N6339421R0017_Summary of Changes_Amendment 4.pdf
PDF 367 KB Posted
- Attached to
- Vertical Launching System (VLS) - Launch Control Unit (LCU) Federal contract opportunity
- Solicitation number
- N6339421R0017
About this file
This document provides an amendment to a solicitation for the fabrication, assembly, testing and delivery of Vertical Launching System (VLS) Launch Control Units (LCU).
The amendment provides responses to industry questions received regarding the solicitation. It clarifies that adjustments will not be made to account for variable shipping costs in the price evaluation. The response date for proposals is changed from 11 October 2021 to 12 October 2021. Drawings and technical data packages for the LCUs will be provided by the Naval Surface Warfare Center Port Hueneme Division to qualified contractors. The solicitation seeks the production of LCU MK 235 Mod 17, Mod 18, maintenance kits, spare parts kits, and depot kits to support Mod 17, Mod 18, Mod 15, Mod 12 and Mod 11 configurations.
View the file
Other files for this federal contract opportunity
Show all 26
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to provide responses to industry questions received to date.
1. CONTRACT ID CODE PAGE OF PAGES
1 6
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N6339421R0017
X 9B. DATED (SEE ITEM 11)
18-Aug-2021
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
U0004
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3.EFFECTIVE DATE
05-Oct-2021
CODE
NAVAL SURFACE WARFARE CENTER
4363 MISSILE WAY
PORT HUENEME CA 93043-4307
N63394 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N6339421R0017
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
SOLICITATION AMENDMENT 4
Q&A
1. Question: Can the Government provide the audit excel files or the indentured parts list text files that include quantities columns?
Answer: The TDP determines the BOM. The Government does not have a separate BOM and one will not be provided.
2. Question: Re: TDP/Attachment 1. In reviewing the TDP, we found what we believe may be some discrepancies between the parts lists provided in the TDP folder and attachment J-1. There seem to be extra parts (a CCA and 28 cables) in the INCO and DEPOT list in J-1.
Answer: The CCAs and 28 cables are not applicable to the LCU, please disregard. The Government’s response and resolution are found in the last two columns of the following table:
Drawing
No.
Dash
No.
Affected
Title Used on
Assembly
Drawing Comments
(note if U/O PP)
Government’s
Response
Government’s
Resolution
8652182 -9
CCA,
RECEIVER,
GEM GPS VME
MOD 15
OBRP
Item to be provided as
GFM. No drawing to be provided
No Action
Necessary
79C0048 -01
FAN, 12VDC,
235CFM W/
FPS
7421118-under MOD 11/12 INCO spares
Listed with supplier PNs in 7999121.
7999121KT was provided
Upon request, the
Government will provide version
7999121KW
7382275 -01
POWER KIT,
CONDITIONER
- NGP 115VAC
1 PH IN,
115VAC 1.8
KW OUT
7572100-item 35 under 7104280-
179 we have the PL, just not the base drawing also a reference doc in
7382266-02
This is a kit. It has a PL but no drawing.
No Action
Necessary
7381617 -03
HARDWARE
KIT, SHOCK
7383326-item 22 under 7104280-
179 only have PL
7104280-179 uses
7383326-03 which does not call out 7381617
No Action
Necessary
79C0069 -01 SHOCK ASSY
7381617-item 1 under 7104280-
Listed with supplier PNs in 7999121.
7999121KT was provided
Upon request, the
Government will provide version
7999121KW
79C0163 -14 FILTER ASSY
7382270-item 1 under 7104280-
Listed with supplier PNs in 7999121.
7999121KT was provided
Upon request, the
Government will provide version
7999121KW
79C0094 -02
POWER
CONDITIONER
7382275-item 1 under 7104280-
Listed with supplier PNs in 7999121.
7999121KT was provided
Upon request, the
Government will provide version
7999121KW
7956645 -03 WIRE FABRIC
7383326-
ITEM 1 UNDER
7373704-00, 7369699-
00, 7373766-00, &
7373729-02 PARTS
LIST
7956645 is included in
7104280-179, & -189 in the Drawings/Q70 folder
No Action
Necessary
7956645 -00 WIRE FABRIC
8652120-
ITEM 1 UNDER
7375272-00 PARTS
LIST
7956645 is included in
7104280-179, & -189 in the Drawings/Q70 folder
No Action
Necessary
7956912 -03
ANODIZED
ALUMINUM
SHEET
7572100-
ITEM 1 UNDER
7376555-00 PARTS
LIST
7956912 is included in
7104280-179, & -189 in the Drawings/Q70 folder. Also listed in
Row 11
No Action
Necessary
7956359 -00
ADHESIVE -
BONDING
FILM
7572100-
ITEM 2 UNDER
7376555-00 PARTS
LIST
7956359 is included in
7104280-179, & -189 in the Drawings/Q70 folder. Also listed in
Row 12
No Action
Necessary
7104655 -1
PAD,
COMPRESSIVE
SILICONE
SPONGE
7572068-
ITEM 2 UNDER
7104654-9 PARTS LIST
7104655 is included in
7104280-179, & -189 in the Drawings folder.
No Action
Necessary
7959246 -01 PAINT
7383326-
ITEM 5 UNDER
7373748-00 PARTS
LIST
7373681-01
7373683-00
7373710-04
7373701-01
7386943-21
7368364-00
7368365-04
7959246 is included in
7104280-179, & -189 in the Drawings/Q70 folder.
No Action
Necessary
7956193 -00 PAINT-EPOXY
7383326-
ITEM 5A UNDER
7373748-00 PARTS
LIST
7410756-00
7410756-01
7373681-01
7373683-00
7373710-04
7373701-01
7386943-21
7956193 is included in
7104280-179, & -189 in the Drawings/Q70 folder.
No Action
Necessary
7368364-00
7368365-04
7999070 EPOXY PAINT
7383326-
ITEM S06 UNDER
7373748-00 PARTS
LIST
7410756-00
7410756-01
7373681-01
7373683-00
7373710-04
7373701-01
7386943-21
7368364-00
7368365-04
7381679-16
7999070 is included in
7104280-179, & -189 in the Drawings/Q70 folder.
No Action
Necessary
7999053 -00
PAINT
ACCEPTANCE
CRITERIA
7383326-
ITEM SO7 UNDER
7373748-00 PARTS
LIST
7410756-00
7410756-01
7373681-01
7373683-00
7373710-04
7373701-01
7386943-21
7368364-00
7368365-04
7381679-16
7999053 is included in
7104280-179, & -189 in the Drawings/Q70 folder.
No Action
Necessary
7410760 -00
RETAINER,
DOOR BOLT
7376490-
ITEM 4 UNDER
7376489-02 PARTS
LIST
7410760 is included in
7104280-179, & -189 in the Drawings/Q70 folder.
No Action
Necessary
7572088 -19
TRANSITION
MODULE
SUPPORT
BRACKET
8652400-
MISSING PARTS LIST
Included with delivery for both 7104280-179, and -189 file labeled
PL7572080
No Action
Necessary
7572091 -9
MOUNTING
PLATE, PTC
8652400-
MISSING PARTS LIST
Drawing and PL included in delivery of
7104280-189, received
PL on 2021-08-26 post compilation of the -179
Upon request, the
Government will provide
PL
7956253 -132
ALUMINUM
ALLOY BAR
7376490-
7240395-00
Included in delivery of
7104280-179, & -189 located in Drawings/Q70 folder
No Action
Necessary
7909210 -03 SCREW
7376490-
7240395-00
Included in delivery of
7104280-179, & -189
No Action
Necessary located in Drawings/Q70 folder
7957160 -03
COATING
COMPOUND
7376490-
7240395-00
Included in delivery of
7104280-179, & -189 located in Drawings/Q70 folder
No Action
Necessary
7956498 -05
PLASTIC
SHEET
7383329-
7373715-00
7373715-01
Included in delivery of
7104280-179, & -189 located in Drawings/Q70 folder
No Action
Necessary
7956168 -00
ADHESIVE -
EPOXY
7383329-
7373715-00
7373715-01
Included in delivery of
7104280-179, & -189 located in Drawings/Q70 folder
No Action
Necessary
903662 -04
NUT, SELF-
LOCKING
8652120-
7373410-04
7375279-00
7375279-01
7368364-00
7381679-16
Included in delivery of
7104280-179, & -189 located in Drawings/Q70 folder
No Action
Necessary
7999063
ALUMINUM
BRAZING &
WELDING
8652120-
7373410-04
Included in delivery of
7104280-179, & -189 located in Drawings/Q70 folder
No Action
Necessary
907724 -04 STUD-CLINCH 7381679-16
Not Required. As per
7381679_W_90536_PL
(provided) this Drawing
No. is only used on the
Dash 00 and 01
No Action
Necessary
906375 -04 STUD-CLINCH 7381679-16
Not Required. As per
7381679_W_90536_PL
(provided) this Drawing
No. is only used on the
Dash 03 and 04
No Action
Necessary
3. Question: Re: Exhibit_(A)_CDRLS. According to L-215-H004(a), The Offeror shall complete the “Price
Group” (Block 17) and “Estimated Total Price” (Block 18) of each data item on the Contract Data
Requirements List (CDRL). In Exhibit A, “N/A” has been entered into the “Estimated Total Price”. Is the
Offeror supposed to override the “N/A” in Block 18 with a price in Exhibit A, as well as enter the “Price
Group” in Block 17?
Answer: Exhibit_(A)_CDRL, block 18 with “N/A” was deleted to allow offerors to fill in the appropriate information in accordance with L-215-H004.
4. Question: Re: Solicitation Amendment 3, Question #1. Bid submissions are currently due 11 October 2021.
This is a Federal Holiday. Please confirm due date of 11 October 2021 and that the Government intends on confirming receipt of Bid submittals same day despite the Holiday? Or will the Bid Submission date be extended?
Answer: The proposal submissions have been updated to 12 October 2021 via amendment 4.
5. Question: The Government has confirmed that deliveries are FOB (Destination). Based on Section L 3.0, the Price factor is to be evaluated by “only a price analysis to the extent it is required, in accordance with
FAR 15.404-1(b)(1)." How does the Government intend to evaluate and account for the price variations due to each Bidder’s variable shipment/insurance costs from the Bidder’s place of shipment to Government
Destination point?
Answer: The evaluation methodology for Factor 1 Total Evaluated Price is specified in Section M 3.0.
Adjustments will not be made to account for the various shipping costs offerors may encounter.
SECTION A - SOLICITATION/CONTRACT FORM
The required response date/time has changed from 11-Oct-2021 04:00 PM to 12-Oct-2021 04:00 PM.
(End of Summary of Changes)
File details come from the government source that posted it. Updated .