N6339421R0017_Conformed Copy_Amendment 5.pdf
PDF 1 MB Posted
- Attached to
- Vertical Launching System (VLS) - Launch Control Unit (LCU) Federal contract opportunity
- Solicitation number
- N6339421R0017
About this file
This solicitation seeks proposals for the fabrication, assembly, testing and delivery of Vertical Launching System Launch Control Units MK 235 Mod 17 and Mod 18, as well as associated Maintenance Assistance Module kits, Onboard Repair Part kits, Installation and Checkout spares kits, and Depot spares kits. The Naval Surface Warfare Center Port Hueneme Division is the program authority, with deliverables including units, data items, and production readiness reviews. Offerors must meet requirements defined in the statement of work and technical data packages. The contractor will perform first article inspections and support a follow-on physical configuration audit. Questions are due by two weeks before proposals, with submissions required by 12 October 2021.
View the file
Other files for this federal contract opportunity
Show all 26
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CODE
(Hour)
PAGE(S)
until 04:00 PM local t ime 25 Oct 2021
X
A X B X C X D
EX
X
G F 133 - 140
141 - 153 X H 154
RATING PAGE OF PAGES
7. ISSUED BY
(Date)
IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.
Previous Edition is Unusable 33-134 STANDARD FORM 33 (REV. 9-97)
Prescribed by GSA FAR (48 CFR) 53.214(c)
DX-A3 1 160
(If other than Item 7)
15A. NAME 16. NAME AND TITLE OF PERSON AUTHORIZED TO
AND
ADDRESS SIGN OFFER (Type or print)
OF
OFFEROR
AMENDMENT NO. DATE
15B. TELEPHONE NO (Include area code) 17. SIGNATURE15C. CHECK IF REMITTANCE ADDRESS
IS DIFFERENT FROM ABOVE - ENTER
SUCH ADDRESS IN SCHEDULE.
18. OFFER DATE
1. THIS CONTRACT IS A RATED ORDER
UNDER DPAS (15 CFR 700)
2. CONTRACT NO.
N63394 8. ADDRESS OFFER TO
See Item 7
9. Sealed offers in original and 0 copies for furnishing the supplies or services in the Schedule will be received at the place specified in Item 8, or if handcarried, in the depository located in
CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and
N/A conditions contained in this solicitation.
10. FOR INFORMATION
CALL:
A. NAME (NO COLLECT CALLS)
11. TABLE OF CONTENTS
SOLICITATION/ CONTRACT FORM
SUPPLIES OR SERVICES AND PRICES/ COSTS
1 - 11 12 - 68
X I CONTRACT CLAUSES
DESCRIPTION/ SPECS./ WORK STATEMENT X
PACKAGING AND MARKING
69 - 90 91 - 93
J LIST OF ATTACHMENTS
INSPECTION AND ACCEPTANCE
DELIVERIES OR PERFORMANCE
94 - 98
99 - 109 X K REPRESENTATIONS, CERTIFICATIONS AND
OTHER STATEMENTS OF OFFERORS
CONTRACT ADMINISTRATION DATA 110 - 118 X
SPECIAL CONTRACT REQUIREMENTS
OFFER (Must be fully completed by offeror) 119 - 120 X M
L INSTRS., CONDS., AND NOTICES TO OFFERORS
EVALUATION FACTORS FOR AWARD
NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.
is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.
13. DISCOUNT FOR PROMPT PAYMENT
(See Section I, Clause No. 52.232-8)
14. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments
AMENDMENT NO. DATE
to the SOLICITATION for offerors and related documents numbered and dated):
FACILITY
12. In compliance with the above, the undersigned agrees, if this offer is accepted within calendar days (60 calendar days unless a different period
SOLICITATION, OFFER AND AWARD
X
(X) SEC. DESCRIPTION (X) SEC. DESCRIPTION PAGE(S)
PART I - THE SCHEDULE
26. NAME OF CONTRACTING OFFICER (Type or print) 27. UNITED STATES OF AMERICA 28. AWARD DATE
EMAIL:TEL: (Signature of Contracting Officer)
CODE CODE
B. TELEPHONE (Include area code) C. E-MAIL ADDRESS
AWARD (To be completed by Government)
19. ACCEPTED AS TO ITEMS NUMBERED 20. AMOUNT 21. ACCOUNTING AND APPROPRIATION
22. AUTHORITY FOR USING OTHER THAN FULL AND OPEN COMPETITION:
10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)
23. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
24. ADMINISTERED BY (If other than Item 7) CODE 25. PAYMENT WILL BE MADE BY CODE
PART IV - REPRESENTATIO NS AND INSTRUCTIO NS
PART III - LIST O F DO CUMENTS, EXHIBITS AND O THER ATTACHMENTS
121 - 131
PART II - CO NTRACT CLAUSES
NAVAL SURFACE WARFARE CENTER
4363 MISSILE WAY
PORT HUENEME CA 93043-4307
(805) 228-8287
805-228-6299FAX:
TEL:
FAX:
TEL:
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
SOLICITATION
6. REQUISITION/PURCHASE NO.5. DATE ISSUED
18 Aug 2021
4. TYPE OF SOLICITATION
SEALED BID (IFB)
NEGOTIATED (RFP)
[ X ]
3. SOLICITATION NO.
N6339421R0017
Section SF 30 - BLOCK 14 CONTINUATION PAGE
SOLICITATION AMENDMENT 1
The purpose of this amendment is to update the quantities required for Base Year, Option Year 1, Option Year 2, Option Year 3, and Option Year 4. As a result, attachment J-S-1 has been updated accordingly.
SOLICITATION AMENDMENT 2
Q&A
1. Question: RE: N6339421R0017_J-S-1_Pricing_Spreadsheet_Amendment+1, Page 136, “Volume I of the proposal shall include pricing spreadsheets for all CLINs, for all items (with options) as described in Section B. Spreadsheets shall be in Microsoft Excel format with cells containing working formulas that are visible for Government examination of price buildup and methodology. All pricing shall be proposed in whole dollars.” The Solicitation states suppliers are to assume there is adequate price competition and cost and/or pricing data is not required in accordance with FAR 15.403-1(b). The referenced comment seems to be in opposition to this statement. Are suppliers required to provide working excel sheets, showing the price build-up and methodology of how each CLIN’s unit price was formulated? This seems to be very similar to the requirements of cost and/or pricing data. Can’t the Government determine price reasonableness by comparing each Supplier’s proposal?
Answer: Attachment J-S-1_Pricing_Spreadsheets is to be used as a template for offerors to fill in pricing information as described in Section B. As stated in section L.2.4, on page 136, “If after receipt of proposals, the Contracting Officer determines that adequate price competition does not exist in accordance with FAR 15.403-1 or that only one offer is received, the Offeror shall provide certified cost and/or pricing data as requested by the Contracting Officer.” Certified Cost and/or pricing data is not required. Cost and pricing data, other than certified cost and pricing data is required.
2. Question: RE: Page 137, Section L.2.5., Factor 2 Past Perf (b). RFP Statement – “Include with your proposal submission a copy of the PPQ Cover Sheet.” Will the Government please exclude such pages from the page count?
Answer: The PPQ Cover Sheet will not be included in Volume II Technical (Non-Price) page count.
3. Question: RE: Pages 63 & 64, Section C.9.0 & C.12.2. SOW 12.2 Military Specifications and Standards appears to be a repeat of SOW 9.0 Technical Data Rights. Recommending removal of 12.2 and revising 9.0 to incorporate the last statement in 12.2.
Answer: SOW Section C.9.0 has been updated and SOW Section C.12.2 has been deleted to remove duplicated language. As a result, SOW Section 12 references in CDRL A005 as well as Sections L&M have been updated accordingly.
4. Question: Due to the delay in TDP release, will the Government grant a 3 week extension from receipts of the TDP for final proposal submission? (SEPT 20. 2021 + 3 weeks)
Answer: The Government grants a two-week extension for final proposal submission from 20 September 2021 to 4 October 2021.
5. Question: RE: Page 137, Section L.2.5, Factor 2 Past Perf (d). RFP Statement: “While the Government may elect to consider data from other sources, the burden of providing detailed, current, accurate and complete past performance information rests with the Offeror.” Will the Government allow the entire CPARS documentation (consisting of multiple pages) to be included as an attachment to the Vol. II Technical (Non- Price) Proposal and not included in the volume page count?
Answer: The CPARs documentation, which has been uploaded to CPARS, will not be included in Volume II, Technical (Non-Price) page count.
6. Question: RE: Page 68 Section C.16.1. If an offeror chooses to include full tabloid-size screenshots of the IMS as an attachment to the Volume II Technical, can they be excluded from the page count?
Answer: Figures and screenshots added as an attachment, will not be included in Volume II Technical (Non-Price) page count.
7. Question: RE: Page 135, Section L.2.3. The disposition of Technical Data Package and Technical Drawings paragraph states that Offerors should not transfer the data by any means to a third party.
a. Can an Offeror provide access to the TDP to its subcontractor’s with whom it is seeking quotes?
b. If an Offeror cannot provide the TDP to its subcontractors, does every subcontractor of every
Prime Offeror have to request a TDP CD from NSWWC PHD.
Answer: The Offeror can provide the TDP to subcontractors as long as the subcontractor has an active Joint Certification Program (JCP) certification. Certifications are searchable on the following DLA site:
https://public.logisticsinformationservice.dla.mil/jcp/search.aspx
8. Question: Does the solicitation TDP take into account any current waivers, NORs, deviations or variances for the current production?
Answer: The TDP provided with the solicitation is the approved TDP for this procurement. The awardee can submit any applicable waivers, deviations or variances for review and approval by the Government during post-award.
9. Question: RE: Page 135, Section L.2.3. For any solicitation sections with “Offeror Fill-Ins” or request for other information or data, should Offeror include in the Volume I Price Proposal only the specific RFP page as filled-in or the complete Section containing such RFP pages as filled in?
Answer: Specific RFP page is acceptable as long as the RFP page and corresponding clause number is clear and visible in the proposal.
10. Question: RE: GFP ATT J-3 provided in PDF does not include all of the information in the Notes column.
Please clarify statements in the Notes section for each listed item.
Answer: Attachment J-3 GFP Attachments has been updated to fully show the notes.
11. Question: RE: Pages 4-58 Section B, Pages 85-86 Section E, Pages 90-99 Section F. Section B, Section E and Section F list “Destination” as FOB, INSPECT AT and ACCEPT AT. Request all to be updated to be
ORIGIN.
Answer: The Government’s requirement is to deliver with FOB Destination terms. However, inspection and acceptance with be at origin and performed by DCMA. Inspection and Acceptance information will be updated upon award based on Contractor’s place of performance.
12. Question: RE: Page 64 Section C.12.2. SOW para 12.2 (Technical Data Rights) states “The Contractor shall prepare the updated drawings, specifications and all related documents with revisions, including the RFV.” There is also a clause C-243-H003.c that seems to align to this language. Is the Contractor expected to generate NORs and ECPs for this Build to Print contract?
Answer: No, the contractor will not be expected to generate NORs or ECPs. The contract is build-to-print.
If NORs or ECPs are required, the Government will provide them.
13. Question: Is this project considered a new requirement? If this project is not considered a new requirements, who is the incumbent? What was the contract number?
Answer: Yes, this solicitation is considered a new requirement.
14. Question: RE: TDP-MOD 18. 8652182-9 is required by the VLS LCU MOD 18 console as well as the MOD 15 and 18 kits however the provided TDP did not contain a DWG or PL for this assembly. Please provide missing files.
Answer: The Government will provide P/N 8652182-9 as Government Furnished Equipment (GFE), if needed.
15. Question: RE: TDP – MOD 17 & 18. A revision comparison between the provided MOD 17 and MOD 18 TDP folders resulted in 17 revision differences. The below table outlines these differences (revisions are base + NOR # if applicable). Are contractors expected to maintain the down revs of MOD 17 or are we expected to use the highest REV provided for both MODs?
Answer: Offerors are to use the latest MOD version.
SOLICITATION AMENDMENT 3
1. Question: Offeror respectfully requests a thirty (30) day proposal due date extension during which time we hope to acquire the current missing documents, evaluate them and prepare a fully compliant proposal in response to the subject solicitation.
Answer: The proposal due date is extended to 11 October 2021 via solicitation amendment 3
2. Question: Will the gov’t extend the deadline by 2 weeks as our proposal preparation team fully researches technical solution and cost?
Answer: The proposal due date is extended to 11 October 2021 via solicitation amendment 3
3. Question: Our interpretation of the CLIN structure is that the government expects offeror to have the First Article ready 40 weeks after award. Would the government discuss the time line to need date?
a. Our manufacturing engineers anticipate needing more than 40 weeks to be ready for FAI.
Answer: The first unit is expected to be ready for FAI 52 weeks after award. Section F’s delivery schedule has been updated to reflect this change.
4. Question: Since the incumbent no longer has to address NRE, how does the government want bidders to address NRE?
a. Perhaps amortized in the first CLIN?
b. Accounted for across the initial award year (not option years)?
Answer: This is a firm-fixed-price contract for LCU and associated component kits. The Government will not have a CLIN for NRE.
5. Question: In addition to the test equipment provided as GFE, will the government provide the test procedures as GFI?
Answer: Test procedures are included in the TDPs.
6. Question: Will the government confirm our interpretation of pricing in the 27 Jan 2020 award to the incumbent for Mk 235 Mod 11, part number 7104280-119, and Mk 235 Mod 12, part number 7104280- 129? The government’s answer will be important in helping bidder determine if our offer will be competitive.
Answer: The Government does not have authorization to disclose unit pricing on a different contract.
7. Question: Please advise on the following 12 documents not found in the TDP
Drawing No.
Dash No.
Affected Title Used on
Assembly
Drawing Comments (note if
U/O PP)
Government Response
1 8652182 -9
CCA,
RECEIVER,
GEM GPS VME
MOD 15
OBRP
This item will be provided as GFE as required
2 7104830 N/A
ATR, FIBER
OPTIC
TRANSMITTER
7104699-9 under MOD 11/12
MAMS kit REFERENCE doc
Available via DoD SAFE upon request
3 79C0048 -01
FAN, 12VDC,
235CFM W/
FPS
7421118-00 under MOD 11/12
INCO spares
Item is listed in drawing 7999121 Rev KT, which was provided in the original TDP package. An updated version of that drawing, 7999121 Rev
KW, is provided via DoD SAFE and should replace
Rev KT.
4 7572032 WRL AND
SCHEMATIC 7572052-9 Available via DoD SAFE upon request
5 7572010 -2
CCA, NTDS
TYPE D, DUAL
CHANNEL
MOD 15
INCO
waiting confirmation of use
Available via DoD SAFE upon request
6 7105582 -289 through
CABLE
ASSEMBLY
NTDS TYPE D
MOD 15
INCO
waiting confirmation of use
Available via DoD SAFE upon request
7 8652401
INTERCONN.
DIAG, MK235
LCU
8652400-19 under 7104280-179 reference doc Available via DoD SAFE upon request
8 7382275 -01
POWER KIT,
CONDITIONER
- NGP 115VAC
1 PH IN,
115VAC 1.8
KW OUT
7572100-29 item 35 under 7104280-179 we have the PL, just not the base drawing
7382275 is a kit that has a parts list but no drawing.
9 7381617 -03 HARDWARE
KIT, SHOCK 7383326-02 item 22 under 7104280-179
7381617 is not required for any of the LCUs in the
RFP
10 79C0069 -01 SHOCK ASSY 7381617-03 item 1 under 7104280-179
Item is listed in drawing 7999121 Rev KT, which was provided in the original TDP package. An updated version of that drawing, 7999121 Rev
KW, is available via DoD SAFE upon request and should replace Rev KT.
11 79C0163 -14 FILTER ASSY 7382270-02 item 1 under 7104280-179
Item is listed in drawing 7999121 Rev KT, which was provided in the original TDP package. An updated version of that drawing, 7999121 Rev
KW, is available via DoD SAFE upon request and should replace Rev KT.
12 79C0094 -02 POWER
CONDITIONER 7382275-01 item 1 under 7104280-179
Item is listed in drawing 7999121 Rev KT, which was provided in the original TDP package. An updated version of that drawing, 7999121 Rev
KW, is available via DoD SAFE upon request and should replace Rev KT.
8. Question: RE: AMD 0002 Question# 15. Offeror requests a proposal submission extension of a minimum of three weeks from the current due date of 10/4/2021. Our request is due to clarified TDP data not received as of 9/9/2021. The USG response to question 15 was to use the latest MOD versions which would mean the NORs provided with MOD 18 should also be applied to MOD 17. These TDP updates will need to be incorporated into our MOD 17 LCU pricing BOMs and quotes sent out for updated materials.
NOR001 of 8652400 alone has high dollar impact changes to the MOD 17 LCU with various BOM changes such as the 8652407-9 to -19 CCA assembly swap, the addition of multiple cables assemblies, and various qty updates. We are requesting an extension to be able to thoroughly analyze the TDP for these updates and obtain quoted pricing to ensure a compliant proposal submission.
Answer: The proposal due date is extended to 11 October 2021 via solicitation amendment 3.
9. Question: RE: AMD 0002 Question# 11. Please provide further clarification regarding FOB (destination).
Is it the Government's intent for the supplier to price shipping, risk of loss, and title transfer at Destination?
Or is it the Government's intent to use FOB (origin) for inspection acceptance and transfer of title with the Government responsible for any shipping costs-risk of loss?
Offeror renews request to have shipping terms defined as FOB (origin) (shipping point).
Answer: It is the Government's intent for the supplier to price shipping, risk of loss, and title transfer at Destination.
10. Question: Please provide clarification on PN 8652182-9 as GFE. Is it the Government's intent to provide as Government Furnished Material (GFM) and integrate into all LCUs and Spares Kits?
Please update Attachment J-3 accordingly, whether determined to be GFE or GFM.
Answer: P/N 8652182-9 will be provided as GFE. Attachment J-3 has been updated accordingly.
SOLICITATION AMENDMENT 4
1. Question: Can the Government provide the audit excel files or the indentured parts list text files that include quantities columns?
Answer: The TDP determines the BOM. The Government does not have a separate BOM and one will not be provided.
2. Question: Re: TDP/Attachment 1. In reviewing the TDP, we found what we believe may be some discrepancies between the parts lists provided in the TDP folder and attachment J-1. There seem to be extra parts (a CCA and 28 cables) in the INCO and DEPOT list in J-1.
Answer: The CCAs and 28 cables are not applicable to the LCU, please disregard. The Government’s response and resolution are found in the last two columns of the following table:
Drawing No.
Dash No.
Affected Title Used on
Assembly Drawing Comments
(note if U/O PP) Government’s
Response Government’s
Resolution
8652182 -9
CCA,
RECEIVER,
GEM GPS VME
MOD 15
OBRP
Item to be provided as GFM. No drawing to be provided
No Action Necessary
79C0048 -01
FAN, 12VDC,
235CFM W/
FPS
7421118-under MOD 11/12 INCO spares
Listed with supplier PNs in 7999121.
7999121KT was provided
Upon request, the Government will provide version
7999121KW
7382275 -01
POWER KIT,
CONDITIONER
- NGP 115VAC
1 PH IN,
115VAC 1.8
KW OUT
7572100-item 35 under 7104280- 179 we have the PL, just not the base drawing also a reference doc in 7382266-02
This is a kit. It has a PL but no drawing.
No Action Necessary
7381617 -03 HARDWARE
KIT, SHOCK
7383326-item 22 under 7104280- 179 only have PL
7104280-179 uses 7383326-03 which does not call out 7381617
No Action Necessary
79C0069 -01 SHOCK ASSY 7381617-
item 1 under 7104280-
Listed with supplier PNs in 7999121.
7999121KT was provided
Upon request, the Government will provide version
7999121KW
79C0163 -14 FILTER ASSY 7382270-
item 1 under 7104280-
Listed with supplier PNs in 7999121.
7999121KT was provided
Upon request, the Government will provide version
7999121KW
79C0094 -02 POWER
CONDITIONER
7382275-item 1 under 7104280-
Listed with supplier PNs in 7999121.
7999121KT was provided
Upon request, the Government will provide version
7999121KW
7956645 -03 WIRE FABRIC 7383326-
ITEM 1 UNDER
7373704-00, 7369699- 00, 7373766-00, &
7373729-02 PARTS
LIST
7956645 is included in 7104280-179, & -189 in the Drawings/Q70 folder
No Action Necessary
7956645 -00 WIRE FABRIC 8652120-
ITEM 1 UNDER
7375272-00 PARTS
LIST
7956645 is included in 7104280-179, & -189 in the Drawings/Q70 folder
No Action Necessary
7956912 -03
ANODIZED
ALUMINUM
SHEET
7572100-
ITEM 1 UNDER
7376555-00 PARTS
LIST
7956912 is included in 7104280-179, & -189 in the Drawings/Q70 folder. Also listed in Row 11
No Action Necessary
7956359 -00
ADHESIVE -
BONDING
FILM
7572100-
ITEM 2 UNDER
7376555-00 PARTS
LIST
7956359 is included in 7104280-179, & -189 in the Drawings/Q70 folder. Also listed in Row 12
No Action Necessary
7104655 -1
PAD,
COMPRESSIVE
SILICONE
SPONGE
7572068-
ITEM 2 UNDER
7104654-9 PARTS LIST
7104655 is included in 7104280-179, & -189 in the Drawings folder.
No Action Necessary
7959246 -01 PAINT 7383326-
ITEM 5 UNDER
7373748-00 PARTS
LIST
7373681-01 7373683-00 7373710-04 7373701-01 7386943-21 7368364-00 7368365-04
7959246 is included in 7104280-179, & -189 in the Drawings/Q70 folder.
No Action Necessary
7956193 -00 PAINT-EPOXY 7383326-
ITEM 5A UNDER
7373748-00 PARTS
LIST
7410756-00 7410756-01 7373681-01 7373683-00 7373710-04 7373701-01 7386943-21 7368364-00 7368365-04
7956193 is included in 7104280-179, & -189 in the Drawings/Q70 folder.
No Action Necessary
7999070 EPOXY PAINT 7383326-
ITEM S06 UNDER
7373748-00 PARTS
LIST
7410756-00 7410756-01 7373681-01 7373683-00 7373710-04 7373701-01 7386943-21 7368364-00
7999070 is included in 7104280-179, & -189 in the Drawings/Q70 folder.
7368365-04 7381679-16
7999053 -00
PAINT
ACCEPTANCE
CRITERIA
7383326-
ITEM SO7 UNDER
7373748-00 PARTS
LIST
7410756-00 7410756-01 7373681-01 7373683-00 7373710-04 7373701-01 7386943-21 7368364-00 7368365-04 7381679-16
7999053 is included in 7104280-179, & -189 in the Drawings/Q70 folder.
No Action Necessary
7410760 -00 RETAINER,
DOOR BOLT
7376490-
ITEM 4 UNDER
7376489-02 PARTS
LIST
7410760 is included in 7104280-179, & -189 in the Drawings/Q70 folder.
