GFI NAVSEA 4340_2 (MRS PPD).pdf

PDF 2 MB Posted

Attached to
1. 5 Ton Modular Refrigeration System (MRS) Procurement
Solicitation number
N64498-24-R-4057
Issued by

About this file

This document is a Government Furnished Information attachment used to identify required documentation for a federal contract. It lists the title "1. 5 Ton Modular Refrigeration System (MRS) Procurement" and references RFQ N64498-24-R-4057, which closes on March 6, 2024 and is for the Department of the Navy Naval Sea Systems Command. While the attachment includes columns for listing relevant details, it appears to be a blank template and does not include any populated data on specific documentation required for the refrigeration system procurement.

View the file

Other files

File Type Posted
Amendment P00004.pdf PDF
CDRL A014 - Small Business Utilization Report1.pdf PDF
QAs (5 March 2024).docx DOCX document
Amendment 0003.pdf PDF
CDRL A014 - Small Business Utilization Report1.pdf PDF
N6449824R4057 AMENDMENT 0002.pdf PDF
N6449824R4057-0001.pdf PDF
GFI NAVSEA.pdf PDF
GFI NAVSEA.pdf PDF
CDRL A012 - Shock and Vibration Test Report.pdf PDF
CDRL A009 - Unauthorized Supplier Purchase Report_BH signed.pdf PDF
CDRL A013 - Electromagnetic (EMI) Test Report.pdf PDF
CDRL A008 - Obsolescence Alert Notice_BH signed.pdf PDF
Solicitation N6449824R4057..pdf PDF
Attachment 1 -NSWCPD SBPCD August 2018.xlsx XLSX spreadsheet
CDRL A010 - Counterfeit Prevention Plan.pdf PDF
CDRL A001 - Product Drawings Models and Associated Lists_rev1_BH signed.pdf PDF
CDRL A005 - Visual and Operational Test Report_BH signed.pdf PDF
CDRL A002 - Engineering Change Proposal_rev1_BH signed.pdf PDF
CDRL A004 - Request for Waivers (RFW)_BH signed.pdf PDF
Pre Award Survey of Prospective Contractor Accounting System Checklist (1).pdf PDF
2_PPD 516-8627963 1.5-ton MRS 20190128.pdf PDF
CDRL A003 - Request for Variance (RFV)_BH signed.pdf PDF
CDRL A011 - Inclination Test Report.pdf PDF
CDRL A006 - Airborne and Structureborne Noise Test Report_BH signed.pdf PDF
CDRL A007 - Diminishing Manufacturing Sources and Material Shortages (DMSMS) Management Plan_BH signed.pdf PDF
Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NAVSEA 4340/2 (Rev. Aug. 2021) Page 1 of 6

GOVERNMENT FURNISHED INFORMATION

ATTACHMENT # PR#

PROGRAM TITLE: CONTRACT NUMBER: DATE:

CODE:

(1) NUMBER (5) GFI DUE DATE(4) DOCUMENT DATE(3) DOCUMENT NUMBER(2) DOCUMENT TITLE

NAVSEA 4340/2 (Rev. Aug. 2021) Page 2 of 6

GOVERNMENT FURNISHED INFORMATION (CON'T)

NAVSEA 4340/2 (Rev. Aug. 2021) Page 3 of 6

NAVSEA 4340/2 (Rev. Aug. 2021) Page 4 of 6

NAVSEA 4340/2 (Rev. Aug. 2021) Page 5 of 6

NAVSEA 4340/2 (Rev. Jul 2020) Page 6 of 6

NAVSEA Form 4340/2 - Government Furnished Information Instructions

ATTACHMENT #: Leave blank, contracting officer will complete when preparing solicitation or contract.

PR #: Enter Purchase Request (PR) number.

PROGRAM TITLE: Enter the title of the program.

CONTRACT NO.: Leave blank if this requirement will result in a new contract. Insert contract number if the PR will result in the modification to an existing contract.

DATE: Enter the calendar date that this form was prepared.

CODE: Enter the Program Office / Requiring Activity's office code.

NUMBER, Column (1): Enter a sequential number for each item of GFI to be supplied.

DOCUMENT TITLE, Column (2): Enter Document Title for each item.

DOCUMENT NUMBER, Column (3): Enter Document Number assigned to identify a specific document. If no number has been assigned, leave blank.

DOC DATE, Column (4): Enter publication date of the document. If the item has no date assigned, leave blank. This format (MM/DD/YR) for the date is preferred (e.g., 06/25/16).

GFI DUE DATE, Column (5): Insert the date the item is due at the contractor's plant or is to be first available to the contractor for use. A calendar date format (MM/DD/YR) is preferred (e.g., 02/28/19), but following non-calendar methods are acceptable:

DAC - Days after contract award date MAC - Months after contract award date MACM - Months after contract modification date MAOE - Months after option exercise MBD - Months before delivery MBT - Months before the start of ship builder's trials or equipment test

PAGE __ OF __: Assign page numbers sequentially.

NAVSEA 4340/2 (Rev. Aug. 2021) Page of NAVSEA 4340/2 (Rev. Jul 2020) Page of

GOVERNMENT FURNISHED INFORMATION

(1) NUMBER

(5) GFI DUE DATE

(4) DOCUMENT DATE

(3) DOCUMENT NUMBER

(2) DOCUMENT TITLE

GOVERNMENT FURNISHED INFORMATION (CON'T)

(1) NUMBER

(5) GFI DUE DATE

(4) DOCUMENT DATE

(3) DOCUMENT NUMBER

(2) DOCUMENT TITLE

GOVERNMENT FURNISHED INFORMATION (CON'T)

(1) NUMBER

(5) GFI DUE DATE

(4) DOCUMENT DATE

(3) DOCUMENT NUMBER

(2) DOCUMENT TITLE

GOVERNMENT FURNISHED INFORMATION (CON'T)

(1) NUMBER

(5) GFI DUE DATE

(4) DOCUMENT DATE

(3) DOCUMENT NUMBER

(2) DOCUMENT TITLE

GOVERNMENT FURNISHED INFORMATION (CON'T)

(1) NUMBER

(5) GFI DUE DATE

(4) DOCUMENT DATE

(3) DOCUMENT NUMBER

(2) DOCUMENT TITLE

NAVSEA Form 4340/2 - Government Furnished Information Instructions

ATTACHMENT #: Leave blank, contracting officer will complete when preparing solicitation or contract.

PR #: Enter Purchase Request (PR) number.

PROGRAM TITLE: Enter the title of the program.

CONTRACT NO.: Leave blank if this requirement will result in a new contract. Insert contract number if the PR will result in the modification to an existing contract.

DATE: Enter the calendar date that this form was prepared.

CODE: Enter the Program Office / Requiring Activity's office code.

NUMBER, Column (1): Enter a sequential number for each item of GFI to be supplied.

DOCUMENT TITLE, Column (2): Enter Document Title for each item.

DOCUMENT NUMBER, Column (3): Enter Document Number assigned to identify a specific document. If no number has been assigned, leave blank.

DOC DATE, Column (4): Enter publication date of the document. If the item has no date assigned, leave blank. This format (MM/DD/YR) for the date is preferred (e.g., 06/25/16).

GFI DUE DATE, Column (5): Insert the date the item is due at the contractor's plant or is to be first available to the contractor for use. A calendar date format (MM/DD/YR) is preferred (e.g., 02/28/19), but following non-calendar methods are acceptable:

DAC - Days after contract award date MAC - Months after contract award date MACM - Months after contract modification date MAOE - Months after option exercise MBD - Months before delivery MBT - Months before the start of ship builder's trials or equipment test

PAGE __ OF __: Assign page numbers sequentially.

11.0.1.20130826.2.901444.899636

CurrentPage:
PageCount:
TextField1:
TextField2:
TextField7: LM2500 Power Turbine Blade & Vane Repair
TextField8:
DateField1: 16 May, 2023
TextField3: 424
DateField3: DAC
DateField2: 2022-05-31
TextField6: S9234-AD-MMO-070
TextField5: PROPULSION GAS TURBINE MODULE LM2500

VOLUME 3 PART 1 ILLUSTRATED PARTS BREAKDOWN GAS TURBINE ASSEMBLY

TextField4: 1

File details come from the government source that posted it. Updated .