOR_1
=IFERROR(K48*VLOOKUP($F48,FRINGE,2,FALSE),0)=IFERROR(SUM(K48,L48)*VLOOKUP($G48,OH,2,FALSE),0)=SUM(K48,L48,M48)*GA_PRIME_LABOR_1=IFERROR(K48*VLOOKUP($F48,FRINGE,2,FALSE),0)=IFERROR(SUM(K48,L48)*VLOOKUP($G48,OH,2,FALSE),0)=SUM(K48,L48,M48)*GA_PRIME_LABOR_1
=IFERROR(K49*VLOOKUP($F49,FRINGE,2,FALSE),0)=IFERROR(SUM(K49,L49)*VLOOKUP($G49,OH,2,FALSE),0)=SUM(K49,L49,M49)*GA_PRIME_LABOR_1=IFERROR(K49*VLOOKUP($F49,FRINGE,2,FALSE),0)=IFERROR(SUM(K49,L49)*VLOOKUP($G49,OH,2,FALSE),0)=SUM(K49,L49,M49)*GA_PRIME_LABOR_1
=IFERROR(K50*VLOOKUP($F50,FRINGE,2,FALSE),0)=IFERROR(SUM(K50,L50)*VLOOKUP($G50,OH,2,FALSE),0)=SUM(K50,L50,M50)*GA_PRIME_LABOR_1=IFERROR(K50*VLOOKUP($F50,FRINGE,2,FALSE),0)=IFERROR(SUM(K50,L50)*VLOOKUP($G50,OH,2,FALSE),0)=SUM(K50,L50,M50)*GA_PRIME_LABOR_1
=IFERROR(K51*VLOOKUP($F51,FRINGE,2,FALSE),0)=IFERROR(SUM(K51,L51)*VLOOKUP($G51,OH,2,FALSE),0)=SUM(K51,L51,M51)*GA_PRIME_LABOR_1=IFERROR(K51*VLOOKUP($F51,FRINGE,2,FALSE),0)=IFERROR(SUM(K51,L51)*VLOOKUP($G51,OH,2,FALSE),0)=SUM(K51,L51,M51)*GA_PRIME_LABOR_1
=IFERROR(K52*VLOOKUP($F52,FRINGE,2,FALSE),0)=IFERROR(SUM(K52,L52)*VLOOKUP($G52,OH,2,FALSE),0)=SUM(K52,L52,M52)*GA_PRIME_LABOR_1=IFERROR(K52*VLOOKUP($F52,FRINGE,2,FALSE),0)=IFERROR(SUM(K52,L52)*VLOOKUP($G52,OH,2,FALSE),0)=SUM(K52,L52,M52)*GA_PRIME_LABOR_1
=IFERROR(K53*VLOOKUP($F53,FRINGE,2,FALSE),0)=IFERROR(SUM(K53,L53)*VLOOKUP($G53,OH,2,FALSE),0)=SUM(K53,L53,M53)*GA_PRIME_LABOR_1=IFERROR(K53*VLOOKUP($F53,FRINGE,2,FALSE),0)=IFERROR(SUM(K53,L53)*VLOOKUP($G53,OH,2,FALSE),0)=SUM(K53,L53,M53)*GA_PRIME_LABOR_1
=IFERROR(K54*VLOOKUP($F54,FRINGE,2,FALSE),0)=IFERROR(SUM(K54,L54)*VLOOKUP($G54,OH,2,FALSE),0)=SUM(K54,L54,M54)*GA_PRIME_LABOR_1=IFERROR(K54*VLOOKUP($F54,FRINGE,2,FALSE),0)=IFERROR(SUM(K54,L54)*VLOOKUP($G54,OH,2,FALSE),0)=SUM(K54,L54,M54)*GA_PRIME_LABOR_1
=IFERROR(K55*VLOOKUP($F55,FRINGE,2,FALSE),0)=IFERROR(SUM(K55,L55)*VLOOKUP($G55,OH,2,FALSE),0)=SUM(K55,L55,M55)*GA_PRIME_LABOR_1=IFERROR(K55*VLOOKUP($F55,FRINGE,2,FALSE),0)=IFERROR(SUM(K55,L55)*VLOOKUP($G55,OH,2,FALSE),0)=SUM(K55,L55,M55)*GA_PRIME_LABOR_1
=IFERROR(K56*VLOOKUP($F56,FRINGE,2,FALSE),0)=IFERROR(SUM(K56,L56)*VLOOKUP($G56,OH,2,FALSE),0)=SUM(K56,L56,M56)*GA_PRIME_LABOR_1=IFERROR(K56*VLOOKUP($F56,FRINGE,2,FALSE),0)=IFERROR(SUM(K56,L56)*VLOOKUP($G56,OH,2,FALSE),0)=SUM(K56,L56,M56)*GA_PRIME_LABOR_1