No Action Necessary
7572088 -19
TRANSITION
MODULE
SUPPORT
BRACKET
8652400-
19 MISSING PARTS LIST
Included with delivery for both 7104280-179, and -189 file labeled
PL7572080
No Action Necessary
7572091 -9 MOUNTING
PLATE, PTC
8652400-
19 MISSING PARTS LIST
Drawing and PL included in delivery of 7104280-189, received PL on 2021-08-26 post compilation of the -179
Upon request, the Government will provide
PL
7956253 -132 ALUMINUM
ALLOY BAR
7376490- 03 7240395-00
Included in delivery of 7104280-179, & -189 located in Drawings/Q70 folder
No Action Necessary
7909210 -03 SCREW 7376490-
03 7240395-00
Included in delivery of 7104280-179, & -189 located in Drawings/Q70 folder
No Action Necessary
7957160 -03 COATING
COMPOUND
7376490- 03 7240395-00
Included in delivery of 7104280-179, & -189 located in Drawings/Q70 folder
No Action Necessary
7956498 -05 PLASTIC
SHEET
7383329-
7373715-00 7373715-01
Included in delivery of 7104280-179, & -189 located in Drawings/Q70 folder
No Action Necessary
7956168 -00 ADHESIVE -
EPOXY
7383329-
7373715-00 7373715-01
Included in delivery of 7104280-179, & -189 located in Drawings/Q70 folder
903662 -04 NUT, SELF-
LOCKING
8652120-
7373410-04 7375279-00 7375279-01 7368364-00 7381679-16
Included in delivery of 7104280-179, & -189 located in Drawings/Q70 folder
No Action Necessary
7999063
ALUMINUM
BRAZING &
WELDING
8652120- 9 7373410-04
Included in delivery of 7104280-179, & -189 located in Drawings/Q70 folder
No Action Necessary
907724 -04 STUD-CLINCH 7381679-16
Not Required. As per
7381679_W_90536_PL
(provided) this Drawing No. is only used on the Dash 00 and 01
No Action Necessary
906375 -04 STUD-CLINCH 7381679-16
Not Required. As per
7381679_W_90536_PL
(provided) this Drawing No. is only used on the Dash 03 and 04
3. Question: Re: Exhibit_(A)_CDRLS. According to L-215-H004(a), The Offeror shall complete the “Price
Group” (Block 17) and “Estimated Total Price” (Block 18) of each data item on the Contract Data Requirements List (CDRL). In Exhibit A, “N/A” has been entered into the “Estimated Total Price”. Is the Offeror supposed to override the “N/A” in Block 18 with a price in Exhibit A, as well as enter the “Price Group” in Block 17?
Answer: Exhibit_(A)_CDRL, block 18 with “N/A” was deleted to allow offerors to fill in the appropriate information in accordance with L-215-H004.
4. Question: Re: Solicitation Amendment 3, Question #1. Bid submissions are currently due 11 October 2021.
This is a Federal Holiday. Please confirm due date of 11 October 2021 and that the Government intends on confirming receipt of Bid submittals same day despite the Holiday? Or will the Bid Submission date be extended?
Answer: The proposal submissions have been updated to 12 October 2021 via amendment 4.
5. Question: The Government has confirmed that deliveries are FOB (Destination). Based on Section L 3.0, the Price factor is to be evaluated by “only a price analysis to the extent it is required, in accordance with FAR 15.404-1(b)(1)." How does the Government intend to evaluate and account for the price variations due to each Bidder’s variable shipment/insurance costs from the Bidder’s place of shipment to Government Destination point?
Answer: The evaluation methodology for Factor 1 Total Evaluated Price is specified in Section M 3.0.
Adjustments will not be made to account for the various shipping costs offerors may encounter.
Section B - Supplies or Services and Prices
NOTE A
Stepladder Pricing. Stepladder pricing is utilized in this solicitation to provide Offerors an opportunity to propose different pricing for separate quantity ranges within applicable Contract Line Items (CLINs). Price evaluation of step ladder CLINs will utilize a randomly selected quantity. Notwithstanding the option to propose different unit pricing for different quantities, the Offeror may propose the same unit price for all quantities.
For all option CLINs with stepladder pricing, the Government may unilaterally exercise a given line item more than once. Option CLINs with stepladder pricing may be exercised until the total quantity purchased equals the maximum quantity listed for that option CLIN in Section B.
(End of Text)
NOTE B
The following table provides the approximate timeframes that the CLINs and associated SLINs, where applicable, will be awarded or exercised. This information is provided for planning purposes only and is subject to change depending on need and funding availability.
Deliverable CLINs and Award/Option Exercise Timeframe
Award/Base Year* O ption Year 1 O ption Year 2 O ption Year 3 O ption Year 4
VLS MK 235 LCU MOD 17 & 18 CLIN 1000 CLIN 1100 CLIN 1200 CLIN 1300 CLIN 1400
VLS MK 235 LCU MAM Components CLIN 2000 CLIN 2100 CLIN 2200 CLIN 2300 CLIN 2400 VLS MK 235 LCU OBRP Components CLIN 3000 CLIN 3100 CLIN 3200 CLIN 3300 CLIN 3400 VLS MK 235 LCU INCO Spares CLIN 4000 CLIN 4100 CLIN 4200 CLIN 4300 CLIN 4400 VLS MK 235 Depot Spares CLIN 5000 CLIN 5100 CLIN 5200 CLIN 5300 CLIN 5400 Production Readiness Review (PRR) CLIN 6000 CLIN 6100 CLIN 6200 CLIN 6300 CLIN 6400 Physical Configuration Audit (PCA) CLIN 7000 N/A N/A N/A N/A Data Deliverables - CDRLs CLIN 8000
*CLINS 1000, 2000, 3000, 4000, 5000, and 6000 will be funded at award.
NOTE C
MAXIMUM QUANTITY MULTIPLE OPTION QUANTITY CLINS
CLINs, SLINs or other provisions in this contract set forth option quantities associated with option exercise periods.
Offerors should use those estimated quantities for planning purposes and in the preparation of its proposals including its price proposal. After award of the contract the Government may need to move quantity between these option CLINs. The contract resulting from this solicitation will have a maximum dollar value or a maximum number of units that may be purchased. The Government, may, through contract modification, move quantities of items labor or estimated costs between the option CLINs as long as the contract maximum is not exceeded.
If pricing varies by option exercise period the pricing applicable is the pricing applicable when the option is exercised. For example, items moved from option year four to option year one will be payable at the rates applicable to option year one.
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
MK 235 LCU Base Year (BY)
FFP
Procure, fabricate, assemble and conduct First Article Inspection (FAI) and Physical Configuration Audit (PCA) in accordance with (IAW) Statement of Work (SOW) sections 4.2 and 6.0 respectively. Refer to CDRLs for item and data requirements.
NET AMT
1000AA 6 Each
MK 235 MOD 17 LCU BY
FFP
Procure, fabricate, assemble and conduct FAI and PCA IAW SOW 4.2 and 6.0 respectively, Refer to CDRLs for item and data requirements.
NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
FOB: Destination
DWG NR: 7104280-179
PSC CD: 5999
1000AB 12 Each
MK 235 MOD 18 LCU BY
FFP
Procure, fabricate, assemble and conduct FAI and PCA IAW SOW 4.2 and 6.0 respectively, Refer to CDRLs for item and data requirements.
NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
FOB: Destination
DWG NR: 7104280-189
MK 235 LCU Option Year 1 (OY1)
FFP
Production Phase: Fabricate, assemble and deliver LCUs and associated equipment IAW the SOW and Technical Data Package (TDP). Refer to CDRLs for item and data requirements.
1100AA Each
OPTION MK 235 MOD 17 LCU OY1
FFP
Production Phase: Fabricate, assemble and deliver LCUs and associated equipment IAW the SOW and TDP. Refer to CDRLs for item and data requirements.
NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
FOB: Destination
STEPLADDER PRICING
STEPLADDER NAME ITEM NO FROM QUANTITY TO QUANTITY UNIT PRICE
MK 235 MOD 17 LCU OY1 1100AA 6.00 10.00
11.00 14.00
15.00 18.00
1100AB Each
OPTION MK 235 MOD 18 LCU OY1
FFP
Production Phase: Fabricate, assemble and deliver LCUs and associated equipment IAW the SOW and TDP. Refer to CDRLs for item and data requirements.
NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
FOB: Destination
MK 235 MOD 18 LCU OY1 1100AB 6.00 10.00
MK 235 LCU Option Year 2 (OY2)
FFP
Production Phase: Fabricate, assemble and deliver LCUs and associated equipment IAW the SOW and TDP. Refer to CDRLs for item and data requirements.
1200AA Each
OPTION MK 235 MOD 17 LCU OY2
FFP
Production Phase: Fabricate, assemble and deliver LCUs and associated equipment IAW the SOW and TDP. Refer to CDRLs for item and data requirements.
NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
FOB: Destination
MK 235 MOD 17 LCU OY2 1200AA 6.00 10.00
1200AB Each
OPTION MK 235 MOD 18 LCU OY2
FFP
Production Phase: Fabricate, assemble and deliver LCUs and associated equipment IAW the SOW and TDP. Refer to CDRLs for item and data requirements.
NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
FOB: Destination
MK 235 MOD 18 LCU OY2 1200AB 6.00 10.00
MK 235 LCU Option Year 3 (OY3)
FFP
1300AA Each
OPTION MK 235 MOD 17 LCU OY3
FFP
Production Phase: Fabricate, assemble and deliver LCUs and associated equipment IAW the SOW and TDP. Refer to CDRLs for item and data requirements.
NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
FOB: Destination
MK 235 MOD 17 LCU OY3 1300AA 6.00 10.00
1300AB Each
OPTION MK 235 MOD 18 LCU OY3
FFP
Production Phase: Fabricate, assemble and deliver LCUs and associated equipment IAW the SOW and TDP. Refer to CDRLs for item and data requirements.
FOB: Destination
MK 235 MOD 18 LCU OY3 1300AB 6.00 10.00
MK 235 LCU Option Year 4 (OY4)
FFP
1400AA Each
OPTION MK 235 MOD 17 LCU OY4
FFP
Production Phase: Fabricate, assemble and deliver LCUs and associated equipment IAW the SOW and TDP. Refer to CDRLs for item and data requirements.
NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
FOB: Destination
MK 235 MOD 17 LCU OY4 1400AA 6.00 10.00
1400AB Each
OPTION MK 235 MOD 18 LCU OY4
FFP
Production Phase: Fabricate, assemble and deliver LCUs and associated equipment IAW the SOW and TDP. Refer to CDRLs for item and data requirements.
NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
FOB: Destination
MK 235 MOD 18 LCU OY4 1400AB 6.00 10.00
MK 235 LCU MAM Components BY
FFP
Maintenance Assistance Module (MAM) Production Phase: Fabricate, assemble and deliver LCU MAM and associated equipment IAW the SOW and TDP. Refer to CDRLs for item and data
2000AA 12 Set MK 235 MOD 11/12 LCU MAM Components BY
FFP
Maintenance Assistance Module (MAM) Production Phase: Fabricate, assemble and deliver LCU MAM and associated equipment IAW the SOW and TDP. Refer to CDRLs for item and data requirements.
NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
FOB: Destination
2000AB 8 Set MK 235 MOD 15 LCU MAM Components BY
FFP
Maintenance Assistance Module (MAM) Production Phase: Fabricate, assemble and deliver LCU MAM and associated equipment IAW the SOW and TDP. Refer to CDRLs for item and data requirements.
NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
2000AC 3 Set MK 235 MOD 17 LCU MAM Components BY
FFP
Maintenance Assistance Module (MAM) Production Phase: Fabricate, assemble and deliver LCU MAM and associated equipment IAW the SOW and TDP. Refer to CDRLs for item and data requirements.
NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
2000AD 6 Set MK 235 MOD 18 LCU MAM Components BY
FFP
Maintenance Assistance Module (MAM) Production Phase: Fabricate, assemble and deliver LCU MAM and associated equipment IAW the SOW and TDP. Refer to CDRLs for item and data requirements.
NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
MK 235 LCU MAM Components OY1
FFP
Maintenance Assistance Module (MAM) Production Phase: Fabricate, assemble and deliver LCU MAM and associated
2100AA Set OPTION MK 235 MOD 17 LCU MAM Components OY1
FFP
Maintenance Assistance Module (MAM) Production Phase: Fabricate, assemble and deliver LCU MAM and associated equipment IAW the SOW and TDP. Refer to CDRLs for item and data requirements.
NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
MK 235 MOD 17 LCU MAM
Components OY1
2100AA 3.00 5.00
6.00 8.00
2100AB Set OPTION MK 235 MOD 18 LCU MAM Components OY1
FFP
Maintenance Assistance Module (MAM) Production Phase: Fabricate, assemble and deliver LCU MAM and associated equipment IAW the SOW and TDP. Refer to CDRLs for item and data requirements.
NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
MK 235 MOD 18 LCU MAM
Components OY1
2100AB 3.00 5.00
6.00 9.00
MK 235 LCU MAM Components OY2
FFP
Maintenance Assistance Module (MAM) Production Phase: Fabricate, assemble and deliver LCU MAM and associated
2200AA Set OPTION MK 235 MOD 17 LCU MAM Components OY2
FFP
Maintenance Assistance Module (MAM) Production Phase: Fabricate, assemble and deliver LCU MAM and associated equipment IAW the SOW and TDP. Refer to CDRLs for item and data requirements.
NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
MK 235 MOD 17 LCU MAM
Components OY2
2200AA 3.00 5.00
2200AB Set OPTION MK 235 MOD 18 LCU MAM Components OY2
FFP
Maintenance Assistance Module (MAM) Production Phase: Fabricate, assemble and deliver LCU MAM and associated equipment IAW the SOW and TDP. Refer to CDRLs for item and data requirements.
NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
MK 235 MOD 18 LCU MAM
Components OY2
2200AB 3.00 5.00
MK 235 LCU MAM Components OY3
FFP
Maintenance Assistance Module (MAM) Production Phase: Fabricate, assemble and deliver LCU MAM and associated
2300AA Set OPTION MK 235 MOD 17 LCU MAM Components OY3
FFP
Maintenance Assistance Module (MAM) Production Phase: Fabricate, assemble and deliver LCU MAM and associated equipment IAW the SOW and TDP. Refer to CDRLs for item and data requirements.
NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
MK 235 MOD 17 LCU MAM
Components OY3
2300AA 3.00 5.00
2300AB Set OPTION MK 235 MOD 18 LCU MAM Components OY3
FFP
Maintenance Assistance Module (MAM) Production Phase: Fabricate, assemble and deliver LCU MAM and associated equipment IAW the SOW and TDP. Refer to CDRLs for item and data requirements.
NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
MK 235 MOD 18 LCU MAM
Components OY3
2300AB 3.00 5.00
MK 235 LCU MAM Components OY4
FFP
Maintenance Assistance Module (MAM) Production Phase: Fabricate, assemble and deliver LCU MAM and associated
2400AA Set OPTION MK 235 MOD 17 LCU MAM Components OY4
FFP
Maintenance Assistance Module (MAM) Production Phase: Fabricate, assemble and deliver LCU MAM and associated equipment IAW the SOW and TDP. Refer to CDRLs for item and data requirements.
NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
MK 235 MOD 17 LCU MAM
Components OY4
2400AA 3.00 5.00
6.00 10.00
2400AB Set OPTION MK 235 MOD 18 LCU MAM Components OY4
FFP
Maintenance Assistance Module (MAM) Production Phase: Fabricate, assemble and deliver LCU MAM and associated equipment IAW the SOW and TDP. Refer to CDRLs for item and data requirements.
NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
MK 235 MOD 18 LCU MAM
Components OY4
2400AB 3.00 5.00
MK 235 LCU OBRP Components BY
FFP
Onboard Repair Part (OBRP) Production Phase: Fabricate, assemble and deliver LCU MAM and associated
3000AA 12 Set MK 235 MOD 11/12 LCU OBRP Components BY
FFP
Onboard Repair Part (OBRP) Production Phase: Fabricate, assemble and deliver LCU MAM and associated equipment IAW the SOW and TDP. Refer to CDRLs for item and data requirements.
NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
3000AB 8 Set MK 235 MOD 15 LCU OBRP Components BY
FFP
Onboard Repair Part (OBRP) Production Phase: Fabricate, assemble and deliver LCU MAM and associated equipment IAW the SOW and TDP. Refer to CDRLs for item and data requirements.
NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
3000AC 3 Set MK 235 MOD 17 LCU OBRP Components BY
FFP
Onboard Repair Part (OBRP) Production Phase: Fabricate, assemble and deliver LCU MAM and associated equipment IAW the SOW and TDP. Refer to CDRLs for item and data requirements.
NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
3000AD 6 Set MK 235 MOD 18 LCU OBRP Components BY
FFP
Onboard Repair Part (OBRP) Production Phase: Fabricate, assemble and deliver LCU MAM and associated equipment IAW the SOW and TDP. Refer to CDRLs for item and data requirements.
NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
MK 235 LCU OBRP Components OY1
FFP
Onboard Repair Part (OBRP) Production Phase: Fabricate, assemble and deliver LCU MAM and associated
3100AA Set OPTION MK 235 MOD 17 LCU OBRP Components OY1
FFP
Onboard Repair Part (OBRP) Production Phase: Fabricate, assemble and deliver LCU MAM and associated equipment IAW the SOW and TDP. Refer to CDRLs for item and data requirements.
NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
MK 235 MOD 17 LCU OBRP
OY1
3100AA 3.00 5.00
3100AB Set OPTION MK 235 MOD 18 LCU OBRP Components OY1
FFP
Onboard Repair Part (OBRP) Production Phase: Fabricate, assemble and deliver LCU MAM and associated equipment IAW the SOW and TDP. Refer to CDRLs for item and data requirements.
NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
MK 235 MOD 18 LCU OBRP
OY1
3100AB 3.00 5.00
MK 235 LCU OBRP Components OY2
FFP
Onboard Repair Part (OBRP) Production Phase: Fabricate, assemble and deliver LCU MAM and associated
3200AA Set OPTION MK 235 MOD 17 LCU OBRP Components OY2
FFP
Onboard Repair Part (OBRP) Production Phase: Fabricate, assemble and deliver LCU MAM and associated equipment IAW the SOW and TDP. Refer to CDRLs for item and data requirements.
NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
MK 235 MOD 17 LCU OBRP
OY2
3200AA 3.00 5.00
3200AB Set OPTION MK 235 MOD 18 LCU OBRP Components OY2
FFP
Onboard Repair Part (OBRP) Production Phase: Fabricate, assemble and deliver LCU MAM and associated equipment IAW the SOW and TDP. Refer to CDRLs for item and data requirements.
NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
MK 235 MOD 18 LCU OBRP
OY2
3200AB 3.00 5.00
MK 235 LCU OBRP Components OY3
FFP
Onboard Repair Part (OBRP) Production Phase: Fabricate, assemble and deliver LCU MAM and associated
3300AA Set OPTION MK 235 MOD 17 LCU OBRP Components OY3
FFP
Onboard Repair Part (OBRP) Production Phase: Fabricate, assemble and deliver LCU MAM and associated equipment IAW the SOW and TDP. Refer to CDRLs for item and data requirements.
NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
MK 235 MOD 17 LCU OBRP
OY3
3300AA 3.00 5.00
3300AB Set OPTION MK 235 MOD 18 LCU OBRP Components OY3
FFP
Onboard Repair Part (OBRP) Production Phase: Fabricate, assemble and deliver LCU MAM and associated equipment IAW the SOW and TDP. Refer to CDRLs for item and data requirements.
NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
MK 235 MOD 18 LCU OBRP
OY3
3300AB 3.00 5.00
MK 235 LCU OBRP Components OY4
FFP
Onboard Repair Part (OBRP) Production Phase: Fabricate, assemble and deliver LCU MAM and associated
3400AA Set OPTION MK 235 MOD 17 LCU OBRP Components OY4
FFP
Onboard Repair Part (OBRP) Production Phase: Fabricate, assemble and deliver LCU MAM and associated equipment IAW the SOW and TDP. Refer to CDRLs for item and data requirements.
NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
MK 235 MOD 17 LCU OBRP
OY4
3400AA 3.00 5.00
3400AB Set OPTION MK 235 MOD 18 LCU OBRP Components OY4
FFP
Onboard Repair Part (OBRP) Production Phase: Fabricate, assemble and deliver LCU MAM and associated equipment IAW the SOW and TDP. Refer to CDRLs for item and data requirements.
NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
MK 235 MOD 18 LCU OBRP
OY4
3400AB 3.00 5.00
MK 235 INCO Spares BY
FFP
Installation and Checkout (INCO) spares kit.
Production Phase: Fabricate, assemble and deliver LCU INCO spares kit and associated equipment IAW the SOW and TDP. Refer to CDRLs for item and data
4000AA 2 Set MK 235 MOD 11/12 LCU INCO Spares BY
FFP
Installation and Checkout (INCO) spares kit.
Production Phase: Fabricate, assemble and deliver LCU INCO spares kit and associated equipment IAW the SOW and TDP. Refer to CDRLs for item and data requirements.
NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
4000AB 3 Set MK 235 MOD 15 LCU INCO Spares BY
FFP
Installation and Checkout (INCO) spares kit.
Production Phase: Fabricate, assemble and deliver LCU INCO spares kit and associated equipment IAW the SOW and TDP. Refer to CDRLs for item and data requirements.
NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
4000AC 3 Set MK 235 MOD 17 LCU INCO Spares BY
FFP
Installation and Checkout (INCO) spares kit.
Production Phase: Fabricate, assemble and deliver LCU INCO spares kit and associated equipment IAW the SOW and TDP. Refer to CDRLs for item and data requirements.
NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
4000AD 2 Set MK 235 MOD 18 LCU INCO Spares BY
FFP
Installation and Checkout (INCO) spares kit.
Production Phase: Fabricate, assemble and deliver LCU INCO spares kit and associated equipment IAW the SOW and TDP. Refer to CDRLs for item and data requirements.
NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
MK 235 INCO Spares OY1
FFP
Installation and Checkout (INCO) spares kit.
Production Phase: Fabricate, assemble and deliver LCU INCO spares kit and
4100AA Set OPTION MK 235 MOD 17 LCU INCO Spares OY1
FFP
Installation and Checkout (INCO) spares kit.
Production Phase: Fabricate, assemble and deliver LCU INCO spares kit and associated equipment IAW the SOW and TDP. Refer to CDRLs for item and data requirements.
NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
MK 235 MOD 17 LCU INCO
Spares OY1
4100AA 1.00 2.00
3.00 4.00
4100AB Set OPTION MK 235 MOD 18 LCU INCO Spares OY1
FFP
Installation and Checkout (INCO) spares kit.
Production Phase: Fabricate, assemble and deliver LCU INCO spares kit and associated equipment IAW the SOW and TDP. Refer to CDRLs for item and data requirements.
NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
MK 235 MOD 18 INCO
Spares OY1
4100AB 1.00 2.00
MK 235 INCO Spares OY2
FFP
Installation and Checkout (INCO) spares kit.
Production Phase: Fabricate, assemble and deliver LCU INCO spares kit and
4200AA Set OPTION MK 235 MOD 17 LCU INCO Spares OY2
FFP
Installation and Checkout (INCO) spares kit.
Production Phase: Fabricate, assemble and deliver LCU INCO spares kit and associated equipment IAW the SOW and TDP. Refer to CDRLs for item and data requirements.
NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .