RFP N6449823R40040001 AMENDMENT 0001.pdf

PDF 728 KB Posted

Attached to
Hull, Mechanical and Electrical (HM&E) Machinery and Systems Services
Solicitation number
N6449823R4004
Issued by

View the file

Other files

File Type Posted
RFP N6449823R40040005 CONFORMED THROUGH AMENDMENT 0005 - 3-2-23.pdf PDF
RFP N6449823R40040005 AMENDMENT 0005 - 3-2-23.pdf PDF
RFP N6449823R40040005 AMENDMENT 0005 - 3-2-23.pdf PDF
RFP N6449823R40040005 CONFORMED THROUGH AMENDMENT 0005.pdf PDF
RFP N6449823R40040004 AMENDMENT 0004 - 2-22-23.pdf PDF
RFP N6449823R40040004 CONFORMED THROUGH AMENDMENT 0004.pdf PDF
RFP N6449823R40040003 AMENDMENT 0003 - 2-17-23.pdf PDF
RFP N6449823R40040003 CONFORMED THROUGH AMENDMENT 0003.pdf PDF
RFP N6449823R40040002 CONFORMED THROUGH AMENDMENT 0002.pdf PDF
ATTACHMENT 4 DD254.pdf PDF
RFP N6449823R40040002 AMENDMENT 0002.pdf PDF
RFP N6449823R4004 CONFORMED THROUGH AMENDMENT 0001.pdf PDF
ATTACHMENT 8 -NSWCPD SBPCD.xlsx XLSX spreadsheet
ATTACHMENT 4 DD254.pdf PDF
RFP N6449823R4004 - 41-43 MAC FOLLOW-ON.pdf PDF
CDRL A006 Condition Found Report.pdf PDF
CDRL A004 Technical Report Services.pdf PDF
CDRL A005 Test Procedures.pdf PDF
ATTACHMENT 1 Pre Award Survey of Prospective Contractor Accounting System Checklist.pdf PDF
CDRL A013 - GP Inventory Report.pdf PDF
CDRL A025 Software Product.pdf PDF
CDRL A021 Work Completion Report.pdf PDF
CDRL A003 Contractor Personnel Roster.pdf PDF
CDRL A009 Obsolescence Alert Notice.pdf PDF
CDRL A023 EPC.pdf PDF
CDRL A002 Travel Trip Report.pdf PDF
CDRL A010 Small Business Utilization Report.pdf PDF
CDRL A018 Software Development Plan.pdf PDF
CDRL A027 Virtual Shelf Commonality Report.pdf PDF
RFP N6449823R4004 41-43 FOLLOW-ON MAC.pdf PDF
CDRL A008 Technical Manuals.pdf PDF
CDRL B001 Technical Data Package.pdf PDF
CDRL A020 Ship Check Report.pdf PDF
CDRL A026 Acceptance Inspection Equipment Report.pdf PDF
CDRL A011 Systems Security Plan.pdf PDF
ATTACHMENT 5 Commercial Warranty Tracking Information -Version 2.6.pdf PDF
CDRL A001 Contract Status Report.pdf PDF
CDRL A006 Condition Found Report.pdf PDF
CDRL A017 CSWF Baseline Certifications.pdf PDF
CDRL A007 Training Materials.pdf PDF
CDRL A022 Pre-Start Checklist and Parts Tracking.pdf PDF
ATTACHMENT 6 Commercial Warranty Source of Repair Instructions - Version 2.1.pdf PDF
ATTACHMENT 3 Government Furnished Property (GFP) Module Template - Version 2.1 (MAR 2020).xlsx XLSX spreadsheet
CDRL A024 QA Workbook.pdf PDF
CDRL A004 Technical Report Services.pdf PDF
CDRL A005 Test Procedures.pdf PDF
CDRL A014 - GP Inventory Report - Final.pdf PDF
CDRL A016 CSEP.pdf PDF
ATTACHMENT 2 Government Furnished Information (GFI) NAVSEA FORM 4340-2.pdf PDF
ATTACHMENT 4 DD254.pdf PDF
Show 40 more

Latest 50 of 54 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

See page 2.

1. CONTRACT ID CODE PAGE OF PAGES

S 1 50

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 07-Feb-2023

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N6449823R4004

X 9B. DATED (SEE ITEM 11)

19-Jan-2023

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

07-Feb-2023

CODE

NAVAL SURFACE WARFARE CENTER PHILA

CODE 02222, CRAIG WRIGHT

215-897-8275, CRAIG.WRIGHT@NAVY.MIL

5001 SOUTH BROAD STREET

PHILADELPHIA PA 19112

N64498 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

N6449823R4004

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION A - SOLICITATION/CONTRACT FORM

The required response date/time has changed from 20-Feb-2023 12:00 PM to 06-Mar-2023 12:00 PM.

The solicitation issue date has changed from 15-Mar-2022 to 19-Jan-2023.

The following have been added by full text:

AMENDMENT 0001

The purpose of the subject Amendment 0001 is to perform the following:

1. Extend the closing date of the solicitation from 20 February 2023 at 12:00 pm to 06 March 2023 at 12:00 pm in block 9 of the SF33.

2. Correct the SF33 block 5 Date Issued from 15-Mar-2022 to 19-Jan-2023.

3. Section C, SOW update Section 12.5 to delete the asterisk and reference to “(four resumes required).”

4. Section H, the fill-in at H-216-H002 LEVEL OF EFFORT--ALTERNATE I (NAVSEA) (NOV 2022), subparagraph (b) has been updated to reflect, “TBD AT TASK ORDER LEVEL.”

5. Section J, add Attachment 8 – NSWCPD Small Business Participation Commitment Document (SBPCD).

6. Section L, update Section L.3 table to specify the page count for Volume II – Technical to be 50 pages.

7. Section L, update Section L.3.2.5.c NAICS from 336611 with a size standard of 1,250 employees to

541330 with a size standard of $25.5 million.

8. Section L, update Section L.3.3.1 to reference Attachment 8 – NSWCPD Small Business Participation

Commitment Document (SBPCD) vice Attachment X.

9. Section L, update Section L.3.3.1 to indicate a Minimum Quantitative Requirement (MQR) of 40%, of which at least 25% shall be attributed to direct labor hours.

10. Update SAM.GOV Notice ID N6449823R4004 for the following:

a. Update the NACIS from 336611 to 541330.

b. Update the solicitation closing date and time from 20 February 2023 at 12:00 pm to 06 March

2023 at 12:00 pm.

c. Upload solicitation N6449823R4004 Amendment 0001.

d. Upload a working copy of Section J Attachment 4, DD254.

e. Add Section J Attachment 8 – NSWCPD Small Business Participation Commitment Document

(SBPCD).

11. Answer potential Offeror questions received in regards to solicitation N6449823R4004.

The answers to questions received are below:

1. The current closing date for this solicitation is a Federal Holiday, Presidents Day. Will the Government please provide a 2 week extension of time to submit.

ANSWER: Amendment 0001 updates the solicitation closing date and time from 20 February 2023 at 12:00 pm to

06 March 2023 at 12:00 pm.

2. RFP p. 180, Clause 52.204-8 states: “(a)(1) The North American Industry Classification System (NAICS) code for this acquisition is 541330.” RFP p. 206, Section L.3.2.5.c states “NOTE: The North American Industry

Classification (NAICS) code applicable to the requirements contained within this solicitation is 336611. Please clarify the NAICS Code.

ANSWER: The North American Industry Classification System (NAICS) code for this acquisition is 541330 with a size standard of $22.5 million. Section L.3.2.5.c has been updated to reflect 541330 with the correct size standard.

The solicitation posting in SAM has also been updated to reflect a NAICS of 541330.

3. RFP p. 206, Section L.3.3.1. Please provide the SBPCD attachment referenced in this section as attachment X.

ANSWER: The Small Business Participating Document (SBPCD) has been added as Attachment 8 in RFP Section

J. The SBPCD has been referenced as Attachment 8 in RFP Section L.3.3.1.

4. RFP p. 28, Section 12.3 indicates that zero resumes are required for Computer Engineer III. RFP p. 30, Section

12.5 states “Computer Engineer Level III* (EC3) (four resumes required)”. Please clarify if resumes are required for this non-key position.

ANSWER: Section C SOW, Section 12.5, has been updated to delete reference to “(four resumes required)” as well as the asterisk.

5. Will relevant experience be accepted in lieu of the degree requirements stated in the solicitation?

ANSWER: No, relevant experience will not be accepted in lieu of degree requirements as stated. The solicitation is clear on its face.

6. RFP p. 200, Section L.2 states: “The font shall be Times New Roman with a font size of 12 throughout the document.” Will the government allow a minimum font size of 8 for tables and charts?

ANSWER: No, the Government will not allow a minimum font size of 8 for tables and charts.

The font shall be Times New Roman with a font size of 12 throughout the document.

7. Volume III: Factor 2 - Section L.3.3.1 Small Business Participation Commitment Document (SBPCD) the government states “All Offerors (both other than small businesses and small businesses) shall comply with the requirements of this factor. In preparation of the Small Business Participating Document (SBPCD), please note the Minimum Quantitative Requirement (MQR) specified in Section M. Offerors shall submit the SBPCD in the format provided under Attachment X.” Would the Government please provide Attachment X?

ANSWER: Section L.3.3.1 has been updated to indicate a Minimum Quantitative Requirement (MQR) of 40%, with at least a minimum of 25% shall be attributed to direct labor, as well as assigns Attachment 8 to the Small Business

Participating Document (SBPCD).

8. Section L.3.2.5 (c) Subcontract Management states “The North American Industry Classification (NAICS) code applicable to the requirements contained within this solicitation is 336611. Section K Fill-in 52.204-8 (a)(1) states “The North American Industry Classification System (NAICS) code for this acquisition is 541330”.

Would the government clarify which NAICS code is applicable for this effort?

ANSWER: Please see the answer to #2.

9. Section L-215-H004, Instructions for Pricing of Contract Data Requirements List, Page 217 of the solicitation requires Offerors to complete the Price Group and Total Estimated Price blocks. Will the government please clarify if this is a requirement for this proposal submission?

ANSWER: The Offeror is not required to price Contract Data Requirements Lists (CDRLs) for this requirement since the CDRLs are Not Separately Priced (NSP), and the source selection is technical evaluation only.

10. Section L.3 of the RFP specifies the page count for Volume II-Technical to be 35 pages. Recognizing that the previous RFP for this work had a 50 page limit, the following new items have been added to N6449823R4004:

3.2.5 Computer Programming, Software Engineering and Network Support

3.7 Commonality of Systems, Subsystems, and Components;

3.8 Manufacturing Phase-Out or Discontinuation of Production, Diminishing Sources, and

Obsolete Materials or Components

Would the government consider an increase in the page count to 50 pages for Volume II-

Technical?

ANSWER: Section L.3 table of the RFP has been revised to specify the page count for Volume II – Technical to be

50 pages.

11. RFP L.3.2.3 Non-key Personnel states– “Resumes are not required for non-key personnel” SOW paragraph

12.5, non-key personnel, identifies a requirement under Computer Engineer III for four(4) resumes required. RFP 12.4.4, key personnel does not include Computer Engineer III as a key person. Please confirm that resumes are not required for Computer Engineer III (a non-key personnel).

ANSWER: Please see the answer to #4.

12. Based on the complexity of the RFP and the Government's desired response, coupled with the requirements for subcontractor Letters of Commitment, would the Government consider extending the due date by 15 days?

ANSWER: Please see the answer to #1.

13. On page 207 of 224, paragraph L.3.4 states "If subcontractor experience is submitted for consideration as part of the proposal, the Offeror should include a commitment signed by Offeror and subcontractor certifying that if a contract is awarded resulting from the proposal, the parties commit to joint performance as proposed." Would the government confirm that signed teaming agreements meet this requirement?

ANSWER: Yes, bilaterally signed teaming agreements meet the solicitation requirement.

14. On Page 206 of 224 the NAICS Code is listed as, "The North American Industry Classification (NAICS) code applicable to the requirements contained within this solicitation is 336611. Therefore, companies proposing as a subcontractor under this solicitation as a small business concern must have had an average over their three (3) previous fiscal years that was less than 1250 employees. The size standard certified to by the Prime for their contract is valid for the ordering period and duration of any resultant Contract and Delivery Order issued against this solicitation." Would the Government confirm that the NAICS code for this RFP is 336611?

15. On Page 180 of 224 the NAICS Code is listed as "(a)(1) The North American Industry Classification System

(NAICS) code for this acquisition is 541330. (2) The small business size standard is $22,500,000." Would the

Government confirm that the NAICS code is incorrectly listed on page 180 and it should be 336611?

16. On page 206 of 224, section L.3.3.1 speaks to a Small Business Participation Commitment Document located in Attachment X: "L.3.3.1 SMALL BUSINESS PARTICIPATION COMMITMENT DOCUMENT (SBPCD) 1.

Contracts would like to submit the questions listed at the end of this email in regards to the SBPCD and Attachment

X document. Normally we are provided a SBPCD attachment that includes both cost information and technical information."

Does the Government intend to provide an "Attachment X" SBPCD Template, or is this a document that will be created by the prime?

ANSWER: Please see the answer to #3.

17. On the Standard Form 33 the Date Issued is 15 Mar 2022. Would the Government update to reflect the correct issue date?

ANSWER: The Standard Form 33 block 5 Date Issued date has been updated from 15 March 2022 to 19 January

2023.

18. On page 30 the Computer Engineer III (EC3) LCAT states that four resumes are required. Would the

Government please confirm whether or not resumes are required for the Computer Engineer III (EC3) since it is a non-key LCAT?

19. Page 200 of 224, Section L.2.The proposal requirements specify font size not to exceed 12 point font. Will the

Government allow the use of 10 point font in tables and charts?

ANSWER: Please see the answer to #6.

20. Would the Government confirm there is no requirement for the subcontractors to submit anything to the

Government via DoD SAFE?

ANSWER: The solicitation is clear on its face.

21. The proposal submission date is February 20, 2023 which is a Federal Holiday. Will the Government extend the submission date one week?

22. Section K: (page 180) 52.204-8 ANNUAL REPRESENTATIONS AND CERTIFICATIONS (a)(1), states that the NAICS code for this acquisition is 541330, however, Section L.3.2.5 Subfactor E (c) (page 206) states that the

NAICS code is 336611. Will the Government clarify if both 541330 and 336611 are applicable to this MAC?

23. Section K: (page 180) 52.204-8 ANNUAL REPRESENTATIONS AND CERTIFICATIONS (a)(1), states that the NAICS code for this acquisition is 541330 with a small business size standard of $22,500,000. If NAICS code

541330 is applicable to this solicitation will the Government consider the exemption for a small business size standard size of $47,000,000?

ANSWER: The solicitation is clear on its face.

24. Section C, 12.3 LOE Table (page 28) states that there are 4 key positions requiring resumes, PM II. However, Paragraph 12.5, (page 30) states that the Computer Engineer Level III requires four resumes. Will the Government please clarify the key positions and the resumes required?

25. Section L: Clauses Incorporated by Reference (page 209) 252.215-7009 - Proposal Adequacy Checklist. Is the offeror required to submit this checklist with the proposal? If yes, which volume should contain the document?

ANSWER: As the source selection is technicual evaluation only, the checklist is not applicable.

26. The RFP is due on the 20th, which is a federal holiday. Will the Government revise the due date?

27. The RFP sates that questions are due 14 days after the issuance of the solicitation; however, the date of issue on the RFP is 15 March 2022. Can the Government please clarify the issue date and the deadline for questions?

ANSWER: The solicitation was posted to SAM.GOV on 19 January 2023, which is considered to be the date of issuance. The SF33 block 5 Date Issued has been updated to reflect 19 January 2023. Therefore, 02 February 2023 was the deadline for questions.

28. RFP L.3.2.3 indicates that resumes are not required for non-key personnel. Please confirm that resumes are not required for the non-key position of Computer Engineer Level III as indicated on page 30.

29. To facilitate the photographing of shop equipment from various teammates would the Government consider a two- week extension of time to submit the proposals?

30. Section L.1 General Instructions defines “subcontractor” and “major subcontractor” – please clarify how to determine the designation of “major subcontractor” as no pricing is to be submitted.

ANSWER: Please use the program ceiling amount of $496,122,347 of which ODCs total $227,784,120.

31. Section L.3.2.5 SUBFACTOR E – TECHNICAL AND MANAGEMENT APPROACH, subparagraph (c)

Subcontract Management states “Irrespective of the number of hours proposed, the Offeror shall provide a

Subcontract Management Plan detailing the work or portion of work that it intends to subcontract, the type of subcontract, its basis for selecting the subcontractor, and how each subcontractor will be integrated into the overall management plan.” Please explain as no pricing is required for the submission. Please note the italicized text.

32. Page 222, FACTOR 2. SMALL BUSINESS PARTICIPATION COMMITMENT, Paragraph 1. Small Business

Participation Commitment Document (SBPCD) states “The baseline small business Minimum Quantitative

Requirement (MQR) for small business is 40% of the total proposed contract value (not subcontracting dollars).

Of the proposed 40% of the total contract value at least 25% shall be attributed to direct labor hours. Proposals that do not use the total proposed contract value as the base in any calculations contained in the SBPCD, or that do not meet the MQR, will be considered unacceptable.” Please clarify how to comply with this requirement as no pricing is required in the submission.

33. Page 206, L.3.3.1 SMALL BUSINESS PARTICIPATION COMMITMENT DOCUMENT (SBPCD) states

“Signed letters of commitment/intent for each proposed small business subcontractor, performing labor hours, listed on the SBPCD.” Please explain how to comply with this requirement when no pricing is being submitted.

34. Page 7, B-216-H006 FEE TABLE (NAVSEA) (MAR 2019) – please advise how to respond when no pricing is being developed for the submission.

ANSWER: The table under B-216-H006 states, “TBD AT TASK ORDER LEVEL.”

35. Page 85, H-216-H002 LEVEL OF EFFORT--ALTERNATE I (NAVSEA) (NOV 2022), subparagraph (b) states

“Of the total man-hours of direct labor set forth in Section B, it is estimated that (Offeror to fill-in) man-hours are uncompensated effort.” Please explain how to comply with this requirement as no pricing is being developed for the submission.

ANSWER: The fill-in of H-216-H006 has been updated to reflect, “TBD AT TASK ORDER LEVEL.”

36. Please confirm the correct NAICS – both 541330 (page 180) and 336611 (page 206) are referenced in the RFP.

37. Would the Government allow a small font to be used for tables and graphics?

38. RFP N6449823R4004 - 41-43 MAC FOLLOW-ON Page 3-7 of 224 Section B

The Government states "Price or Cost will not be a factor" Would the Government remove max amount/Item No pricing from the Section B Document requirements?

ANSWER: No, they are placeholders for when the contract is awarded.

39. RFP N6449823R4004 - 41-43 MAC FOLLOW-ON Page 217 of 224 L-215-H004

The Government states "Offeror shall complete the "Price Group." Would the Government remove the pricing requirement from the solicitation?

ANSWER: Please see the answer to #9.

40. RFP N6449823R4004 - 41-43 MAC FOLLOW-ON Page 180 of 224 Section K – Representations, Certification and Other Statements of Offerors, Section K states that (a)(1) The North American Industry Classification

System (NAICS) code for this acquisition is 541330. However, SAM.GOV lists NAICS for this opportunity as

336611 - Ship Building and Repairing. However, Would the Government please clarify the correct NAICS code and update Section K to 336611 - Ship Building and Repairing?

41. RFP N6449823R4004 - 41-43 MAC FOLLOW-ON Page 200 of 224 L.2.1. PAGE NUMBERS AND LIMITS -

The bulleted list references Section J Attachments as excluded from the page limitations; yet we are unable to locate any reference in the Instructions as to where Section J Attachments are to be included. Would the

Government clarify in which Volume the Section J Attachments are to be included?

ANSWER: Each Section J Attachment, if applicable at the base contract level, would be included in whichever

Volume to which it applies. Several Section J Attachments are intended for use at the Task Order level in execution of the Contract.

42. RFP N6449823R4004 - 41-43 MAC FOLLOW-ON 206 of 224 L.3.3.1 SMALL BUSINESS

PARTICIPATION COMMITMENT DOCUMENT (SBPCD) The Government references an "Attachment X" but this attachment was not included in the RFP documents. Would the Government provide the referenced attachment?

43. RFP N6449823R4004 - 41-43 MAC FOLLOW-ON Page 222 of 224 Section M, FACTOR 2. SMALL

BUSINESS PARTICIPATION COMMITMENT Total proposed contract value - The baseline Minimum

Quantitative Requirement (MQR) for small business is 40% of the total proposed contract value (not subcontracting dollars). Since there is no Cost Volume/Pricing in this proposal, should offerors use the

Government’s total program estimate of $496,122,347 for calculating the small business goal?

ANSWER: Yes, please use the program ceiling amount of $496,122,347 of which ODCs total $227,784,120.

44. RFP N6449823R4004 - 41-43 MAC FOLLOW-ON Page 200 of 224 L.2. PROPOSAL FORMAT - The

Government states "Proposals shall be prepared on standard 8-1/2” by 11’ paper, set at single-spaced with 1” width spacing, 0” left and right indent and a single blank line before and after each paragraph." Does this requirement apply to graphics and tables or for text only?

ANSWER: The proposal format specified applies to the entire document.

45. RFP N6449823R4004 - 41-43 MAC FOLLOW-ON 200 of 224 - L.2. PROPOSAL FORMAT Would the

Government allow a smaller font size of no smaller than 10 point for tables to align with the font allowed for spreadsheets?

46. RFP N6449823R4004 - 41-43 MAC FOLLOW-ON 200 of 224 - L.2. PROPOSAL FORMAT Would the

Government allow a smaller font size of no smaller than 10 point for headers and footers?

47. RFP N6449823R4004 - 41-43 MAC FOLLOW-ON Page 200 of 224 - L.2. PROPOSAL FORMAT - The

Government states "The font shall be Times New Roman with a font size of 12 throughout the document."

Does this font requirement apply to information in the header and footer?

48. RFP N6449823R4004 - 41-43 MAC FOLLOW-ON Page 200 of 224 - L.2.1. PAGE NUMBERS AND LIMITS

Font Size in graphics Would the Government allow a smaller font size of no smaller than 10 point for drawings and graphics as a 12 point font may distort the presentation and flow of information within the graphic and make it difficult to understand?

49. RFP N6449823R4004 - 41-43 MAC FOLLOW-ON SF33 Would to Government consider an extension to the due date to 1 March 2023?

50. RFP N6449823R4004 - 41-43 MAC FOLLOW-ON ATTACHMENT 4 DD254

The provided file for Attachment 4 DD254 is "empty". Will the Government provide an updated DD254?

ANSWER: The Government has uploaded the DD254 to SAM.GOV.

51. 12.4 Key Personnel - Computer Engineers, Page 28-30, Program/Project Managers are listed as Key Personnel on page 29 but on page 30, the Computer Engineer III (EC3) states that four resumes are required. Additionally, in 12.3, on page 28, the table says that resumes are only required for the

Program/Project Manager. Are resumes required for the Computer Engineer III?

52. L.3.3.1 SBPCD, Page 206, This section requires the SBPCD to be submitted in the form of Attachment X which is not listed in Section J List of Attachments. Please provide Attachment X.

53. L.2. Proposal Format , Font Size, Page 200, RFP States: “The font shall be Times New Roman with a font size of 12 throughout the document.” Will the Government allow a smaller size font in Graphics?

54. K,52.204-8,(a)(1),(2),(3), NAICS Code, Pages 180/206, 52-204-8 (a) states applicable NAICS code is 541330 with a small business size standard of $22,500,000. L.3.2.5,c states that the NAICS code is 336611, with a size standard of 1,250 people. Can the Government please confirm the NAICS code and size standard for this effort?

55. We respectfully request that the subject solicitation proposal due date be extended to 13 March 2023.

56. Will the Government Agency confirm the NAICS code is 336611 and size standard is 1,250 employees? Section K (pg 180) identifies the NAICS Code and Size Standard as 541330 and 22,500,000 and

Section L (pg 206) identifies the NAICS Code and size standard as 336611 and 1250 employees. For reference, previous RFP (N6449817R4004) had same SOW and NAICS Code of 336611 and current RFP has a preponderance (61%) of work, measured by hours, in blue collar labor categories, leading this offeror to believe that Section K (pg 180) is incorrect.

57. 52.244-2(j), Subcontracts/SBPCD, Pages 110/207, All subcontracts and teaming agreements submitted with the proposal. Can the Government please confirm that Teaming Agreements are only required for Small Business

Subcontractors.

ANSWER: No, subcontracting/teaming agreements must be reported for all Subcontractors.

58. RFP Section L.3.3.1 Small Business Participation Commitment Document refers to an Attachment X for the

SBPCD format. Would the government please provide Attachment X?

The following have been modified:

NOTES

1. In accordance with Federal Acquisition Regulation (FAR) 15.304(c)(1)(ii), the Naval Surface Warfare Center

Philadelphia Division (NSWCPD) proposes to award an Indefinite Delivery, Indefinite Quantity (IDIQ) Multiple

Award Contract (MAC) to each and all qualifying Offerors. A qualifying Offeror is defined as a responsible Offeror whose offer/proposal, conforming to the solicitation, is considered to be technically acceptable in accordance with the evaluation criteria set forth in Section M and the Contracting Officer has no reason to believe would be likely to offer other than fair and reasonable pricing. Price or Cost will not be a factor in award of the IDIQ, however, price or cost will be considered as one of the factors in the selection decision for each task or delivery order under the

IDIQ.

2. This Multiple Award Contract (MAC) will expire either when the ordering term expires, or the cumulative total of all Task Orders (TOs) issued to all awardees equals the Government’s total program estimate of $496,122,347.

3. This procurement is being solicited unrestricted, with set-aside decisions to be made at the task order level.

4. The minimum contract award amount will be $500.00 of Hull, Mechanical, and Electrical Services (HM&E).

5. The Government Furnished Property will be provided at the Task Order level.

6. This is a competitive procurement. If the solicitation should result in a single offer, the Government reserves the right to re-solicit this procurement in order to enhance competition.

SECTION C - DESCRIPTIONS AND SPECIFICATIONS

The following have been modified:

STATEMENT OF WORK

Statement of Work (SOW) for

Hull, Mechanical and Electrical (HM&E) Machinery and Systems Services

1.0 INTRODUCTION

1.0.1 The Naval Surface Warfare Center Philadelphia Division (NSWCPD) is a Department of Defense entity responsible for research and development, test and evaluation, engineering and fleet support organization for the

Navy’s ships, submarines, military watercraft and unmanned vehicles. This requirement is for NSWCPD Divisions

41, 43, and 45, which are responsible for Auxiliary Machinery Systems, and Hull, Sail, and Machinery Systems, respectively.

1.0.2 This contract is for non-personal services. It does not create employment rights with the U.S. Government whether actual, inherent, or implied

1.0.3 Government/Contractor Relationship

1.0.3.1 The services to be delivered under this Contract are non-personal services and the parties recognize and agree that no employer-employee relationship exists or will exist under the Contract between the Government and the Contractor's personnel. Therefore, it is in the best interest of the Government to provide both parties a full understanding of their respective obligations.

1.0.3.2 The Contractor employees shall identify themselves as Contractor personnel by introducing themselves or being introduced as Contractor personnel and displaying distinguishable badges or other visible identification for meetings with Government personnel. In addition, Contractor personnel shall appropriately identify themselves as

Contractor employees in telephone conversations and in formal and informal written correspondence.

1.0.3.3 Contractor personnel under this Contract shall not engage in any of the inherently Governmental functions listed at FAR Subpart 7.5 or DFARS Subpart 207.5.

1.0.4 Employee Relationship:

1.0.4.1 The services to be performed under this Contract do not require the Contractor or its personnel to exercise personal judgment and discretion on behalf of the Government. Rather the Contractor's personnel will act and exercise personal judgment and discretion on behalf of the Contractor.

1.0.4.2 Rules, regulations, directives, and requirements that are issued by the U. S. Navy and NSWCPD under its responsibility for good order, administration, and security are applicable to all personnel who enter a Government installation or who travel on Government transportation. This is not to be construed or interpreted to establish any degree of Government control that is inconsistent with a non-personal services contract.

1.0.4.3 Inapplicability of Employee Benefits: This Contract does not create an employer-employee relationship.

Accordingly, entitlements and benefits applicable to such relationships do not apply.

1.0.4.4 It is the Contractor's, as well as the Government's, responsibility to monitor Contract activities and notify the

Contracting Officer if the Contractor believes that the intent of this Section has been or may be violated.

1.0.4.4.1 The Contractor shall notify the Contracting Officer in writing via letter or email within three (3) calendar days from the date of any incident that the Contractor considers to constitute a violation of this Section. The notice should include the date, nature, and circumstances of the conduct; the name, function, and activity of each

Government employee or Contractor official or employee involved or knowledgeable about such conduct; identify any documents or substance of any oral communication involved in the conduct; and the Contractor's estimated date when, absent a response, cost, schedule or performance will be impacted.

1.0.4.4.2 The Contracting Officer will, within five (5) calendar days after receipt of notice, respond to the notice in writing. In responding, the Contracting Officer will either:

(i) Confirm the conduct is in violation and when necessary direct the mode of further performance,

(ii) Countermand any communication regarded as a violation,

(iii) Deny that the conduct constitutes a violation and when necessary direct the mode of further performance, or

(iv) In the event the notice is inadequate to make a decision, advise the Contractor what additional information is required, and establish the date by which it should be furnished by the Contractor.

1.1 BACKGROUND

Naval Surface Warfare Center, Philadelphia Division (NSWCPD), as the Division's Machinery Engineering

Directorate, is the Navy’s agent for the coordination and planning of all the engineering and technical support services for Hull, Mechanical and Electrical (HM&E) machinery and systems. To accomplish this mission, NSWCPD utilizes extensive resources to conduct its business to the best advantage of the Navy, Fleet and other Federal Agency maritime assets. The engineering and technical support services are accomplished in all areas where Foreign Military, U.S.

Navy, and Military Sealift Command (MSC) ships operate and are homeported. These services are accomplished in whole or in phases that minimize interruption in ship operating schedules while maximizing the capacity of Type

Commander and NAVSEA agencies to upgrade and modernize systems.

Examples of the HM&E machinery and systems that are supported by the engineering and technical services described under this SOW are provided below.

AUXILIARY SYSTEMS

Auxiliary Machinery & Fluid Systems

Auxiliary Machinery Silencing Systems

Climate Control & Refrigeration Systems

Compressed Air & Gas Systems

Fluid Systems Automation

Seawater, Chill Water & Combat Support Systems

Sonar Systems

Steam Systems

Submarine Fluid Systems

Submarine Life Support Systems

Submarine Sail Systems

Vertical Launching Systems (VLS)

ELECTRICAL SYSTEMS

400 Hertz and DC Electrical Power Systems

Advanced Electrical Power Systems

Energy Conversion Systems

Gas Turbine Electrical Power Systems

Steam and Diesel Electrical Power Systems

HULL & DECK MACHINERY & HABITABILITY SYSTEMS

Amphibious Assault Systems

Anchor, Mooring and Towing Systems

Aviation & Material Handling and Stowage

Boat and Towed Body Handling & Stowage

Hull Outfitting & Shipboard Habitability Systems

Hydraulics and Steering Systems

Shipboard Cranes

Underway Replenishment Systems

Weapons/Cargo Handling and Stowage Systems

PROPULSION SYSTEMS

Diesel Engine Systems

Power Transmission Systems

Propulsion Steam Plant Automation Systems

Surface Combatant Gas Turbines

1.2 SCOPE OF WORK

The Statement of Work establishes the requirement for non-commercial engineering and technical services to include: design, development, build, and testing support; prototype engineering; technology insertion; development and revision of test specifications and technical documentation; performance and data analysis; system safety and fault analysis; system integration; installation support; computer programming and software engineering; software verification and validation; Integrated Logistics Support (ILS) document preparation and system training development; program management and presentation support; and on-site technical support, alteration services, Integrated logistics, system certification support and staging in support of surface fleet, submarine, and shore-based installations in support of HM&E machinery and systems, other Federal Agency vessels, federally contracted vessels and platforms, selected maritime agency vessels, and select land-based sites.

2.0 APPLICABLE DOCUMENTS

2.1. ASTM-1166, Human Systems Interface for Marine Systems

2.2. NAVSEA S9AA0-AB-GSO-010, General Specification for Overhaul of Surface Navy Ships

2.3. NAVSEA 0902-018 2010 Rev B, General Overhaul Specifications for Deep Diving SSBN/SSN

Submarines (DDGOS), dated 1-Aug-2018

2.4. NAVSEA S9AA0-AA-SPN-010/GEN SPEC, General Specifications for Ships

2.5. NAVSEA SL720-AAMAN_010/FMP, Fleet Modernization Program (FMP) Management & Operations

Manual, dated 15-Apr-2016

2.6. MIL-HDBK-454B, Standard General Guidelines for Electronic Equipment

2.7. NAVSEA Technical Publication S9074-AQ-GIB-010/248, Requirements for Welding and Brazing

Procedure and Performance Qualification (Amend 002)

2.8. NAVSEA S9300-AW-EDG-010, Electrical Plant Installation Standard Methods

2.9. Electrical Workmanship Standards, Portsmouth Naval Shipyard Standard 4855.1 through 4855.6

2.10. MIL-DTL-81927C, Manuals, Technical: General Style and Format of Work Package Concept, dated 26

Nov 1997

2.11. MIL-STD-38784(1), Standard Practice for Manuals, Technical: General Style and Format, dated 1 Dec

2.12. MIL-PRF-87269A, Interactive Electronic Technical Manuals, dated 15 Aug 2000, Data Base, Revisable

2.13. MIL-DTL-24784 06, Manuals, Technical: General Acquisition and Development Requirements, dated

June 2017

2.14. MIL-STD-1689A, Fabrication, Welding and Inspection of Ship Structures (Amend 002)

2.15. MIL-STD-0022, Welded Joint Design

2.16. MIL-STD-882E, System Safety

2.17. MIL-P-24534A (Navy); Planned Maintenance System: Development of Maintenance Requirement Cards, Maintenance Index Pages, and Associated Documentation, dated 7 May 1985

2.18. S0005-AA-GYD-030, Guide for User Maintenance of NAVSEA Technical Manuals, dated 30 Sep 1988

2.19. S0005-AA-GYD-070, Guide for Quality Assurance of NAVSEA Technical Manuals, dated 01 Feb 1991

2.20. OPNAV Instruction 5100.23B, Navy Safety and Occupational Health Manual

2.21. NAVSEA T9074-AS-GIB-010/271, Requirements for Nondestructive Testing Methods

2.22. AWS B4.0, Standard Methods of Mechanical Testing of Weld

2.23. AWS Z49.1, Safety Welding and Cutting

2.24. Standards and Interpretations, Occupational Safety and Health Chapters 1915.14, 1915.15 and 1915.16

2.25. NAVSEA Technical Publication S9074-AR-GIB-010/278, Requirements for Fabrication Welding

2.26. NAVSEA Standard Items

2.27. NAVSEA TS9090-310 (Latest Revision) Alterations to Ships Accomplished by Alteration Installation

Teams

2.28. NAVSEA TS9090-600 Ship Alteration Drawing Preparation

2.29. NAVSEA TS9090-400 Ship Change Document

2.30. IEEE Std 610.12-1990, Standard Glossary of Software Engineering Terminology (ANSI)

2.31. IEEE Std 12207.0-1996, Software Life Cycle Process

2.32. IEEE Std 12207.1-1997, Software Life Cycle Process-Life Cycle Data

2.33. IEEE Std 12207.2-1997, Software Life Cycle Process-Implementation Considerations

2.34. NAVSEA Information Technology Standard Guidance

2.35. ASQ/ANSI/ISO 9001:2015, “Quality Management Systems — Requirements”

2.36. ISO-9002 Quality Systems - Model for Quality Assurance in Production, Installation and Servicing

2.37. COMFLTFORCOMINST 4790.3, Joint Fleet Maintenance Manual at www.submepp.navy.mil/jfmm/index.htm

2.38. NIST SP-800-37, Risk Management Framework for IT and Organizations

2.39. NIST SP-800-53, Security and Privacy Controls for Federal IS and Org.

2.40. DoD 5220.22-M National Industrial Security Program Operating Manual

2.41. DoD 8510.01 Risk Management Framework for Information Technology

2.42. DoD 8570.01-M Information Assurance Workforce Improvement Program

2.43. DoD 8140.01 Cyberspace Workforce Management Requirement

2.44. DoD Cyber Exchange Public, DoD Approved 8570 Baseline Certifications, available https://public.cyber.mil/cwmp/dod-approved-5870-baseline-certifications/

2.45. NAVSEAINST 4720.14E, Temporary Alterations to Fleet Submarines

2.46. NAVSEAINST 4350.2D, Contract Work Onboard Nuclear-Powered Ships, dated 5 Jun 2013

2.47. NAVSEAINST C9210.4A, Changes, Repairs and Maintenance to Nuclear Powered Ships

2.48. NAVSEAINST 4120.8A, NAVSEA Policy for Commonality of Systems, Subsystems, and Components, 22 Sep 2016.

These documents can be referenced at: https://mercury.tdmis.navy.mil unless otherwise noted. The Contractor shall reference and utilize the latest version available unless otherwise noted.

Additional reference documents and applicable standards may be listed on individual Task Orders.

3.0 REQUIREMENTS

The specific services to be provided and required deliverables shall be detailed in the individual Task Orders placed against the contract by the Contracting Officer, and shall be within the parameters of one or more of the tasks listed below. To fulfill Task Orders written under this Contract, the Contractor shall:

3.1 Program Management

3.1.1 Ensure mission responsive, cost efficient management of the cost, schedule and performance goals and objectives of the contract. Plan and conduct Program Review Meetings in accordance with Task

Order requirements. (CDRL A001, A002, A003, A016, A019)

3.1.2 Analyze technical goals and facility requirements, and assist the Government in developing proposals to support the research, development, test and evaluation (RDT&E) of HM&E machinery and systems.

3.1.3 Prepare technical reports that document engineering efforts. Reports may be informal summary reports, or drafts or final submittals of formal technical reports, as specified by the Government in accordance with CDRL A004.

3.1.4 Assist in the review of technical documentation, such as specifications, drawings, and procedures, and provide comments relative to established technical objectives. (CDRL A004, A005, B001) https://public.cyber.mil/cwmp/dod-approved-5870-baseline-certifications/ https://mercury.tdmis.navy.mil/

3.1.5 Prepare presentation materials such as view graphs, slide decks and videos, military equipment specifications, equipment acquisition specifications, etc. Provide technical writing and publication support, and related services.

3.2 Engineering and Technical Support Services

3.2.1 Component and System Level Engineering Analysis, Development, and Design

3.2.1.1 Provide engineering, testing, and analysis services to evaluate safety, reliability, maintainability, performance, qualification, and availability, and to identify and develop solutions to engineering, design, and maintenance problems. Performance may occur on-site at Government facilities or at Contractor’s facilities.

3.2.1.2 Provide support for engineering and technical investigations and analyses relating to concepts and designs, focusing on systems engineering, compatibility and operability, and interfaces. Prepare procedures for integration of new installation/alteration projects, including identifying and defining interfaces and relationships between these programs and other DoD systems and subsystems.

3.2.1.3 Develop or review test specifications, and monitor testing of HM&E and associated electronic systems. (CDRL A004, A005)

3.2.1.4 Provide support to develop drawings, field sketches, test memoranda, installation procedures, and maintenance procedures, as required to accomplish the necessary work. (CDRL A004, B001)

3.2.1.5 Provide new, revised or updated documentation reflecting changed configurations.

(CDRL A004, A008, B001)

3.2.1.6 Conduct systems engineering to include fault analysis, detection, and isolation, casualty control, human engineering factors, and operations sequencing capabilities in the ships detail design. Establish detailed maintainability design criteria to minimize the maintenance man-hours required. Calculate and provide available equipment reliability data, such as Mean Time to Repair (MTTR), Mean Time Between Failures

(MTBF) and Maximum Corrective Maintenance Time values.

3.2.1.7 Conduct ship assessment engineering visits in support of various material assessment programs. (CDRL A006, A015)

3.2.2 Prototype Engineering

3.2.2.1 Provide engineering services to analyze Non-Developmental Item (NDI)/Commercial

Off the Shelf (COTS) technology insertion, prototype demonstrations and evaluate integration with existing systems and perform system qualification.

3.2.2.2 Develop integrated Operational Evaluations (OPEVALs) and Technical Evaluations

(TECHEVALs), planning and necessary ship change documentation (i.e. Ship’s

Change Documents (SCDs), Ship Alterations (SHIPALTs), Temporary Alterations

(TEMPALTs), Ordnance Alterations (ORDALTs), Field Changes, Alterations

Equivalent to Repair (AERs), etc.) for system integration and installation.

3.2.2.3 Establish performance and design specifications for prototype equipment and testing articles.

3.2.2.4 Provide engineering and design services, and analyses, for newly developed or modified COTS systems.

3.2.2.5 Test, evaluate and install prototype equipment in accordance with performance specifications and other applicable requirements as specified in Task Orders.

3.2.2.6 Develop design drawings for installation of shipboard systems, including prototype systems and equipment. (CDRL B001)

3.2.2.7 Design and fabricate models, prototypes and other testing articles to be evaluated in

RDT&E efforts.

3.2.3 System Automation

3.2.3.1 Provide engineering services to analyze, develop, design, and support automation of system operation and maintenance.

3.2.4 Graphics Support

3.2.4.1 Prepare graphic materials, such as Plan of Action and Milestones (POA&Ms) and

Variant-tree diagrams, in support of engineering programs. (CDRL A019)

3.2.4.2 Develop orientation and presentation materials (i.e., written, viewgraphs, DVDs, Blu-rays, CD-ROM, etc.).

3.2.4.3 Develop layouts, charts, graphs, visuals, and other graphics as needed for engineering drawings, documentation, technical manuals (TMs), and training materials.

3.2.5 Computer Programming, Software Engineering and Network Support (CDRLs A017, A018, A025)

3.2.5.1 Provide analysis and design of computer software systems.

3.2.5.2 Provide software verification and validation services including software system emulation.

3.2.5.3 Develop software and graphical user interfaces (GUIs). Document and test code in accordance with established NSWCPD policy.

3.2.5.4 Develop simulation techniques, real-time software architectures, and graphics screen interfaces.

3.2.5.5 Develop software on communications algorithms. (e.g. TCP/IP, UDP).

3.2.5.6 Develop software on Component Object Model (COM) and Active Template Library

(ATL) programming.

3.2.5.7 Provide server and workstation setup and administration. Personnel performing under this task must meet all applicable Cybersecurity Workforce (CSWF) requirements and provide proof of current (ongoing) certification.

3.2.5.8 Modify and/or develop computer code in the following languages: C/C++, SQL, Java, CMS2, Ada, Visual Basic and Delphi, and other languages as specified on individual

Task Orders. Computer programming languages selected for use in all applications shall require approval by the Navy.

3.2.5.9 Develop and deliver documentation for computer software in accordance with

IEEE/EIA 12207 requirements. Tailored requirements will be provided by the Navy.

Comments to all source code and any developmental tools shall be provided in a format approved by the Navy.

3.2.5.10 Design, develop, administer, implement, test, modify, and upgrade database maintenance support programs utilizing latest COTS software.

3.2.5.11 Develop and deliver software development plans (CDRL A018) and software products

(CDRL A025).

3.2.5.12 Conduct software development testing and configuration management in accordance with IEEE 12207 and other standards as specified on individual Task Orders.

3.2.5.13 Provide network engineering and technical services as required to support alteration installation as directed by individual Task Orders.

3.2.6 Human Systems Interface and Engineering Risk/Safety Assessment Support

3.2.6.1 Provide engineering services to identify system hazards or safety concerns to machinery and personnel during technology insertion, prototype demonstrations or designs and integration with existing systems.

3.2.6.2 Provide engineering services to identify Human Systems Interface (HSI) during technology insertion, prototype demonstrations or designs and integration with existing systems.

3.2.6.3 Provide engineering services to analyze and quantify system hazards or safety concerns to machinery and personnel for frequency and impact during technology insertion, prototype demonstrations or designs and integration with existing systems.

3.2.6.4 Provide engineering support for technology insertion, prototype demonstrations or designs and integration with existing systems.

3.3 Shipboard, Submarine and Shore-Based Installations

3.3.1 Perform Installation/Repair Planning: Plan and coordinate the use of facilities, equipment, materials and personnel resources necessary to efficiently and effectively accomplish installations and repairs.

3.3.1.1 Designate a Contractor Installation/Repair Team Leader. The Team Leader shall be the Contractor’s focal point to the Program Office Alteration Installation/Repair Team

(AIT) installation manager.

3.3.1.2 Conduct pre-installation/pre-repair site surveys and ship checks on designated ships

(CDRL A006, A015), and develop a detailed installation/repair schedule and POA&M which details the installation/repairing, testing and checkout phases of the effort

(CDRL A019).

3.3.1.3 Review and compare applicable ship change documentation (SCD, ORDALTs, SHIPALTs, MACHALTs, TEMPALTs and AERs) or working plans for each ship class for compliance with existing Installation Control Drawings (ICD) and recommend changes. Include findings and recommendations in the Ship Check

Report. (CDRL A006, A015, A020)

3.3.1.4 Ensure that all requirements of the Industrial/Alteration Pre-start Checklist are accomplished prior to the start of the installation/repair. (CDRL A022)

3.3.1.5 Coordinate installation/repair schedule and POA&M with ship’s force, Government and other activities as necessary to ensure proper support is available and interference or delays are minimized. (CDRL A019)

3.3.1.6 Prepare and submit the necessary Quality Assurance (QA) documentation prior to the start of the installation or repair (CDRL A024).

3.3.2 Alteration Installations and Repairs

3.3.2.1 Provide the personnel necessary to successfully complete the installation or repair detailed on individual Task Orders.

3.3.2.2 Provide fabrication services for material, structures, cabinets and other components as specified by plans, drawings, schematics or other requirements as specified on individual Task Orders.

3.3.2.3 Provide portable workshops as required to support AIT. Provide the necessary tools, equipment and maintenance for the portable workshop.

3.3.2.4 Remove and relocate the necessary existing equipment per applicable alteration drawings. Dispose or reuse removed equipment as required by the Task Order.

3.3.2.5 Perform the alteration installation/repair in accordance with plans, procedures and drawings developed under Section 3.3.1, and specific guidance defined in individual

Task Orders.

3.3.2.6 Rehabilitate affected spaces to original or equivalent condition. This includes:

3.3.2.6.1 Cleaning, preparing, priming and painting new and disturbed surfaces and components to match surrounding areas.

3.3.2.6.2 Replacing all deck coverings and insulation damaged incidental to installation.

3.3.2.6.3 Repairing all damaged lagging and installing new lagging where required.

3.3.2.6.4 Preparing and attaching applicable labels, tags, and nameplates to power panels, piping, data and power cables, and other equipment.

3.3.2.7 Develop and perform procedures for testing and checkout of installed/repaired systems, including system circuit tests, system operability tests and QA tests. (CDRL

A004, A005, A022, A026)

3.3.2.8 Provide specific installation/repair status and financial reports as specified in individual Task Orders. (CDRL A001, A016, A021)

3.3.2.9 Provide materials, consumables, and tooling needed to complete the installation or repair as specified on individual Task Orders.

3.3.3 Post-Installation Reporting and Closeout

3.3.3.1 Provide Shipboard Industrial Work Completion Reports in accordance with NAVSEA

TS9090-310 (Latest Revision) Alterations to Ships Accomplished by Alteration

Installation Teams. (CDRL A021)

3.3.4 Other…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .