Attachment J-S-2 - Pre-Award Survey.docx
DOCX document 55 KB Posted
- Solicitation number
- N6339420R0008
About this file
This document contains a template for a pre-award survey of a prospective contractor's accounting system for the SEAPORTe program. The template requires the contractor to provide explanatory narrative responses for 27 questions regarding its accounting practices and systems. Key areas addressed include whether the contractor's accounting system has been audited by DCAA, is compliant with CAS, adequately segregates direct and indirect costs and charges labor to contracts. The contractor must also describe whether its billing and cost allocation practices meet requirements.
A related federal contract opportunity posted is solicitation number N6339420R0008 for sustainment, installation, procurement and engineering services in support of TI16 equipment for Naval Surface Warfare Center Port Hueneme Division. Services include limited manufacturing, assembly and testing of TI16 equipment and spares as well as engineering services, procurement and installation of ordnance alteration kits. The specification/drawing package is available via DOD SAFE to DoD contractors under the Joint Certification Program. Comments on the solicitation are due within 15 days of issuance.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| N6339420R0008_TI16_QandA_5.xlsx | XLSX spreadsheet | |
| N6339420R0008_Amendment 0005 (Modification Copy).pdf | ||
| N6339420R0008_Amendment 0004 (Conformed Copy).pdf | ||
| N6339420R0008_TI16_QandA_4.xlsx | XLSX spreadsheet | |
| N6339420R0008_Amendment 0004 (Modification Copy).pdf | ||
| Attachment J-S-1 - Price-Cost Template_Revision 2.xlsx | XLSX spreadsheet | |
| N6339420R0008_TI16_QandA_3.xlsx | XLSX spreadsheet | |
| N6339420R0008_Amendment 0003 (Modification Copy).pdf | ||
| N6339420R0008-0002 (Conformed Copy).pdf | ||
| N6339420R0008_TI16_QandA_2.xlsx | XLSX spreadsheet | |
| Attachment J-S-1 - Price-Cost Template_Revision 1.xlsx | XLSX spreadsheet | |
| N6339420R0008-0002 (Modification Copy).pdf | ||
| N6339420R0008_Amendment 0001.pdf | ||
| N6339420R0008_TI16_QandA_1.xlsx | XLSX spreadsheet | |
| N6339420R0008.pdf | ||
| Attachment J-S-1 - Price-Cost Template.xlsx | XLSX spreadsheet | |
| Attachment J-2 - DD254.pdf | ||
| Attachment J-1 - CDRLS.pdf | ||
| Attachment J-4 - Service Contract Act (SCA) Wage Determination.pdf |
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SF 1408 TEMPLATE
NAVSEA CONTRACTS HANDBOOK
SEAPORT-e
PRE-AWARD SURVEY (SF 1408) OF
PROSPECTIVE CONTRACTOR ACCOUNTING SYSTEM
NAVSEA (SEAPORTe) PRE-AWARD ACCOUNTING SYSTEM ADEQUACY CHECKLIST
OF PROSPECTIVE CONTRACTOR’S ACCOUNTING SYSTEM
Date: XX/XX/2017
| Company Name SEAPORTe Contract Number and Complete Address: |
| Click here to enter text. |
| Commercial and Government Agency (CAGE) Code Number: |
(found at http://www.dlis.dla.mil/cage_welcome.asp) Click here to enter text.
Data Universal Numbering System (DUNS) Number:
(FAR 52.204-6)
| Click here to enter text. |
| Cognizant Defense Contract Audit Agency (DCAA) office info (Address / ph # / /eMail) – |
(found at http://www.dcaa.mil/office_locator.html)
| Click here to enter text. |
| Company Point of Contact: |
(Name, Title, Phone Number, and E-mail address) Click here to enter text.
Name, Title, and Signature of Company Principal (President / VP / Controller, etc) responsible for the design of the Accounting System.
Name
Title eMail Address
| ______________________________ | __________________________ | |
| Signature | Date |
For further information, please review DCAA Manual No. 7641.90, Information for Contractors, dated June 26, 2012, located at http://www.dcaa.mil/audit_process_overview.html .
For each Question, check only one box. ALL Questions must have explanatory narrative text entered in the boxes. Please provide sufficient detail to describe the process (Including Account Numbers / Process Flow etc.). Each Question must be complete. Do NOT refer to previous answers, (i.e. “See Question 3 Above”). Answer all questions using the space provided (Attachments can be provided to amplify or document the responses, but the Form should be a stand-alone explanation of your Accounting System.
Instruction: Please complete the Form and provide explanatory narrative for all of the following questions.
1. Has your organization’s Accounting System ever been audited by DCAA?
|_| YES (if YES, the Offeror should attach a copy of their most recent DCAA audit report to this Modified Pre-Award Survey) or provide DCAA Report # or DCAA POC info.
|_| NO (if NO, answer N/A to Questions 1.A., 1.B., and 1.C. below)
1.A. If the answer is “Yes” to Question 1 above, when was the audit performed?
|_| Within the past 1 Year.
|_| Within the past 3 Years.
|_| Greater than 3 Years ( PROVIDE THE YEAR THE AUDIT WAS PERFORMED HERE - ________ ).
|_| N/A (Answer to Question 1 is NO)
1.B. If the answer is “Yes” to Question 1 above, did DCAA or DCMA determine the Accounting System acceptable for award of prospective flexibly priced contracts?
|_| YES
|_| NO (if NO provide an explanation in the box below)
|_| N/A (Answer to Question 1 is NO)
Click here to enter text.
1.C. If the answer is “Yes” to Question 1 above, have there been any changes to the Accounting System since the DCAA audit?
|_| YES (if YES, describe the changes in the box below)
|_| NO
|_| N/A (Answer to Question 1 is NO))
Click here to enter text.
1.D. If the answer is “Yes” to Question 1 above, and your audit is older than 3 years, have you had any past proposals rejected due to the age of your DCAA audit?
|_| YES
|_| NO
|_| N/A (Answer to Question 1 is NO))
Click here to enter text.
2. Is your organization subject to CAS (48 CFR Chapter 99)?
|_| YES (If YES, is it FULL or MODIFIED CAS?) |_| FULL |_| MODIFIED
(If YES (FULL or MODIFIED), the Offeror MUST attach a copy of their most recent audit reports/documentation regarding all CAS compliance or non-compliance issues to this Modified Pre-Award Survey)
|_| NO (if NO, provide an explanation in the box below why your organization is exempt and answer N/A to Questions 2.A., 2.B., and 2.C. below)
Click here to enter text.
2.A. Has your organization submitted a CASB disclosure statement (CASB DS-1) to DCAA and has it been determined adequate?
|_| YES (if YES, provide an explanation that validates your answer in the box below)
|_| NO (if NO, provide an explanation in the box below)
|_| N/A (Answer to Question 2 is NO)
Click here to enter text.
2.B. Has your organization been notified by DCAA that it is in (or may be in) noncompliance with its disclosure statement or CAS?
|_| NO (if NO, provide an explanation in the box below)
|_| N/A (N/A, if the answer to Question 2 is NO)
Click here to enter text.
2.C. Is any aspect of this proposal inconsistent with your organization’s disclosed practices or applicable CAS?
|_| NO (if NO, provide an explanation in the box below)
|_| N/A (N/A, if the answer to Question 2 is NO or if you have no current, active proposal being considered)
Click here to enter text.
3. Has your organization’s Accounting System been audited by an outside Certified Public Accountant/Consultant or other Cognizant Federal Agency other than DCAA?
|_| YES (If YES, the Offeror MUST attach a copy of their most recent audit report to this Modified Pre-Award Survey ) NOTE: Do not submit your Annual Financial Audit.
|_| NO
4. Is your organization’s Accounting System currently in full operation?
|_| YES (if YES, provide an explanation that validates your answer in the box below)
|_| NO (if NO, provide an explanation in the box below which portions are (1) in operation, (2) set up, but not yet in operation, (3) anticipated, or (4) non-existent)
|_| N/A (if N/A, provide an explanation in the box below)
Click here to enter text.
5. Is your organization’s Accounting System in accord with Generally Accepted Accounting Principles (GAAP) Applicable in the Circumstances?
|_| NO (if NO, provide an explanation in the box below)
Click here to enter text.
6. Is your organization’s Accounting System ready for a DCAA audit?
|_| NO (if NO, provide an explanation in the box below as to when you will be ready for an Audit)
Click here to enter text.
7. Are the loaded hourly labor rates proposed consistent with your established Estimating and Accounting principles and procedures and FAR Part 31, Cost Principles? (Answer this Question “N/A” if you do not have an active proposal currently submitted to SEAPORTe / SBIRs)
|_| NO (if NO, provide an explanation in the box below)
Click here to enter text.
8. Does the Accounting System provide for the proper segregation of Direct Costs from Indirect Costs?
|_| NO (if NO, provide an explanation in the box below)
Click here to enter text.
9. Does the Accounting System provide for the identification and accumulation of Direct Costs by contract?
|_| NO (if NO, provide an explanation in the box below)
Click here to enter text.
10. Does the Accounting System provide for a logical and consistent method for the allocation of Indirect Costs to intermediate and final cost objectives? (A contract is a final cost objective.)
|_| NO (if NO, provide an explanation in the box below)
Click here to enter text.
11. Does the Accounting System provide for the accumulation of costs under general ledger control?
|_| NO (if NO, provide an explanation in the box below)
Click here to enter text.
12. Does the Accounting System provide for a timekeeping system that identifies employees’ labor by intermediate or final cost objectives?
|_| NO (if NO, provide an explanation in the box below)
Click here to enter text.
13. Does the Accounting System provide for a labor distribution system that charges Direct and Indirect labor to the appropriate cost objectives?
Click here to enter text.
14. Does the Accounting System provide for an interim (at least monthly) determination of costs charged to a contract through routine posting of books of account?
Click here to enter text.
15. Does the Accounting System provide for an exclusion of costs charged to government contracts of amounts which are not allowable in terms of FAR 31, Contract Cost Principles and Procedures, or other contract provisions?
Click here to enter text.
16. Does the Accounting System provide for the identification of costs by contract line item and by units (as if each unit or line item were a separate contract) if required by the proposed contract?
|_| NO (if NO, provide an explanation in the box below)
Click here to enter text.
17. Does the Accounting System provide for the segregation of preproduction costs from production costs?
|_| NO (if NO, provide an explanation in the box below)
Click here to enter text.
18. Does the Accounting System provide financial information as required by contract clauses concerning Limitation of Cost (FAR 52.232-20 and 21) or Limitation on Payments (FAR 52.216-16)?
|_| NO (if NO, provide an explanation in the box below)
Click here to enter text.
19. Does the Accounting System provide financial information required to support requests for Progress Payments?
|_| NO (if NO, provide an explanation in the box below)
Click here to enter text.
20. Is the Accounting System designed, and are the records maintained, in such a manner that adequate, reliable data are developed for use in pricing follow-on acquisitions?
|_| NO (if NO, provide an explanation in the box below)
Click here to enter text.
21. Is your organization planning on submitting proposals on Cost-Type (FAR 16.3) contracts/task orders?
|_| NO (if NO, provide an explanation in the box below)
Click here to enter text.
22. Is your organization currently performing on Cost-Type (FAR 16.3) contracts/task orders?
|_| NO (If No, indicate below whether your Organization ever performed Cost Type Contracts (When?)
|_| N/A
Click here to enter text.
23. Is your organization required to submit Incurred Cost Proposals to DCAA/DCMA?
|_| YES (If Yes, indicate below whether you are current with your ICE submission and the Last year an audit was performed by DCAA)
|_| NO
Click here to enter text.
24. Has your organization submitted Cost Vouchers or Progress Payments to DCAA/DCMA?
|_| YES (If Yes, indicate below whether any Cost Vouchers have been rejected by DCAA)
|_| NO
Click here to enter text.
25. Does your organization have FPRA or Provisional Billing Rates with DCMA or DCAA?
|_| YES (If Yes, Please provide a copy)
|_| NO
Click here to enter text.
26. Is your Company new to SEAPORTe this year?
|_| NO (if NO, provide the Year you first were accepted into SEAPORTe ( in the box below)
Click here to enter text.
27. Does your Company bid/propose Uncompensated Overtime (UCOT)?
|_| YES (If Yes describe your methodology below)
|_| NO
Click here to enter text.
NOTE: Before returning the completed Template to SEAPORTe, Rename file(s) using the Following Format:
Template filename = Company Name _CAGE Code_ Zip Code.
( i.e. Smith Co_ EA982_48088)
In “Subject” line of return email put “Company Name _CAGE Code_ zip code _Company eMail_NEW or INCUMBENT to SEAPORTe” ( i.e. SmithCo_EA982.Doc_j.smith@smithco.com_NEW)
Please NOTE: Failure to follow the naming conventions described above will cause a delay in the processing of your submission. If you are actively pursuing a flexibly priced proposal and wish to be considered for an expedited review, add “PLEASE EXPEDITE” to your eMail Subject Line. In the body of the email provide details of the active proposal.
Please note that responsibility for "Financial Capability" reviews was separated from the Pre-Award Accounting System Audit and transferred from DCAA to DCMA in 2010. DO NOT SEND ANY FINANCIAL DOCUMENTS TO SEAPORTe OR DCMA AT THIS TIME. To prevent contractor from expending resources prematurely, a DCMA Financial Capability review will be requested only after successful completion of a DCAA Pre-Award Accounting System Audit.
(If your “Word” Version does not permit Signatures, you may send the Signature Page as a separate pdf, using naming convention referred to above) NCH 53.9–1 SEAPORTe PRE-AWARD ACCOUNTING SYSTEM ADEQUACY CHECKLIST
File details come from the government source that posted it. Updated .