This solicitation requests proposals for sustainment, installation, procurement, and engineering services for TI16 equipment. Key details include the requirement for limited manufacturing and assembly of TI16 equipment and spares, associated engineering services such as failure analysis and reliability engineering, procurement and harvesting activities, and installation of ordnance alteration kits. Offerors are instructed to submit pricing for engineering, installation, materials, other direct costs, and materials in support of engineering services line items. The solicitation provides labor categories, hours and location estimates to develop pricing, and instructions on composing the technical approach, management approach, past performance, and price volumes. Proposals are due by the date specified in the SF33.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| N6339420R0008_TI16_QandA_5.xlsx | XLSX spreadsheet | |
| N6339420R0008_Amendment 0005 (Modification Copy).pdf | ||
| N6339420R0008_Amendment 0004 (Conformed Copy).pdf | ||
| N6339420R0008_TI16_QandA_4.xlsx | XLSX spreadsheet | |
| N6339420R0008_Amendment 0004 (Modification Copy).pdf | ||
| Attachment J-S-1 - Price-Cost Template_Revision 2.xlsx | XLSX spreadsheet | |
| N6339420R0008_TI16_QandA_3.xlsx | XLSX spreadsheet | |
| N6339420R0008_Amendment 0003 (Modification Copy).pdf | ||
| N6339420R0008-0002 (Conformed Copy).pdf | ||
| N6339420R0008_TI16_QandA_2.xlsx | XLSX spreadsheet | |
| Attachment J-S-1 - Price-Cost Template_Revision 1.xlsx | XLSX spreadsheet | |
| N6339420R0008-0002 (Modification Copy).pdf | ||
| N6339420R0008_TI16_QandA_1.xlsx | XLSX spreadsheet | |
| N6339420R0008.pdf | ||
| Attachment J-S-1 - Price-Cost Template.xlsx | XLSX spreadsheet | |
| Attachment J-2 - DD254.pdf | ||
| Attachment J-1 - CDRLS.pdf | ||
| Attachment J-S-2 - Pre-Award Survey.docx | DOCX document | |
| Attachment J-4 - Service Contract Act (SCA) Wage Determination.pdf |
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to: (1) Respond to industry questions and (2) Revise Section L.
1. CONTRACT ID CODE PAGE OF PAGES
S 1 14
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 04-May-2020
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N6339420R0008
X 9B. DATED (SEE ITEM 11)
28-Apr-2020
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
04-May-2020
CODE
NSWC PHD 022
4363 MISSILE WAY
PORT HUENEME CA 93043
N63394 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N6339420R0008
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION L - INSTRUCTIONS, CONDITIONS AND NOTICES TO BIDDERS
The following have been modified:
INSTRUCTIONS TO OFFERORS
PART A – GENERAL INSTRUCTIONS
1.0 GENERAL
1.1 The Offeror must respond to all requirements of the solicitation and may not alter or rearrange the solicitation.
The Offeror is advised that the Government may incorporate any portion of the Offeror’s proposal into the resulting contract.
1.2 The Offeror is required to submit a proposal that is sufficiently detailed and complete to fully demonstrate an understanding of, and compliance with, all of the requirements of the solicitation. Proposals shall contain only material directly related to this acquisition. The Offeror’s proposal shall be based on the requirements contained in this solicitation (including those documents, exhibits, and other attachments to the solicitation identified in Section
J). Offerors shall submit a proposal encompassing all of the line items listed in Section B of this solicitation.
FAILURE TO FOLLOW THE INSTRUCTIONS OR CONFORM TO ALL REQUIREMENTS OUTLINED
IN THIS SOLICITATION MAY RESULT IN REJECTION OF THE OFFEROR’S PROPOSAL.
1.3 Proposals submitted in response to the solicitation must contain a complete description of all pertinent aspects of the effort proposed by the Offeror. Offerors shall not assume that previously submitted data or prior experience presumed to be known to the Government (e.g., previous projects performed for the Government) will be considered as part of the proposal.
1.4 General statements such as, “the Offeror understands,” “the Offeror can or will comply with the requirements,”
“standard procedures will be used,” “well-known techniques will be used,” or statements which merely paraphrase the solicitation in whole or in part do not constitute compliance with the requirements for proposal content.
Discussions of each topic in the proposal shall exhibit continuity and logical progression.
1.5 The Government advises the Offeror that taking exception or deviating from any term or condition of the solicitation may result in the assessment of a deficiency to the proposal.
1.6 All proposals must be UNCLASSIFIED.
1.7 The Specifications/Drawing package will be provided via DOD SAFE (https://safe.apps.mil/) upon written request from the offeror to terren.jo@navy.mil and john.carhart@navy.mil.These drawings are restricted and can only be made available to DoD contractors under the Joint Certification Program.
1.8 Offerors may submit comments regarding solicitation requirements by emailing the Contract Specialist at terren.jo@navy.mil and the Contracting Officer at john.carhart@navy.mil. It is required that all questions be received within 15 calendar days of the date this solicitation is issued. Questions received after 15 calendar days may not be answered prior to the proposal due date.
2.0 PROPOSAL FORMAT AND ORGANIZATION
2.1 Written proposals must be formatted using Times New Roman, 12-point, normal font (no reduction permitted), single-spaced with one-inch margins all around, and formatted for standard 8.5 X 11-inch paper. All pages shall be mailto:terren.jo@navy.mil mailto:john.carhart@navy.mil mailto:terren.jo@navy.mil mailto:michael.d.thompson@navy.mil numbered with section and page numbers. When foldout pages are used, they must not exceed 11 X 17 inches and will be counted as two pages. Tables and graphs shall contain no smaller than 10-point font. Spreadsheets shall contain unlocked and intact formulas used to calculate any aspect of the proposal. Spreadsheets provided without intact formulas are unacceptable and may render an Offerors proposal ineligible for award.
2.2 Proposal material shall be presented on double-sided pages only and in a single column on each page in accordance with FAR 52.204-4. Each double-sided page counts as two pages.
2.3 The Offeror will provide one complete copy of the proposal to the Procuring Contracting Officer (PCO) as electronic files fully compatible with Microsoft Office and for information not supported by MS Office products, with the latest Adobe Acrobat reader. The Offeror will ensure that the Price/Cost Volume is provided on a separate electronic file. Each electronic file is to be labeled for content and the Offeror’s name.
2.4 The offer shall contain all pertinent information in sufficient detail to conduct an effective evaluation. The information shall be organized as follows:
a) Volume 1 – Technical Approach
b) Volume 2 – Management Approach
c) Volume 3 – Past Performance
d) Volume 4 – Price/Cost, Cover Letter, Standard Form 33, Requirements of Section B, Requirements of
Section K, and Confirmation of VETS-4212 Report(s) Filing as follows:
i. A Cover Letter containing the requirements at FAR 52.215-1(c)(2) and the following information:
1. Date
2. Solicitation number
3. Company name
4. CAGE code DUNS number
5. Physical address
6. Mailing address, if different than the physical address
7. Company point of contact (POC), telephone and fax number, email address
8. Name of Contract Administration Office (if available)
9. Statement specifying the extent of agreement with all terms, conditions, and provisions included in the solicitation and agreement to furnish any or all services and items upon which prices are offered
10. Date of the submission
11. Names, titles, and telephone and facsimile numbers (and electronic addresses if available) of persons authorized to negotiate on the Offerors behalf with the
Government in connection with this solicitation
12. Name, title, and signature of person authorized to sign the proposal. Proposals signed by an agent shall be accompanied by evidence of that agent’s authority, unless that evidence has been previously furnished to the issuing office
13. Whether the Offerors organization is subject to cost accounting standards
(CAS), whether your organization has submitted a cost accounting standards board (CASB) disclosure statement, and if it has been determined adequate, whether you have been notified that you are or may be in noncompliance with your Disclosure Statement or CAS (other than a noncompliance that the cognizant Federal agency official has determined to have an immaterial cost impact), and if yes, provide an explanation, whether any aspect of this proposal is inconsistent with your disclosed practices or applicable CAS, and if so, provide an explanation, and whether the proposal is consistent with your established estimating and accounting principles/procedures and FAR Part 31, and if not, provide an explanation.
14. Whether Offerors organization has a Government approved purchasing system.
If so, provide a copy of the Administrative Contracting Officer (ACO) letter granting approval. An “approved purchasing system” means a contractor’s purchasing system that has been reviewed and approved in accordance with
FAR Part 44 (Subcontracting Policies and Procedures)
ii. Standard Form 33 – Solicitation, Offer, and Award
1. To be considered for award, the Offeror must insert 270 days in block 12 of the SF 33 to ensure adequate time for proposal evaluation and contract award
2. Blocks 12 through 18 shall be completed on the first page of the SF 33
iii. Requirements of Section B – Supplies or Services and Prices
1. To be considered for award, pricing shall be listed for all Contract Line Items (CLINs) and Subline Item Numbers (SLINs)
iv. Requirements of Section K – Representations, Certifications, and Other Statements of Offerors
v. Confirmation of VETS-4212 report(s) filing
3.0 PROPOSAL CONTENT AND VOLUMES
3.1 The Offeror must present proposal information in a manner that facilitates a one-to-one comparison between the information presented and this proposal instruction. Proposal information must be structured such that its volume/paragraph number matches the proposal instructions volume/paragraph number provided in Section L “Part
B – Specific Instructions” to which it is responding, although an Offeror may add lower tier subparagraphs. The
Offeror must provide reasons it will not provide information for a particular paragraph. The proposal information instructions are structured by paragraph numbers where first, second, third, and fourth parts correspond to the volume, book, section, and element in the Offeror s proposal.
3.2 The table below supersedes the copies requested in Block 9 of the SF 33. All volumes of the original proposal shall be delivered to the address provided in Section 4.0 prior to the closing date/time stated in this solicitation.
Page limitations for each volume, if any, are also specified in the table below; title pages, cover letters, tabs, index pages, glossaries, and table of contents do not count towards the page limit. In presenting material in these volumes, Offerors are advised that the quality of information is significantly more important than quantity. In this respect, the page limitation must be strictly observed. Pages in excess of the applicable page limit shall not be read or evaluated and will be removed by the PCO from the back of the respective volume prior to evaluation. It is not necessary to supply the maximum number of pages allowed for each volume; fewer pages may be submitted. Offerors shall organize proposal content sections with clear cross-referencing to the table of contents. All pages shall be consecutively numbered within each volume (e.g., 1, 2, 3,…).
Volume Section Title Page Limit Electronic Copies
1 1.0 Technical Approach 100 1
2 2.0 Management Approach 50 1
2.1 Small Business Subcontracting Plan None
3 3.0 Past Performance None 1
4 4.0 Price/Cost Proposal, Cover Letter, Standard Form
33, Requirements of Section B, Requirements of
Section K, and Confirmation of VETS-4212
Report(s) Filing
None 1
3.3 Each volume shall contain the following information:
a) Cover and title page;
b) Title of the proposal and proposal number as applicable;
c) Offerors name, address, and POC;
d) Solicitation number;
e) Proposal volume/book number;
f) Copy number; and
g) Table of contents
4.0 PROPOSAL SUBMISSION
4.1 Offeror shall provide all proposal volumes to the following email addresses no later than the date and time specified in Block 9 of the SF 33 of the solicitation: terren.jo@navy.mil and john.carhart@navy.mil. Reference the solicitation number in the email subject line.
4.2 The proposal shall contain all the pertinent information in sufficient detail to permit evaluation. Information shall be confined to the appropriate volume to facilitate independent evaluation. The proposal should be clear and concise, logically assembled, indexed, and cross-indexed to applicable parts of this solicitation as appropriate.
5.0 ELECTRONIC FILES
5.1 The electronic files shall be uncompressed and shall be submitted via email to terren.jo@navy.mil and john.carhart@navy.mil; text shall be prepared using Microsoft Word compatible applications; and spreadsheets, worksheets, or workbooks shall be prepared using Microsoft Excel compatible applications. Electronic files shall only consist of the following extensions: doc for Microsoft Word files, xls for Microsoft Excel files, ppt for
Microsoft PowerPoint files, and pdf for Adobe Acrobat files.
5.2 Graphics, tables, photographs, and other data beyond the capability of Microsoft Word or Microsoft PowerPoint may be submitted in Adobe Acrobat format. Pricing data and technical data must be provided as separate electronic files. One electronic submission of each volume shall be provided via email.
5.3 The electronic spreadsheets shall not be compiled or password protected; all cells and formulas shall be visible, editable, and unprotected. Offerors shall not establish links referencing other spreadsheet files not included with the proposal.
6.0 SOLICITATION CHANGES
6.1 For notice of any changes and additional information provided by the Government for the solicitation, please go to https://www.beta.sam.gov.
PART B – SPECIFIC INSTRUCTIONS
7.0 FACTOR 1: TECHNICAL APPROACH (Volume 1)
7.1 Do not include cost or price information in this volume. The Offeror shall address each of the following elements to accomplish the tasks defined in Section C.
7.1.1 Element 1: Sustainment Engineering
a. Describe the approach to monitor, plan for and develop technology refresh solutions to Diminishing
Manufacturing Sources and Material Shortages (DMSMS) items and the capability to produce, evaluate, integrate, test and qualify the proposed solution to satisfy the requirements of SOW paragraph 5.16 Provide relevant experience and examples to substantiate.
b. Describe the DMSMS process and the planned action, with relevant experience and examples, to mitigate engineering and ILS impacts related to DMSMS.
c. Describe proposed equipment procurement, materials management and production process, with relevant examples, supporting the development and production of ORDALT Kits and spare parts to satisfy the requirement of SOW paragraph 6.1.
d. Describe proposed reliability engineering and failure analysis process to satisfy the requirements of SOW paragraph 5.12 The Offeror shall demonstrate, with relevant examples, how their failure analysis process and expertise identified failure trends that resulted in design improvement recommendation.
e. Describe proposed testing and qualification approach for all redesign efforts as mailto:john.carhart@navy.mil mailto:john.carhart@navy.mil well as the building of ORDALT kits to satisfy the requirements of SOW paragraph 5.14 Describe how testing and qualification will be implemented in the Offeror’s facility. Identify any testing requirements that cannot be performed in the present facility and provide a work around plan for any such requirements.
f. Describe approach to Configuration Management (CM) to demonstrate a comprehensive understanding of the CM requirements for this solicitation and how it will be used to manage changes or deviations to the baseline configuration to satisfy the requirements of SOW paragraph 5.2 Provide examples of how the
Offeror has successfully initiated ECPs and managed CM on a program of similar complexity.
g. Demonstrate understanding of Environmental Qualification Test (EQT) requirements, including but not limited to Shock, Vibration, EMI, Thermal and Offeror’s approach to evaluating and executing the EQT requirements based on familiarity and past performance. Provide examples of how the Offeror has successfully developed, evaluated and executed EQT on a previous program of similar complexity.
h. Demonstrate experience and understanding of the Level III TDP and the capabilities that are necessary to maintain the TDP, including electronic models of the TDP.
i. Describe plan to ensure complete TDP compliance prior to ordering material and prior to release of material for manufacturing.
j. Demonstrate capability and technical approach to performing CM and managing the Software, Firmware, Operating Environment and Diagnostic Software Tools maintenance and updates. Provide examples of how the Offeror updated and maintained Software, Firmware, Operating Environment and Diagnostic Software
Tools of similar size and complexity.
k. Describe approach to provide Distance Support, On-Site Tech Assists, System Assessment Support
Services, and installation of Design changes aboard US Navy Vessels and Shore Sites. Provide examples of how the Offeror has provided Naval shipboard technical support including installation of equipment changes.
7.1.2 Element 2: Installation
a. Describe the approach to deliver systems upgrades and meet the installation schedules and requirements.
b. Describe the approach to develop Preliminary AIT Workbooks.
c. Describe the approach to harvest and ship assets once ORDALT installation is complete.
d. Describe the approach to finalize and deliver completed AIT Workbooks.
e. Describe installation experience with requirements similar in scope, size and complexity.
8.0 FACTOR 2: MANAGEMENT and LIFECYCLE APPROACH (Volume 2)
8.1 Do not include cost or price information in this volume with the exception of the Small Business Subcontracting Plan. Address each of the following elements:
8.1.1 Element 1: Program Management
a. Describe capability to maintain a Quality Assurance (QA) system that, at a minimum, meets the requirements of ANSI/ISO 9001:2015, and ensures the items delivered meet the minimum functional and environmental requirements specified by the SRD and Section C of this solicitation. The quality system shall include provisions conforming to all production requirements including calibration, subcontractor/vendor control, failure diagnosis and corrective action, statistical process control, component and environmental screening, testing, and inspection.
b. Provide an executable staffing plan to obtain skilled/experienced personnel with appropriate personnel security clearance.
c. Describe the ability to support surges in production and/or installation. This includes demonstrating the capability to ramp up employees to support the required capacity and clearance level.
d. Describe the approach to working with Original Equipment Manufacturers (host system level) to mitigate risks associated with technology driven change and associated impacts to overall system costs.
8.1.2 Element 2: Risk Management
a. Demonstrate a Risk Management Plan, which shall include risk identification, assessment, ranking, trends, mitigation, monitoring and reporting as part of the Contractor’s Progress, Status and Management Report during all program reviews. The risk section of the subject report shall include, as a minimum, the following:
i. Identification and assessment of risks, including relative ranking by program impact;
ii. Definition of methods or alternatives to mitigate each risk, including the identification of criteria upon which to base programmatic decisions;
iii. Human, hardware, and software performance;
iv. Analysis and tradeoffs impacted/considered during risk analysis; and
v. Status of resolving/mitigating identified risks.
8.1.3 Element 3: Subcontractor Management
a. Identify contractual agreements/arrangements with teammates, subcontractors and/or vendors. A delineation of roles and responsibilities shall be established. Address how such agreements will benefit the
Government and aid the contractor in achieving the requirements and objectives of this procurement.
b. Large Business Concerns shall submit a Small Business Subcontracting Plan in accordance with HQ-L-
219-H001.
9 FACTOR 3: PAST PERFORMANCE (Volume 3)
9.1 Recent and Relevant Past Performance
a. Offeror shall provide a discussion of recent (within the last three years) and relevant past performance providing the types of supplies and services listed in the SOW in Section C of the solicitation. Offerors shall specifically address ability to meet cost, schedule, and technical requirements. Ensure the discussion provides both information on problems encountered during performance of the identified contracts and corrective actions taken. The discussion shall cite a minimum of one and maximum of three contracts for the Offeror. In addition, the discussion shall cite a minimum of one and maximum of three contracts for all subcontractors whose total subcontract price (inclusive of all options) is greater than or equal to 10% or more of the total proposed price (inclusive of all options). Emphasis shall be placed on Navy contracts that are similar in nature to the work required by this solicitation or that demonstrate the
Offeror's/subcontractor's ability to perform the proposed effort. If the Offeror/subcontractor does not have recent, relevant past performance on Navy contracts, the Offeror/subcontractor shall submit information for its contracts with other DoD agencies, other Federal agencies, state and local Governments, and/or private companies in that order of preference. For each contract cited as recent and relevant past performance, the Offeror/subcontractor shall provide:
i. Contract/Order Number;
ii. Contract Type;
iii. Customer/Program Name;
iv. Total Contract Cost;
v. Period of Performance;
vi. Valid Name, Email Address, and Phone Number of Contracting Officer and Contracting Officer
Representative; and
vii. Description of Work Performed and How it Relates to the SOW in Regards to Size and Scope.
b. The Government may use past performance information obtained from sources other than the sources identified by the Offeror and the information obtained may be used for both the responsibility and technical acceptability determinations.
10 FACTOR 4: PRICE/COST PROPOSAL (Volume 4)
10.1 It is expected that the resulting contracts will be awarded based on adequate price competition; therefore, the
Offeror is not required to submit or certify cost and/or pricing data with their proposal, however data other than certified cost data or pricing data is required to be submitted. If, after receipt of proposals, the Contracting Officer determines that adequate price competition does not exist in accordance with FAR 15.403-1 or that only one offer is received, the Offeror shall provide certified cost and/or pricing data as requested by the Contracting Officer.
10.2 Organization and contents of the Price/Cost Proposal: Volume 4 shall include:
a) Schedule of Total Estimated Price. Complete the Schedule of Total Estimated Price (reference attachment in Section J of the solicitation) and Section B of the submitted SF 33.
i. For the CPFF segment, the Offeror shall supply the most currently available forecasted annual rates for direct labor, overhead expense, general and administrative expense, and any other factors used in developing the proposal.
ii. Use the Government estimated annual amounts delineated below for labor category hours, material costs, and travel costs in developing the proposal. The Government estimated annual hours and costs are provided for proposal and planning purposes.
iii. The contract includes a five-year ordering period. In order to allow for procurement lead time and a fair and equal evaluation of all proposals submitted under this competitive procurement, all proposals shall be based on a contract start date of 26 February 2021. This date is only an estimate of the anticipated contract start date and will be used for the purpose of proposal evaluation only.
A definitive start date will be incorporated into the contract award document.
iv. The cost proposal shall contain spreadsheets in Microsoft Excel. Spreadsheets shall include all calculations in the cells.
b) Basis of estimate narrative for rates and factors proposed for the contract. Describe the basis of estimate for each of the following cost elements proposed for the contemplated contract. The requirements are:
i. CLIN 0001 – Engineering Services (CPFF):
a. Direct labor costs:
Hourly rates – Describe the basis of estimate for all proposed direct labor rates
(unburdened). Submit any information reasonably required to explain the estimating process, including the judgmental factors applied and the mathematical or other methods used in the hourly rate estimate. Offeror may propose individual wages or category average rates for labor categories.
i. Current Employees: Provide a screen-capture (or equivalent) from the employer's payroll system for each current named employee. Fully explain all pertinent data on a sample screen capture. The Government must be able to derive the direct rate from the screen capture information provided by the offeror. Identify the date as of which the actual wage rate is current. If proposed direct labor rates vary from actual wages of personnel, explain the basis for those rates. If the Offeror proposes/invoices category average rates, the Offeror must provide the detail of employees and wage rates within each labor category and the average rate computational methodology.
ii. Contingent Hires: Any proposed “new hires” shall be identified and provide justification for the wage rate (e.g., signed letter of intent to hire, company compensation policy). The proposed direct labor rates shall trace to supporting justification. Letters of intent must be signed by both the employer and the employee within 30 days of proposal submission manifesting the intent to employ the individual at a stated salary and indicating the applicable labor category.
iii. Unnamed/TBD Labor Rates:If neither payroll data nor a signed letter of intent is available, Offerors shall list the individual as “TBD”. The basis for all "TBD" employee rates proposed shall be detailed with specificity to include providing sufficient information necessary to enable the government to understand why the proposed rates are what the Offeror could realistically expect to pay to attract and retain qualified personnel.
Offerors shall also consider the labor rates for the Bureau of Labor Statistics (BLS) equivalent categories identified in the table below. These BLS rates reflect the
Government’s best approximation of the wage for each labor category considering the level of complexity and experience necessary for the associated eCraft labor categories identified.
Annual labor hours by labor category – The Offeror shall use the Government estimated annual labor hours delineated below to develop its proposal and prepare the schedule of estimated CPFF (reference attachment in Section J of the solicitation).
Estimated Labor Categories and Hours Per Year
Direct Labor (eCRAFT
Occupation Code)
BLS Occupation Code BLS Percentile SCA Total Year 1 Year 2 Year 3 Year 4 Year 5
MANAGER,
PROGRAM/PROJECT III
(eCraft MANP3)
Engineering Manager 11-
50th percentile N/A 2880 960 480 480 480 480
ANALYST,
MANAGEMENT II (eCraft
ANM2)
Management Analyst 13-
25th percentile N/A 2880 960 480 480 480 480
ANALYST,
MANAGEMENT II (eCraft
ANM2)
Management Analyst 13-
25th percentile N/A 2240 960 320 320 320 320
LOGISTICIAN III (eCraft
LGT3)
Logisticians 13-1080 50th percentile N/A 7200 1440 1440 1440 1440 1440
ENGINEER, DESIGN IV
(eCraft ED4)
Computer Hardware Engineer
17-2061
75th percentile N/A 17280 1920 3840 3840 3840 3840
ENGINEER, SYSTEMS III
(eCraft ESY3)
Electrical Engineer 17-2070 50th percentile N/A 19200 3840 3840 3840 3840 3840
ENGINEER,
ELECTRICAL/ELECTRONI
CS IV (eCraft EE4)
Electrical Engineer 17-2071 75th percentile N/A 19200 3840 3840 3840 3840 3840
ENGINEERING
TECHNICIAN V (eCraft
30085)
Engineering Technician 17-
90th percentile 30085 26880 3840 5760 5760 5760 5760
ENGINEER, COMPUTER III
(eCraft EC3)
SW Developer 15-1133 50th percentile N/A 16320 960 3840 3840 3840 3840
ENGINEER IV (eCraft E4) Electrical Engineer 17-2071 75th percentile N/A 8640 960 1920 1920 1920 1920
ENGINEER, MECHANICAL
III (eCraft EM3)
Mechanical Engineer 17-
50th percentile N/A 8160 480 1920 1920 1920 1920
ENGINEERING
TECHNICIAN V (eCraft
30085)
Aerospace Engineering and
Operations Technician 17-
90th percentile 30085 8160 480 1920 1920 1920 1920
ENGINEERING
TECHNICIAN V (eCraft
30085)
Electrical and Electronics
Engineering Technicians 17-
90th percentile 30085 8640 960 1920 1920 1920 1920
MATERIAL
COORDINATOR (eCraft
21030)
Electrical, Electronics, and
Electromechanical
Assemblers 51-2020
25th percentile 21030 8640 960 1920 1920 1920 1920
ENGINEERING
TECHNICIAN IV (eCraft
30084)
Mechanical Engineering
Technicians 17-3027
75th percentile 30084 9600 1920 1920 1920 1920 1920
TOTAL
165,920
24,480
35,360
b. Annual labor escalation: Labor escalation is defined as including all factors that affect an employee’s direct hourly rate to include promotion, other merit increases, and cost of living increases. Offerors (Prime and subcontractors) shall provide the following information for analysis of the offeror’s direct labor costs:
i. Offerors shall provide a narrative explanation of the escalation percentage(s) proposed and how/when the escalation rate is applied in the base period and each option period.
ii. Offerors shall describe the offeror’s corporate raise policy (e.g. raises are given on individuals’ anniversary dates, or all employees receive raises on the same date each year. If the answer is the latter, provide the date).
iii. Offerors shall provide three years of historical documentation supporting the laborescalation proposed.
Indirect expense rates: Provide a written narrative describing the basis of estimate for all proposed indirect expense rates. The Offeror shall submit any information reasonably required to explain the estimating process, including actual indirect expense rates for the last three years, the judgmental factors applied and the mathematical or other methods used in the estimate. Offerors shall not propose rates reflecting unapproved reduced indirect rates based upon speculation of becoming the successful Offeror of this contract. Offerors shall provide their most recent three-year history of actual rates incurred for each proposed indirect rate. This history shall include the Offeror’s most recently completed fiscal year even if the rates are considered preliminary and have not yet been submitted to DCAA for audit. Note whether the actual rates have been audited by DCAA or any other independent organization. Specifically state which indirect rates have been finalized. Explain individual rate fluctuations greater than 10%. In addition, if the Offeror uses rates in developing its proposal that are at variance from its historical rate data, the Offeror shall provide a justification for the difference, including sufficient supporting cost data.
Provide an overview of the company’s indirect cost rate structure used for estimating purposes. We suggest that the Offerors proposal include a summary schedule similar to the one below, which identifies the name of each cost burden center and related allocation base. Offer must describe each indirect cost pool. Describe or list the major cost components that make up the indirect cost pool. Offeror must describe the allocation bases used in the computation of indirect cost rates. Describe or list the cost elements that comprise each allocation base.
Name of Burden Center Allocation Base
(i.e. the cost base to which the rate is applied)
If formal forward pricing rate agreement (FPRA) has been negotiated and is the basis for proposed indirect expense rates, provide a complete copy of the FPRA. If in the Offerors opinion, the FPRA is too voluminous to include in its Price/Cost volume, then so state and identify the company’s cognizant Defense Contract Management Agency (DCMA) and Defense Contract Audit Agency (DCAA) office and provide current contract information for each.
Proposed indirect rates will be based on historical rates or binding FPRA.
If the Offeror proposes an indirect rate cap, it shall propose a clause to be incorporated into Section H of the resulting contract which enforces such cap(s). If the Offeror does not propose an indirect rate cap, the Government will utilize historical information when performing realism. Further, indirect rates lower than recent actuals, or declining indirect rates may not be evaluated as realistic unless maximums/caps are offered. A composite cap or maximum including all burdens applied to direct labor is considered preferable to individual rate caps or maximums. The following draft clause is acceptable to the
Government. Should the Offeror elect to propose an alternate, it shall cover the same substance as is contained in the draft clause.
LIMITATIONS ON INDIRECT COST RATES
(a) Pursuant to FAR 42.707, an indirect cost rate ceiling is incorporated into the contract.
"Indirect cost" is defined as set forth at FAR 2.101 and 31.203. "Indirect cost rate" is defined as set forth at FAR 2.101.
(b) Notwithstanding the clause of this contract entitled "ALLOWABLE COST AND
PAYMENT" (FAR 52.216-7), the allowable indirect cost under this contract shall be obtained by applying limitations on indirect cost rates to bases agreed upon by the parties, as specified below.
(c) Allowability of costs and acceptability of cost allocation methods shall be determined in accordance with FAR Subpart 31.2 in effect on the date of this contract, as limited by the indirect cost rates established by this requirement.
(d) For the duration of this contract, the indirect cost rate caps contained in the
Contractor's accepted contract proposal shall be incorporated into the contract schedule as limitations on indirect cost rates for each Contractor fiscal year of contract performance.
The bases to which the indirect cost rates apply shall be those contained in the
Contractor's accepted contract proposal and hereby, incorporated into the contract schedule, in accordance with the Contractor's accounting system upon which its proposal was based.
(e) Pending establishment of indirect cost rates for any subsequent Contractor fiscal year
(or other period agreed to by the parties), the Contractor shall be reimbursed either at the rates fixed for the previous fiscal year or at billing rates acceptable to the Contracting
Officer, subject to appropriate adjustment when the final indirect cost rates for that period are established.
(f) The Government will not be obligated to pay any additional amount should any final indirect cost rates for any Contractor fiscal year of contract performance exceed the indirect rates incorporated into the contract schedule. In the event any of the Contractor's final indirect cost rates are less than the indirect cost rates incorporated into the contract schedule, the incorporated rates shall be reduced to conform with the lower rates.
(h) The limitations on indirect cost rate shall not change any monetary ceiling, contract obligation, or specific cost allowance or disallowance provided for in this contract. If facilities capital cost of money is proposed as an allowable cost, the rates proposed shall be subject to the limitations imposed by this requirement.
(i) The limitations on the indirect cost rate shall apply to all work performed under the contract, and to all change orders and supplemental agreements, including changes due to growth, supplemental, emergent and new work.
(j) Notwithstanding any of the terms of this requirement, should the Contractor initiate a change to its accounting systems which would alter the composition of any overhead base or pool effected by this requirement, the Contracting Officer and Contractor shall negotiate to determine the rate ceilings to be applied to the new overhead pools, provided that no agreement shall be made which would increase the costs paid by the United States under this contract.
(k) The limitation on indirect cost rates specified in the Contractor's cost proposal shall be the rates used to compute the costs in the Contractor's cost proposal upon which the award is based.
(End of Clause)
c. Labor Tripwire. Offerors shall identify any individual (prime and subcontractor) whose fully burdened labor rates exceed $183 per hour. If the individual is a subcontractor, the fully burdened hourly rate includes the prime contractor’s pass thru and fee rates. The build-up (i.e. employee direct labor rate, indirect rates, fee, etc.) of the individual’s fully burdened hourly labor rate shall be provided. Offerors shall fully justify why the proposed individual is required for contract performance and the specific benefit to be derived from the individual’s participation.
d. Subcontractor/Consultant Costs, if any: The prime Offeror shall state the planned subcontract type and pricing arrangement for each proposed subcontractor.
Subcontractors’ proposals shall include subcontract cost data in the SAME LEVEL OF
DETAIL as provided by the prime Offeror. All subcontracting costs shall be fully supported.
FAR 15.404-3(b) requires the prime contractor to conduct appropriate cost or price analysis to establish the reasonableness of proposed subcontract prices. This data shall be included in prime Offerors proposal. Offerors shall note that analysis based solely on a comparison to GSA rates will not be considered adequate because such rates are frequently discounted.
e. Facilities capital cost of money (FCCOM), if any: If FCCOM is proposed, provide the supporting CASB-CMF form Facilities Capital Cost of Money Factors, DD Form 1861-
CONTRACT FACILITIES CAPITAL COST OF MONEY and supporting calculations.
The Offeror shall submit any information reasonably required to explain the average net book values and judgmental factors applied and the mathematical or other methods used in the estimate.
If formal FPRA has been negotiated and is the basis for proposed FCCOM factors, provide a complete copy of the FPRA. If in the Offerors opinion, the FPRA is too voluminous to include in its Price/Cost volume, then so state and identify the company’s cognizant DCMA and DCAA office and provide current contract information for each.
Provide copies of recent DCAA correspondence that approves proposed indirect rates, if any.
f. Fixed Fee: The Offeror shall propose a fixed fee amount for the schedule of estimated total CPFF (reference the attachment in Section J of the solicitation). The proposed fee will be binding as a maximum fee for subsequent orders under CLIN 0001 of the resulting contract.
ii. CLIN 0002 – Installations (FFP): Complete schedule for the total estimated FFP CLIN
(reference the attachments in Section J of the solicitation) and complete pricing entered into
Section B of the submitted SF 33. Use the Government estimated amount of $2,789,054 and apply applicable burden and profit. Insert the fully burdened price into Section B of the submitted
SF 33. The proposed price will be binding as a maximum ceiling for CLIN 0002 and the proposed profit rate will be binding as a maximum profit rate for individual task orders.
iii. CLIN 0003 – Materials (FFP): Complete schedule for the total estimated FFP CLIN (reference the attachments in Section J of the solicitation) and complete pricing entered into Section B of the submitted SF 33. Use the Government estimated amount of $137,953,212 and apply applicable burden and profit. Insert the fully burdened price into Section B of the submitted SF 33. The proposed price will be binding as a maximum ceiling for CLIN 0003 and the proposed profit rate will be binding as a maximum profit rate for individual task orders.
iv. CLIN 0004 – ODCs (COST): Complete schedule for the total estimated COST CLIN (reference the attachments in Section J of the solicitation) and complete pricing entered into Section B of the submitted SF 33. Use the Government estimated amount of $449,324 and apply applicable burdens. Fee is not allowed on travel costs under CLIN 0004; therefore, do not apply fee. ODCs will be reimbursed based on actual allowable and allocable costs inclusive of applicable burdens only. Insert the burdened maximum price into Section B of the submitted SF 33. The proposed price will be binding as a maximum ceiling for CLIN 0004.
v. CLIN 0005 – Materials in support of CLIN 0001 (COST): Complete schedule for the total estimated COST CLIN (reference the attachments in Section J of the solicitation) and complete pricing entered into Section B of the submitted SF 33. Use the Government estimated amount of
$10,532,839 and apply applicable burdens. Fee is not allowed under CLIN 0005; therefore, do not apply fee. Materials in support of CLIN 0001 will be reimbursed based on actual allowable and allocable costs inclusive of applicable burdens only. Insert the burdened maximum price into
Section B of the submitted SF 33. The proposed price will be binding as a maximum ceiling for
CLIN 0005.
vi. CLIN 0006 – CDRLs (NSP): This CLIN will not be evaluated for award.
c) Current and forecasted company operating financial budget
The price/cost proposal shall include a copy of the company i) financial operating budget for the current fiscal year and (ii) the forecasted operating budget for the next fiscal year. Each budgetary report shall include the company’s name and the applicable accounting/operating year.
d) Pre-award survey of prospective contractor accounting system checklist
Offeror shall submit with their price/cost proposal a completed pre-award survey of prospective contractor accounting system checklist or the information requested in subparagraph ii or iii, where applicable.
i. If subparagraphs ii or iii do not apply, the Offeror must complete the pre-award survey of the prospective contractor accounting system checklist (see attachment in Section J of the solicitation).
(FAR 16.301-3 states that a cost-reimbursement type contract may be used only when the contractor’s accounting system is adequate for determining costs applicable to the contract. If no information is available in the DoD activity files to make this determination an SF-1408 can be requested from DCAA. Before DCAA begins such an audit, the Offeror must complete this checklist to ensure they understand the requirements of the SF-1408, and to ensure they are ready for DCAA to come in and perform an audit.)
ii. If DCAA performed an audit or review of the adequacy of the Offerors accounting system design and for performing on cost reimbursable contracts within the past 36-months, then Offeror need only so state and provide the DCAA audit report information as follows:
DCAA Audit Report Number: _________________________
DCAA Audit Report Date: _________________________
DCAA office that performed the accounting system audit or review (office name, address, city, state, zip code): _________________________
iii. If a DCAA accounting system audit or review is currently in-process, then Offeror need only so state and provide the following DCAA office information:
DCAA office that performed the accounting system audit or review (office name, address, city, state, zip code): _________________________
(End of Summary of Changes)