=IFERROR(K57*VLOOKUP($F57,FRINGE,2,FALSE),0)=IFERROR(SUM(K57,L57)*VLOOKUP($G57,OH,2,FALSE),0)=SUM(K57,L57,M57)*GA_PRIME_LABOR_1=IFERROR(K57*VLOOKUP($F57,FRINGE,2,FALSE),0)=IFERROR(SUM(K57,L57)*VLOOKUP($G57,OH,2,FALSE),0)=SUM(K57,L57,M57)*GA_PRIME_LABOR_1
=IFERROR(K58*VLOOKUP($F58,FRINGE,2,FALSE),0)=IFERROR(SUM(K58,L58)*VLOOKUP($G58,OH,2,FALSE),0)=SUM(K58,L58,M58)*GA_PRIME_LABOR_1=IFERROR(K58*VLOOKUP($F58,FRINGE,2,FALSE),0)=IFERROR(SUM(K58,L58)*VLOOKUP($G58,OH,2,FALSE),0)=SUM(K58,L58,M58)*GA_PRIME_LABOR_1
=IFERROR(K59*VLOOKUP($F59,FRINGE,2,FALSE),0)=IFERROR(SUM(K59,L59)*VLOOKUP($G59,OH,2,FALSE),0)=SUM(K59,L59,M59)*GA_PRIME_LABOR_1=IFERROR(K59*VLOOKUP($F59,FRINGE,2,FALSE),0)=IFERROR(SUM(K59,L59)*VLOOKUP($G59,OH,2,FALSE),0)=SUM(K59,L59,M59)*GA_PRIME_LABOR_1
=IFERROR(K60*VLOOKUP($F60,FRINGE,2,FALSE),0)=IFERROR(SUM(K60,L60)*VLOOKUP($G60,OH,2,FALSE),0)=SUM(K60,L60,M60)*GA_PRIME_LABOR_1=IFERROR(K60*VLOOKUP($F60,FRINGE,2,FALSE),0)=IFERROR(SUM(K60,L60)*VLOOKUP($G60,OH,2,FALSE),0)=SUM(K60,L60,M60)*GA_PRIME_LABOR_1
=IFERROR(K61*VLOOKUP($F61,FRINGE,2,FALSE),0)=IFERROR(SUM(K61,L61)*VLOOKUP($G61,OH,2,FALSE),0)=SUM(K61,L61,M61)*GA_PRIME_LABOR_1=IFERROR(K61*VLOOKUP($F61,FRINGE,2,FALSE),0)=IFERROR(SUM(K61,L61)*VLOOKUP($G61,OH,2,FALSE),0)=SUM(K61,L61,M61)*GA_PRIME_LABOR_1
=IFERROR(K62*VLOOKUP($F62,FRINGE,2,FALSE),0)=IFERROR(SUM(K62,L62)*VLOOKUP($G62,OH,2,FALSE),0)=SUM(K62,L62,M62)*GA_PRIME_LABOR_1=IFERROR(K62*VLOOKUP($F62,FRINGE,2,FALSE),0)=IFERROR(SUM(K62,L62)*VLOOKUP($G62,OH,2,FALSE),0)=SUM(K62,L62,M62)*GA_PRIME_LABOR_1
=IFERROR(K63*VLOOKUP($F63,FRINGE,2,FALSE),0)=IFERROR(SUM(K63,L63)*VLOOKUP($G63,OH,2,FALSE),0)=SUM(K63,L63,M63)*GA_PRIME_LABOR_1=IFERROR(K63*VLOOKUP($F63,FRINGE,2,FALSE),0)=IFERROR(SUM(K63,L63)*VLOOKUP($G63,OH,2,FALSE),0)=SUM(K63,L63,M63)*GA_PRIME_LABOR_1
=IFERROR(K64*VLOOKUP($F64,FRINGE,2,FALSE),0)=IFERROR(SUM(K64,L64)*VLOOKUP($G64,OH,2,FALSE),0)=SUM(K64,L64,M64)*GA_PRIME_LABOR_1=IFERROR(K64*VLOOKUP($F64,FRINGE,2,FALSE),0)=IFERROR(SUM(K64,L64)*VLOOKUP($G64,OH,2,FALSE),0)=SUM(K64,L64,M64)*GA_PRIME_LABOR_1
=IFERROR(K65*VLOOKUP($F65,FRINGE,2,FALSE),0)=IFERROR(SUM(K65,L65)*VLOOKUP($G65,OH,2,FALSE),0)=SUM(K65,L65,M65)*GA_PRIME_LABOR_1=IFERROR(K65*VLOOKUP($F65,FRINGE,2,FALSE),0)=IFERROR(SUM(K65,L65)*VLOOKUP($G65,OH,2,FALSE),0)=SUM(K65,L65,M65)*GA_PRIME_LABOR_1
=IFERROR(K66*VLOOKUP($F66,FRINGE,2,FALSE),0)=IFERROR(SUM(K66,L66)*VLOOKUP($G66,OH,2,FALSE),0)=SUM(K66,L66,M66)*GA_PRIME_LABOR_1=IFERROR(K66*VLOOKUP($F66,FRINGE,2,FALSE),0)=IFERROR(SUM(K66,L66)*VLOOKUP($G66,OH,2,FALSE),0)=SUM(K66,L66,M66)*GA_PRIME_LABOR_1
=IFERROR(K67*VLOOKUP($F67,FRINGE,2,FALSE),0)=IFERROR(SUM(K67,L67)*VLOOKUP($G67,OH,2,FALSE),0)=SUM(K67,L67,M67)*GA_PRIME_LABOR_1=IFERROR(K67*VLOOKUP($F67,FRINGE,2,FALSE),0)=IFERROR(SUM(K67,L67)*VLOOKUP($G67,OH,2,FALSE),0)=SUM(K67,L67,M67)*GA_PRIME_LABOR_1
=IFERROR(K68*VLOOKUP($F68,FRINGE,2,FALSE),0)=IFERROR(SUM(K68,L68)*VLOOKUP($G68,OH,2,FALSE),0)=SUM(K68,L68,M68)*GA_PRIME_LABOR_1=IFERROR(K68*VLOOKUP($F68,FRINGE,2,FALSE),0)=IFERROR(SUM(K68,L68)*VLOOKUP($G68,OH,2,FALSE),0)=SUM(K68,L68,M68)*GA_PRIME_LABOR_1
=IFERROR(K69*VLOOKUP($F69,FRINGE,2,FALSE),0)=IFERROR(SUM(K69,L69)*VLOOKUP($G69,OH,2,FALSE),0)=SUM(K69,L69,M69)*GA_PRIME_LABOR_1=IFERROR(K69*VLOOKUP($F69,FRINGE,2,FALSE),0)=IFERROR(SUM(K69,L69)*VLOOKUP($G69,OH,2,FALSE),0)=SUM(K69,L69,M69)*GA_PRIME_LABOR_1
=IFERROR(K70*VLOOKUP($F70,FRINGE,2,FALSE),0)=IFERROR(SUM(K70,L70)*VLOOKUP($G70,OH,2,FALSE),0)=SUM(K70,L70,M70)*GA_PRIME_LABOR_1=IFERROR(K70*VLOOKUP($F70,FRINGE,2,FALSE),0)=IFERROR(SUM(K70,L70)*VLOOKUP($G70,OH,2,FALSE),0)=SUM(K70,L70,M70)*GA_PRIME_LABOR_1
=IFERROR(K71*VLOOKUP($F71,FRINGE,2,FALSE),0)=IFERROR(SUM(K71,L71)*VLOOKUP($G71,OH,2,FALSE),0)=SUM(K71,L71,M71)*GA_PRIME_LABOR_1=IFERROR(K71*VLOOKUP($F71,FRINGE,2,FALSE),0)=IFERROR(SUM(K71,L71)*VLOOKUP($G71,OH,2,FALSE),0)=SUM(K71,L71,M71)*GA_PRIME_LABOR_1
=IFERROR(K72*VLOOKUP($F72,FRINGE,2,FALSE),0)=IFERROR(SUM(K72,L72)*VLOOKUP($G72,OH,2,FALSE),0)=SUM(K72,L72,M72)*GA_PRIME_LABOR_1=IFERROR(K72*VLOOKUP($F72,FRINGE,2,FALSE),0)=IFERROR(SUM(K72,L72)*VLOOKUP($G72,OH,2,FALSE),0)=SUM(K72,L72,M72)*GA_PRIME_LABOR_1
=IFERROR(K73*VLOOKUP($F73,FRINGE,2,FALSE),0)=IFERROR(SUM(K73,L73)*VLOOKUP($G73,OH,2,FALSE),0)=SUM(K73,L73,M73)*GA_PRIME_LABOR_1=IFERROR(K73*VLOOKUP($F73,FRINGE,2,FALSE),0)=IFERROR(SUM(K73,L73)*VLOOKUP($G73,OH,2,FALSE),0)=SUM(K73,L73,M73)*GA_PRIME_LABOR_1
=IFERROR(K74*VLOOKUP($F74,FRINGE,2,FALSE),0)=IFERROR(SUM(K74,L74)*VLOOKUP($G74,OH,2,FALSE),0)=SUM(K74,L74,M74)*GA_PRIME_LABOR_1=IFERROR(K74*VLOOKUP($F74,FRINGE,2,FALSE),0)=IFERROR(SUM(K74,L74)*VLOOKUP($G74,OH,2,FALSE),0)=SUM(K74,L74,M74)*GA_PRIME_LABOR_1
=IFERROR(K75*VLOOKUP($F75,FRINGE,2,FALSE),0)=IFERROR(SUM(K75,L75)*VLOOKUP($G75,OH,2,FALSE),0)=SUM(K75,L75,M75)*GA_PRIME_LABOR_1=IFERROR(K75*VLOOKUP($F75,FRINGE,2,FALSE),0)=IFERROR(SUM(K75,L75)*VLOOKUP($G75,OH,2,FALSE),0)=SUM(K75,L75,M75)*GA_PRIME_LABOR_1
=IFERROR(K76*VLOOKUP($F76,FRINGE,2,FALSE),0)=IFERROR(SUM(K76,L76)*VLOOKUP($G76,OH,2,FALSE),0)=SUM(K76,L76,M76)*GA_PRIME_LABOR_1=IFERROR(K76*VLOOKUP($F76,FRINGE,2,FALSE),0)=IFERROR(SUM(K76,L76)*VLOOKUP($G76,OH,2,FALSE),0)=SUM(K76,L76,M76)*GA_PRIME_LABOR_1
=IFERROR(K77*VLOOKUP($F77,FRINGE,2,FALSE),0)=IFERROR(SUM(K77,L77)*VLOOKUP($G77,OH,2,FALSE),0)=SUM(K77,L77,M77)*GA_PRIME_LABOR_1=IFERROR(K77*VLOOKUP($F77,FRINGE,2,FALSE),0)=IFERROR(SUM(K77,L77)*VLOOKUP($G77,OH,2,FALSE),0)=SUM(K77,L77,M77)*GA_PRIME_LABOR_1
=IFERROR(K78*VLOOKUP($F78,FRINGE,2,FALSE),0)=IFERROR(SUM(K78,L78)*VLOOKUP($G78,OH,2,FALSE),0)=SUM(K78,L78,M78)*GA_PRIME_LABOR_1=IFERROR(K78*VLOOKUP($F78,FRINGE,2,FALSE),0)=IFERROR(SUM(K78,L78)*VLOOKUP($G78,OH,2,FALSE),0)=SUM(K78,L78,M78)*GA_PRIME_LABOR_1
=IFERROR(K79*VLOOKUP($F79,FRINGE,2,FALSE),0)=IFERROR(SUM(K79,L79)*VLOOKUP($G79,OH,2,FALSE),0)=SUM(K79,L79,M79)*GA_PRIME_LABOR_1=IFERROR(K79*VLOOKUP($F79,FRINGE,2,FALSE),0)=IFERROR(SUM(K79,L79)*VLOOKUP($G79,OH,2,FALSE),0)=SUM(K79,L79,M79)*GA_PRIME_LABOR_1
=IFERROR(K80*VLOOKUP($F80,FRINGE,2,FALSE),0)=IFERROR(SUM(K80,L80)*VLOOKUP($G80,OH,2,FALSE),0)=SUM(K80,L80,M80)*GA_PRIME_LABOR_1=IFERROR(K80*VLOOKUP($F80,FRINGE,2,FALSE),0)=IFERROR(SUM(K80,L80)*VLOOKUP($G80,OH,2,FALSE),0)=SUM(K80,L80,M80)*GA_PRIME_LABOR_1
=IFERROR(K81*VLOOKUP($F81,FRINGE,2,FALSE),0)=IFERROR(SUM(K81,L81)*VLOOKUP($G81,OH,2,FALSE),0)=SUM(K81,L81,M81)*GA_PRIME_LABOR_1=IFERROR(K81*VLOOKUP($F81,FRINGE,2,FALSE),0)=IFERROR(SUM(K81,L81)*VLOOKUP($G81,OH,2,FALSE),0)=SUM(K81,L81,M81)*GA_PRIME_LABOR_1
=IFERROR(K82*VLOOKUP($F82,FRINGE,2,FALSE),0)=IFERROR(SUM(K82,L82)*VLOOKUP($G82,OH,2,FALSE),0)=SUM(K82,L82,M82)*GA_PRIME_LABOR_1=IFERROR(K82*VLOOKUP($F82,FRINGE,2,FALSE),0)=IFERROR(SUM(K82,L82)*VLOOKUP($G82,OH,2,FALSE),0)=SUM(K82,L82,M82)*GA_PRIME_LABOR_1
=IFERROR(K83*VLOOKUP($F83,FRINGE,2,FALSE),0)=IFERROR(SUM(K83,L83)*VLOOKUP($G83,OH,2,FALSE),0)=SUM(K83,L83,M83)*GA_PRIME_LABOR_1=IFERROR(K83*VLOOKUP($F83,FRINGE,2,FALSE),0)=IFERROR(SUM(K83,L83)*VLOOKUP($G83,OH,2,FALSE),0)=SUM(K83,L83,M83)*GA_PRIME_LABOR_1
=IFERROR(K84*VLOOKUP($F84,FRINGE,2,FALSE),0)=IFERROR(SUM(K84,L84)*VLOOKUP($G84,OH,2,FALSE),0)=SUM(K84,L84,M84)*GA_PRIME_LABOR_1=IFERROR(K84*VLOOKUP($F84,FRINGE,2,FALSE),0)=IFERROR(SUM(K84,L84)*VLOOKUP($G84,OH,2,FALSE),0)=SUM(K84,L84,M84)*GA_PRIME_LABOR_1
=IFERROR(K85*VLOOKUP($F85,FRINGE,2,FALSE),0)=IFERROR(SUM(K85,L85)*VLOOKUP($G85,OH,2,FALSE),0)=SUM(K85,L85,M85)*GA_PRIME_LABOR_1=IFERROR(K85*VLOOKUP($F85,FRINGE,2,FALSE),0)=IFERROR(SUM(K85,L85)*VLOOKUP($G85,OH,2,FALSE),0)=SUM(K85,L85,M85)*GA_PRIME_LABOR_1
=IFERROR(K86*VLOOKUP($F86,FRINGE,2,FALSE),0)=IFERROR(SUM(K86,L86)*VLOOKUP($G86,OH,2,FALSE),0)=SUM(K86,L86,M86)*GA_PRIME_LABOR_1=IFERROR(K86*VLOOKUP($F86,FRINGE,2,FALSE),0)=IFERROR(SUM(K86,L86)*VLOOKUP($G86,OH,2,FALSE),0)=SUM(K86,L86,M86)*GA_PRIME_LABOR_1
=IFERROR(K87*VLOOKUP($F87,FRINGE,2,FALSE),0)=IFERROR(SUM(K87,L87)*VLOOKUP($G87,OH,2,FALSE),0)=SUM(K87,L87,M87)*GA_PRIME_LABOR_1=IFERROR(K87*VLOOKUP($F87,FRINGE,2,FALSE),0)=IFERROR(SUM(K87,L87)*VLOOKUP($G87,OH,2,FALSE),0)=SUM(K87,L87,M87)*GA_PRIME_LABOR_1
=IFERROR(K88*VLOOKUP($F88,FRINGE,2,FALSE),0)=IFERROR(SUM(K88,L88)*VLOOKUP($G88,OH,2,FALSE),0)=SUM(K88,L88,M88)*GA_PRIME_LABOR_1=IFERROR(K88*VLOOKUP($F88,FRINGE,2,FALSE),0)=IFERROR(SUM(K88,L88)*VLOOKUP($G88,OH,2,FALSE),0)=SUM(K88,L88,M88)*GA_PRIME_LABOR_1
=IFERROR(K89*VLOOKUP($F89,FRINGE,2,FALSE),0)=IFERROR(SUM(K89,L89)*VLOOKUP($G89,OH,2,FALSE),0)=SUM(K89,L89,M89)*GA_PRIME_LABOR_1=IFERROR(K89*VLOOKUP($F89,FRINGE,2,FALSE),0)=IFERROR(SUM(K89,L89)*VLOOKUP($G89,OH,2,FALSE),0)=SUM(K89,L89,M89)*GA_PRIME_LABOR_1
=IFERROR(K90*VLOOKUP($F90,FRINGE,2,FALSE),0)=IFERROR(SUM(K90,L90)*VLOOKUP($G90,OH,2,FALSE),0)=SUM(K90,L90,M90)*GA_PRIME_LABOR_1=IFERROR(K90*VLOOKUP($F90,FRINGE,2,FALSE),0)=IFERROR(SUM(K90,L90)*VLOOKUP($G90,OH,2,FALSE),0)=SUM(K90,L90,M90)*GA_PRIME_LABOR_1
=IFERROR(K91*VLOOKUP($F91,FRINGE,2,FALSE),0)=IFERROR(SUM(K91,L91)*VLOOKUP($G91,OH,2,FALSE),0)=SUM(K91,L91,M91)*GA_PRIME_LABOR_1=IFERROR(K91*VLOOKUP($F91,FRINGE,2,FALSE),0)=IFERROR(SUM(K91,L91)*VLOOKUP($G91,OH,2,FALSE),0)=SUM(K91,L91,M91)*GA_PRIME_LABOR_1
=IFERROR(K92*VLOOKUP($F92,FRINGE,2,FALSE),0)=IFERROR(SUM(K92,L92)*VLOOKUP($G92,OH,2,FALSE),0)=SUM(K92,L92,M92)*GA_PRIME_LABOR_1=IFERROR(K92*VLOOKUP($F92,FRINGE,2,FALSE),0)=IFERROR(SUM(K92,L92)*VLOOKUP($G92,OH,2,FALSE),0)=SUM(K92,L92,M92)*GA_PRIME_LABOR_1
=IFERROR(K93*VLOOKUP($F93,FRINGE,2,FALSE),0)=IFERROR(SUM(K93,L93)*VLOOKUP($G93,OH,2,FALSE),0)=SUM(K93,L93,M93)*GA_PRIME_LABOR_1=IFERROR(K93*VLOOKUP($F93,FRINGE,2,FALSE),0)=IFERROR(SUM(K93,L93)*VLOOKUP($G93,OH,2,FALSE),0)=SUM(K93,L93,M93)*GA_PRIME_LABOR_1
=IFERROR(K94*VLOOKUP($F94,FRINGE,2,FALSE),0)=IFERROR(SUM(K94,L94)*VLOOKUP($G94,OH,2,FALSE),0)=SUM(K94,L94,M94)*GA_PRIME_LABOR_1=IFERROR(K94*VLOOKUP($F94,FRINGE,2,FALSE),0)=IFERROR(SUM(K94,L94)*VLOOKUP($G94,OH,2,FALSE),0)=SUM(K94,L94,M94)*GA_PRIME_LABOR_1
=IFERROR(K95*VLOOKUP($F95,FRINGE,2,FALSE),0)=IFERROR(SUM(K95,L95)*VLOOKUP($G95,OH,2,FALSE),0)=SUM(K95,L95,M95)*GA_PRIME_LABOR_1=IFERROR(K95*VLOOKUP($F95,FRINGE,2,FALSE),0)=IFERROR(SUM(K95,L95)*VLOOKUP($G95,OH,2,FALSE),0)=SUM(K95,L95,M95)*GA_PRIME_LABOR_1
=IFERROR(K96*VLOOKUP($F96,FRINGE,2,FALSE),0)=IFERROR(SUM(K96,L96)*VLOOKUP($G96,OH,2,FALSE),0)=SUM(K96,L96,M96)*GA_PRIME_LABOR_1=IFERROR(K96*VLOOKUP($F96,FRINGE,2,FALSE),0)=IFERROR(SUM(K96,L96)*VLOOKUP($G96,OH,2,FALSE),0)=SUM(K96,L96,M96)*GA_PRIME_LABOR_1
=IFERROR(K97*VLOOKUP($F97,FRINGE,2,FALSE),0)=IFERROR(SUM(K97,L97)*VLOOKUP($G97,OH,2,FALSE),0)=SUM(K97,L97,M97)*GA_PRIME_LABOR_1=IFERROR(K97*VLOOKUP($F97,FRINGE,2,FALSE),0)=IFERROR(SUM(K97,L97)*VLOOKUP($G97,OH,2,FALSE),0)=SUM(K97,L97,M97)*GA_PRIME_LABOR_1
=IFERROR(K98*VLOOKUP($F98,FRINGE,2,FALSE),0)=IFERROR(SUM(K98,L98)*VLOOKUP($G98,OH,2,FALSE),0)=SUM(K98,L98,M98)*GA_PRIME_LABOR_1=IFERROR(K98*VLOOKUP($F98,FRINGE,2,FALSE),0)=IFERROR(SUM(K98,L98)*VLOOKUP($G98,OH,2,FALSE),0)=SUM(K98,L98,M98)*GA_PRIME_LABOR_1
=IFERROR(K99*VLOOKUP($F99,FRINGE,2,FALSE),0)=IFERROR(SUM(K99,L99)*VLOOKUP($G99,OH,2,FALSE),0)=SUM(K99,L99,M99)*GA_PRIME_LABOR_1=IFERROR(K99*VLOOKUP($F99,FRINGE,2,FALSE),0)=IFERROR(SUM(K99,L99)*VLOOKUP($G99,OH,2,FALSE),0)=SUM(K99,L99,M99)*GA_PRIME_LABOR_1
=IFERROR(K100*VLOOKUP($F100,FRINGE,2,FALSE),0)=IFERROR(SUM(K100,L100)*VLOOKUP($G100,OH,2,FALSE),0)=SUM(K100,L100,M100)*GA_PRIME_LABOR_1=IFERROR(K100*VLOOKUP($F100,FRINGE,2,FALSE),0)=IFERROR(SUM(K100,L100)*VLOOKUP($G100,OH,2,FALSE),0)=SUM(K100,L100,M100)*GA_PRIME_LABOR_1
=IFERROR(K101*VLOOKUP($F101,FRINGE,2,FALSE),0)=IFERROR(SUM(K101,L101)*VLOOKUP($G101,OH,2,FALSE),0)=SUM(K101,L101,M101)*GA_PRIME_LABOR_1=IFERROR(K101*VLOOKUP($F101,FRINGE,2,FALSE),0)=IFERROR(SUM(K101,L101)*VLOOKUP($G101,OH,2,FALSE),0)=SUM(K101,L101,M101)*GA_PRIME_LABOR_1
=IFERROR(K102*VLOOKUP($F102,FRINGE,2,FALSE),0)=IFERROR(SUM(K102,L102)*VLOOKUP($G102,OH,2,FALSE),0)=SUM(K102,L102,M102)*GA_PRIME_LABOR_1=IFERROR(K102*VLOOKUP($F102,FRINGE,2,FALSE),0)=IFERROR(SUM(K102,L102)*VLOOKUP($G102,OH,2,FALSE),0)=SUM(K102,L102,M102)*GA_PRIME_LABOR_1
=IFERROR(K103*VLOOKUP($F103,FRINGE,2,FALSE),0)=IFERROR(SUM(K103,L103)*VLOOKUP($G103,OH,2,FALSE),0)=SUM(K103,L103,M103)*GA_PRIME_LABOR_1=IFERROR(K103*VLOOKUP($F103,FRINGE,2,FALSE),0)=IFERROR(SUM(K103,L103)*VLOOKUP($G103,OH,2,FALSE),0)=SUM(K103,L103,M103)*GA_PRIME_LABOR_1
=IFERROR(K104*VLOOKUP($F104,FRINGE,2,FALSE),0)=IFERROR(SUM(K104,L104)*VLOOKUP($G104,OH,2,FALSE),0)=SUM(K104,L104,M104)*GA_PRIME_LABOR_1=IFERROR(K104*VLOOKUP($F104,FRINGE,2,FALSE),0)=IFERROR(SUM(K104,L104)*VLOOKUP($G104,OH,2,FALSE),0)=SUM(K104,L104,M104)*GA_PRIME_LABOR_1
ERROR:#N/AERROR:#N/AERROR:#N/AERROR:#N/AERROR:#N/AERROR:#N/A
ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#N/AERROR:#N/AERROR:#N/A
ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#N/AERROR:#N/AERROR:#N/A
ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#N/AERROR:#N/AERROR:#N/A
ERROR:#REF!ERROR:#REF!ERROR:#REF!=IFERROR(K109*VLOOKUP($F109,FRINGE,2,FALSE),0)=IFERROR(SUM(K109,L109)*VLOOKUP($G109,OH,2,FALSE),0)=SUM(K109,L109,M109)*GA_PRIME_LABOR_1
ERROR:#REF!ERROR:#REF!ERROR:#REF!=IFERROR(K110*VLOOKUP($F110,FRINGE,2,FALSE),0)=IFERROR(SUM(K110,L110)*VLOOKUP($G110,OH,2,FALSE),0)=SUM(K110,L110,M110)*GA_PRIME_LABOR_1
ERROR:#REF!ERROR:#REF!ERROR:#REF!=IFERROR(K111*VLOOKUP($F111,FRINGE,2,FALSE),0)=IFERROR(SUM(K111,L111)*VLOOKUP($G111,OH,2,FALSE),0)=SUM(K111,L111,M111)*GA_PRIME_LABOR_1
ERROR:#REF!ERROR:#REF!ERROR:#REF!=IFERROR(K112*VLOOKUP($F112,FRINGE,2,FALSE),0)=IFERROR(SUM(K112,L112)*VLOOKUP($G112,OH,2,FALSE),0)=SUM(K112,L112,M112)*GA_PRIME_LABOR_1
ERROR:#REF!ERROR:#REF!ERROR:#REF!=IFERROR(K113*VLOOKUP($F113,FRINGE,2,FALSE),0)=IFERROR(SUM(K113,L113)*VLOOKUP($G113,OH,2,FALSE),0)=SUM(K113,L113,M113)*GA_PRIME_LABOR_1
ERROR:#REF!ERROR:#REF!ERROR:#REF!=IFERROR(K114*VLOOKUP($F114,FRINGE,2,FALSE),0)=IFERROR(SUM(K114,L114)*VLOOKUP($G114,OH,2,FALSE),0)=SUM(K114,L114,M114)*GA_PRIME_LABOR_1
ERROR:#REF!ERROR:#REF!ERROR:#REF!=IFERROR(K115*VLOOKUP($F115,FRINGE,2,FALSE),0)=IFERROR(SUM(K115,L115)*VLOOKUP($G115,OH,2,FALSE),0)=SUM(K115,L115,M115)*GA_PRIME_LABOR_1
ERROR:#REF!ERROR:#REF!ERROR:#REF!=IFERROR(K116*VLOOKUP($F116,FRINGE,2,FALSE),0)=IFERROR(SUM(K116,L116)*VLOOKUP($G116,OH,2,FALSE),0)=SUM(K116,L116,M116)*GA_PRIME_LABOR_1
ERROR:#REF!ERROR:#REF!ERROR:#REF!=IFERROR(K117*VLOOKUP($F117,FRINGE,2,FALSE),0)=IFERROR(SUM(K117,L117)*VLOOKUP($G117,OH,2,FALSE),0)=SUM(K117,L117,M117)*GA_PRIME_LABOR_1
ERROR:#REF!ERROR:#REF!ERROR:#REF!=IFERROR(K118*VLOOKUP($F118,FRINGE,2,FALSE),0)=IFERROR(SUM(K118,L118)*VLOOKUP($G118,OH,2,FALSE),0)=SUM(K118,L118,M118)*GA_PRIME_LABOR_1
ERROR:#REF!ERROR:#REF!ERROR:#REF!=IFERROR(K119*VLOOKUP($F119,FRINGE,2,FALSE),0)=IFERROR(SUM(K119,L119)*VLOOKUP($G119,OH,2,FALSE),0)=SUM(K119,L119,M119)*GA_PRIME_LABOR_1
ERROR:#REF!ERROR:#REF!ERROR:#REF!=IFERROR(K120*VLOOKUP($F120,FRINGE,2,FALSE),0)=IFERROR(SUM(K120,L120)*VLOOKUP($G120,OH,2,FALSE),0)=SUM(K120,L120,M120)*GA_PRIME_LABOR_1
ERROR:#REF!ERROR:#REF!ERROR:#REF!=IFERROR(K121*VLOOKUP($F121,FRINGE,2,FALSE),0)=IFERROR(SUM(K121,L121)*VLOOKUP($G121,OH,2,FALSE),0)=SUM(K121,L121,M121)*GA_PRIME_LABOR_1
ERROR:#REF!ERROR:#REF!ERROR:#REF!=IFERROR(K122*VLOOKUP($F122,FRINGE,2,FALSE),0)=IFERROR(SUM(K122,L122)*VLOOKUP($G122,OH,2,FALSE),0)=SUM(K122,L122,M122)*GA_PRIME_LABOR_1
ERROR:#REF!ERROR:#REF!ERROR:#REF!=IFERROR(K123*VLOOKUP($F123,FRINGE,2,FALSE),0)=IFERROR(SUM(K123,L123)*VLOOKUP($G123,OH,2,FALSE),0)=SUM(K123,L123,M123)*GA_PRIME_LABOR_1
ERROR:#REF!ERROR:#REF!ERROR:#REF!=IFERROR(K124*VLOOKUP($F124,FRINGE,2,FALSE),0)=IFERROR(SUM(K124,L124)*VLOOKUP($G124,OH,2,FALSE),0)=SUM(K124,L124,M124)*GA_PRIME_LABOR_1

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it.