Solicitation N6449824R4057..pdf
PDF 541 KB Posted
- Solicitation number
- N64498-24-R-4057
About this file
This request for quotation (RFQ) solicits proposals for a 1.5 Ton Modular Refrigeration System (MRS) procurement. The Navy seeks to procure up to forty-nine 1.5 Ton MRS units and two spare parts kits for installation on aircraft carriers CVN 75, CVN 78, and CVN 79. Proposals are due by March 6, 2024. The Navy intends to award a single firm-fixed-price indefinite delivery, indefinite quantity contract with a five-year ordering period to provide the MRS units and install them within fifteen months of order. The contractor must manufacture the MRS units in accordance with MRS Project Peculiar Document 516-8627963.
View the file
Other files
Show all 26
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CODE
(Hour)
PAGE(S)
until 02:30 PM local time 06 Mar 2024
X
A X B X C X D
EX
X
G F 54
55 - 69 X H 70 - 76
RATING PAGE OF PAGES
7. ISSUED BY
(Date)
IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.
Previous Edition is Unusable 33-134 STANDARD FORM 33 (REV. 9-97)
Prescribed by GSA FAR (48 CFR) 53.214(c)
DO-A3 1 76
(If other than Item 7)
15A. NAME 16. NAME AND TITLE OF PERSON AUTHORIZED TO
AND
ADDRESS
SIGN OFFER (Type or print)
OF
OFFEROR
AMENDMENT NO. DATE
15B. TELEPHONE NO (Include area code) 17. SIGNATURE15C. CHECK IF REMITTANCE ADDRESS
IS DIFFERENT FROM ABOVE - ENTER
SUCH ADDRESS IN SCHEDULE.
18. OFFER DATE
1. THIS CONTRACT IS A RATED ORDER
UNDER DPAS (15 CFR 700)
2. CONTRACT NO.
N64498 8. ADDRESS OFFER TO
See Item 7
9. Sealed offers in original and 1 copies for furnishing the supplies or services in the Schedule will be received at the place specified in Item 8, or if handcarried, in the depository located in
CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and conditions contained in this solicitation.
10. FOR INFORMATION
CALL:
A. NAME (NO COLLECT CALLS)
11. TABLE OF CONTENTS
SOLICITATION/ CONTRACT FORM
SUPPLIES OR SERVICES AND PRICES/ COSTS
1 - 2 3 - 6
X I CONTRACT CLAUSES
DESCRIPTION/ SPECS./ WORK STATEMENT X
PACKAGING AND MARKING
7 - 23
J LIST OF ATTACHMENTS
INSPECTION AND ACCEPTANCE
DELIVERIES OR PERFORMANCE
25 - 26
X K
REPRESENTATIONS, CERTIFICATIONS AND
OTHER STATEMENTS OF OFFERORS
CONTRACT ADMINISTRATION DATA 28 - 40 X
SPECIAL CONTRACT REQUIREMENTS
OFFER (Must be fully completed by offeror) 41 X M
L INSTRS., CONDS., AND NOTICES TO OFFERORS
EVALUATION FACTORS FOR AWARD
NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.
is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.
13. DISCOUNT FOR PROMPT PAYMENT
(See Section I, Clause No. 52.232-8)
14. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments
AMENDMENT NO. DATE
to the SOLICITATION for offerors and related documents numbered and dated):
FACILITY
12. In compliance with the above, the undersigned agrees, if this offer is accepted within calendar days (60 calendar days unless a different period
SOLICITATION, OFFER AND AWARD
X
(X) SEC. DESCRIPTION (X) SEC. DESCRIPTION PAGE(S)
PART I - THE SCHEDULE
26. NAME OF CONTRACTING OFFICER (Type or print) 27. UNITED STATES OF AMERICA 28. AWARD DATE
EMAIL:TEL: (Signature of Contracting Officer)
CODE CODE
B. TELEPHONE (Include area code) C. E-MAIL ADDRESS
AWARD (To be completed by Government)
19. ACCEPTED AS TO ITEMS NUMBERED 20. AMOUNT 21. ACCOUNTING AND APPROPRIATION
22. AUTHORITY FOR USING OTHER THAN FULL AND OPEN COMPETITION:
10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)
23. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
24. ADMINISTERED BY (If other than Item 7) CODE 25. PAYMENT WILL BE MADE BY CODE
PART IV - REPRESENTATIONS AND INSTRUCTIONS
PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS
42 - 52
PART II - CONTRACT CLAUSES
NAVAL SURFACE WARFARE CENTER PHILA
CODE 0232, DESTINY SPELLER
DESTINY.SPELLER@NAVY.MIL
5001 SOUTH BROAD STREET
PHILADELPHIA PA 19112
FAX:
TEL:
FAX:
TEL:
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
SOLICITATION
6. REQUISITION/PURCHASE NO.5. DATE ISSUED
05 Feb 2024
4. TYPE OF SOLICITATION
SEALED BID (IFB)
NEGOTIATED (RFP)
[ X ]
3. SOLICITATION NO.
N6449824R4057
Section A - Solicitation/Contract Form
1. The Naval Surface Warfare Center, Philadelphia Division (NSWCPD) intends to award a single, Firm‐Fixed‐Price (FFP) Indefinite‐Delivery, Indefinite‐Quantity (IDIQ) Contract providing 1.5 Ton Modular Refrigeration System (MRS) Procurement as described in Section C resulting from this solicitation. This procurement will be conducted utilizing the Best Value Tradeoff Source Selection process. The intended resulting Contract shall have an ordering period of five (5) years.
2. As detailed in Section M, the Government intends to make a single award.
3. The guaranteed minimum for this IDIQ is the value of $500.00.
4. This acquisition will be solicited as a Full and Open Competition.
5. The POCs for this action are:
Destiny Speller Contract Specialist destiny.l.speller.civ@us.navy.mil
Gregory Kaiser Contracting Officer gregory.f.kaiser2.civ@us.navy.mil
Section B - Supplies or Services and Prices
ITEM NO SUPPLIES/SERVICES MAX
QUANTITY
UNIT UNIT PRICE MAX AMOUNT
0001 1 Lot First Article Test Unit
FFP
First Article Test Unit - In accordance with Section C of the Statement of Work.
To be ordered during the period from Date of Award through 365 days after award. NOTE: freight costs per unit are included within the unit price.
FOB: Destination
PSC CD: 4110
MAX
NET AMT
UNIT UNIT PRICE MAX AMOUNT
0002 11 Each
1.5 Ton Modular Refrigeration System
FFP
CVN 75 - In accordance with Section C of the Statement of Work. To be ordered during the period from date of Award through 365 days after award. NOTE:
freight costs per unit are included within the unit price.
UNIT UNIT PRICE MAX AMOUNT
0003 19 Each
1.5 Ton Modular Refrigeration System
FFP
CVN 78- In accordance with Section C of the Statement of Work. To be ordered during the period from date of Award through 365 days after award. NOTE:
freight costs per unit are included within the unit price.
UNIT UNIT PRICE MAX AMOUNT
0004 1 Each Spares
FFP
CVN 78- In accordance with Section C of the Statement of Work. To be ordered during the period from date of Award through 365 days after award. NOTE:
freight costs per unit are included within the unit price.
UNIT UNIT PRICE MAX AMOUNT
0005 19 Each
1.5 Ton Modular Refrigeration System
FFP
CVN 79 - In accordance with Section C of the Statement of Work. Generator to be ordered within the five (5)-year ordering period. Unit prices of the generator when ordered in the specific time-frame are as follows:
Unit Range Pricing:
366-730 days after award: $ 731-1,095 days after award: $ 1,096-1,460 days after award: $ 1,461-1,825 days after award: $ NOTE: freight costs per unit are included within the unit price.
UNIT UNIT PRICE MAX AMOUNT
0006 1 Each Spares
FFP
CVN 79 - In accordance with Section C of the Statement of Work. Generator to be ordered within the five (5)-year ordering period. Unit prices of the generator when ordered in the specific time-frame are as follows:
Unit Range Pricing:
366-730 days after award: $ 731-1,095 days after award: $ 1,096-1,460 days after award: $ 1,461-1,825 days after award: $ NOTE: freight costs per unit are included within the unit price.
UNIT UNIT PRICE MAX AMOUNT
0007 1 Lot Technical Data
FFP
Technical Data CDRLs: A001, A002, A003, A004, A005, A006, A007, A008, A009, A010, A011, A012, and A013
Section C - Descriptions and Specifications
STATEMENT OF WORK
Statement of Work (SOW) for
1.5 Ton Modular Refrigeration System (MRS) Procurement
1.0 INTRODUCTION
1.0.1 The Naval Surface Warfare Center Philadelphia Division (NSWCPD) is a Department of Defense entity responsible for research and development, test and evaluation, engineering and fleet support organization for the Navy’s ships, submarines, military watercraft and unmanned vehicles.
This requirement is for NSWCPD Code 411, which serves as the In-Service Engineering Agent (ISEA) for Air Conditioning and Refrigeration (AC&R) Systems.
1.0.2 This contract is for non-personal services. It does not create employment rights with the U.S. Government whether actual, inherent, or implied
1.0.3 Government/Contractor Relationship
1.0.3.1 The services to be delivered under this Contract are non-personal services and the parties recognize and agree that no employer-employee relationship exists or will exist under the Contract between the Government and the Contractor's personnel. Therefore, it is in the best interest of the Government to provide both parties a full understanding of their respective obligations.
1.0.3.2 The Contractor employees shall identify themselves as Contractor personnel by introducing themselves or being introduced as Contractor personnel and displaying distinguishable badges or other visible identification for meetings with Government personnel. In addition, Contractor personnel shall appropriately identify themselves as Contractor employees in telephone conversations and in formal and informal written correspondence.
1.0.3.3 Contractor personnel under this Contract shall not engage in any of the inherently Governmental functions listed at FAR Subpart 7.5 or DFARS Subpart 207.5.
1.0.4 Employee Relationship:
1.0.4.1 The services to be performed under this Contract do not require the Contractor or its personnel to exercise personal judgment and discretion on behalf of the Government. Rather the Contractor's personnel will act and exercise personal judgment and discretion on behalf of the Contractor.
1.0.4.2 Rules, regulations, directives, and requirements that are issued by the U. S. Navy and NSWCPD under its responsibility for good order, administration, and security are applicable to all personnel who enter a Government installation or who travel on Government transportation.
This is not to be construed or interpreted to establish any degree of Government control that is inconsistent with a non-personal services contract.
1.0.4.3 Inapplicability of Employee Benefits: This Contract does not create an employer-employee relationship. Accordingly, entitlements and benefits applicable to such relationships do not apply.
1.0.4.4 It is the Contractor's, as well as the Government's, responsibility to monitor Contract activities and notify the Contracting Officer if the Contractor believes that the intent of this Section has been or may be violated.
1.0.4.4.1 The Contractor shall notify the Contracting Officer in writing via letter or email within three (3) calendar days from the date of any incident that the Contractor considers to constitute a violation of this Section. The notice should include the date, nature, and circumstances of the conduct; the name, function, and activity of each Government employee or Contractor official or employee involved or knowledgeable about such conduct; identify any documents or substance of any oral communication involved in the conduct; and the Contractor's estimated date when, absent a response, cost, schedule or performance will be impacted.
1.0.4.4.2 The Contracting Officer will, within five (5) calendar days after receipt of notice, respond to the notice in writing. In responding, the Contracting Officer will either:
(i) Confirm the conduct is in violation and when necessary direct the mode of further performance,
(ii) Countermand any communication regarded as a violation,
(iii) Deny that the conduct constitutes a violation and when necessary direct the mode of further performance, or
(iv) In the event the notice is inadequate to make a decision, advise the Contractor what additional information is required, and establish the date by which it should be furnished by the Contractor.
1.1 BACKGROUND
The AC&R Branch (Code 411) in the Auxiliary Machinery Systems Division (Division 41), at the Naval Surface Warfare Center, Philadelphia Division (NSWCPD), provides programmatic, technical, logistical, alteration, and life cycle management services to the United States Navy (USN). One of the current projects in Code 411, is the back-fit, ship alteration of the Ship Stores Refrigeration System (SSRS) on aircraft carriers (CVN). The project aims to deliver the Navy’s latest Modular Refrigeration System (MRS) to all available CVNs.
1.2 SCOPE OF WORK
The Contractor shall provide up to forty-nine (49) 1.5 Ton MRS and two (2) spare parts kits in support of upcoming MRS back-fits on CVN 75, 78, and 79. Each MRS will consist of a Modular Refrigeration Unit (MRU), control panel, rupture disk assembly, and flat plate condenser. Each spare parts kit will consist of those components listed in Table 2, at a minimum.
The contractor shall manufacture these MRS in accordance with the MRS Project Peculiar Document (PPD) 516-8627963.
The contractor shall deliver the MRS and spare parts kits within fifteen (15) months from when ordered via individual Delivery Orders. Section 3.1, provides further details about anticipated ships, quantities, delivery locations, and order timelines.
2.0 APPLICABLE DOCUMENTS
2.1 MRS Project Peculiar Document (PPD) NAVSEA No. 516-8627963.
These documents will be delivered as Government Furnished Information (GFI) upon solicitation.
The Contractor shall reference and utilize the latest version available when performing tasks within this SOW.
3.0. REQUIREMENTS
3.1 1.5 Ton MRS Delivery
3.1.1 The Contractor shall manufacture 1.5 Ton MRS in accordance with the latest revision of NAVSEA PPD No. 516-8627963 and deliver, upon order from Code 411, to the below ships. An estimated quantity, location, and order timeframe are included in Table 1 below. The delivery of each order shall be no more than fifteen (15) months after each order is placed. Specific delivery addresses will be provided in each order. All wide area work flow (WAWF) acceptance will be through NSWCPD.
Ship Quantity Delivery Location Estimated Order Timeframe CVN 75 11 Norfolk, VA Upon Contract Award (FY24) CVN 78 19 Norfolk, VA Upon Contract Award (FY24) CVN 79 19 Norfolk, VA FY28
Table 1: 1.5T MRS Delivery Details
3.1.2 The Contractor shall provide a spare parts kit with the CVN 78 and 79 orders, including the parts listed in Table 2.
Part Description Quantity
MRU 1
Discharge Pressure Transducer 4 Suction Pressure Transducer 4 Rupture Disk Assembly 4 All PLC Module Types 2 All Control Panel Fuse Types 6 All Current Transducer Types 2 Voltage Monitor 2 Transformer 2 All Relay Types 2 All Motor Starter Types 2
Table 2: Spare Parts Kit Breakdown
3.1.3. The Contractor shall conduct first article and production tests in accordance with the requirements of NAVSEA PPD No. 516-8627963. A waiver may be granted to any Offeror with previously qualified unit.
3.1.3. The Contractor shall furnish data prepared in accordance with the Contract Data Requirements List (CDRL), Data Items A001 through A009.
3.1.3.1. CDRL A001, Product Drawings/Models and Associated Lists. Shall be delivered to the government upon contract bid and also upon delivery of each MRS set.
3.1.3.2. CDRL A002, Engineer Change Proposal (ECP). An ECP shall be submitted whenever an engineering change to the 1.5 Ton MRS offered and detailed upon contract award, is necessary.
3.1.3.3. CDRL A003, Request for Variance (FRV). An RFV shall be submitted whenever an unplanned nonconformance, to the last submitted Product Drawing Package, is found in the MRS post-production.
3.1.3.4. CDRL A004, Request For Waiver (RFW). An RFW shall be submitted during or after manufacture to obtain authorization to deliver nonconforming items to the Government, which do not comply with PPD 516-8627963.
3.1.3.5. CDRL A005, Visual and Operational Test Report. This report shall be submitted for every third MRS manufactured, and should demonstrate that the MRS conforms with the visual and operational requirements of PPD 516- 8627963. This includes capacity testing. See PPD Section 4 for further information on visual and operational testing.
3.1.3.6. CDRL A006, Airborne and Structureborne Noise Test Report. This report shall be submitted for every third MRS manufactured, and should demonstrate that the MRS complies with the noise limitations as outline in PPD 516-8627963.
3.1.3.7. CDRL A011, Inclination Test Report.
3.1.3.8. CDRL A012, Shock and Vibration Test Report.
3.1.3.9. CDRL A013, Electromagnetic Interference (EMI) Test Report.
3.2 Manufacturing Phase-Out or Discontinuation of Production, Diminishing Sources, and Obsolete Materials or Components
3.2.1 The contractor shall notify the contracting officer immediately upon determining the unavailability of obsolete materials or components. The contractor may recommend a solution to include the impact on the contract price and delivery. The contractor shall not initiate any item redesign or incur any additional costs without the express, written authorization of the contracting officer.
3.3 Diminishing Manufacturing Sources and Material Shortages Management (DMSMS) Contract Requirements
3.3.1. DMSMS Management Plan. The Contractor shall develop and submit as part of its proposal (with an advance copy supplied to the Government at time of cost estimate submission), an Obsolescence and DMSMS Management Plan (CDRL A007) for managing the loss, or impending loss, of manufacturers or suppliers of parts and/or material required for performance of this contract.
At a minimum, the plan shall address the following:
Means and approach for providing the Government with information regarding obsolescence and DMSMS issues
Planned resolution of current obsolescence and DMSMS issues Parts list screening
Parts list monitoring Receiving, processing and disseminating Government-Industry Data Exchange Program
(GIDEP) DMSMS Notices Receiving, processing and disseminating Defense Logistics Agency (DLA) DMSMS
Alerts Communication with and availability of information to the Government Means and approach for establishing obsolescence and DMSMS solutions Plan for conducting DMSMS predictions.
3.3.2. Assignment of Obsolescence Management Responsibility to the Contractor. The Contractor is responsible for managing obsolescence over the entire period of the contract, and notwithstanding any obsolescence issues or problems, the Contractor remains responsible for meeting all performance and other requirements of this contract. This obsolescence management responsibility includes an ongoing review and identification of actual and potential obsolescence issues, including but not limited to obsolescence of items, assemblies, sub-assemblies, piece parts, and material (hereafter referred to for purposes of this section only as “parts and/or material”). The Contractor is responsible for all costs associated with obtaining a replacement if and when any parts and/or material become obsolete. The costs for which the Contractor is responsible include, but are not limited to, the costs of investigating part availability, interchangeability and substitutability, locating part replacement, vendor interface, engineering efforts, testing requirements, internal drawing changes, etc. The Contractor shall prevent any additional costs from being incurred by the Government due to obsolescence. Any configuration changes due to obsolescence shall be approved in accordance with the Configuration Management requirements of this SOW. The Contractor shall provide the Government immediate notice of discovered obsolescence (CDRL A008), and follow-on obsolescence status briefs.
3.3.3. Requirement for Mitigation Information Pertaining to Specific Critical Materials. If a refrigerant on the Environmental Protection Agency’s (EPA) AIM Act HFC Phase out list, or a refrigerant that is a blend of at least one refrigerant on that list, is planned to be used or will be required for maintenance operations, provide the following information for each application and alternative:
1. Cost effectiveness of alternative materials or processes over the Modular Refrigeration System life cycle.
2. Technical feasibility of alternative materials.
3.4 Parts Obsolescence
3.4.1 The contractor shall establish and implement a parts obsolescence program. In the event that manufacturing phase-out or discontinuance of production of such items is contemplated, the contractor is required to notify the contracting officer and publish the discontinuance in the Government-Industry Data Exchange Program (GIDEP), where feasible; and to provide immediate advance notice of production phase-out to NSWCPD Code 411.
4.0 DATA REQUIREMENTS
CDRL A001, Product Drawings/Models and Associated Lists CDRL A002, Engineering Change Proposal
CDRL A003, Request for Variance CDRL A004, Request for Waiver CDRL A005, Visual and Operational Test Report CDRL A006, Airborne and Structureborne Noise Test Report CDRL A007, Diminishing Manufacturing Sources and Material Shortages (DMSMS)
Management Plan CDRL A008, Obsolescence Alert Notice CDRL A009, Unauthorized Supplier Purchase Report CDRL A010, Counterfeit Prevention Plan CDRL A011, Inclination Test Report CDRL A012, Shock and Vibration Test Report CDRL A013, Electromagnetic Interference (EMI) Test Report.
5.0 SECURITY REQUIREMENTS
5.1 SECURITY TRAINING. The Contractor is responsible for completing all required Government mandated training to maintain security and network access to government sites and IT systems to include but not limited to: Antiterrorism Level 1 Awareness; Records Management in the DON: Everyone's Responsibility; Training and Readiness: The Active Shooter; NAVSEA Introduction to Controlled Unclassified Information; Operations Security (OPSEC); NAVSEA Counterintelligence Training; Privacy and Personally Identifiable Information (PII) Awareness Training; NAVSEA Physical Security training and Cybersecurity 101 Training. Certificates of successful completion shall be sent to the COR and as otherwise specified in the contract.
5.1.1 In accordance with the National Industrial Security Program Operating Manual (NISPOM) (37 CFR Part 117), Contractor personnel that require access to Department of Navy (DON) information systems and/or work on-site require an open investigation or favorable adjudicated Tier 3 by the Vetting Risk Operations Center (VROC). An interim clearance is granted by VROC and recorded in the Defense Information System for Security (DISS). An open or closed investigation with a favorable adjudication is required prior to issuance of a badge providing access to NSWCPD buildings. Furthermore, if the Navy Central Adjudication Facility, have made an unfavorable determination access will be denied. For Common Access Card (CAC) you must have an open investigation and/or a favorably adjudicated investigation. Interim security clearance are acceptable for a CAC. Access will be denied for anyone that has eligibility pending in DISS. Vetting through the National Crime Information Center, Sex Offender Registry, and the Terrorist screening database shall be process for a contractor that does not have a favorable adjudicated investigation.
5.1.2 Within 30 days after contract award, the contractor shall submit a list of all contractor personnel, including subcontractor employees, who will have access to DON information systems and/or work on-site at one of the NSWCPD sites to the appointed Contracting Officer Representative (COR) via email. The contractor shall provide each employee's first name, last name, contract number, the NSWCPD technical code, work location, whether or not the employee has a CAC and or Standard Access Control Badge (SACB), the systems the employee can access (i.e., NMCI, RDT&E), and the name of the Contractor's local point of contact, phone number and email address. Throughout the period of performance of the contract, the Contractor shall immediately provide any updated information to the COR when any Contractor personnel changes occur including substitutions or departures.
5.2 ON SITE WORK. Contractor personnel that require a badge to work on-site at one of the NSWCPD sites must provide an I-9 form to verify proof of citizenship. The I-9 form should be signed by the company Facility Security Officer or the company Human Resource Department.
In addition to the I-9 form, Contractors shall also bring their birth certificate, current United States Passport or naturalization certificate and state issued ID to the NSWCPD Security Officer at the time of badge request to verify citizenship. Any contractor that has unfavorable information that has not been favorably adjudicated, by Department of Defense Central Adjudication Facility (DOD CAF) will not be issued a badge. Finally, contractors shall supply a copy of their OPSEC Training Certificate or other proof that the training has been completed.
5.2.1 In accordance with NSWCPD security protocol, contractor employees who hold dual citizenship will not be granted security clearance to our facilities.
5.3 OPERATIONS SECURITY (OPSEC)
5.3.1 The Contractor shall protect critical information associated with this contract to prevent unauthorized disclosure. The NSWC Philadelphia Division's (NSWCPD) Critical Information List (CIL)/ CIIL (Critical Indicators and information list) will be provided on site, if warranted.
Performance under this contract requires the contractor to adhere to OPSEC requirements, which may include the NSWCPD Contractor OPSEC Plan. When the NSWCPD Contractor OPSEC Plan is required, the contractor shall return acknowledgment of the plan within 15 days of receipt. During the period of this contract, the Contractor may be exposed to, use, or produce, NSWCPD Critical Information (CI) and/or observables and indicators which may lead to discovery of CI. NSWCPD’s CI will not be distributed to unauthorized third parties, including foreign governments, or companies under Foreign Ownership, Control, or Influence (FOCI) unless such FOCI has been appropriately mitigated through measures approved by the Defense Counterintelligence and Security Agency. Questions concerning these requirements shall be directed to the PCO.
5.3.2 CUI correspondence transmitted internally on the contractor's unclassified networks or information systems, and externally, shall be protected per NIST SP-800-171, Protecting Controlled Unclassified Information (CUI) in Non-federal Systems and Organizations.
Assembled large components/systems being transported to and from testing areas, other production or government facilities (whether or not on public roadways) shall be in an enclosed van trailer or covered flatbed trailer. Component/System outside storage, staging, and test areas shall be shielded/obscured from public view wherever physically possible.
5.3.3 NSWCPD’s CI shall not be publicized in corporate wide newsletters, trade magazines, displays, intranet pages or public facing websites. Media requests related to this project shall be directed to the PCO, and the COR who will forward the required to the NSWCPD Public Release Authority for review.
5.3.4 Any attempt by unauthorized third parties to solicit, obtain, photograph, or record, or;
incidents of loss/compromise of government Classified or CI, Business Sensitive, Company Proprietary information related to this or other program must be immediately reported to the contractor's Facility Security Officer and Cognizant Security Office and/or the Naval Criminal Investigative Service, and the NSWC PD Security Division (Code 105).
5.4 RECEIPT, STORAGE, AND GENERATION OF CONTROLLED UNCLASSIFIED
INFORMATION (CUI) All Controlled Unclassified Information (CUI) associated with this contract must follow the minimum marking requirements of DoDI 5200.48, Section 3, paragraph 3.4.a, and include the acronym "CUI" in the banner and footer of the document. In accordance with DoDI 5200.48, CUI must be safeguarded to prevent Unauthorized Disclosure (UD). CUI export controlled technical information or other scientific, technical, and engineering information must be marked with an export control warning as directed in DoDI 5230.24, DoDD 5230.25, and Part 250 of Title 32, CFR. Nonfederal information systems storing and processing CUI shall be protected per NIST SP-800-171, or subsequent revisions. All transmissions to personal email accounts (AOL, Yahoo, Hotmail, Comcast, etc.) and posting on social media websites (Facebook, Instagram, Twitter, LinkedIn, etc.) are prohibited. Destroy CUI associated with this contract by any of the following approved methods: A cross-cut shredder; a certified commercial destruction vendor; a central destruction facility; incineration; chemical decomposition;
pulverizing, disintegration; or methods approved for classified destruction.
5.5 PLANNING, PROGRAMMING, BUDGETING AND EXECUTION (PPBE) DATA.
When contractor employees, in the performance of their duties, are exposed to Planning, Programming, Budgeting and Execution (PPBE) data, a Non-Disclosure Agreement (NDA) with all affected contactor personnel must be executed in coordination with the COR and PCO to ensure safeguarding disclosure of this data.
6.0 PLACE OF PERFORMANCE
All work is to be performed at the Contractor facility.
7.0 TRAVEL
No travel is expected under this requirement.
8.0 GOVERNMENT FURNISHED INFORMATION
NSWCPD Code 411 will provide the government furnished information referenced in Sections 2.0 at the time of solicitation.
8.1 GFI is for informational purposes and its use by the Contractor is mandatory.
9.0 PURCHASES
N/A
10.0 COUNTERFEIT MATERIAL PREVENTION
10.1 Electronic End-Items
10.1.1 Preventing Counterfeit Parts and Materials
The Contractor shall take steps as defined in DFARS 252.246-7007 and herein to minimize the risk of receiving counterfeit parts and materials. The Contractor shall:
• Maximize availability of authentic, originally designed and/or qualified parts throughout the product’s life cycle, including management of parts obsolescence
• Assess potential suppliers to minimize the risk of receiving counterfeit parts or materials
• Maintain a listing of approved suppliers with documented criteria for approval and removal of suppliers from the list
• Have purchasing procedures which require the selection of parts and materials from OM or authorized suppliers whenever possible
• Require a certificate of compliance and supply chain traceability for all electronic part purchases, and provide to the Government upon request
• Use Government or industry services such as GIDEP and other commercially available services to identify part or supplier quality or authenticity problems
• Define minimum inspection and test requirements for parts being procured from unauthorized suppliers, and shall ensure that in-house, third-party, and/or distributor inspection and test procedures and facilities comply with these requirements
• Incorporate procurement clauses which plainly identify quality requirements and liability to all approved suppliers
• Flow the requirements above to affected Subcontractors
SAE AS6174 contains information regarding the detection, avoidance, and mitigation of counterfeit materiel, and may be used as a reference document for meeting the above steps.
Parts and materials shall not be purchased from unauthorized sources (e.g. independent distributor or broker) unless there is no other means for procurement. In isolated cases when an unauthorized supplier is the only possible choice for procurement, an Unauthorized Supplier Purchase Report (CDRL A009) shall be provided to the Contracting Officer and program office.
The report shall contain the following information:
• Reason why an authorized supplier or original component manufacturer (OM) could not provide the part or material
• Product certificate of conformance with traceability to the OM, if available
• Verification and authenticity data results (e.g., visual inspection, marking/surface finish permanency, DPA, Scanning Acoustic Microscopy, Energy Dispersive X-Ray Spectroscopy, Fourier Transform Infrared (FTIR) Spectroscopy, Rockwell Hardness Test, etc.) SAE AS5553 contains information regarding the detection, avoidance, and mitigation of counterfeit electronic components, and may be used as a reference document for meeting the above steps.
10.1.2 Counterfeit Parts and Materials
The Contractor shall provide a Counterfeit Prevention Plan (CDRL A010) that documents procedures to minimize the risk of procuring and/or using counterfeit parts and materials. This plan shall be in accordance with DFARS 252.246-7007 Contractor Counterfeit Electronic Part Detention and Avoidance. Solicitations and subcontracts for all suppliers shall contain a requirement for procedures to minimize the risk of procuring and/or using counterfeit parts and materials.
10.1.3 Containing Counterfeit Parts and Materials
Suspect counterfeit parts and materials shall be impounded with all other items from the same lot. The contractor shall identify and locate all potential users or hardware items with the suspect part or material, and contain product which has this suspect product, pending confirmation of the part or material’s authenticity. The OM may be involved at this point in order to verify authenticity. Confirmed counterfeit material shall be contained and provided to investigative agencies for ongoing investigation or prosecution. The counterfeit product shall not be scrapped or otherwise disposed of without approval from investigative authorities or the program office.
Confirmed counterfeit product shall not be returned or handled in a way which would allow its resale or reuse. Suspect counterfeit parts or materials whose authenticity (or lack of) cannot be definitively determined, shall be dispositioned via Material Review Board (MRB).
10.1.4 Reporting Counterfeit Parts and Materials
The prime contractor and program office shall be notified of the occurrence of a suspect or confirmed counterfeit part or material, and the actions taken to identify, contain, and impound all product from the lot. The contractor shall also contact the OM, and supplier if applicable. The contractor shall initiate and submit an ALERT to the Government-Industry Data Exchange Program (GIDEP) within 60 days of knowledge of the counterfeit part or material. The contractor shall notify the appropriate parties to document the case for legal action if required (e.g., contracting officer, DOD Office of Inspector General).
10.1.5 Nonconforming Material and Parts
Electrical components which fail during production or acceptance testing shall be assessed to determine if the supplier of the part was an authorized supplier for the manufacturer. Analysis of these failures shall include assessment of part authenticity (potential of being counterfeit or fraudulent).
10.1.6 Warranty “Counterfeit”
10.1.6.1 Seller warrants the goods delivered pursuant to this Contract, unless specifically stated otherwise in this Contract, shall (i) be new (ii) be free from defects in workmanship, materials, and design and (iii) be in accordance with all the requirements of this Contract. Seller further warrants that the performance of work and services shall conform with the requirements of this Contract and to high professional standards. All warranties in this Contract shall survive inspection, test, final acceptance and payment of goods and services.
10.1.6.2 Unless Buyer expressly identifies the goods that are procured under this Contract as nontechnical and for Buyer’s internal use only, Seller warrants without limitation as to time that the goods delivered pursuant to this Contract shall (i) be and only contain materials obtained directly from the OM or an authorized OM reseller or distributor (collectively, an Authorized
Distributor); (ii) not be or contain Counterfeit Items or Suspect Counterfeit Items, as defined below; and (iii) contain only authentic, unaltered OM labels and other markings. Seller shall obtain and retain all documentation required to fully trace the distribution and sale of the goods delivered hereunder back to the relevant OM, and, on request of Buyer, shall provide such authenticating documentation. Counterfeit Item means an unlawful or unauthorized reproduction, substitution, alteration, or the false identification of grade, serial number, lot number, date code, or performance characteristic, that has been knowingly mismarked, misidentified, or otherwise misrepresented to be an authentic, unmodified item from the OM, an Authorized Distributor, or an Aftermarket Manufacturer as defined in SAE AS5553 “Counterfeit Electronic Parts;
Avoidance, Detection, Mitigation, and Disposition” (Authorized Aftermarket Manufacturer). A Suspect Counterfeit Item means an item for which credible evidence (including, but not limited to, visual inspection or testing) provides reasonable doubt that the item is authentic. Seller warrants that it will not act as or engage an independent distributor, non-authorized distributor, non-franchised distributor, non-authorized supplier, or non-authorized reseller (collectively, Broker), to assist it in delivering goods pursuant to this Contract unless the Buyer provides prior written approval to do so. Any Seller request to procure from a Broker shall include complete and compelling support for such request and shall include all actions completed by Seller to ensure the goods thus procured are not Counterfeit Items. Seller’s supporting documentation shall include: (i) results of authentication test and analysis conducted (reference SAE AS5553 ),
(ii) traceability with identification of all supply chain intermediaries wherever such traceability exists, and (iii) identification of and traceability to the source for any remarked or resurfaced material. Seller shall include the substance of this Section in any agreement between Seller and Seller’s lower tier subcontractors, including in any agreement between Seller and Seller’s Broker, and Seller shall cause Seller’s lower tier subcontractors and Seller’s Broker to include the substance of this Section in all agreements with any of their lower tier subcontractors.
10.1.6.3 Unless Buyer expressly identifies the goods that are procured under this Contract as nontechnical and for Buyer’s internal use only, Seller, as OM, Authorized Distributor, Authorized Aftermarket Manufacturer or Broker approved by Buyer, further warrants that it has and shall maintain a Counterfeit Item risk mitigation process, internally and with its suppliers, (reference SAE AS5553), for goods delivered hereunder, and in accordance with the standards or instructions set forth in any Buyer’s specifications and other required provisions and specifications incorporated into this Contract. Buyer shall have the right to audit, inspect, and / or approve the processes at any time before or after delivery of the goods ordered hereunder. Seller shall provide evidence of the Seller’s risk mitigation process to Buyer upon request. Buyer shall have the right to require changes to the processes to conform with Buyer’s defined standards, if any. Seller and Seller's lower-tier subcontractors that are allowed access to the US Government Industry Data Exchange Program (GIDEP) shall participate in monitoring GIDEP reports and Seller shall act on GIDEP reports that affect product delivered to Buyer. Seller shall immediately notify Buyer with the pertinent facts if Seller becomes aware of or suspects that items delivered for the Contract are, or contain, suspect or confirmed counterfeit items. Failure of the Seller or any of its lower-tier subcontractors to conform its processes with Buyer’s defined standards may result in the termination of this Contract in accordance with the termination provisions set forth herein. If, during Buyer’s inspection procedures, a good delivered hereunder is discovered to be a Counterfeit Item or Suspect Counterfeit Item, Buyer shall have the right to quarantine the good for further investigation of its authenticity. Buyer’s investigation may include the participation of third parties or governmental investigative agencies as required by law or regulations by Buyer’s customer, or by Buyer, in its sole discretion. The Seller and/or the Seller’s lower-tier subcontractors shall cooperate in good faith with any investigation conducted by Buyer, including, but not limited to, cooperation by Seller’s or Seller’s lower-tier subcontractor’s staffs responsible for the maintenance and disclosure of all design, development, manufacturing, and traceability records with respect to the good in possession of Seller or Seller’s lower-tier subcontractor. Upon Buyer’s request, Seller shall provide Buyer certificates of conformance with respect to the goods delivered. Buyer shall not be required to return the good to the Seller during the investigation process or thereafter. Buyer shall not be liable for payment to Seller of the price of any Suspect Counterfeit Items under investigation. When so authorized by Buyer, Seller shall be responsible for counterfeit risk mitigation testing and providing traceability identifiers (i.e.
Date Code / Lot Code, Serial number) for Broker procured parts, and identifying items delivered to Buyer that contain such parts. If Buyer determines in its sole discretion that there is credible evidence after visual inspection, testing, or other information that a good delivered under this Contract may have been misrepresented by the Seller or Seller’s lower-tier subcontractor and constitutes a Counterfeit Item or Suspect Counterfeit Item, Seller, or its lower-tier subcontractor, shall, if directed by Buyer to do so, issue a GIDEP alert and shall ensure suspect or confirmed Counterfeit Items are not delivered to Buyer. Buyer reserves its right hereunder, to issue its own GIDEP alert if, after investigation, Buyer concludes, in its sole estimation, that a good is a Counterfeit Item or Suspect Counterfeit Item. Seller shall include the substance of this Section in any agreement between Seller and Seller’s lower tier subcontractors, including in any agreement between Seller and Seller’s Broker, and Seller shall cause Seller’s lower tier subcontractors and Seller’s Broker to include the substance of this Section in all agreements with any of their lower tier subcontractors.
10.1.6.4 Seller warrants without limitation as to time that any hardware, software and firmware goods delivered under this Contract: (i) shall not contain any viruses, malicious code, Trojan horse, worm, time bomb, self-help code, back door, or other software code or routine designed to: (a) damage, destroy or alter any software or hardware; (b) reveal, damage, destroy, or alter any data.
10.2 Non-Electronic Materials
10.2.1 Department of the Navy contractors (and their subcontractors at all tiers) who obtain critical or high risk materiel shall implement a risk mitigation process as follows:
10.2.1.1 If the materiel is currently in production or currently available, materiel shall be obtained only from authorized suppliers
10.2.1.2 If the materiel is not in production or currently available from authorized suppliers, materiel shall be obtained from suppliers that meet appropriate counterfeit avoidance criteria
10.2.1.3 Contractor shall notify the contracting officer when critical or high risk materiel cannot be obtained from an authorized supplier;
10.2.1.4 Contractor shall take mitigating actions to authenticate the materiel if purchased from an unauthorized supplier
10.2.1.5 Contractor shall report instances of counterfeit and suspect counterfeit materiel to the contracting officer and the GIDEP as soon as the contractor becomes aware of the issue.
CLAUSES INCORPORATED BY FULL TEXT
C-202-H001 ADDITIONAL DEFINITIONS–BASIC (NAVSEA) (OCT 2018)
(a) Department - means the Department of the Navy.
(b) Commander, Naval Sea Systems Command - means the Commander of the Naval Sea Systems Command of the Department of the Navy or his duly appointed successor.
(c) References to The Federal Acquisition Regulation (FAR) - All references to the FAR in this contract shall be deemed to also reference the appropriate sections of the Defense FAR Supplement (DFARS), unless clearly indicated otherwise.
(d) National Stock Numbers - Whenever the term Federal Item Identification Number and its acronym FIIN or the term Federal Stock Number and its acronym FSN appear in the contract, order or their cited specifications and standards, the terms and acronyms shall be interpreted as National Item Identification Number (NIIN) and National Stock Number (NSN) respectively which shall be defined as follows:
(1) National Item Identification Number (NIIN). The number assigned to each approved Item Identification under the Federal Cataloging Program. It consists of nine numeric characters, the first two of which are the National Codification Bureau (NCB) Code. The remaining positions consist of a seven digit non-significant number.
(2) National Stock Number (NSN). The National Stock Number (NSN) for an item of supply consists of the applicable four-position Federal Supply Class (FSC) plus the applicable nine-position NIIN assigned to the item of supply.
(End of text)
C-204-H001 USE OF NAVY SUPPORT CONTRACTORS FOR OFFICIAL CONTRACT FILES (NAVSEA)
(OCT 2018)
(a) NAVSEA may use a file room management support contractor, hereinafter referred to as "the support contractor", to manage its file room, in which all official contract files, including the official file supporting this procurement, are retained. These official files may contain information that is considered a trade secret, proprietary, business sensitive or otherwise protected pursuant to law or regulation, hereinafter referred to as “protected information”. File room management services consist of any of the following: secretarial or clerical support; data entry; document reproduction, scanning, imaging, or destruction; operation, management, or maintenance of paper-based or electronic mail rooms, file rooms, or libraries; and supervision in connection with functions listed herein.
(b) The cognizant Contracting Officer will ensure that any NAVSEA contract under which these file room management services are acquired will contain a requirement that:
(1) The support contractor not disclose any information;
(2) Individual employees are to be instructed by the support contractor regarding the sensitivity of the official contract files;
(3) The support contractor performing these services be barred from providing any other supplies and/or services, or competing to do so, to NAVSEA for the period of performance of its contract and for an additional three years thereafter unless otherwise provided by law or regulation; and,
(4) In addition to any other rights the contractor may have, it is a third party beneficiary who has the right of direct action against the support contractor, or any person to whom the support contractor has released or disclosed protected information, for the unauthorized duplication, release, or disclosure of such protected information.
(c) Execution of this contract by the contractor is considered consent to NAVSEA's permitting access to any information, irrespective of restrictive markings or the nature of the information submitted, by its file room management support contractor for the limited purpose of executing its file room support contract responsibilities.
(d) NAVSEA may, without further notice, enter into contracts with other contractors for these services. Contractors should enter into separate non-disclosure agreements with the file room contractor. Contact the Procuring Contracting Officer for contractor specifics. However, any such agreement will not be considered a prerequisite before information submitted is stored in the file room or otherwise encumber the government.
C-211-H008 QUALIFICATION OF CONTRACTOR NON-DESTRUCTIVE TESTING (NDT) PERSONNEL
(NAVSEA) (OCT 2018)
(a) The Contractor and any Non-destructive Testing (NDT) subcontractor shall utilize for the performance of required NDT, only Level I, II and III personnel currently certified in accordance with NAVSEA Technical Publication T9074-AS-GIB-010/271, Revision 1 of 11 September 2014. Documentation pertaining to the qualification and certification of NDT personnel shall be made available to the Contracting Officer for review upon request.
(b) These requirements do not apply with respect to nuclear propulsion plant systems and other matters under the technical cognizance of the Office of Navy Nuclear Propulsion (NAVSEA 08). Because of health and safety considerations, such matters will continue to be handled as directed by NAVSEA 08.
C-211-H018 APPROVAL BY THE GOVERNMENT (NAVSEA) (JAN 2019)
Approval by the Government as required under this contract and applicable specifications shall not relieve the Contractor of its obligation to comply with the specifications and with all other requirements of the contract, nor shall it impose upon the Government any liability it would not have had in the absence of such approval.
C-215-H002 CONTRACTOR PROPOSAL (NAVSEA) (OCT 2018)
(a) Performance of this contract by the Contractor shall be conducted and performed in accordance with the detailed obligations to which the Contractor committed itself in Proposal TBD dated TBD in response to Solicitation No.
N6449823R0002.
(b) The technical volume(s) of the Contractor's proposal is(are) hereby incorporated by reference and made subject to the "Order of Precedence" (FAR 52.215-8) clause of this contract. Under the "Order of Precedence" clause, the technical volume(s) of the Contractor's proposal referenced herein is (are) hereby designated as item (f) of the clause, following "the specifications" in the order of precedence.
C-227-H006 DATA REQUIREMENTS (NAVSEA) (OCT 2018)
The data to be furnished hereunder shall be prepared in accordance with the Contract Data Requirements List, DD Form 1423, Exhibit(s) A001 - A013, attached hereto.
(End of Text)
C-227-H014 PROTECTION OF DEPARTMENT OF NAVY TRADEMARKS - BASIC (NAVSEA) (JUL 2021)
(a) The contractor shall not assert any claim, in any jurisdiction, based on trademark or other name or design-based causes of action that are based on rights the contractor believes it has in the term(s) TBD [contracting officers shall list terms(s) (Government assigned or approved nomenclature)] (the “Designation(s)”), against the Government or others authorized by the Government to use the Designation(s) (including the word(s), name, symbol, or design) acting within the scope of such authorization (i.e. claims for trademark infringement, dilution, trade dress infringement, unfair competition, false advertising, palming off, passing off, or counterfeiting).
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .