GDS_100pct DRAFT_Site 14_Vol. 14.7.pdf
PDF 16 MB Posted
- Solicitation number
- N62742GDSCC
About this file
This document is a Draft Request for Proposal (RFP) for the construction (design-bid-build) of a command center, 9 MW (N+2) mission power generation facility, switchgear building, and associated equipment for the Guam Defense System at Joint Region Marianas, Guam. The estimated cost range is $250,000,000 to $500,000,000.
The Draft RFP is being released for industry review and comment to improve understanding of the government's requirements and industry capabilities prior to issuing the final RFP. The government is requesting industry feedback through an Industry Feedback Questionnaire and/or questions and comments via email by 2:00 PM HST on 15 August 2024. Proprietary information will not be accepted. The government intends to use Navy personnel and possibly an architect-engineering firm to review and evaluate the responses. Responding to this draft does not preclude participation in any future solicitation.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L
F A
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S Y
S T
E M
S C
O M
M A
N D
DRAWFORM REVISION: 25 AUGUST 2020
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
N A
V F
A C
P A
C
IF
IC
M
A K
A L A
P A
H
A W
A
II
AS NOTED
P R
O J E
C T
S
IT
E
C O
M M
A N
D C
E N
T E
R
N A
V F
A C
P A
C
IF
IC
1812861
KYM
JC
Jacobs/B&V, A Joint Venture (Federal Services) 1003 Bishop Street Suite 1340 Honolulu, HI 96813
A/E Task Order No. N6274223F0324
FOR REVIEW
ONLY
Name
Registration Number #
These documents are for Design Review and not intended for
Construction Bidding or Permit Purposes. They were prepared by, or under the supervision of:
Date
SEAL
24 JUN 2024
A N
D E
R S
E N
A
IR
F O
R C
E B
A S
E
KYM
AWK/DMK
/2
/2
:3 :0
A
M
C U s e rs
\l a r6
\D o c u m e n ts
\P
G L a re s
.r v t
14GI-G-013
C O
V E
R S
H E
E T
DCT
EL EL
G U
A M
G
I- G
-0
FINAL DESIGN SUBMITTAL
100% DESIGN SUBMITTAL
VICINITY MAP PROJECT LOCATION MAP
VOLUME 14.7 - POWER PLANT (GENERAL, MECHANICAL,
ELECTRICAL, TELECOMMUNICATIONS & SECURITY
PRIME CONSULTANT
CONSULTANTS
GENERAL NOTES AND REQUIREMENTS
VOLUME DESCRIPTION
VOL 14.1 GENERAL & SITE
VOL 14.2
VOL 14.4
COMMAND CENTER (GENERAL & STRUCTURAL)
VOL 14.5 COMMAND CENTER ( GENERAL, TELECOMMUNICATIONS, AUDIO VISUAL & SECURITY)
COMMAND CENTER ( GENERAL & ELECTRICAL)
VOL 14.3 COMMAND CENTER (GENERAL, ARCH, INTERIOR, FIRE PROTECTION, PLUMBING & MECHANICAL )
VOL 14.6 POWER PLANT (GENERAL, STRUCT, ARCH, INTERIOR, FIRE PROTECTION & PLUMBING
VOL 14.7 POWER PLANT (GENERAL, MECHANICAL, ELECTRICAL, TELECOMMUNICATIONS & SECURITY
VOL 14.8 ACCESS CONTROL
PROJECT 693
SITE 14 COMMAND CENTER
ANDERSEN AIR FORCE BASE, GUAM
PLAN NORTH PLAN NORTH
Jacobs/B&V, a Joint Venture (Federal Services)
BLACK & VEATCH
SHEET REFERENCES WITHOUT SITE NUMBER AND BUILDING ID (I.E. FRIST FOUR
CHARACTERS) ARE INDICATING SHEETS WITHIN THE SAME SERIES OF DRAWINGS
OR TO GENERAL SHEETS, AS APPLICABLE.
S Y
M D
E S
C R
IP
TI
O N
D A
TE
A
P P
R
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L
F A
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S Y
S T
E M
S C
O M
M A
N D
DRAWFORM REVISION: 25 AUGUST 2020
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
N A
V F
A C
P A
C
IF
IC
M
A K
A L A
P A
H
A W
A
II
AS NOTED
F Y
P
R O
J E
C T
G D
S C
O M
M A
N D
C E
N T
E R
N A
V F
A C
P A
C
IF
IC
1764210
KYM
JC
Jacobs/B&V, A Joint Venture (Federal Services) 1003 Bishop Street Suite 1340 Honolulu, HI 96813
A/E Task Order No. N6274223F0324
FOR REVIEW
ONLY
Name
Registration Number #
These documents are for Design Review and not intended for
Construction Bidding or Permit Purposes. They were prepared by, or under the supervision of:
Date
SEAL
24 JUN 2024
A N
D E
R S
E N
A
IR
F O
R C
E B
A S
E
KYM
AWK/DMK
/2
/2
:2
:5
P
M
C R e v it \l o c a l_
\P
G
T a rr D
C b v .c o m
.r v t
14GI-G-014
S H
E E
T
IN
D E
X
ELDCT DCT
G U
A M
G I-
G -0
100% DESIGN SUBMITTAL
SITE 14 - MECHANICAL SHEET INDEX - VOL. 14.7
SHEET.
NO
NAVFAC
DWG. NO. SHEET NUMBER SHEET NAME
MECHANICAL
0 14GI-M-001 MECHANICAL LEGENDS AND ABBREVIATIONS
0 14GI-M-002 MECHANICAL LEGENDS AND ABBREVIATIONS
0 14GI-M-003 MECHANICAL GENERAL NOTES
0 14GI-M-004 MECHANICAL PIPING LEGENDS
0 14GI-M-005 MECHANICAL HVAC LEGENDS
0 14GI-M-006 MECHANICAL EQUIPMENT LEGENDS
0 14GI-M-007 MECHANICAL INSTRUMENTATION LEGENDS
0 14GI-M-008 POINT SCHEDULE INSTRUCTIONS
MECHANICAL
0 14PP-M-501 POWER PLANT - MECHANICAL DETAILS
0 14PP-M-502 POWER PLANT - MECHANICAL DETAILS
0 14PP-M-503 POWER PLANT - MECHANICAL DETAILS
0 14PP-M-504 POWER PLANT - MECHANICAL DETAILS
0 14PP-M-601 POWER PLANT - MECHANICAL SCHEMATICS
0 14PP-M-611 POWER PLANT - MECHANICAL SCHEMATICS
0 14PP-M-701 POWER PLANT - MECHANICAL SCHEDULES
0 14PP-M-702 POWER PLANT - MECHANICAL SCHEDULES
0 14PP-M-703 POWER PLANT - MECHANICAL SCHEDULES
0 14PP-M-704 POWER PLANT - MECHANICAL SCHEDULES
0 14PP-M-801 POWER PLANT - MECHANICAL CONTROLS
0 14PP-M-802 POWER PLANT - MECHANICAL CONTROLS
0 14PP-M-803 POWER PLANT - MECHANICAL CONTROLS
0 14PP-M-804 POWER PLANT - MECHANICAL CONTROLS
0 14PP-M-805 POWER PLANT - MECHANICAL CONTROLS
0 14PP-M-806 POWER PLANT - MECHANICAL CONTROLS
0 14PP-M-807 POWER PLANT - MECHANICAL CONTROLS
0 14PP-M-808 POWER PLANT - MECHANICAL CONTROLS
0 14PP-M-809 POWER PLANT - MECHANICAL CONTROLS
0 14PP-M-810 POWER PLANT - MECHANICAL CONTROLS
0 14PP-M-811 POWER PLANT - MECHANICAL CONTROLS
0 14PP-M-901 POWER PLANT - FUEL OIL RISER DIAGRAM - OVERALL
0 14PP-MH111 POWER PLANT - HVAC PLAN - OVERALL
0 14PP-MH112 POWER PLANT - HVAC PLAN - AREA A
0 14PP-MP111 POWER PLANT - MECHANICAL PIPING PLAN - OVERALL
0 14PP-MP113 POWER PLANT - MECHANICAL PIPING PLAN - AREA B
0 14PP-MP114 POWER PLANT - MECHANICAL PIPING PLAN - AREA C
SITE 14 - ELECTRICAL SHEET INDEX - VOL. 14.7
SHEET.
NO
NAVFAC
DWG. NO. SHEET NUMBER SHEET NAME
ELECTRICAL
0 14GI-E-001 ELECTRICAL ABBREVIATIONS
0 14GI-E-002 ELECTRICAL LEGEND AND NOTES
0 14GI-E-003 GENERAL - ELECTRICAL LEGEND AND NOTES
0 14GI-E-004 ELECTRICAL CIRCUIT AND RACEWAY LEGEND
0 14GI-E-005 CIRCUIT & RACEWAY TYPES
0 14GI-E-006 INSTRUMENTATION I/O LIST LEGEND
ELECTRICAL - POWER
0 14PP-EP101 POWER PLANT - UNDERFLOOR RACEWAY PLAN - OVERALL
0 14PP-EP102 POWER PLANT - UNDERFLOOR RACEWAY PLAN - AREA A
0 14PP-EP103 POWER PLANT - UNDERFLOOR RACEWAY PLAN - AREA B
0 14PP-EP104 POWER PLANT - UNDERFLOOR RACEWAY PLAN - AREA C
0 14PP-EP111 POWER PLANT - POWER PLAN - OVERALL
0 14PP-EP112 POWER PLANT - POWER PLAN - AREA A
0 14PP-EP113 POWER PLANT - POWER PLAN - AREA B
0 14PP-EP114 POWER PLANT - POWER PLAN - AREA C
0 14PP-EP201 POWER PLANT - EQUIPMENT ELEVATIONS - GENERATOR
SWITCHGEAR
0 14PP-EP202 POWER PLANT - EQUIPMENT ELEVATIONS - MV SWITCHGEAR
0 14PP-EP203 POWER PLANT - EQUIPMENT ELEVATIONS - LV SWITCHGEAR
0 14PP-EP501 POWER PLANT - DUCTBANK SECTION DETAILS
0 14PP-EP511 POWER PLANT - ELECTRICAL MANHOLE BUTTERFLY DETAILS
0 14PP-EP518 POWER PLANT - ELECTRICAL MANHOLE DETAILS
0 14PP-EP521 POWER PLANT - GENSET ENCLOSURE DETAIL
0 14PP-EP601 POWER PLANT - ONE-LINE DIAGRAM
0 14PP-EP602 POWER PLANT - ONE-LINE DIAGRAM
0 14PP-EP603 POWER PLANT - ONE-LINE DIAGRAM
0 14PP-EP604 POWER PLANT - ONE-LINE DIAGRAM - 125 VDC
0 14PP-EP605 POWER PLANT - ONE-LINE DIAGRAM INVERTER
0 14PP-EP611 POWER PLANT - ONE-LINE DIAGRAM - ZONES OF PROTECTION
0 14PP-EP612 POWER PLANT - ONE-LINE DIAGRAM - ZONES OF PROTECTION
0 14PP-EP613 POWER PLANT - MVS SCHEMATICS SYNC CHECK
INTERCONNECTIONS
0 14PP-EP616 POWER PLANT - BREAKER CONTROL INTERCONNECTION BLOCK
DIAGRAM
0 14PP-EP617 POWER PLANT - DIESEL GENERATOR OVERALL CONTROL
DIAGRAM
0 14PP-EP651 POWER PLANT - ONE-LINE DIAGRAM - TYP MVS BREAKERS -
GENERATOR SWGR
0 14PP-EP652 POWER PLANT - ONE-LINE DIAGRAM - TYP MVS BREAKERS -
GENERATOR SWGR
0 14PP-EP653 POWER PLANT - ONE-LINE DIAGRAM - MVS BREAKERS - SWGR A
0 14PP-EP654 POWER PLANT - ONE-LINE DIAGRAM - MVS BREAKERS - SWGR A
0 14PP-EP655 POWER PLANT - ONE-LINE DIAGRAM - MVS BREAKERS - SWGR B
0 14PP-EP656 POWER PLANT - ONE-LINE DIAGRAM - MVS BREAKERS - SWGR B
0 14PP-EP661 POWER PLANT - THREE LINE DIAGRAM 13.8kV BREAKER
0 14PP-EP671 POWER PLANT - MVS SCHEMATICS TYPICAL GENERATOR
BREAKER DC
0 14PP-EP672 POWER PLANT - MVS SCHEMATICS GENERATOR SYNC CONTROL
DC
0 14PP-EP673 POWER PLANT - MVS SCHEMATICS TYPICAL UTILITY BREAKER DC
0 14PP-EP674 POWER PLANT - MVS SCHEMATICS UTILITY SYNC CONTROL DC
0 14PP-EP675 POWER PLANT - MVS SCHEMATICS MAIN BUS DIFFERENTIAL DC
0 14PP-EP676 POWER PLANT - MVS SCHEMATICS GENERATOR DIFFERENTIAL
DC
0 14PP-EP677 POWER PLANT - MVS SCHEMATICS GENERATOR TIE BREAKER DC
0 14PP-EP678 POWER PLANT - MVS SCHEMATICS TYPICAL FEEDER BREAKER
DC
0 14PP-EP679 POWER PLANT - MVS SCHEMATICS BUS TIE BREAKER DC
0 14PP-EP680 POWER PLANT - MVS SCHEMATICS BUS TIE SYNC CONTROL DC
0 14PP-EP681 POWER PLANT - MVS SCHEMATICS LVS FEEDER BREAKER DC
0 14PP-EP682 POWER PLANT - MVS SCHEMATICS LOAD BANK BREAKER DC
0 14PP-EP683 POWER PLANT - MVS SCHEMATICS ASSET FEEDER BREAKER DC
0 14PP-EP684 POWER PLANT - COMMUNICATIONS PROCESSOR RELAYING
INTERCONNECTIONS
0 14PP-EP685 POWER PLANT - LVS SCHEMATICS BUS A
0 14PP-EP686 POWER PLANT - LVS SCHEMATICS BUS B
0 14PP-EP687 POWER PLANT - LVS SCHEMATICS BUS A AND B
0 14PP-EP688 POWER PLANT - INVERTER PANELBOARD SYNC CHECK RELAY
0 14PP-EP701 POWER PLANT - PANEL SCHEDULES
0 14PP-EP702 POWER PLANT - PANEL SCHEDULES
0 14PP-EP703 POWER PLANT - PANEL SCHEDULES
0 14PP-EP751 POWER PLANT - CIRCUIT SCHEDULES
0 14PP-EP752 POWER PLANT - CIRCUIT SCHEDULES
0 14PP-EP771 POWER PLANT - RACEWAY SCHEDULES
0 14PP-EP772 POWER PLANT - RACEWAY SCHEDULES
0 14PP-EP773 POWER PLANT - RACEWAY SCHEDULES
0 14PP-EP774 POWER PLANT - RACEWAY SCHEDULES
0 14PP-EP775 POWER PLANT - RACEWAY SCHEDULES
0 14PP-EP901 POWER PLANT - SEQUENCE OF OPERATION
0 14PP-EP902 POWER PLANT - SEQUENCE OF OPERATION
ELECTRICAL - LIGHTING
0 14PP-EL111 POWER PLANT - LIGHTING PLAN - OVERALL
0 14PP-EL112 POWER PLANT - LIGHTING PLAN - AREA A
0 14PP-EL113 POWER PLANT - LIGHTING PLAN - AREA B
0 14PP-EL114 POWER PLANT - LIGHTING PLAN - AREA C
0 14PP-EL501 POWER PLANT - LIGHTING CONTROL DIAGRAM
0 14PP-EL502 POWER PLANT - LIGHTING DETAILS
0 14PP-EL701 POWER PLANT - LUMINAIRE SCHEDULE
ELECTRICAL - GROUNDING & LIGHTNING PROTECTION
0 14PP-EG111 POWER PLANT - GROUNDING PLAN - OVERALL
0 14PP-EG112 POWER PLANT - GROUNDING PLAN - AREA A
0 14PP-EG113 POWER PLANT - GROUNDING PLAN - AREA B
0 14PP-EG114 POWER PLANT - GROUNDING PLAN - AREA C
0 14PP-EG121 POWER PLANT - LIGHTNING PROTECTION PLAN - OVERALL
0 14PP-EG122 POWER PLANT - LIGHTNING PROTECTION PLAN - AREA A
0 14PP-EG123 POWER PLANT - LIGHTNING PROTECTION PLAN - AREA B
0 14PP-EG124 POWER PLANT - LIGHTNING PROTECTION PLAN - AREA C
0 14PP-EG501 POWER PLANT - GROUNDING DETAILS
0 14PP-EG502 POWER PLANT - GROUNDING DETAILS
0 14PP-EG503 POWER PLANT - LIGHTNING PROTECTION DETAILS
0 14PP-EG601 POWER PLANT - GROUNDING RISER
ELECTRICAL - INSTRUMENTATION & CONTROL
0 14PP-EI111 POWER PLANT - INSTRUMENTATION & CONTROL PLAN - OVERALL
0 14PP-EI112 POWER PLANT - BUILDING CONTROL SYSTEM PLAN - AREA A
0 14PP-EI113 POWER PLANT - INSTRUMENTATION & CONTROL PLAN - AREA B
0 14PP-EI114 POWER PLANT - INSTRUMENTATION & CONTROL PLAN - AREA C
0 14PP-EI601 POWER PLANT - FACILITY CONTROL SYSTEMS BLOCK DIAGRAM
0 14PP-EI602 POWER PLANT - PCMS COMMUNICATIONS RACK ELEVATIONS
0 14PP-EI603 POWER PLANT - PCMS-14PP69111 - ENCLOSURE BLOCK DIAGRAM
0 14PP-EI604 POWER PLANT - PCMS-14PP69112 - ENCLOSURE BLOCK DIAGRAM
0 14PP-EI605 POWER PLANT - PCMS-14PP69113 - ENCLOSURE BLOCK DIAGRAM
0 14PP-EI606 POWER PLANT - PCMS-14PP69114 - ENCLOSURE BLOCK DIAGRAM
0 14PP-EI607 POWER PLANT - PCMS-14PP69201A - ENCLOSURE BLOCK
DIAGRAM
0 14PP-EI608 POWER PLANT - PCMS-14PP69201B - ENCLOSURE BLOCK
DIAGRAM
0 14PP-EI609 POWER PLANT - PCMS-14PP69301A - ENCLOSURE BLOCK
DIAGRAM
0 14PP-EI610 POWER PLANT - PCMS-14PP69301B - ENCLOSURE BLOCK
DIAGRAM
0 14PP-EI611 POWER PLANT - PCMS-14PP-69101A - ENCLOSURE BLOCK
DIAGRAM
0 14PP-EI612 POWER PLANT - PCMS-14PP69101B - ENCLOSURE BLOCK
DIAGRAM
0 14PP-EI630 POWER PLANT - PCMS-14PP69101A & PCMS-14PP69101B FUEL
CONTROL BLOCK DIAGRAM
0 14PP-EI750 POWER PLANT - PCMS CONDUIT SCHEDULE
0 14PP-EI760 POWER PLANT - PCMS CIRCUIT SCHEDULE
0 14PP-EI761 POWER PLANT - PCMS CIRCUIT SCHEDULE
0 14PP-EI762 POWER PLANT - PCMS CIRCUIT SCHEDULE
0 14PP-EI901 POWER PLANT - PCMS I/O LIST - SHEET 1
0 14PP-EI902 POWER PLANT - PCMS I/O LIST - SHEET 2
0 14PP-EI903 POWER PLANT - PCMS I/O LIST - SHEET 3
0 14PP-EI904 POWER PLANT - PCMS I/O LIST - SHEET 4
0 14PP-EI905 POWER PLANT - PCMS I/O LIST - SHEET 5
0 14PP-EI906 POWER PLANT - PCMS I/O LIST - SHEET 6
0 14PP-EI907 POWER PLANT - PCMS I/O LIST - SHEET 7
0 14PP-EI908 POWER PLANT - PCMS I/O LIST - SHEET 8
0 14PP-EI909 POWER PLANT - PCMS I/O LIST - SHEET 9
0 14PP-EI910 POWER PLANT - PCMS I/O LIST - SHEET 10
0 14PP-EI911 POWER PLANT - PCMS I/O LIST - SHEET 11
0 14PP-EI912 POWER PLANT - PCMS I/O LIST - SHEET 12
0 14PP-EI913 POWER PLANT - PCMS I/O LIST - SHEET 13
0 14PP-EI914 POWER PLANT - PCMS I/O LIST - SHEET 14
0 14PP-EI915 POWER PLANT - PCMS I/O LIST - SHEET 15
0 14PP-EI916 POWER PLANT - PCMS I/O LIST - SHEET 16
0 14PP-EI917 POWER PLANT - PCMS I/O LIST - SHEET 17
0 14PP-EI918 POWER PLANT - PCMS I/O LIST - SHEET 18
0 14PP-EI919 POWER PLANT - PCMS I/O LIST - SHEET 19
0 14PP-EI920 POWER PLANT - PCMS I/O LIST - SHEET 20
0 14PP-EI921 POWER PLANT - PCMS I/O LIST - SHEET 21
0 14PP-EI922 POWER PLANT - PCMS I/O LIST - SHEET 22
0 14PP-EI923 POWER PLANT - PCMS I/O LIST - SHEET 23
0 14PP-EI924 POWER PLANT - PCMS I/O LIST - SHEET 24
0 14PP-EI925 POWER PLANT - PCMS I/O LIST - SHEET 25
0 14PP-EI926 POWER PLANT - PCMS I/O LIST - SHEET 26
0 14PP-EI927 POWER PLANT - PCMS I/O LIST - SHEET 27
0 14PP-EI928 POWER PLANT - PCMS I/O LIST - SHEET 28
0 14PP-EI929 POWER PLANT - PCMS I/O LIST - SHEET 29
0 14PP-EI930 POWER PLANT - PCMS I/O LIST - SHEET 30
0 14PP-EI931 POWER PLANT - PCMS I/O LIST - SHEET 31
0 14PP-EI932 POWER PLANT - PCMS I/O LIST - SHEET 32
0 14PP-EI933 POWER PLANT - PCMS I/O LIST - SHEET 33
0 14PP-EI934 POWER PLANT - PCMS I/O LIST - SHEET 34
0 14PP-EI935 POWER PLANT - PCMS I/O LIST - SHEET 35
0 14PP-EI936 POWER PLANT - PCMS I/O LIST - SHEET 36
0 14PP-EI937 POWER PLANT - PCMS I/O LIST - SHEET 37
0 14PP-EI938 POWER PLANT - PCMS I/O LIST - SHEET 38
0 14PP-EI939 POWER PLANT - PCMS I/O LIST - SHEET 389
0 14PP-EI940 POWER PLANT - PCMS I/O LIST - SHEET 40
SITE 14 - TELECOMMUNICATIONS SHEET - VOL. 14.7
SHEET.
NO
NAVFAC
DWG. NO. SHEET NUMBER SHEET NAME
GENERAL
0 14GI-T-001 TELECOMMUNICATIONS LEGEND
TELECOMMUNICATIONS
0 14PP-T-111 POWER PLANT - TELECOMMUNICATIONS PLAN - OVERALL
0 14PP-T-112 POWER PLANT - TELECOMMUNICATIONS PLAN - AREA A
0 14PP-T-113 POWER PLANT - TELECOMMUNICATIONS PLAN - AREA B
0 14PP-T-114 POWER PLANT - TELECOMMUNICATIONS PLAN - AREA C
0 14PP-T-201 POWER PLANT - TELECOMMUNICATIONS ELEVATIONS
0 14PP-T-501 POWER PLANT - TELECOMMUNICATIONS - STANDARD DETAILS
0 14PP-T-601 TELECOMMUNICATIONS GROUNDING DETAILS
0 14PP-T-603 TELECOMMUNICATIONS GROUNDING ONE-LINE
SITE 14 - GENERAL SHEET INDEX - VOL. 14.7
SHEET
NO.
NAVFAC
DWG. NO. SHEET NUMBER SHEET NAME
GENERAL
0 14GI-G-013 COVER SHEET
0 14GI-G-014 SHEET INDEX
S Y
M D
E S
C R
IP
TI
O N
D A
TE
A
P P
R
P R
O J E
C T
S
IT
E
C O
M M
A N
D C
E N
T E
R
A N
D E
R S
E N
A
IR
F O
R C
E B
A S
E G
U A
M
GENERAL ABBREVIATIONS GENERAL ABBREVIATIONS
(CONTINUED)
@ AT
& AND
˪ ANGLE
AAV AUTOMATIC AIR VENT
AC ALTERNATING CURRENT OR AIR CONDITIONING
AD ACCESS DOOR
ADA AMERICANS WITH DISABILITIES ACT (STANDARDS)
ADJ ADJUSTABLE
AFF ABOVE FINISHED FLOOR
ALM ALARM
AMP AMPERE
ANSI AMERICAN NATIONAL STANDARDS INSTITUTE
APD AIR PRESSURE DROP
APPROX APPROXIMATE
ARCH ARCHITECT
ASSY ASSEMBLY
ATMOS ATMOSPHERE
AUTO AUTOMATIC
AUX AUXILIARY
AVG AVERAGE
BAS BUILDING AUTOMATION SYSTEM
BD MANUAL BALANCING (VOLUME) DAMPER
BLDG BUILDING
BLW BELOW
BMS BUILDING MANAGEMENT SYSTEM
BOD BOTTOM OF DUCT
BOI BOTTOM OF INSULATION
BOP BOTTOM OF PIPE
BOS BOTTOM OF STEEL
BOT BOTTOM
BTU BRITISH THERMAL UNIT
BTUH BRITISH THERMAL UNITS PER HOUR
C CHANNEL, CELSIUS
CAP CAPACITY
CBN COMMON BONDING NETWORK
CCW COUNTERCLOCKWISE
CFM CUBIC FEET PER MINUTE
CFS CUBIC FEET PER SECOND
CHEM CHEMICAL
CI CAST IRON OR CONTRACTOR INSTALLED
CL CENTERLINE
CLG COOLING
CLR CLEAR, CLEARANCE
CNDS CONDENSATE
CNTRL CONTROL
CMD COMMAND
CMU CONCRETE MASONRY UNIT
CNTRL CONTROL
CO2 CARBON DIOXIDE
COL COLUMN
CONC CONCRETE
CONN CONNECTION
CONT CONTINUATION, CONTINUE
CP CONTROL PANEL
CTR CENTER
CU COPPER
CV VALVE FLOW COEFFICIENT
DB DECIBEL, DRY BULB
DC DIRECT CURRENT
DD DUCT DETECTOR
DDC DIRECT DIGITAL CONTROL
DEF DIESEL EXHAUST FLUID
DEG OR ° DEGREE
DIA OR ø DIAMETER
DIFF DIFFERENTIAL
DIM DIMENSION
DISCH DISCHARGE
DN DOWN
DP DEW POINT, DIFFERENTIAL PRESSURE
DS DISCONNECT SWITCH
DSC DESICCANT
DSW DESICCANT WHEEL
DWG DRAWING
EA EACH
EAT ENTERING AIR TEMP
ECC ECCENTRIC
ECM ELECTRONICALLY COMMUNICATED MOTOR
EDB ENTERING DRY BULB
EFF EFFICIENCY
ELEC ELECTRIC
EL, ELEV ELEVATION
EMCS EMERGENCY MONITORING CONTROL STATION
EPO EMERGENCY POWER OFF (SWITCH)
ESP EXTERNAL STATIC PRESSURE
EQUIP EQUIPMENT
EWB ENTERING WET BULB
EXIST EXISTING
EXT EXTERIOR
F FAHRENHEIT
FA FREE AREA
FBO FURNISHED BY OTHERS (OR OWNER)
FC FAIL CLOSED
FH FILTER HOUSING, FLEXIBLE HOSE
FIG FIGURE
FLA FULL LOAD AMPS
FLG FLANGE
FLR FLOOR
FM FACTORY MUTUAL
FO FAIL OPEN, FLAT OVAL, OR FIBER OPTIC
FOB FLAT ON BOTTOM
FOT FLAT ON TOP
FPM FEET PER MINUTE
FT FEET OR FOOT
G GAUGE, GAGE
GA GAUGE
GAL GALLON
GALV GALVANIZED
GFCI GOVERNMENT FURNISHED CONTRACTOR INSTALLED
GFGI GOVERNMENT FURNISHED GOVERNMENT INSTALLED
GND GROUND
GPH GALLON PER HOUR
GPM GALLON PER MINUTE
GWB GYPSUM WALLBOARD
GYP GYPSUM
H HEIGHT
HDPE HIGH DENSITY POLYETHYLENE
HOR HORIZONTAL
HR HOUR
HRV HEAT RECOVERY VENTILATOR
HP HORSEPOWER
HT HEIGHT
HTG HEATING
HZ HERTZ
IBC INTERNATIONAL BUILDING CODE
ID INSIDE DIAMETER
IE INVERT ELEVATION
IN INCHES
INCL INCLUDED
INWC INCHES OF WATER COLUMN
INST INSTRUMENTATION, INSTANTANEOUS
INSUL INSULATION
IPS IRON PIPE SIZE
IR INFRARED
kV KILOVOLT kVA KILOVOLT AMPERES kW KILOWATT kWh KILOWATT-HOUR
KW KILOWATT
L LENGTH
LAT LEAVING AIR TEMP
LB POUND
LDP LEAVING DEWPOINT
LED LIGHT EMITTING DIODE
LP LOW PRESSURE
LR LONG RADIUS
M METER, MOTOR
MATL MATERIAL
MAX MAXIMUM
MBH ONE THOUSAND BRITISH THERMAL UNITS PER HOUR
MFG MANUFACTURING
MFR MANUFACTURER
MIN MINIMUM, MINUTE
MNOA MINIMUM OUTSIDE AIR
MOCP MAXIMUM OVER CURRENT PROTECTION
MPT MALE PIPE THREAD
MS MOTOR SWITCH, MOTOR STARTER
NA NOT APPLICABLE
NC NORMALLY CLOSED
NEC NATIONAL ELECTRIC CODE
NEG NEGATIVE
NEMA NATIONAL ELECTRICAL MANUFACTURERS ASSOCIATION
NFPA NATIONAL FIRE PROTECTION ASSOCIATION
NIC NOT IN CONTRACT
NO NUMBER, NORMALLY OPEN
NOM NOMINAL
NPT NATIONAL PIPE THREAD
NTS NOT TO SCALE
OCC OCCUPIED
OD OUTSIDE DIAMETER
OF/CI OWNER FURNISHED / CONTRACTOR INSTALLED
(THE FOLLOWING ARE ALL ENCOMPASSING AND MAY
OR MAY NOT BE UTILIZED HERE-IN)
DETAIL IDENTIFICATION
DETAIL NUMBER
SHEET NUMBER ON WHICH
DETAIL IS SHOWN
SECTION IDENTIFICATION
SECTION LETTER
SHEET NUMBER ON WHICH
DETAIL IS SHOWN
DETAIL, SECTIONS & PLAN TITLE
DETAIL, SECTION OR PLAN TITLE
M-501
M-30
A
M-101
DETAIL, SECTION OR PLAN TITLE
DETAIL OR PLAN NUMBER,
OR SECTION LETTER
APPROPRIATE ARCHITECTURAL OR
ENGINEERING SCALE, OTHERWISE
"NOT TO SCALE".
SCALE
SHEET NUMBER OR WHICH DETAIL,
SECTION OR PLAN IS SHOWN
GENERAL LEGEND
(LEGEND: BVF - GENERAL LEGEND)
DUCTWORK ABBREVIATIONS
EA EXHAUST AIR
OA OUTSIDE AIR
MA MIXED AIR
MUA MAKEUP AIR
RA RETURN AIR
RFA RELIEF AIR
SA SUPPLY AIR
TA TRANSFER AIR
MECHANICAL PIPING ABBREVIATIONS
ATV ATMOSPHERIC (STEAM) VENT
ATF AUTOMATIC TRANSMISSION FLUID
BBD BOILER BLOWDOWN
BFW BOILER FEEDWATER
CBR CHILLED BEAM RETURN
CBS CHILLED BEAM SUPPLY
CD CONDENSATE DRAIN
CG CHASSIS GREASE
CHWS CHILLED WATER SUPPLY
CHWR CHILLED WATER RETURN
CST CLEAN STEAM
CSC CLEAN STEAM CONDENSATE
CS CONDENSER WATER SUPPLY
CR CONDENSER WATER RETURN
DEFF DIESEL EXHAUST FLUID OFFLOADING
DEFP DIESEL EXHAUST FLUID PIPE
DEFS DIESEL EXHAUST FLUID SUPPLY
DEFR DIESEL EXHAUST FLUID RETURN
EC ENGINE COOLANT
EEV ENGINE EXHAUST VENT
EO ENGINE OIL
FOF FUEL OIL OFFLOADING
FOR FUEL OIL RETURN
FOS FUEL OIL SUPPLY
FOV FUEL OIL VENT
GO GEAR OIL
GV ATMOSPHERIC COMBUSTION GAS VENT
GWS GLYCOL CHILLED WATER SUPPLY
GWR GLYCOL CHILLED WATER RETURN
HWS HEATING HOT WATER SUPPLY
HWR HEATING HOT WATER RETURN
MTWS MEDIUM TEMPERATURE HEATING WATER SUPPLY
MTWR MEDIUM TEMPERATURE HEATING WATER RETURN
HTWS HIGH TEMPERATURE HEATING WATER SUPPLY
HTWR HIGH TEMPERATURE HEATING WATER RETURN
IA INSTRUMENT AIR
LPS LOW PRESSURE STEAM
LPC LOW PRESSURE CONDENSATE
PGV PRESSURIZED COMBUSTION GAS VENT
RD REFRIGERANT DISCHARGE
RL REFRIGERANT LIQUID
RS REFRIGERANT SUCTION
VAC VACUUM
(THE FOLLOWING ARE ALL ENCOMPASSING AND MAY OR MAY NOT BE UTILIZED HERE-IN)
(THE FOLLOWING ARE ALL ENCOMPASSING AND MAY OR MAY NOT BE UTILIZED HERE-IN)
PIPING SYSTEM IDENTIFICATION
PIPE SIZE
SYSTEM (SEE SYSTEM ABBREVIATIONS)
2" XX
GENERAL ABBREVIATIONS
(CONTINUED)
% PERCENT
PH OR ø PHASE
PL PLATE
PSI POUNDS PER SQUARE INCH
PSIG POUNDS PER SQUARE INCH GAUGE
PT POINT
QTY QUANTITY
R RADIUS
RAF RAISED ACCESS FLOOR
RECIRC RECIRCULATION
RED REDUCER
REF REFERENCE
REQ'D REQUIRED
RH RELATIVE HUMIDITY
RM ROOM
RPM REVOLUTIONS PER MINUTE
RST RESET
RT RATE
S SECOND
SCH SCHEDULE
SCRD SCREWED
SEC SECOND
SHT SHEET
SPEC SPECIFICATION SECTION
STD STANDARD
STL STEEL
SYS SYSTEM
TDH TOTAL DYNAMIC HEAD
TEMP TEMPERATURE OR TEMPORARY
TOC TOP OF CONCRETE
TOD TOP OF DUCT
TOS TOP OF STEEL
TSP TOTAL STATIC PRESSURE
TYP TYPICAL
UL UNDERWRITERS LABORATORIES
UNG UNDERGROUND
UNO UNLESS NOTED OTHERWISE
UNOCC UNOCCUPIED
V VENT, VOLT, VOLTAGE
VAC VOLTS ALTERNATING CURRENT, VACUUM
VEL VELOCITY
VERT VERTICAL
VFD VARIABLE FREQUENCY DRIVE
VOL VOLUME
W WIDTH, WATT
W/ WITH
W/O WITHOUT
WB WET BULB
WC WATER PRESSURE DROP
WT WEIGHT
ZN ZONE
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D E
P
AR
TM
E
N T
O F
TH
E
N A
VY
N
A
VA
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S
YS
TE
M
S C
O M
M A
N D
DRAWFORM REVISION: 25 AUGUST 2020
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
NA
VF
AC
P
AC
IF
IC
M
A K
AL
A
PA
, H
AW
AI
I
AS NOTED
FY
P R
O
JE
C T
G D
S C
O M
M
AN
D C
EN
TE
R
N A
VF
AC
P A
C
IF
IC
1764210
KYM
JC
Jacobs/B&V, A Joint Venture (Federal Services) 1003 Bishop Street Suite 1340 Honolulu, HI 96813
A/E Task Order No. N6274223F0324
FOR REVIEW
ONLY
Name
Registration Number #
These documents are for Design Review and not intended for
Construction Bidding or Permit Purposes. They were prepared by, or under the supervision of:
Date
SEAL
24 JUN 2024
AN
DE
RS
EN
A
IR
F O
RC
E
BA
SE
LJE
AWK/DMK
6/
/2
6:
:0
PM
P6
_1
_1 4_
G _d et ac he d.
rv t
14GI-M-001
ME
CH
AN
IC
AL
LE
GE
ND
S
AN
D
AB
BR
EV
IA
TI
ON
S
MAMMGP JTW
G
UA
M
G
I-M -0
100% DESIGN SUBMITTAL
SY
M
DE
SC
RI
PT
IO
N
DA
TE
AP
PR
P R
O J E
C T
S
IT
E
C O
M M
A N
D C
E N
T E
R
A N
D E
R S
E N
A
IR
F O
R C
E B
A S
E G
U
INTERFACE SYMBOLS
ITEMS THIS SIDE OF SYMBOL NEW
ITEMS THIS SIDE SYMBOL
EXISTING (OR MUST REMAIN)
ITEMS THIS SIDE OF SYMBOL
MUST BE REMOVED
ITEMS THIS SIDE OF SYMBOL
EXISTING (OR MUST REMAIN)
ITEMS THIS SIDE OF SYMBOL
TO BE INSTALLED IN THIS CONTRACT
ITEMS THIS SIDE OF SYMBOL
TO BE INSTALLED IN FUTURE CONTRACT
ITEMS THIS SIDE OF SYMBOL
ARE INCLUDED IN THE SYSTEM
INDICATED.
ITEMS THIS SIDE OF SYMBOL
ARE INCLUDED IN THE SYSTEM
INDICATED.
ITEMS THIS SIDE OF SYMBOL
ARE INCLUDED IN THE SYSTEM
INDICATED.
EXISTING, DEMOLITION, AND NEW
CONTRACT LIMITS
YY-ZZZ##
DRAWING -TO-DRAWING INTERFACE CONTINUATION FLAGS
FLOW "FROM" DRAWING
"TO" DRAWING NUMBER
SEQUENTIAL FLAG ID NUMBER
(EACH FLAG LEAVING FROM
DRAWING HAS A UNIQUE
FLAG ID NUMBER)
YY-ZZZ##
FLOW "TO" DRAWING
"FROM" DRAWING NUMBER
FLAG ID NUMBER CORRESPONDS
TO SEQUENTIAL ID ON
"FROM" DRAWING
X
"FROM" FLOW CONTINUATION
ON SAME DRAWING
SEQUENTIAL FLAG ID NUMBER
(EACH "FROM" FLAG LEAVING FROM
DRAWING HAS A UNIQUE
FLAG ID NUMBER)
"TO" FLOW CONTINUATION
ON SAME DRAWING
FLAG ID NUMBER
(EACH "TO" FLAG ID NUMBER
CORRESPONDS TO ID NUMBER
ON "FROM" FLAG)
X
MECHANICAL SYSTEM LIMITS
SAME DRAWING -TO-DRAWING INTERFACE CONTINUATION FLAGS
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D E
P
AR
TM
E
N T
O F
TH
E
N A
VY
N
A
VA
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S
YS
TE
M
S C
O M
M A
N D
DRAWFORM REVISION: 25 AUGUST 2020
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
NA
VF
AC
P
AC
IF
IC
M
A K
AL
A
PA
, H
AW
AI
I
AS NOTED
FY
P R
O
JE
C T
G D
S C
O M
M
AN
D C
EN
TE
R
N A
VF
AC
P A
C
IF
IC
1764210
KYM
JC
Jacobs/B&V, A Joint Venture (Federal Services) 1003 Bishop Street Suite 1340 Honolulu, HI 96813
A/E Task Order No. N6274223F0324
FOR REVIEW
ONLY
Name
Registration Number #
These documents are for Design Review and not intended for
Construction Bidding or Permit Purposes. They were prepared by, or under the supervision of:
Date
SEAL
24 JUN 2024
AN
DE
RS
EN
A
IR
F O
RC
E
BA
SE
LJE
AWK/DMK
6/
/2
6:
:2
PM
P6
_1
_1 4_
G _d et ac he d.
rv t
14GI-M-002
ME
CH
AN
IC
AL
LE
GE
ND
S
AN
D
AB
BR
EV
IA
TI
ON
S
MAMMGP JTW
G
UA
M
G
I-M -0
100% DESIGN SUBMITTAL
SY
M
DE
SC
RI
PT
IO
N
DA
TE
AP
PR
P R
O J E
C T
S
IT
E
C O
M M
A N
D C
E N
T E
R
A N
D E
R S
E N
A
IR
F O
R C
E B
A S
E G
U
GENERAL MECHANICAL NOTES
(CONTINUED)
GENERAL DUCT SUPPORT NOTES
1. ENTIRE SCOPE OF SUPPORT LOCATION, DESIGN, FABRICATION, AND INSTALLATION
OF HVAC DUCTS MUST BE CONTRACTOR'S RESPONSIBILITY. HVAC DUCTS MUST BE
IN ACCORDANCE WITH THE LATEST SMACNA PUBLICATION "SEISMIC RESTRAINT
MANUAL" AND SPECIFICATIONS.
GENERAL HVAC NOTES
1. ALL HVAC PENETRATIONS IN FIRE WALLS MUST HAVE FIRE DAMPERS. ALL FIRE
DAMPERS, SMOKE DAMPERS, AND FIRE/SMOKE DAMPERS MUST BE INSTALLED IN
ACCORDANCE WITH SHEET METAL AND AIR CONDITIONING NATIONAL
ASSOCIATION (SMACNA) SMOKE, AND RADIATION DAMPER INSTALLATION GUIDE
FOR HVAC SYSTEMS, UL, IBC, AND DAMPER MANUFACTURER'S
RECOMMENDATIONS
2. ALL RECTANGULAR DUCT ELBOWS MUST HAVE TURNING VANES UNLESS NOTED
OTHERWISE. ALL UNEQUAL TURNING VANES MUST HAVE SINGLE-THICKNESS
TURNING VANES WITH TRAILING EDGE. NOT ALL TURNING VANES ARE INDICATED
ON THE DRAWINGS.
3. ALL DUCT SIZE DIMENSIONS INDICATED ON THE DRAWINGS ARE CLEAR INSIDE
DIMENSIONS.
4. ALL HVAC PENETRATIONS EQUAL OR GREATER THAN 96 SQ IN AND ALONG THE
SECURE BOUNDARY MUST HAVE MANBARS.
5. REFER TO THE ARCHITECTURAL DRAWINGS FOR EXACT LOCATION OF ALL FIRE
RATED WALLS AND ASSEMBLIES. PROVIDE APPROVED FIRE DAMPERS IN ALL
REQUIRED PENETRATIONS FOR DUCTWORK, GRILLES, REGISTERS, AND
DIFFUSERS.
6. COORDINATE THE LOCATION OF ALL DIFFUSERS, GRILLES, REGISTERS, ACCESS
DOORS, ETC. WITH ARCHITECTURAL REFLECTED CEILING PLANS.
7. CONTRACTOR MUST COORDINATE ALL DUCTWORK WITH PIPING, STRUCTURAL,
AND ELECTRICAL SYSTEMS AND MUST PROVIDE NECESSARY OFFSETS TO AVOID
CONFLICTS AND TO MAINTAIN EQUIPMENT ACCESS AND SERVICEABILITY.
8. PIPING SUPPORTS, ELECTRICAL TRAY AND CONDUIT SUPPORTS, OR CEILING
SUPPORTS, MUST NOT BE SUSPENDED FROM DUCTWORK.
9. DUCT MOUNTED ACCESS DOORS MUST BE PROVIDED AT EACH CONTROL DAMPER,
FIRE DAMPER, CONTROL INSTRUMENTS, AND OTHER EQUIPMENT THAT REQUIRES
SERVICE OR INSPECTION AND AT LOCATIONS SPECIFIED. THE ACCESS DOOR
MUST BE INSTALLED IN AN ACCESSIBLE LOCATION (PREFERABLY BOTTOM OF
DUCT) AND MUST OPEN AGAINST PRESSURE. CONTRACTOR MUST INSTALL
ACCESS DOORS AFTER SUCH LOCATIONS ARE APPROVED BY THE OWNER.
10. MANUAL VOLUME DAMPERS MUST BE PROVIDED WHERE INDICATED OR AS
REQUIRED FOR SYSTEM BALANCING.
11. PROVIDE TRANSITION FITTINGS WHEN CHANGING DUCT DIMENSIONS. ALL
OFFSETS IN THE DUCTWORK MUST BE OF THE SMACNA TYPE 3 (RADIUSED OR
OGEE) UNLESS OTHERWISE NOTED.
GENERAL INSTRUMENTATION NOTES
1. INSTRUMENT CONNECTIONS ARE NOT DIMENSIONED ON THE DRAWINGS. THE
CONNECTION LOCATIONS SHOWN ARE INTENDED TO SERVE AS A GENERAL GUIDE
ONLY TO ILLUSTRATE THE DESIRED LOCATIONS OF THE CONNECTIONS. FOR
INSTRUMENT CONNECTIONS NOT IDENTIFIED ON PLAN DRAWING(S) REFER TO HVAC
AIRFLOW AND INSTRUMENTATION DIAGRAMS FOR RELATIVE LOCATIONS. THE
CONTRACTOR MUST AVOID INTERFERENCE WITH OTHER INSTRUMENT
CONNECTIONS, PIPING, EQUIPMENT, AND THE WORK OF OTHER DISCIPLINES.
WHERE PRESSURE AND TEMPERATURE CONNECTIONS ARE SHOWN ADJACENT TO
EACH OTHER, A MINIMUM DISTANCE OF 12 IN MUST BE MAINTAINED BETWEEN
INSTRUMENT CONNECTIONS WHERE POSSIBLE.
2. INSTRUMENTATION (FOR EXAMPLE, PI, TI, PDI) IS NOT ALL SHOWN ON PLAN
DRAWINGS. CONTRACTOR MUST PROVIDE INSTRUMENTATION AS INDICATED ON
CONTROL DIAGRAMS AND MUST LOCATE DEVICES SUCH THAT A PERSON CAN
EASILY READ GAUGE WHILE STANDING ON FLOOR.
3. THERMOSTATS AND ROOM TEMPERATURE TRANSMITTERS MUST BE MOUNTED 4 FT
ABOVE FINISHED FLOOR UNLESS NOTED OTHERWISE.
4. ALL PRESSURE INSTRUMENTATION MUST BE FOR 0.75 IN DIA PIPING.
TEMPERATURE TAPS MUST BE SUITABLE FOR THERMOWELL, IN NO CASE LESS
THAN 0.75 IN. ALL PRESSURE INSTRUMENTATION MUST BE PROVIDED WITH A 0.75
IN ISOLATION BALL VALVE.
5. CONTRACTOR MUST AFFIX PERMANENT TAGS/LABELS TO ALL DEVICES AS
SPECIFIED.
6. CONTRACTOR MUST LABEL ALL DDC I/O SIGNAL LINES: 4-20 mA, VDC, OR SNVT.
7. CONTRACTOR MUST SHOW A UNIQUE IDENTIFIER FOR EACH DEVICE. WHERE
MULTIPLE IDENTICAL DEVICES ARE SHOWN (FOR EXAMPLE; DDC CONTROLLER, OA
SENSOR, OR EP TRANSDUCER) EACH MUST BE SEQUENTIALLY NUMBERED. WHERE
SEPARATE DDC CONTROLLER BUBBLES ARE USED TO REPRESENT/SHOW
A COMMON (OR SINGLE) CONTROLLER EACH BUBBLE MUST USE THE SAME
IDENTIFIER AND NUMBER. DEVICE AND SIGNAL IDENTIFIERS MUST BE CONSISTENT
BETWEEN DRAWINGS.
8. CONTRACTOR MUST UNIQUELY NUMBER ALL ANSI 709.1 DEVICES. THIS NUMBERING
MUST BE CONSISTENT BETWEEN ALL DRAWINGS.
GENERAL PIPE SUPPORT NOTES
1. ALL PIPE SUPPORTS MUST CONFORM TO THE REQUIREMENTS OF MSS-SP-58 AND
MSS-SP-69 AND AS SPECIFIED.
2. SUPPORTS MUST BE CAPABLE OF RESISTING HORIZONTAL AND VERTICAL FORCES
INDUCED BY EARTHQUAKE IN ADDITION TO NORMAL LOADS DUE TO WEIGHT OF
PIPE, FITTINGS, WEIGHT OF FLUID, INSULATION, AND LOADS DUE TO THERMAL
EXPANSION OR CONTRACTION. DESIGN OF SEISMIC BRACING MUST CONFORM TO
SPECIFICATIONS. SUPPORTS ON OUTSIDE PIPING EXPOSED TO WIND MUST BE
CAPABLE TO WITHSTAND 105 MPH WIND LOAD.
3. CONTRACTOR MUST BE RESPONSIBLE FOR THE DESIGN, FABRICATION, AND
INSTALLATION OF ALL PIPE SUPPORTS AND SEISMIC BRACING. SHOP DRAWINGS
THAT INDICATE TYPE AND LOCATION MUST BE PROVIDED FOR GOVERNMENT
APPROVAL.
4. CONTRACTOR MUST BE RESPONSIBLE FOR ALL SUPPLEMENTARY STEEL REQUIRED
FOR PIPE SUPPORT INSTALLATION.
5. CONTROL VALVE AND MOTOR OPERATED VALVE OPERATORS MUST BE BRACED
FOR SEISMIC LOADS IN ACCORDANCE WITH THE SPECIFICATIONS.
GENERAL PIPING NOTES
1. REFER TO LEGENDS AND SYMBOLS SHEETS FOR ADDITIONAL INFORMATION.
2. PIPING IS SHOWN FOR INFORMATION AND GENERAL ROUTING. THE CONTRACTOR
MUST PROVIDE FINAL ROUTING FOR ALL PIPING AND MUST PROVIDE SHOP
DRAWINGS THAT INCLUDE: EXACT DIMENSIONED ROUTING OF ALL PIPE, PIPE SIZE,
DIMENSIONED TIE-IN LOCATIONS, AND FIRE WALL PENETRATION DETAILS. THE
CONTRACTOR MUST AVOID INTERFERENCES WITH OTHER PIPING, EQUIPMENT,
CODE REQUIRED CLEARANCES, AND THE WORK OF OTHER DISCIPLINES.
3. ALL THREADED PIPING (VALVES, EQUIPMENT, AND FITTINGS) SHOWN ON THE
DRAWING AS FITTING TO FITTING AND NOT DIMENSIONED MUST BE INSTALLED
USING 3 IN LONG PIPE NIPPLES BETWEEN EACH ITEM UNLESS NOTED OTHERWISE.
4. PIPING AND SUPPORTS MUST NOT INTERFERE WITH EQUIPMENT MAINTENANCE
ACCESS OR PULL SPACE. PIPE SUPPORTS MUST BE FURNISHED AND INSTALLED IN
ACCORDANCE WITH THE SPECIFICATIONS.
5. ROUTE PIPING AS HIGH AS POSSIBLE. COORDINATE WITH ALL TRADES FOR
SPATIAL REQUIREMENTS PRIOR TO ROUGH-IN.
6. EQUIPMENT PIPING CONNECTION SIZES AND CONFIGURATION SHOWN ON
DRAWINGS ARE ESTIMATED AND MUST BE ADJUSTED FOR THE ACTUAL
EQUIPMENT FURNISHED.
7. CONTRACTOR MUST PROVIDE ALL PIPING WITH VALVED AND CAPPED HIGH POINT
VENTS AND LOW POINT DRAINS TO ALLOW VENTING, FILLING, AND DRAINING ALL
PIPE SECTIONS. UNLESS OTHERWISE INDICATED, SIZE MUST BE 1 IN FOR PIPE 6"
DIA AND LARGER, 0.75 IN FOR PIPE 0.75 IN THROUGH 4 IN DIA, AND LINE SIZE FOR
PIPE SMALLER THAN 0.75 IN DIAMETER. DRAWINGS DO NOT INDICATE ALL
REQUIRED VENTS AND DRAINS.
8. ISOLATION VALVES MUST BE PROVIDED WHERE INDICATED AND AS REQUIRED FOR
EQUIPMENT ISOLATION. EVERY VALVE MUST BE INSTALLED IN AN ACCESSIBLE
LOCATION. IF INSTALLED ABOVE A HARD CEILING, CONTRACTOR MUST PROVIDE
AN ACCESS PANEL FOR ACCESSIBILITY. REFER TO ARCHITECTURAL RCP FOR
ADDITIONAL INFORMATION.
9. ALL VALVE OPERATORS INCLUDING CONTROL VALVE AND MOTOR OPERATED
VALVE OPERATORS MUST BE ORIENTED PER MANUFACTURER'S INSTRUCTIONS
AND TO AVOID INTERFERENCE WITH OTHER PIPING AND EQUIPMENT.
GENERAL WATER RISER DIAGRAM NOTES
1. REFER TO LEGENDS AND SYMBOLS SHEETS FOR ADDITIONAL INFORMATION.
2. PROVIDE CHAINWHEEL OPERATORS FOR ALL VALVES IN EQUIPMENT ROOMS
MOUNTED GREATER THAN 7'-0" ABOVE FLOOR LEVEL. CHAIN MUST EXTEND DOWN
TO 7'-0" ABOVE FLOOR LEVEL.
3. ALL VALVES (EXCEPT MODULATING CONTROL VALVES) AND STRAINERS MUST BE
FULL SIZE OF PIPE BEFORE REDUCING SIZE TO MAKE CONNECTIONS TO
EQUIPMENT AND CONTROLS.
4. PROVIDE AN AIR VENT AT THE HIGH POINT OF EACH DROP IN THE HYDRONIC
PIPING SYSTEM. ALL PIPING MUST GRADE TO LOW POINTS. PROVIDE HOSE END
DRAIN VALVES EQUAL TO PIPE (MAX OF 3/4") AT THE BOTTOM OF ALL RISERS AND
LOW POINTS.
5. UNIONS AND/OR FLANGES MUST BE INSTALLED AT EACH PIECE OF EQUIPMENT, IN
BYPASSES, AND IN LONG PIPING RUNS (100 FEET OR MORE) TO PERMIT
DISASSEMBLY FOR ALTERATION AND REPAIRS.
GENERAL PIPING NOTES
(CONTINUED)
1. CONTRACTOR MUST REVIEW ALL DRAWINGS AND SPECIFICATIONS PRIOR TO BID TO
ALLOW FOR A COMPLETE UNDERSTANDING OF THE SCOPE OF WORK REQUIRED.
2. THE PLANS ARE TO A GREAT EXTENT SCHEMATIC IN NATURE. DRAWING SCALES SHOULD
BE VERIFIED FROM DIMENSIONS ON ARCHITECTURAL PLANS. THE INFORMATION
PRESENTED IS AS EXACT AS COULD BE SECURED. THE CONTRACTOR MUST OBTAIN
EXACT LOCATION, MEASUREMENTS, LEVELS, ETC. AT THE SITE AND MUST
SATISFACTORILY ADAPT THE WORK TO THE ACTUAL CONDITIONS AT THE PROJECT SITE.
ALL UNDERGROUND UTILITIES MUST BE VERIFIED AND LOCATED TO AVOID DAMAGE AND
DISRUPTION OF SERVICES.
3. ALL ELEVATIONS SHOWN ARE ABOVE FINISHED FLOOR, UNLESS NOTED OTHERWISE.
4. THE CONTRACT DRAWINGS DO NOT SHOW EVERY FITTING AND APPURTENANCE FOR
EACH UTILITY BECAUSE OF THE SCALE OF THE DRAWINGS. EACH CONTRACTOR MUST
HAVE INCLUDED IN HIS BID SUFFICIENT FITTINGS, MATERIAL AND LABOR TO ALLOW FOR
ADJUSTMENT IN ROUTING OF UTILITIES MADE NECESSARY BY THE COORDINATION
PROCESS.
5. CONTRACTOR MUST COORDINATE WITH ALL TRADES PRIOR TO STARTING INSTALLATION.
COORDINATION INCLUDES, BUT NOT LIMITED TO, UTILITIES REQUIRED, SPACIAL
REQUIREMENTS AND ANY ADDITIONAL INSTALLATION REQUIREMENTS.
6. CONTRACTOR MUST PROVIDE COMPLETE AND FUNCTIONAL SYSTEMS FOR ITEMS
DETAILED IN THE CONTRACT DOCUMENTS. THIS INCLUDES, BUT IS NOT LIMITED TO,
VALVES, DAMPERS AND ACCESSORIES REQUIRED.
7. IF A DISCREPANCY EXISTS BETWEEN THE DRAWINGS AND THE SPECIFICATIONS,
CONTACT THE ENGINEER FOR RESOLUTION BEFORE PROCEEDING. IF CONTRACTOR
DOES NOT RECEIVE CLARIFICATION PRIOR TO BID, THEY MUST ASSUME THE MOST
EXPENSIVE OPTION FOR BID.
8. CONSTRUCTION OF SECURE AREAS, AND SECURE AREA MATERIALS AND COMPONENTS,
SHALL COMPLY WITH UFC 4-010-015 AND IC TECH SPECS FOR ICD/ICS 705, AND FULLY
MEET AND PASS ALL ACCREDITATION.
GENERAL MECHANICAL NOTES
9. SUPPORTS - EQUIPMENT, PIPING, DUCTWORK, OR ANY OTHER ACCESSORY MUST NOT BE
SUPPORTED FROM OTHER PIPING, DUCTWORK, METAL ROOF DECK, LATERAL BRACING
BRIDGING, OR CONDUIT. ITEMS MUST ONLY BE SUPPORTED FROM BUILDING STRUCTURE.
10. ALL EQUIPMENT MUST BE SELECTED FOR SITE CONDITIONS.
11. PLAN AND SECTION DRAWINGS ARE BASED ON SPECIFIC BASIS-OF-DESIGN EQUIPMENT
MODELS. LAYOUT OF EQUIPMENT, CONCRETE PADS, DUCT CONNECTIONS AND PIPING
EQUIPMENT MUST BE VERIFIED AND ADJUSTED BY CONTRACTOR TO MATCH ACTUAL
EQUIPMENT FURNISHED. PHYSICAL CONSTRAINTS MAY PRECLUDE PURCHASE OF
CERTAIN EQUIPMENT MODELS. PLACEMENT OF ACTUAL EQUIPMENT FURNISHED MUST
NOT VIOLATE CODE RELATED SPACE REQUIREMENTS AND MANUFACTURER-
RECOMMENDED MAINTENANCE SPACE. UNLESS INDICATED OTHERWISE, CONCRETE
HOUSEKEEPING PAD, AS DETAILED ON THE STRUCTURAL DRAWINGS, MUST BE PROVIDED
FOR ALL FLOOR MOUNTED MECHANICAL EQUIPMENT. THE MECHANICAL CONTRACTOR
MUST COORDINATE THE PAD DIMENSIONAL REQUIREMENTS WITH THE STRUCTURAL
CONTRACTOR.
12. BEFORE INSTALLATION OF EQUIPMENT CONTRACTOR MUST VERIFY THAT COILS, TUBES,
AND OTHER MAINTENANCE ITEMS FOR EQUIPMENT CAN BE REMOVED WITHOUT
INTERFERENCE. CONTRACTOR MUST PROVIDE ADEQUATE ACCESS TO ALL EQUIPMENT
AND RECOMMENDED MAINTENANCE CLEARANCES.
13. ALL PENETRATIONS OF FIRE RESISTANCE-RATED CONSTRUCTION RATED ASSEMBLIES
ARE TO BE PROTECTED BY AN APPROVED THROUGH-PENETRATION SYSTEM THAT HAS
BEEN TESTED IN ACCORDANCE WITH DIVISION 7 SPECIFICATIONS. REFER
ARCHITECTURAL PLANS FOR FIRE RESISTANCE-RATED CONSTRUCTION LOCATIONS.
14. ALL HVAC PENETRATIONS IN FIRE RESISTANCE-RATED CONSTRUCTION MUST HAVE AN
APPROVED LIFE SAFETY DAMPER AND IN COMPLIANCE WITH NFPA. ALL LIFE SAFETY
DAMPERS (FIRE, SMOKE, AND FIRE/SMOKE) MUST BE INSTALLED IN ACCORDANCE WITH
SHEET METAL AND AIR CONDITIONING NATIONAL ASSOCIATION (SMACNA), SMOKE AND
RADIATION DAMPER INSTALLATION GUIDE FOR HVAC SYSTEMS, UL, IBC, AND DAMPER
MANUFACTURER'S RECOMMENDATIONS. FIRE DAMPERS MUST BE INSTALLED IN ALL FIRE
RESISTANCE RATED WALLS, PARTITIONS AND FLOORS. FIRE/SMOKE DAMPERS ARE
REQUIRED IN FIRE/SMOKE RATED CONSTRUCTION. SMOKE DAMPERS ARE REQUIRED IN
SMOKE RATED CONSTRUCTION. RADIATION DAMPERS ARE REQUIRED IN CEILING RATED
CONSTRUCTION. REFER ARCHITECTURAL PLANS FOR FIRE RESISTANCE-RATED
CONSTRUCTION LOCATIONS.
15. DUCT MOUNTED ACCESS DOORS MUST BE PROVIDED AT EACH CONTROL DAMPER, FIRE
DAMPER, CONTROL INSTRUMENTS, AND OTHER EQUIPMENT THAT REQUIRES SERVICE OR
INSPECTION AND AT LOCATIONS SPECIFIED. THE ACCESS DOOR MUST BE INSTALLED IN
AN ACCESSIBLE LOCATION (PREFERABLY BOTTOM OF DUCT) AND MUST OPEN AGAINST
PRESSURE. CONTRACTOR MUST INSTALL ACCESS DOORS AFTER SUCH LOCATIONS ARE
APPROVED BY THE OWNER.
16. CONTRACTOR TO PROVIDE DUCT TRANSITIONS AS REQUIRED FOR CONNECTION OF
DUCTS TO THE MECHANICAL UNITS. VERIFY SIZES FOR FINAL CONNECTION TO THE
PURCHASED EQUIPMENT.
17. PROVIDE TRANSITION FITTINGS WHEN CHANGING DUCT DIMENSIONS. ALL OFFSETS IN
THE DUCTWORK MUST BE OF THE SMACNA TYPE 3 (RADIUSED OR OGEE) UNLESS
OTHERWISE NOTED.
18. ALL RECTANGULAR SUPPLY, RETURN, AND EXHAUST AIR ELBOWS MUST BE SQUARE WITH
TURNING VANES OR RADIUS ELBOWS. ALL UNEQUAL TURNING VANES MUST HAVE
SINGLE-THICKNESS TURNING VANES WITH TRAILING EDGE. NOT ALL TURNING VANES ARE
INDICATED ON THE DRAWINGS.
19. ALL DUCT SIZE DIMENSIONS INDICATED ON THE DRAWINGS ARE CLEAR INSIDE
DIMENSIONS.
20. COORDINATE THE LOCATION OF ALL DIFFUSERS, GRILLES, REGISTERS, ACCESS DOORS,
ETC. WITH ARCHITECTURAL REFLECTED CEILING PLANS, FIRE PROTECTION SHOP
DRAWINGS AND ELECTRICAL SPECIAL SYSTEM PLANS.
21. CONTRACTOR MUST COORDINATE ALL DUCTWORK WITH PIPING, STRUCTURAL, AND
ELECTRICAL SYSTEMS AND MUST PROVIDE NECESSARY OFFSETS TO AVOID CONFLICTS
AND TO MAINTAIN EQUIPMENT ACCESS AND SERVICEABILITY.
10. ALL BUTTERFLY VALVES MUST HAVE SPOOL PIECES UPSTREAM AND
DOWNSTREAM SO THAT THE DISK WILL NOT ENTER ADJACENT FITTINGS.
WHERE STEEL FLANGES CONNECT WITH CAST IRON FLANGES, THEY MUST
BE PROVIDED WITH FLAT FACES AND FULL FACE GASKETS.
11. UNLESS DIRECTED OTHERWISE, DO NOT ROUTE PIPING ABOVE ELECTRICAL
PANELS AND GEAR. ANY PIPING THAT IS ROUTED OVER SUCH EQUIPMENT
MUST BE PROVIDED WITH A DRIP PAN.
12. PIPING INSULATION IS NOT SHOWN ON PLANS FOR DRAWING CLARITY.
13. PIPING PLANS DO NOT SHOW ALL REQUIRED DEVICES, VALVES AND
APPURTANANCES. SEE DIAGRAMS AND DETAILS FOR ITEMS NOT SHOWN ON
PIPING PLANS.
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D E
P
AR
TM
E
N T
O F
TH
E
N A
VY
N
A
VA
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S
YS
TE
M
S C
O M
M A
N D
DRAWFORM REVISION: 25 AUGUST 2020
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
NA
VF
AC
P
AC
IF
IC
M
A K
AL
A
PA
, H
AW
AI
I
AS NOTED
FY
P R
O
JE
C T
G D
S C
O M
M
AN
D C
EN
TE
R
N A
VF
AC
P A
C
IF
IC
1764210
KYM
JC
Jacobs/B&V, A Joint Venture (Federal Services) 1003 Bishop Street Suite 1340 Honolulu, HI 96813
A/E Task Order No. N6274223F0324
FOR REVIEW
ONLY
Name
Registration Number #
These documents are for Design Review and not intended for
Construction Bidding or Permit Purposes. They were prepared by, or under the supervision of:
Date
SEAL
24 JUN 2024
AN
DE
RS
EN
A
IR
F O
RC
E
BA
SE
LJE
AWK/DMK
6/
/2
6:
:0
PM
P6
_1
_1 4_
G _d et ac he d.
rv t
14GI-M-003
ME
CH
AN
IC
AL
G
EN
ER
AL
N
OT
ES
MAMMGP JTW
G
UA
M
G
I-M -0
100% DESIGN SUBMITTAL
SY
M
DE
SC
RI
PT
IO
N
DA
TE
AP
PR
P R
O J E
C T
S
IT
E
C O
M M
A N
D C
E N
T E
R
A N
D E
R S
E N
A
IR
F O
R C
E B
A S
E G
U
S
S
S
S
S
S
M
M
M
M
F
F
LS
L
T
S
S S
S
MF
A
D
VFD
MS
P
VB
V/A
PSD
AS
P
T
EDUCATOR, AIR INJECTOR
STRAINER, Y-TYPE
POST INDICATOR GATE VALVE
STRAINER, SIMPLEX BASKET TYPE
STRAINER, DUPLEX BASKET TYPE
STRAINER, CONE OR PLATE TYPE
RUPTURE DISC
MUFFLER
FLEXIBLE HOSE
EXPANSION JOINT
SIGHT GLASS, INLINE
FLOW INDICATOR, INLINE
SOLENOID OPERATED VALVE
SOLENOID OPERATED VALVE 3-WAY
SOLENOID OPERATED VALVE 4-WAY
SOLENOID OPERATED VALVE,
WITH MANUAL OVERRIDE
OIL MIST ELIMINATOR
FILTER IN-LINE
INLET FILTER SILENCER
PRESSURE REDUCING REGULATOR
PRESSURE REDUCING REGULATOR,
WITH FILTER
PRESSURE REDUCING REGULATOR,
WITH FILTER AND PRESSURE INDICATOR
PRESSURE REDUCING REGULATOR,
WITH PRESSURE INDICATORS
PRESSURE REGULATING VALVE,
WITH INTERNAL SENSING TAP
PRESSURE REGULATING VALVE,
WITH INTERNAL SENSING TAP
AND PRESSURE INDICATOR
PRESSURE REGULATING VALVE,
WITH EXTERNAL SENSING TAP
PRESSURE REGULATING VALVE,
WITH EXTERNAL SENSING TAP
AND PRESSURE INDICATOR
BACK PRESSURE REGULATING VALVE,
WITH INTERNAL SENSING TAP
BACK PRESSURE REGULATING VALVE,
WITH INTERNAL SENSING TAP
AND PRESSURE INDICATOR
BACK PRESSURE REGULATING VALVE,
WITH EXTERNAL SENSING TAP
BACK PRESSURE REGULATING VALVE,
WITH EXTERNAL SENSING TAP AND
PRESSURE INDICATOR
BACK PRESSURE REGULATING VALVE,
WITH INTERNAL AND EXTERNAL
SENSING TAP
TEMPERATURE REGULATING VALVE,
WITH EXTERNAL SENSING TAP
AUTOMATIC RECIRCULATION
CONTROL
FLOW ELEMENT (ORIFICE)
VENTURI
ANGLE RELIEF VALVE,
SAFETY RELIEF VALVE
ANGLE/SAFETY RELIEF VALVE,
WITH DRIP PAN ELBOW
RELIEF VALVE, IN-LINE
HYDROSTATIC RELIEF VALVE
RELIEF VALVE, WITH FLAME
ARRESTOR COMBINATION
FLAME ARRESTOR
AUTOMATIC AIR VENT
VENT SEAL
HEAD CHAMBER
SEPARATION CHAMBER
PRESSURE BREAKDOWN
ISOLATED DIAPHRAGM
STRAIGHTENING VANES
QUICK DISCONNECT
BUG SCREEN
SPRAY NOZZLE
CIRCUIT BALANCING VALVE
GAUGE CONNECTIONS
PRESSURE/TEMPERATURE (P/T) PLUG
SIPHON LOOP
SAMPLE COIL
EXHAUST HEAD
SOLENOID OPERATED VALVE,
WITH DOUBLE COIL
MOTOR OPERATED VALVE
MOTOR OPERATED VALVE 3-WAY
MOTOR OPERATED VALVE,
WITH MANUAL OVERRIDE
MOTOR OPERATED VALVE 4-WAY
GATE/ISOLATION VALVE
GATE VALVE, SLIDE
PLUG VALVE
PLUG VALVE, 3-WAY
GLOBE VALVE
GLOBE VALVE, 3-WAY
CHECK VALVE
CHECK VALVE, STOP
CHECK VALVE, ANGLE STOP
CHECK VALVE, AIR OPERATED
CHECK VALVE, AIR OPERATED
WITH CLOSING HANDWHEEL
BALL VALVE
BALL VALVE, 3-WAY
BALL VALVE, WITH VENT
BALL VALVE, 3-WAY
WITH FUSIBLE LINK
BUTTERFLY VALVE
NEEDLE VALVE
PET COCK
ANGLE VALVE
3-WAY VALVE
4-WAY VALVE
DIAPHRAGM VALVE
FLOAT VALVE
FLUSH VALVE
FOOT VALVE
INTERLOCK VALVE
PINCH VALVE
UNIT TANDEM BLOWDOWN VALVE
BALL VALVE,
WITH FUSIBLE LINK
PRESSURE REDUCING REGULATOR,
WITH PRESSURE INDICATOR
TRIPLE DUTY VALVE
ANTI-SYPHON VALVE
MECHANICAL PIPING SYMBOLS
PUMP SUCTION DIFFUSER
FLEXIBLE PIPE CONNECTION
LIQUID SEPARATOR
LUBRICATOR
VACUUM BREAKER
TRAP (STEAM)
THERMOSTATIC RADIATOR
VALVE WITH REMOTE SENSOR
ANNUBAR
PRESSURE VACUUM VENT
COMPRESSED AIR, BREATHING
AIR, OR INSTRUMENT AIR, DROP
VACUUM BREAKER/AIR VENT
(THE FOLLOWING ARE ALL ENCOMPASSING AND MAY OR MAY NOT BE UTILIZED HERE-IN)
STRAINER WITH BLOWDOWN
VALVE AND HOSE CONNECTION
CONTROL VALVE
PRESSURE REDUCING VALVE
INLINE CONCENTRIC REDUCER
THERMOMETER
INLINE ECCENTRIC REDUCER
AQUASTAT
FIN TUBE RADIATOR
FLOW MEASURING
AND BALANCING
DEVICE
MOTOR STARTER
VARIABLE FREQUENCY DRIVE
THERMOMETER
BALL VALVE WITH VENT
EXPANSION VALVE
PRESSURE DIFFERENTIAL SENSOR
UNION PURGE VALVE
BALANCING VALVE
FLOW INDICATOR
SIGHT GLASS
3-WAY CONTROL VALVE
LIQUID FLOW SWITCH
FLOW SWITCH
ELBOW DOWN
ELBOW UP
TEE DOWN
TEE UP
SLOPE
PIPE LINE CONCENTRIC REDUCTION
FLOW LINE WITH DIRECTION OF
FLOW
DIRECTION OF SLOPE
(TOWARD LOW POINT)
HEAT TRACED PIPE
HEAT TRACED PIPE INDICATING
ORIGIN OR TERMINATION POINT
PIPE BREAK
CLOSURE, FLANGED
CLOSURE, WELDED CAP
CLOSURE, SCREWED CAP
HOSE CONNECTION
CONNECTION, PLUGGED
INSULATING FLANGE OR
BUSHING
UNION
CLAMP COUPLING
ELBOW
45º ELBOW
45º ELBOW DOWN
45º ELBOW UP
TEE
ELBOW DOWN TO TEE
TEE DOWN TO ELBOW
TEE DOWN TO TEE
ELBOW DOWN LEFT
ELBOW DOWN RIGHT
END CAP
PIPE UP
FLANGES
PIPE ANCHOR
PIPE GUIDE
DUAL DIRECTION OF FLOW
MECHANICAL PIPE AND FITTING LEGEND
(THE FOLLOWING ARE ALL ENCOMPASSING AND MAY OR MAY NOT BE UTILIZED HERE-IN)
PIPE LINE ECCENTRIC REDUCTION
MANUAL AIR VENTM
PRESSURE INDICATOR
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D E
P
AR
TM
E
N T
O F
TH
E
N A
VY
N
A
VA
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S
YS
TE
M
S C
O M
M A
N D
DRAWFORM REVISION: 25 AUGUST 2020
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
NA
VF
AC
P
AC
IF
IC
M
A K
AL
A
PA
, H
AW
AI
I
AS NOTED
FY
P R
O
JE
C T
G D
S C
O M
M
AN
D C
EN
TE
R
N A
VF
AC
P A
C
IF
IC
1764210
KYM
JC
Jacobs/B&V, A Joint Venture (Federal Services) 1003 Bishop Street Suite 1340 Honolulu, HI 96813
A/E Task Order No. N6274223F0324
FOR REVIEW
ONLY
Name
Registration Number #
These documents are for Design Review and not intended for
Construction Bidding or Permit Purposes. They were prepared by, or under the supervision of:
Date
SEAL
24 JUN 2024
AN
DE
RS
EN
A
IR
F O
RC
E
BA
SE
LJE
AWK/DMK
6/
/2
6:
:0
PM
P6
_1
_1 4_
G _d et ac he d.
rv t
14GI-M-004
ME
CH
AN
IC
AL
P
IP
IN
G
LE
GE
ND
S
MAMMGP JTW
G
UA
M
G
I-M -0
100% DESIGN SUBMITTAL
SY
M
DE
SC
RI
PT
IO
N
DA
TE
AP
PR
P R
O J E
C T
S
IT
E
C O
M M
A N
D C
E N
T E
R
A N
D E
R S
E N
A
IR
F O
R C
E B
A S
E G
U
C
C
T
H
F
VS
TT
C
P
SD
PI
SDT
MT
PDG
PDT
TG
E
ES
TE
FOB OR FOT
HS
FAN, CENTRIFUGAL
FAN, PROPELLER
OR VANEAXIAL
PLUG FAN. DUAL
ROOF OR WALL HOOD
SUPPLY AIR
ROOF OR WALL HOOD
EXHAUST AIR
UNIT HEATER
HORIZONTAL DISCHARGE
CONVECTOR
LOUVER
DOOR LOUVER
DAMPER, SHUT-OFF
DAMPER, CONTROL
DAMPER, OPPOSED BLADE
DAMPER,
(SINGLE LINE DUCTWORK)
BACKDRAFT DAMPER
MOTORIZED OPERATOR
AIR MONITOR STATION
WATER COIL
THERMOSTAT
HUMIDISTAT
FREEZESTAT
VAPOR SENSOR
DIRECTION OF FLOW
FLOW ARROW
DISCHARGE/DIRECT
FLOW ARROW
INLET/INDIRECT
STRAIGHTENING VANES
TEMPERATURE TRANSMITTER
CO2 SENSOR
STATIC PRESSURE SENSOR
EMERGENCY AIR DISTRIBUTION SHUTOFF
HVAC LEGEND
FLAT PLATE
ENERGY
RECOVERY
ENTHALPY WHEEL
(THE FOLLOWING ARE ALL ENCOMPASSING AND MAY OR MAY NOT BE UTILIZED HERE-IN)
SMOKE DETECTOR
PRESSURE INDICATOR
SPEED DIFFERENTIAL TRANSMITTER
MOISTURE TRANSMITTER
PRESSURE DIFFERENTIAL GAUGE
PRESSURE DIFFERENTIAL TRANSMITTER
TEMPERATURE SENSOR
TEMPERATURE GAUGE
COIL (ELECTRIC / REFRIGERANT)
FILTER, DISPOSABLE
FILTER, HIGH EFFICIENCY
ON CONTROLS NO DEFINITION
AIR OUTLET AND INLET IDENTIFICATION
DEVICE TYPE: S-SUPPLY, E-EXHAUST, R-RETURN, T-TRANSFER
DEVICE GROUP: R-REGISTER, G-GRILLE, D-DIFFUSER
DEVICE DESIGNATION
CFM THRU DEVICE
NUMBER OF SLOTS (OPTIONAL)
S R-1-750-1
24X10-6Ø-2
NUMBER OF THROWS (OPTIONAL)
DUCT SIZE (IN) OR DIAMETER (Ø) (OPTIONAL)
SIZE - WIDTH BY LENGTH (IN)
FLEXIBLE CONNECTION
TURNING VANES
SPLITTER DAMPER
FLEXIBLE DUCT
REGISTER OR GRILLE IN
DUCTWORK
EXTRACTOR
SUPPLY DIFFUSER
MANUAL VOLUME DAMPER OR
BALANCING DAMPER
SUPPLY DIFFUSER
WITH DIRECTION OF
THROW INDICATED
RETURN INLET,
GRILLE OR REGISTER
EXHAUST INLET,
GRILLE OR REGISTER
24"X12"
8" Ø
30"X20"
30"X20"
12"X24"
DUCT TRANSITION FLAT ON
BOTTOM OR TOP
DUCT SIZE TRANSITION
FLAT ON ONE SIDE
DUCT SIZE TRANSITION
CONCENTRIC
DUCT SIZE TRANSITION
RECTANGULAR TO ROUND
SUPPLY AIR DUCT OR AIR UNDER POSITIVE
PRESSURE (CONDITIONED AIR) TURNING
TOWARD/AWAY RESPECTIVELY
RECTANGULAR
ROUND
OVAL
RETURN AIR/OUTSIDE AIR DUCT, AIR UNDER
NEGATIVE PRESSURE (UNCONDITIONED AIR)
TURNING TOWARD/AWAY RESPECTIVELY
EXHAUST AIR DUCT, AIR UNDER NEGATIVE
PRESSURE (UNCONDITIONED AIR) TURNING
TOWARD/AWAY RESPECTIVELY
RECTANGULAR DUCT SIZE FIRST
NUMBER IS SIDE SHOWN
ROUND DUCT DIMENSION
OVAL DUCT DIMENSION
FIRST DIMENSION IS SIDE SEEN
RECTANGULAR DUCT IN SECTION.
FIRST NUMBER IS ARROW SIDE
OVAL DUCT IN SECTION FIRST
NUMBER IS ARROW SIDE
SUPPLY OUTLET, REGISTER OR
GRILLE IN DUCTWORK (SIDE OR
BOTTOM)
INTERNALLY LINED DUCT
RECTANGULAR
ROUND
OVAL
RECTANGULAR
ROUND
OVAL
RETURN INLET, REGISTER OR
GRILLE IN DUCTWORK (SIDE
OR BOTTOM)
EXHAUST INLET, REGISTER
OR GRILLE IN DUCTWORK
(SIDE OR BOTTOM)
HVAC LEGEND
D DROP IN DUCT, AIR
FLOW DIRECTION
SHOWN
R RISE IN DUCT, AIR
FLOW DIRECTION
SHOWN
D
R
D
R
(THE FOLLOWING ARE ALL ENCOMPASSING AND MAY OR MAY NOT BE UTILIZED HERE-IN)
PLUG FAN, SINGLE
HYDROGEN SENSOR
TERMINAL UNIT
FIRE DAMPER (2 HOUR)
MOTOR OPERATED DAMPER
(MOD) HORIZONTAL DUCT
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D E
P
AR
TM
E
N T
O F
TH
E
N A
VY
N
A
VA
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S
YS
TE
M
S C
O M
M A
N D
DRAWFORM REVISION: 25 AUGUST 2020
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
NA
VF
AC
P
AC
IF
IC
M
A K
AL
A
PA
, H
AW
AI
I
AS NOTED
FY
P R
O
JE
C T
G D
S C
O M
M
AN
D C
EN
TE
R
N A
VF
AC
P A
C
IF
IC
1764210
KYM
JC
Jacobs/B&V, A Joint Venture (Federal Services) 1003 Bishop Street Suite 1340 Honolulu, HI 96813
A/E Task Order No. N6274223F0324
FOR REVIEW
ONLY
Name
Registration Number #
These documents are for Design Review and not intended for
Construction Bidding or Permit Purposes. They were prepared by, or under the supervision of:
Date
SEAL
24 JUN 2024
AN
DE
RS
EN
A
IR
F O
RC
E
BA
SE
LJE
AWK/DMK
6/
/2
6:
:1
PM
P6
_1
_1 4_
G _d et ac he d.
rv t
14GI-M-005
ME
CH
AN
IC
AL
H
VA
C
LE
GE
ND
S
MAMMGP JTW
G
UA
M
G
I-M -0
100% DESIGN SUBMITTAL
SY
M
DE
SC
RI
PT
IO
N
DA
TE
AP
PR
P R
O J E
C T
S
IT
E
C O
M M
A N
D C
E N
T E
R
A N
D E
R S
E N
A
IR
F O
R C
E B
A S
E G
U
S
C
HX-xxxHX-xxx
HX-XXX
CSF-XXX
CH-XXX
XX-YYY
AIR SEPARATOR
EXPANSION TANK
CHEMICAL SHOT FEEDER
AIR COOLED CHILLER
PUMP,
POSITIVE DISPLACEMENT
PUMP
PUMP, DIAPHRAGM
CHEMICAL FEED PUMP
HEATER,
IMMERSION TANK TYPE
MOTOR
METER
CYCLONIC SEPARATOR
MECHANICAL EQUIPMENT LEGEND
XX-EQUIPMENT TYPE (SEE LEGEND)
YYY- EQUIPMENT NUMBER
(THE FOLLOWING ARE ALL ENCOMPASSING AND MAY OR MAY NOT BE UTILIZED HERE-IN)
HEAT EXCHANGER (BRAZED PLATE OR PLATE & FRAME)
HEAT EXCHANGER (SHELL AND TUBE)
RECIRCULATING PUMP OR SUBMERSIBLE PUMP
EQUIPMENT TAG IDENTIFICATIONEQUIPMENT TAG DESIGNATOR
XXXX-XXXXXXXXX
EXAMPLE: FCU-14PP41101
EQUIPMENT TAG NUMBER
SYSTEM ID
BUILDING ID
SITE
EQUIPMENT TAG
T TANK
TCV TEMPERATURE CONTROL VALVE
TG TRANSFER GRILLE
TO TRANSFER OPENING
UH UNIT HEATER
VAV VARIABLE AIR VOLUME TERMINAL UNIT
VF VENTILATION FAN
WB WATER BOILER
WH WATER HEATER
WAHP WATER TO AIR HEAT PUMP
WWHP WATER TO WATER HEAT PUMP
WSHP WATER SOURCE HEAT PUMP
BUILDING IDENTIFIER
YY BUILDING (OR LOCATION) NAME
(CONTINUED)
EQUIPMENT TAG DESIGNATOR
AC AIR COMPRESSOR
ACC ACCUMULATOR
ACCU AIR COOLED CONDENSING UNIT
ACU AIR CONDITIONING UNIT
AD AIR DRYER
AFC AFTER COOLER
AFMA AIR FLOW MEASUREMENT ARRAY
AHU AIR HANDLING UNIT
AR AIR RECEIVER
AS AIR SEPARATOR
BFP BACKFLOW PREVENTER
BLR BOILER
C CONDENSER
CC COOLING COIL
CH CHILLER
CHWP CHILLED WATER PUMP
CMP COMPRESSOR
COND CONDENSER UNIT
CRAC COMPUTER ROOM AIR CONDITIONING UNIT
CRAH COMPUTER ROOM AIR HANDLER
CSF CHEMICAL SUPPLY FEEDER
CT COOLING TOWER
CUH CABINET UNIT HEATER
CV CONTROL VALVE
CWP CONDENSER WATER PUMP
DA DEAERATOR
DDT DIESEL EXHAUST FLUID DAY TANK
DEFP DIESEL EXHAUST FLUID PUMP
DEFT DIESEL EXHAUST FLUID BULK TANK
DHC DUCT HEATING COIL
DHP DOMESTIC HOT WATER PUMP
D DAMPER
DOAS DEDICATED OUTDOOR AIR SYSTEM
DSP DUPLEX SUMP PUMP
ECON ECONOMIZER
EDH ELECTRIC DUCT HEATER
EF EXHAUST FAN
EG EXHAUST GRILLE
ER EXHAUST REGISTER
ET EXPANSION TANK
EUH ELECTRIC UNIT HEATER
EVAP EVAPORATOR
EWU ENERGY WHEEL UNIT
FBT FUEL BULK TANK
FCU FAN COIL UNIT
FD FIRE DAMPER
FF FUEL FILTER
FLT FILTER
FOP FUEL OIL PUMP
FP FUEL POLISHER
FSD FIRE/SMOKE DAMPER
FPB FAN POWERED TERMINAL BOX
HC HEATING COIL
HX HEAT EXCHANGER
HP HEAT PUMP
HUM HUMIDIFIER
HWP HEATING WATER PUMP
IH INFRARED HEATER
L LOUVER
LOC LUBE OIL COOLER
LOH LUBE OIL HEATER
LOP LUBE OIL PUMP
MAU MAKEUP AIR UNIT
MOD MOTOR OPERATED DAMPER
MOV MOTOR OPERATED VALVE
PVR POWER ROOF VENTILATOR
PRV PRESSURE REDUCING VALVE OR
PRESSURE RELIEF VALVE
RAH RECIRCULATING AIR HANDLER
RCV RECEIVER
RD RELIEF DAMPER
RF RETURN FAN
RG RETURN GRILLE
RH ROOF HOOD
RHC REHEAT COIL
RLF RELIEF FAN
RR RETURN REGISTER
RTU ROOF TOP UNIT
SD SUPPLY DIFFUSER
SF SUPPLY FAN
SFH SPRAY FOG HUMIDIFIER
SP SUMP PUMP
(THE FOLLOWING ARE ALL ENCOMPASSING AND MAY OR MAY NOT BE UTILIZED HERE-IN)
PUMP, SUBMERSIBLE SYSTEM IDENTIFIER
03 FUEL OIL SYSTEM
12 POTABLE WATER SYSTEM (PW, DCW, & DHW)
16 NON-POTABLE WATER SYSTEM
17 BUILDING WASTE SYSTEMS
(SANITARY, OIL WASTE, ROOF DRAINS, ETC.)
18 HAZARDOUS FLUID CONTAINMENT
31 CHILLED WATER SYSTEMS
33 REFRIGERATION (DX) SYSTEMS
41 AIR SUPPLY, EXHAUST, AND VENTILATION SYSTEMS
51 MONITORING SYSTEMS (02, CO, N2 PURGE, ETC.)
52 FIRE PROTECTION SYSTEMS
65 BMS
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D E
P
AR
TM
E
N T