GDS_100pct DRAFT_Site 14_Vol. 14.6.pdf
PDF 13 MB Posted
- Solicitation number
- N62742GDSCC
About this file
This document is a draft Request for Proposal (RFP) for the construction of a command center, a 9 MW mission power generation facility, a switchgear building, and associated equipment for the Guam Defense System, Joint Region Marianas in Guam. The estimated cost range for this project is between $250,000,000 to $500,000,000.
The Naval Facilities Engineering Command (NAVFAC) is releasing this draft RFP for industry review and comment prior to the final RFP issuance. The purpose is to improve the understanding of government requirements and industry capabilities, potentially increasing efficiency in proposal preparation. Interested parties are requested to provide feedback, including completing an Industry Feedback Questionnaire or submitting questions and comments by 2:00 PM HST on August 15, 2024. The government will not respond to the comments received but may consider them in developing the final RFP. This document is not a solicitation, and the government does not intend to award a contract based on this draft or pay for review comments.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L
F A
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S Y
S T
E M
S C
O M
M A
N D
DRAWFORM REVISION: 25 AUGUST 2020
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
N A
V F
A C
P A
C
IF
IC
M
A K
A L A
P A
H
A W
A
II
AS NOTED
P R
O J E
C T
S
IT
E
C O
M M
A N
D C
E N
T E
R
N A
V F
A C
P A
C
IF
IC
1812861
KYM
JC
Jacobs/B&V, A Joint Venture (Federal Services) 1003 Bishop Street Suite 1340 Honolulu, HI 96813
A/E Task Order No. N6274223F0324
FOR REVIEW
ONLY
Name
Registration Number #
These documents are for Design Review and not intended for
Construction Bidding or Permit Purposes. They were prepared by, or under the supervision of:
Date
SEAL
24 JUN 2024
A N
D E
R S
E N
A
IR
F O
R C
E B
A S
E
KYM
AWK/DMK
/2
/2
:3 :2
A
M
C U s e rs
\l a r6
\D o c u m e n ts
\P
G L a re s
.r v t
14GI-G-011
C O
V E
R S
H E
E T
DCT
EL EL
G U
A M
G
I- G
-0
FINAL DESIGN SUBMITTAL
100% DESIGN SUBMITTAL
VICINITY MAP PROJECT LOCATION MAP
VOLUME 14.6 - POWER PLANT (GENERAL, ARCH, INTERIOR, FIRE
PROTECTION & PLUMBING
PRIME CONSULTANT
CONSULTANTS
GENERAL NOTES AND REQUIREMENTS
VOLUME DESCRIPTION
VOL 14.1 GENERAL & SITE
VOL 14.2
VOL 14.4
COMMAND CENTER (GENERAL & STRUCTURAL)
VOL 14.5 COMMAND CENTER ( GENERAL, TELECOMMUNICATIONS, AUDIO VISUAL & SECURITY)
COMMAND CENTER ( GENERAL & ELECTRICAL)
VOL 14.3 COMMAND CENTER (GENERAL, ARCH, INTERIOR, FIRE PROTECTION, PLUMBING & MECHANICAL )
VOL 14.6 POWER PLANT (GENERAL, STRUCT, ARCH, INTERIOR, FIRE PROTECTION & PLUMBING
VOL 14.7 POWER PLANT (GENERAL, MECHANICAL, ELECTRICAL, TELECOMMUNICATIONS & SECURITY
VOL 14.8 ACCESS CONTROL
PROJECT 693
SITE 14 COMMAND CENTER
ANDERSEN AIR FORCE BASE, GUAM
PLAN NORTH PLAN NORTH
Jacobs/B&V, a Joint Venture (Federal Services)
BLACK & VEATCH
SHEET REFERENCES WITHOUT SITE NUMBER AND BUILDING ID (I.E. FRIST FOUR
CHARACTERS) ARE INDICATING SHEETS WITHIN THE SAME SERIES OF DRAWINGS
OR TO GENERAL SHEETS, AS APPLICABLE.
S Y
M D
E S
C R
IP
TI
O N
D A
TE
A
P P
R
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L
F A
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S Y
S T
E M
S C
O M
M A
N D
DRAWFORM REVISION: 25 AUGUST 2020
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
N A
V F
A C
P A
C
IF
IC
M
A K
A L A
P A
H
A W
A
II
AS NOTED
F Y
P
R O
J E
C T
G D
S C
O M
M A
N D
C E
N T
E R
N A
V F
A C
P A
C
IF
IC
1764210
KYM
JC
Jacobs/B&V, A Joint Venture (Federal Services) 1003 Bishop Street Suite 1340 Honolulu, HI 96813
A/E Task Order No. N6274223F0324
FOR REVIEW
ONLY
Name
Registration Number #
These documents are for Design Review and not intended for
Construction Bidding or Permit Purposes. They were prepared by, or under the supervision of:
Date
SEAL
24 JUN 2024
A N
D E
R S
E N
A
IR
F O
R C
E B
A S
E
KYM
AWK/DMK
/2
/2
:3 :2
P
M
C R e v it \l o c a l_
\P
G
T a rr D
C b v .c o m
.r v t
14GI-G-012
S H
E E
T
IN
D E
X
ELDCT DCT
G U
A M
G I-
G -0
100% DESIGN SUBMITTAL
SITE 14 - GENERAL SHEET INDEX - VOL. 14.6
SHEET
NO.
NAVFAC
DWG. NO. SHEET NUMBER SHEET NAME
GENERAL
0 14GI-G-011 COVER SHEET
0 14GI-G-012 SHEET INDEX
SITE 14 - STRUCTURAL SHEET - VOL. 14.6
SHEET.
NO
NAVFAC DWG.
NO. SHEET NUMBER SHEET NAME
GENERAL
0 14GI-S-010 GENERAL - ABBREVIATIONS & LEGEND
STRUCTURAL
0 14PP-S-001 POWER PLANT - GENERAL NOTES
0 14PP-S-002 POWER PLANT - GENERAL NOTES
0 14PP-S-003 POWER PLANT - GENERAL NOTES
0 14PP-S-004 POWER PLANT - GENERAL NOTES
0 14PP-S-005 POWER PLANT - GENERAL NOTES
0 14PP-S-006 POWER PLANT - GENERAL NOTES
0 14PP-S-007 POWER PLANT - WIND PRESSURE DIAGRAM
0 14PP-S-101 POWER PLANT - FOUNDATION PLAN - OVERALL
0 14PP-S-102 POWER PLANT - FOUNDATION PLAN - AREA A
0 14PP-S-103 POWER PLANT - FOUNDATION PLAN - AREA B
0 14PP-S-104 POWER PLANT - FOUNDATION PLAN - AREA C
0 14PP-S-112 POWER PLANT - FIRST FLOOR PLAN - AREA A
0 14PP-S-132 POWER PLANT - ROOF PLAN - AREA A
0 14PP-S-133 POWER PLANT - ROOF PLAN - AREA B
0 14PP-S-201 POWER PLANT - WALL ELEVATIONS
0 14PP-S-202 POWER PLANT - WALL ELEVATIONS
0 14PP-S-301 POWER PLANT - BUILDING SECTION
0 14PP-S-302 POWER PLANT - SECTIONS
0 14PP-S-401 POWER PLANT - ENLARGED VIEWS
0 14PP-S-501 POWER PLANT - DETAILS
0 14PP-S-502 POWER PLANT - DETAILS
0 14PP-S-510 POWER PLANT - FOUNDATION DETAILS
0 14PP-S-511 POWER PLANT - FOUNDATION DETAILS
0 14PP-S-520 POWER PLANT - BASE PLATE DETAILS
0 14PP-S-530 POWER PLANT - FRAMING AND WALL DETAILS
0 14PP-S-531 POWER PLANT - FRAMING AND WALL DETAILS
0 14PP-S-532 POWER PLANT - FRAMING AND WALL DETAILS
0 14PP-S-540 POWER PLANT - MASONRY DETAILS
0 14PP-S-541 POWER PLANT - MASONRY DETAILS
0 14PP-S-550 POWER PLANT - STANDARD BEAM CONNECTION DETAILS
0 14PP-S-551 POWER PLANT - STANDARD BEAM CONNECTION DETAILS
0 14PP-S-701 POWER PLANT - PIPING DISTRIBUTION SUPPORT PLAN -
OVERALL
0 14PP-S-702 POWER PLANT - PIPING DISTRIBUTION SUPPORT PLAN -
AREA A
0 14PP-S-703 POWER PLANT - PIPING DISTRIBUTION SUPPORT PLAN -
AREA B
0 14PP-S-704 POWER PLANT - PIPING DISTRIBUTION SUPPORT PLAN -
AREA C
0 14PP-S-705 POWER PLANT - HVAC DISTRIBUTION SUPPORT PLAN -
OVERALL
0 14PP-S-706 POWER PLANT - HVAC DISTRIBUTION SUPPORT PLAN -
AREA A
0 14PP-S-720 POWER PLANT - DISTRIBUTION CONTRACTOR INTERFACE
0 14PP-S-721 POWER PLANT - DISTRIBUTION SUPPORT SCHEDULE
0 14PP-S-750 POWER PLANT - DISTRIBUTION SUPPORT DETAILS
0 14PP-S-751 POWER PLANT - DISTRIBUTION SUPPORT DETAILS
0 14PP-S-752 POWER PLANT - DISTRIBUTION SUPPORT DETAILS
0 14PP-S-753 POWER PLANT - DISTRIBUTION SUPPORT DETAILS
0 14PP-S-770 POWER PLANT - FRAMING PLAN OVERALL
0 14PP-S-901 POWER PLANT - ISOMETRIC VIEW
ARCHITECTURE
0 14PP-A-111 POWER PLANT - FIRST FLOOR PLAN - OVERALL
0 14PP-A-112 POWER PLANT - FIRST FLOOR PLAN - AREA A
0 14PP-A-113 POWER PLANT - FIRST FLOOR PLAN - AREA B
0 14PP-A-121 POWER PLANT - FIRST FLOOR REFLECTED CEILING PLAN
- AREA A
0 14PP-A-131 POWER PLANT - ROOF PLAN - AREA A
0 14PP-A-141 POWER PLANT - AIR BARRIER PLAN - OVERALL
0 14PP-A-201 POWER PLANT - BUILDING ELEVATIONS
0 14PP-A-202 POWER PLANT - BUILDING ELEVATIONS
0 14PP-A-301 POWER PLANT - BUILDING SECTIONS
0 14PP-A-501 POWER PLANT - WALL SECTIONS
0 14PP-A-521 POWER PLANT - ENLARGED DETAILS
SITE 14 - ARCHITECTURAL SHEET - VOL. 14.6
SHEET.
NO
NAVFAC
DWG. NO. SHEET NUMBER SHEET NAME
ARCHITECTURE
0 14GI-A-001 ARCHITECTURAL NOTES AND SYMBOLS
SITE 14 - FIRE PROTECTION SHEET - VOL. 14.6
SHEET.
NO
NAVFAC
DWG. NO. SHEET NUMBER SHEET NAME
GENERAL
0 14GI-F-001 FIRE PROTECTION LEGENDS, SYMBOLS, AND
ABBREVIATIONS
FIRE ALARM
0 14PP-FA112 POWER PLANT - FIRE ALARM PLAN - AREA A
0 14PP-FA601 POWER PLANT - FIRE ALARM SEQUENCE OF
OPERATIONS & SCHEMATIC
0 14PP-FA602 POWER PLANT - CLEAN AGENT SEQUENCE OF
OPERATIONS
0 14PP-FA603 POWER PLANT - AIR SAMPLING SEQUENCE OF
OPERATIONS
FIRE PROTECTION
0 14PP-FX112 POWER PLANT - FIRE PROTECTION PLAN - AREA A
SITE 14 - PLUMBING SHEET - VOL. 14.6
SHEET.
NO
NAVFAC
DWG. NO. SHEET NUMBER SHEET NAME
PLUMBING
0 14GI-P-001 PLUMBING LEGENDS, ABBREVIATIONS, AND GENERAL
NOTES
PLUMBING
0 14PP-P-101 POWER PLANT - UNDERSLAB PLUMBING PLAN -
OVERALL
0 14PP-P-102 POWER PLANT - UNDERSLAB PLUMBING PLAN - AREA A
0 14PP-P-111 POWER PLANT - FIRST FLOOR PLUMBING PLAN -
OVERALL
0 14PP-P-112 POWER PLANT - FIRST FLOOR PLUMBING PLAN - AREA A
0 14PP-P-501 POWER PLANT - PLUMBING DETAILS
0 14PP-P-502 POWER PLANT - PLUMBING DETAILS
0 14PP-P-701 POWER PLANT - PLUMBING SCHEDULES
0 14PP-P-901 POWER PLANT - PLUMBING SANITARY WASTE AND
VENT RISER DIAGRAM
0 14PP-P-902 POWER PLANT - PLUMBING SUPPLY RISER DIAGRAM
GENERAL
0 14PP-GI101 POWER PLANT - LIFE SAFETY CODE SUMMARY ANALYSIS
0 14PP-GI102 POWER PLANT - CODE COMPLIANCE PLAN - OVERALL
0 14PP-A-601 POWER PLANT - ROOM FINISH SCHEDULE AND FINISH
LEGEND
0 14PP-A-602 POWER PLANT - DOOR SCHEDULE
0 14PP-A-901 POWER PLANT - ISOMETRIC
INTERIORS
0 14PP-IG111 POWER PLANT - SIGNAGE PLAN - AREA A
0 14PP-IG601 POWER PLANT - SIGNAGE TYPICALS
S Y
M D
E S
C R
IP
TI
O N
D A
TE
A
P P
R
P R
O J E
C T
S
IT
E
C O
M M
A N
D C
E N
T E
R
A N
D E
R S
E N
A
IR
F O
R C
E B
A S
E G
U A
M
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D
EP
AR
TM
EN
T
O F
TH
E
N
AV
Y N
AV
AL
F
AC
IL
IT
IE
S
EN
G
IN
EE
R
IN
G S
YS
TE
M S
C O
M M
AN
D
DRAWFORM REVISION: 25 AUGUST 2020
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
N
AV
FA
C
P
AC
IF
IC
M
AK
AL
AP
A, H
AW
AI
I
AS NOTED
FY
P R
O
JE
C T
G D
S C
O M
M
AN
D C
EN
TE
R
N
AV
FA
C
P
AC
IF
IC
1764210
KYM
JC
Jacobs/B&V, A Joint Venture (Federal Services) 1003 Bishop Street Suite 1340 Honolulu, HI 96813
A/E Task Order No. N6274223F0324
FOR REVIEW
ONLY
Name
Registration Number #
These documents are for Design Review and not intended for
Construction Bidding or Permit Purposes. They were prepared by, or under the supervision of:
Date
SEAL
24 JUN 2024
AN
DE
RS
EN
A
IR
F O
RC
E
BA
SE
KYM
AWK/DMK
6/
/2
3:
:3
PM
C :\R ev it\ lo ca l_
\P
3_
9_
PP
_A
S_ St on eE
D bv .c om .rv t
14PP-GI101
PO
W
ER
P
LA
NT
LIF
E
SA
FE
TY
C
OD
E
SU
MM
AR
Y
AN
AL
YS
IS
ABCGSE RCB
G
UA
M
PP
-G I1
100% DESIGN SUBMITTAL
BUILDING CODE / LIFE SAFETY ANALYSIS
SWITCHGEAR BUILDING OCCUPANCY LOAD
ROOM
NO, UFC 3-600-01 TABLE 10-3.1 USE OCCUPANT LOAD
SF PER PERSON AREA TOTAL NO. OF
OCCUPANTS
101 SPECIAL PURPOSE INDUSTRIAL 500.00 SF 220 SF 1
102 SPECIAL PURPOSE INDUSTRIAL 500.00 SF 1583 SF 4
103 SPECIAL PURPOSE INDUSTRIAL 500.00 SF 1959 SF 4
104 SPECIAL PURPOSE INDUSTRIAL 500.00 SF 218 SF 1
1. BUILDING CODE ANALYSIS:
UFC 3-460-01 DESIGN: PETROLEUM FUEL FACILITIES, WITH CHANGE 1, 2020
UFC 3-600-01 FIRE PROTECTION ENGINEERING FOR FACILITIES, WITH CHANGE 6, 2021
INTERNATIONAL BUILDING CODE (IBC), 2021
NATIONAL FIRE PROTECTION ASSOCIATION
NFPA 1: FIRE CODE 2024
NFPA 10: STANDARD FOR PORTABLE FIRE EXTINGUISHERS 2022
NFPA 13: STANDARD FOR THE INSTALLATION OF SPRINKLER SYSTEMS 2022
NFPA 30: FLAMMABLE AND COMBUSTIBLE LIQUIDS CODE 2024
NFPA 37: INSTALLATION AND USE OF STATIONARY COMBUSTION ENGINES AND
GAS TURBINES 2021
NFPA 72: NATIONAL FIRE ALARM AND SIGNALING CODE 2022
NFPA 90A: AIR CONDITIONING AND VENTILATING SYSTEMS 2024
NFPA 101: LIFE SAFETY CODE 2024
NFPA 855: STANDARD FOR THE INSTALLATION OF STATIONARY ENERGY STORAGE
SYSTEMS 2023
NFPA 2001: STANDARD ON CLEAN AGENT FIRE EXTINGUISHING SYSTEMS 2022
2. LIFE SAFETY ANALYSIS DESIGN CRITERIA
BUILDING CODE DESIGN CRITERIA IS DEFINED IN UFC 3-600-01. THE IBC DETERMINES
BUILDING CONSTRUCTION TYPE, ALLOWABLE FLOOR AREA, BUILDING HEIGHT LIMITATION,
BUILDING SEPARATION DISTANCES, AND THE REQUIRED FIRE RESISTANCE RATING FOR
VARIOUS BUILDING ELEMENTS. NFPA 101 ESTABLISHES THE MEANS OF EGRESS
REQUIREMENTS. IBC AND NFPA 101 CRITERIA APPLY UNLESS OTHER REQUIREMENTS ARE
SUPERSEDED BY CLIENT-PROVIDED DOCUMENTATION.
3. BUILDING OCCUPANCY (IBC CHAPTER 3)
FACTORY GROUP F-1 (SWITCHGEAR BUILDING)
UTILITY AND MISCELLANEOUS GROUP U (GENERATOR ENCLOSURES AND YARD)
4. CONSTRUCTION TYPE (IBC TABLE 601)
TYPE IIB, NONCOMBUSTIBLE, UNPROTECTED
5. EXTERIOR WALL FIRE SEPARATION DISTANCE (TABLE 705.5)
CONSTRUCTION TYPE OF FACILITY IS TYPE IIB AND MAINTAINS A MINIMUM FIRE
SEPARATION DISTANCE OF 20’-1” FROM THE NEAREST BUILDING OR STRUCTURE. NO
EXTERIOR FIRE RATING REQUIRED.
6. SPRINKLER PROTECTION
THE FACILITY IS not PROTECTED WITH AUTOMATIC SPRINKLER SYSTEMS
7. ALLOWABLE BUILDING HEIGHT (IBC TABLE 504.3)
GROUP FACTORY (F-1)
ALLOWABLE HEIGHT: 55 FEET
ALLOWABLE NUMBER OF STORIES: 2 STORIES
ACTUAL HEIGHT = 19'-4"
ACTUAL NUMBER OF STORIES = 1 STORY
GROUP UTILITY (U)
ALLOWABLE HEIGHT: 55 FEET
ALLOWABLE NUMBER OF STORIES: 2 STORIES
ACTUAL GENERATOR ENCLOSURE HEIGHT = 14'-0"
ACTUAL NUMBER OF STORIES = 1 STORY
8. ALLOWABLE BUILDING AREA - PER STORY (IBC TABLE 506.2)
FACTORY F-1: ALLOWED - 15,500 SF
ACTUAL: SWITCHGEAR BUILDING 4,360 SF
UTILITY U: ALLOWED - 8,500 SF
ACTUAL: GENERATOR ENCLOSURE 450 SF
9. FIRE RESISTANCE RATINGS FOR BUILDING ELEMENTS (IBC TABLE 601)
PRIMARY STRUCTURAL STEEL: 0 HOURS
EXTERIOR BEARING WALLS: 0 HOURS
INTERIOR BEARING WALLS: 0 HOURS
EXTERIOR NONBEARING WALLS AND PARTITIONS: 0 HOURS
INTERIOR NONBEARING WALLS AND PARTITIONS: 0 HOURS
FLOOR CONSTRUCTION AND SECONDARY MEMBERS: 0 HOURS
ROOF CONSTRUCTION AND SECONDARY MEMBERS: 0 HOURS
10. MAXIMUM AREA OF EXTERIOR OPENINGS (IBC TABLE 705.8)
GREATER THAN 20 FEET AND LESS THAN 25 FEET, 45% ALLOWABLE AREA
(IBC TABLE 705.9)
ACTUAL SEPARATION: 23 FT – 1 INCH
(SWITCHGEAR BUILDING FROM GENERATOR ENCLOSURE)
ACTUAL AREA OF OPENINGS ON GENERATOR YARD SIDE OF SWITCHGEAR BUILDING: 8.7%
11. FIRE RESISTANCE RATED CONSTRUCTION
BATTERY ROOM: 1 HOUR FIRE BARRIER (IBC TABLE 508.2.5) AND (NFPA 1 SECTION
52.2.2.3.3)
SWITCHGEAR A/B: 2 HOUR FIRE BARRIER
12. NFPA 101 USE (SECTION 6.1):
SWITCHGEAR BUILDING AND GENERATOR ENCLOSURES: SPECIAL-PURPOSE
INDUSTRIAL USE (CHAPTER 40).
INDUSTRIAL OCCUPANCIES THAT ARE CHARACTERIZED BY A RELATIVELY LOW DENSITY
OF EMPLOYEE POPULATION, WITH MUCH OF THE AREA OCCUPIED BY MACHINERY OR
EQUIPMENT.
13. OCCUPANT LOAD:
THE OCCUPANT LOAD, IN NUMBER OF PERSONS FOR WHOM MEANS OF EGRESS AND
OTHER PROVISIONS ARE REQUIRED, SHALL BE DETERMINED ON THE BASIS OF THE
OCCUPANT LOAD FACTORS OF TABLE 7.3.1.2 THAT ARE CHARACTERISTIC OF THE USE OF
THE SPACE, OR SHALL BE DETERMINED AS THE MAXIMUM PROBABLE POPULATION OF
THE SPACE UNDER CONSIDERATION, WHICHEVER IS GREATER (NFPA 101 40.1.7).
NOTE: OCCUPANT LOAD MUST BE CALCULATED IN ACCORDANCE WITH NFPA 101,
EXCEPT AS NOTED IN UFC 3-600-01, TABLE 10-1.
SWITCHGEAR BUILDING OCCUPANT LOAD FACTOR: 500 SF/PERSON
(UFC 3-600-01, TABLE 10-1)
SWITCHGEAR BUILDING OCCUPANT LOAD: 13 PERSONS.
GENERATOR ENCLOSURE OCCUPANT LOAD FACTOR: 500 SF/PERSON
(UFC 3-600-01, TABLE 10-1)
GENERATOR ENCLOSURE OCCUPANT LOAD: 1 PERSONS.
14. REQUIRED NUMBER OF EXITS:
SWITCHGEAR BUILDING: 4 TOTAL PROVIDED
GENERATOR ENCLOSURE: 2 TOTAL PROVIDED
NOT LESS THAN TWO MEANS OF EGRESS SHALL BE PROVIDED FROM EVERY STORY OR
SECTION, AND NOT LESS THAN ONE EXIT SHALL BE REACHED WITHOUT TRAVERSING
ANOTHER STORY (NFPA 101 40.2.4.1.1).
A SINGLE MEANS OF EGRESS SHALL BE PERMITTED FROM ANY STORY OR SECTION IN
LOW AND ORDINARY HAZARD INDUSTRIAL OCCUPANCIES, PROVIDED THAT THE EXIT CAN
BE REACHED WITHIN THE DISTANCE PERMITTED AS A COMMON PATH OF TRAVEL ((NFPA
101 40.2.4.1.2).
NOT LESS THAN TWO MEANS OF EGRESS WILL BE PROVIDED ON EVERY STORY (NFPA
101 7.4.1.1) AND NOT LESS THAN TWO SEPARATE EXITS WILL BE ACCESSIBLE FROM
EVERY PART OF EVERY STORY (NFPA 101 7.5.1.1.1).
DISCHARGE FROM EXITS SHALL BE IN ACCORDANCE WITH SECTION 7.7 (NFPA 101 40.2.7).
EXIT DISCHARGE TO A PUBLIC WAY IS REQUIRED FOR EACH EXIT (NFPA 101 7.7).
15. REQUIRED ARRANGEMENT OF EXITS (SECTION 7.5):
WHERE TWO EXITS, EXIT ACCESSES, OR EXIT DISCHARGES ARE REQUIRED, THEY SHALL
BE LOCATED AT A DISTANCE FROM ONE ANOTHER NOT LESS THAN ONE-HALF THE
LENGTH OF THE MAXIMUM OVERALL DIAGONAL DIMENSION OF THE BUILDING OR AREA
TO BE SERVED, MEASURED IN A STRAIGHT LINE BETWEEN THE NEAREST EDGE OF THE
EXITS, EXIT ACCESSES, OR EXIT DISCHARGES (NFPA 101 7.5.1.3.2).
16. REQUIRED EXIT COMPONENT WIDTHS (SECTION 7.3.4):
EXIT COMPONENT WIDTH: 0.2-INCH WIDTH PER PERSON (NFPA 101 TABLE 7.3.3.1).
THE MINIMUM WIDTH OF ANY MEANS OF EGRESS NOT SPECIFICALLY LISTED IS 36-
INCHES MINIMUM (NFPA 101 7.3.4.1).
THE REQUIRED DOOR WIDTH OF INDUSTRIAL USES IS 0.2-INCHES PER PERSON (NFPA
101 TABLE 7.3.3.1) WITH 32-INCHES MINIMUM CLEAR WIDTH (NFPA 101 7.2.1.2.3.2):
DOOR LEAVES ARE REQUIRED TO SWING IN THE DIRECTION OF EGRESS WHERE
SERVING A ROOM OR AREA WITH AN OCCUPANT LOAD OF 50 OR MORE.
ACTUAL WIDTH: (4) EXIT DOORS 36 INCH WIDTH (SWITCHGEAR BUILDING)
17. ARRANGEMENT OF EXITS (SECTION 7.5):
EXITS MUST BE ARRANGED SO THE LOSS OF ANY ONE EXIT STILL PROVIDES EXIT
CAPACITY FOR AT LEAST 50% OF THE REQUIRED CAPACITY (NFPA 101 7.3.1.1.2).
EXIT ACCESS FROM ROOMS OR SPACES WILL BE PERMITTED TO BE THROUGH
ADJOINING OR INTERVENING ROOMS OR AREAS, PROVIDED THESE ROOMS OR AREAS
ARE ACCESSORY TO THE AREA SERVED (NFPA 7.5.1.6).
SY
M
DE
SC
RI
PT
IO
N
DA
TE
AP
PR
NFPA 101 MEANS OF EGRESS
18. TRAVEL DISTANCES (NFPA 101 SECTION 7.6)
DEAD END CORRIDORS: SPECIAL-PURPOSE INDUSTRIAL USE (CH 40.2.5)
ALLOWABLE: 50 FT
ACTUAL: NO DEAD END CORRIDORS
COMMON PATH OF TRAVEL: SPECIAL-PURPOSE INDUSTRIAL USE (CH 40.2.5)
ALLOWABLE: 50 FT
ACTUAL: NO COMMON PATHS OF TRAVEL
MAXIMUM TRAVEL DISTANCE: SPECIAL-PURPOSE INDUSTRIAL USE (CH 40.2.5)
ALLOWABLE: 300 FT
ACTUAL: 71 FT
19. FIRE AND SMOKE PROTECTION FEATURES
CONFORM TO THE REQUIREMENTS OF NFPA 101 FOR MARKING AND IDENTIFICATION OF
FIRE WALLS, FIRE BARRIERS, FIRE PARTITIONS, SMOKE BARRIERS, SMOKE PARTITIONS,
OR ANY OTHER WALL REQUIRED TO HAVE PROTECTED OPENINGS.
FIRE WALLS AND FIRE BARRIERS:
FIRE WALLS AND FIRE BARRIERS SHALL BE EFFECTIVELY AND PERMANENTLY
IDENTIFIED WITH SIGNS OR STENCILING ON BOTH SIDES OF THE WALL. IDENTIFICATION
SHALL BE LOCATED WITHIN 15 FEET OF THE END OF EACH WALL AND REPEATED AT
INTERVALS NOT TO EXCEED 30 FEET (NFPA 101 8.2.2.5).
OPENINGS IN A FIRE WALL OR FIRE BARRIER SHALL BE PROTECTED TO LIMIT THE
SPREAD OF FIRE FROM ONE SIDE OF THE FIRE BARRIER TO THE OTHER (NFPA 101 8.3.3).
OPENINGS MUST MEET MINIMUM FIRE PROTECTION RATING PER NFPA 8.3.3.2.1
AND TABLE 8.3.3.2.2.
FIRE PROTECTION OF PIPE AND CONDUIT PENETRATIONS:
ALL PENETRATIONS THROUGH FIRE RATED CONSTRUCTION SHALL BE SEALED TO MEET
OR EXCEED THE PENETRATED CONSTRUCTION RATINGS. PROVIDE UNDERWRITERS
LABORATORIES (UL) TESTED AND APPROVED FIRE STOPPING JOINTS AT ALL FIRE RATED
LOCATIONS, SEE SPEC SECTION 84 00.03 00 FIRESTOPPING.
GENERATOR ENCLOSURE OCCUPANCY LOAD
ROOM
NO, UFC 3-600-01 TABLE 10-3.1 USE OCCUPANT LOAD
SF PER PERSON AREA TOTAL NO. OF
OCCUPANTS
-- UTILITY 500.00 SF 450 SF 1
P R
O J E
C T
S
IT
E
C O
M M
A N
D C
E N
T E
R
A N
D E
R S
E N
A
IR
F O
R C
E B
A S
E G
U
FACP
CACP
CACPASP
ASP
A O
A O
A O
A O
A O
A O
NAC
1583 SF
220 SF
218 SF
1959 SF
OUTDOOR GENERATOR YARD
16,945 GSF
32' - 6"
TRAVEL DISTANCE: A
66' - 0"
TRAVEL DISTANCE: B
71' - 0"
TRAVEL DISTANCE: C
53' - 6"
TRAVEL DISTANCE: D
/ 1605
/ 1605
/1
/1
5'-6"
5'-6"
01 01 01 01
03 03
040406
YARD EXIT PATH FOR INFORMATION ONLY -
NOT SUBJECT TO NFPA 101 REQUIREMENTS
DISTANCE: 175'-0"
1 HOUR FIRE BARRIER
2 HOUR FIRE BARRIER
3 HOUR FIRE BARRIER
1/2 HOUR FIRE BARRIER
FIRE EXTINGUISHER TYPE:
WATER
FOAM
CO2
CLEAN AGENT
MULTI-PURPOSE DRY
CHEMICAL
LIQUID GAS
ELECTRIC
MTL FIRE
TRAVEL DISTANCE
COMMON PATH
DEAD END
PLAN SYMBOLS:
/ 00
ACTUAL
OCCUPANTS
OCCUPANT LOAD
CAPACITY
EGRESS INDICATOR:
/ 00
ROOM NAME/NUMBER
& AREA
150 SF
PATH LENGTH
TRAVEL DISTANCE: A
1' - 0"
FIRE RATED WALL TYPE:
EXIT SIGN LOCATION,
REFER TO FA
A.
B.
FOR GENERAL NOTES, LEGENDS, ABBREVIATIONS,
REFER TO SHEET G-002.
NOT TO BE USED FOR CONSTRUCTION.
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D
EP
AR
TM
EN
T
O F
TH
E
N
AV
Y N
AV
AL
F
AC
IL
IT
IE
S
EN
G
IN
EE
R
IN
G S
YS
TE
M S
C O
M M
AN
D
DRAWFORM REVISION: 25 AUGUST 2020
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
N
AV
FA
C
P
AC
IF
IC
M
AK
AL
AP
A, H
AW
AI
I
AS NOTED
FY
P R
O
JE
C T
G D
S C
O M
M
AN
D C
EN
TE
R
N
AV
FA
C
P
AC
IF
IC
1764210
KYM
JC
Jacobs/B&V, A Joint Venture (Federal Services) 1003 Bishop Street Suite 1340 Honolulu, HI 96813
A/E Task Order No. N6274223F0324
FOR REVIEW
ONLY
Name
Registration Number #
These documents are for Design Review and not intended for
Construction Bidding or Permit Purposes. They were prepared by, or under the supervision of:
Date
SEAL
24 JUN 2024
AN
DE
RS
EN
A
IR
F O
RC
E
BA
SE
KYM
AWK/DMK
6/
/2
3:
:3
PM
C :\R ev it\ lo ca l_
\P
3_
9_
PP
_A
S_ St on eE
D bv .c om .rv t
14PP-GI102
PO
W
ER
P
LA
NT
CO
DE
C
OM
PL
IA
NC
E
PL
AN
OV
ER
AL
L
ABCGSE RCB
G
UA
M
PP
-G I1
100% DESIGN SUBMITTAL
14CC-A-101
SITE #
BUILDING ID DISCIPLINE
CONSECUTIVE NUMBERS
SITE #
SITE 01
SITE 02
SITE 14
BUILDING ID
AC - ACCESS CONTROL POINT
CC - COMMAND CENTER
FP - FIRE PUMP BUILDING
GI - GENERAL
PP - POWER PLANT
SF - SECURITY FORCE
ST - SITE
A B C
3/32" = 1'-0" 0 8' 16' 32'4'
GENERAL SHEET NOTES
GRAPHIC SCALE(S)
KEY PLAN
LEGEND
PLAN
NORTH
SHEET NAMING CONVENTION
SCALE: 3/32" = 1'-0"A1 LIFE SAFETY PLAN
SY
M
DE
SC
RI
PT
IO
N
DA
TE
AP
PRSHEET KEYNOTES##
01. GENERATOR ENCLOSURE ON CONCRETE PAD, REFER TO
STRUCTURAL AND ELECTRICAL
02. TRANSFORMER ON CONCRETE PAD, REFER TO STRUCTURAL AND
ELECTRICAL
0.3 COLUMN FOR OVERHEAD STRUCTURAL LOUVER SYSTEM, REFER TO
STRUCTURAL
04. MECHANICAL EQUIPMENT ON CONCRETE PAD, REFER TO
STRUCTURAL AND MECHANICAL
05. ELECTRICAL MANHOLE, REFER TO ELECTRICAL
06. ELECTRICAL EQUIPMENT ON CONCRETE PAD, REFER TO STRUCTURAL
AND ELECTRICAL
P R
O J E
C T
S
IT
E
C O
M M
A N
D C
E N
T E
R
A N
D E
R S
E N
A
IR
F O
R C
E B
A S
E G
U
VERTICAL BRACING ELEMENTS:
VERTICAL BRACE
UPWARD FROM
PLAN LEVEL
VERTICAL BRACE
DOWNWARD FROM
PLAN LEVEL
PLAN KEY
(ORTHOGONAL)
VERTICAL
BRACE
DOWNWARD
FROM PLAN
LEVEL
VERTICAL
BRACE
UPWARD
FROM PLAN
LEVEL
X
XXX-000
ELEVATION/SECTION/DETAIL
IDENTIFICATION LETTER
SHEET NUMBER ON WHICH THE
ELEVATION/SECTION/DETAIL IS SHOWN
LEGEND:
3 COLUMN OR BEAM SPLICE
6*
SPECIAL DOUBLE CLIP ANGLE BEAM CONNECTION
SPECIAL DOUBLE CLIP ANGLE BEAM CONNECTIONS ARE INDICATED ON PLAN
OR ELEVATION VIEW.
ST#.#*
SPECIAL SHEAR TAB BEAM CONNECTION
SPECIAL SHEAR TAB BEAM CONNECTIONS ARE INDICATED ON PLAN
OR ELEVATION VIEW.
A FIELD BOLTED MOMENT CONNECTION.
FIELD WELDED BEAM TO BEAM MOMENT CONNECTION
2-BOLT CONNECTION OF HORIZONTAL BRACING TO BOTTOM
FLANGE OF FLOOR BEAM. SHIM AS REQUIRED.
FS_ FOOTING (SQUARE SPREAD)
FOUNDATIONS ARE INDICATED ON FOUNDATION PLAN SHEETS.
AR_
ANCHOR ROD
ANCHOR RODS ARE INDICATED ON PLAN SHEET(S).
SEE BASE PLATE DETAIL(S) FOR LAYOUT AND QUANTITY.
CJ
EJ
IJ
CONSTRUCTION OR
CONTRACTION JOINT
EXPANSION JOINT
ISOLATION JOINT
ANCHOR ROD OR CONCRETE REINFORCING BAR IN SECTION
PILE
FOUNDATIONS ARE INDICATED ON
FOUNDATION PLAN SHEETS.
UPLIFT PILE
FOUNDATIONS ARE INDICATED ON
FOUNDATION PLAN SHEETS.
OPENING OR PIT IN CONCRETE
A1 HORIZONTAL BRACE CONNECTIONS ARE INDICATED ON PLAN VIEW.
WHERE NO CONNECTION MARK NUMBER IS INDICATED ON PLAN, THE
CONNECTION SHALL BE AS NOTED BY "STD" IN THE CONNECTION LISTS.
FC_
FOOTING (CONTINUOUS/STRIP/WALL)
FOUNDATIONS ARE INDICATED ON FOUNDATION PLAN
SHEETS.
W_
REINFORCED CONCRETE WALL
WALLS ARE INDICATED ON PLAN SHEET(S).
BP_
BASEPLATE
BASEPLATES ARE INDICATED ON PLAN SHEETS.
SOG_ SLAB-ON-GROUND
MD_ METAL DECK.
BOLLARD
BOLLARDS ARE INDICATED ON FLOOR PLAN SHEETS. SEE
ARCHITECTURAL AND/OR CIVIL SHEETS FOR
PLAN DIMENSIONS.
FOUNDATION ELEMENTS:
SLAB-ON-GROUND ELEMENTS
BASE PLATE, ANCHOR, AND REINFORCEMENT ELEMENTS:
ROOF/FLOOR DECK/DIAPHRAGM ELEMENTS:
PLAN KEY
(NON-ORTHOGONAL)
GENERAL
STEEL BEAM CONNECTION ANNOTATIONS
FR_
FOOTING (RECTANGULAR SPREAD)
FOUNDATIONS ARE INDICATED ON FOUNDATION PLAN
SHEETS.
FN_ FOOTING (NON-TYPICAL/IRREGULAR SPREAD)
FOUNDATIONS ARE INDICATED ON FOUNDATION PLAN
SHEETS.
GB_
GRADE BEAM
FOUNDATIONS ARE INDICATED ON FOUNDATION PLAN
SHEETS.
TB_ TIE BEAM
FOUNDATIONS ARE INDICATED ON FOUNDATION PLAN
SHEETS.
MISCELLANEOUS
VERTICAL
BRACE
DOWNWARD
FROM PLAN
LEVEL
HORIZONTAL BRACING ELEMENTS:
A1
VERTICAL BRACE CONNECTIONS ARE INDICATED ON PLAN OR ELEVATION VIEW.
WHERE NO CONNECTION MARK NUMBER IS INDICATED ON PLAN OR ELEVATION,
THE CONNECTION SHALL
BE AS NOTED BY "STD" IN THE CONNECTION LISTS.
SUPERSTRUCTURE WALL ELEMENTS:
CTMD_ CONCRETE TOPPED METAL DECK.
PC_ PILE CAP
FOUNDATIONS ARE INDICATED ON FOUNDATION PLAN SHEETS.
W24X62 (ADDITIONAL NOTES)
[100] C=1"
TOTAL NUMBER OF SHEAR STUD CONNECTORS
(UNIFORM IF SINGLE NUMBER)
BEAM SIZE
CAMBER (NATURAL MILL CAMBER IF NOT SHOWN).
CAMBER SHALL BE PLACED UPWARD
TOP OF STEEL IF DIFFERENT FROM REFERENCE ELEVATION
FOR THE DRAWING. (+) SIGN INDICATES DISTANCE ABOVE.
(-) SIGN INDICATES DISTANCE BELOW REFERENCE ELEVATION
18LH02
NOMINAL DEPTH
(INCH)
JOIST TYPE
JOIST
28G_X_X
NOMINAL
DEPTH (INCH)
G INDICATES
JOIST GIRDER
JOIST
GIRDER
PROJECT
SPECIFIC
INDICATOR
STEEL JOIST DESIGNATION:
STEEL BEAM DESIGNATION:
STEEL BEAM CONNECTION ANNOTATION
(+/- 1'-0")
STEEL JOIST GIRDER DESIGNATION:
SEE S-616
FOR STEEL JOIST
GIRDER LOADING
REQUIREMENTS
SEE S-615
FOR STEEL JOIST
LOADING
REQUIREMENTS
MISCELLANEOUS STEEL CONNECTION ELEMENTS:
IF NO BEAM CONNECTION IS IDENTIFIED ON PLANS OR ELEVATIONS THEN THE FOLLOWING IS
APPLICABLE:
1. STEEL BEAM TO STEEL COLUMN:
2. STEEL BEAM TO STEEL BEAM:
NONE
DELEGATED CONNECTION DESIGN END SHEAR REACTION.
REACTIONS ARE [LRFD] [ASD] FACTORED REACTIONS UNO.
VALUE SHOWN IS FOR EXAMPLE ONLY, SEE PLANS FOR ACTUAL DEMAND.
55 k
MOMENT CONNECTION
PINNED CONNECTION
SUPPORTING/
SUPPORTED ELEMENT
(COLUMN, BEAM, WALL, ETC.)
TYP
P_
PEDESTAL
PEDESTALS ARE INDICATED ON FOUNDATION PLAN
SHEETS.
FSW_ FOUNDATION STEM WALL
FOUNDATIONS ARE INDICATED ON FOUNDATION PLAN
SHEETS.
DECK SPAN DIRECTION
SEE PLAN FOR INDICATION.
NOTES:
1. AN ASTERISK "*" INDICATES THE IDENTIFIED CONNECTION ON BOTH ENDS OF THE
MEMBER.
2. CALLOUTS ABOVE INCLUDING REACTIONS ARE FOR EXAMPLE ONLY. REFER TO
PLANS AND DETAILS FOR REQUIREMENTS.
FBW_
FOUNDATION BASEMENT WALL
FOUNDATIONS ARE INDICATED ON FOUNDATION PLAN
SHEETS.
CT_ CONCRETE TOPPING
STEPPED SURFACE
MATERIAL LEGEND (APPLICABLE TO STRUCTURAL SHEETS)
CAST-IN-PLACE
CONCRETE
BAR GRATINGEARTH
PRECAST
CONCRETE
CMU
NON-SHRINK
GROUT
STEEL IN
CROSS SECTION
ROCK
THE FOLLOWING SYMBOLS ARE USED TO REPRESENT THE MATERIALS SHOWN ON THE STRUCTURAL DRAWINGS.
REFER TO SPECIFICATIONS AND GENERAL NOTES FOR MATERIAL QUANTITIES REQUIRED
EXISTING
CONCRETE
GEOFOAM
TOPPING
CONCRETE
ABBREVIATIONS:
& AND
@ AT
AB ANCHOR BOLT
ACI AMERICAN CONCRETE
INSTITUTE
ADDNL ADDITIONAL
AISC AMERICAN INSTITUTE
OF STEEL CONSTRUCTION
AR ANCHOR ROD
AS ANCHOR SET
ASCE AMERICAN SOCIETY OF
CIVIL ENGINEERS
AGGR AGGREGATE
ARCH ARCHITECTURAL
ASSY ASSEMBLY
ASTM AMERICAN SOCIETY FOR
TESTING MATERIALS
AVG AVERAGE
BLDG BUILDING
BM BEAM, BENCH MARK
BOC BOTTOM OF CONCRETE
BOMD BOTTOM OF METAL DECK
BOPL BOTTOM OF PLATE
BOS BOTTOM OF STEEL
BOT BOTTOM
BRG BEARING
CEA CONCRETE EMBED ASSEMBLY
CIP CAST-IN-PLACE
CIRC CIRCULAR
CITB CONCRETE INVERTED T BEAM
CL CENTER LINE
CLB CONCRETE L BEAM
CLR CLEAR
CMU CONCRETE MASONRY UNIT
CO CLEANOUT
COL COLUMN
CONC CONCRETE
CONN CONNECTION
CONST CONSTRUCTION
CJ CONTRACTION JOINT OR
CONSTRUCTION JOINT
CONT CONTINUOUS, CONTROL
CONTD CONTINUED
COTR CONTRACTING OFFICER'S
TECHNICAL REPRESENTATIVE
CONV CONVENTIONAL
CRB CONCRETE RECTANGULAR BEAM
CTR CENTER
CU CUBIC
CU FT CUBIC FEET
CU YD CUBIC YARD
db REINFORCING BAR DIAMETER
DET DETAIL
DIA DIAMETER
DIM DIMENSION
DL DEAD LOAD
DN DOWN
DT DOUBLE TEE
DWL DOWEL
DWG DRAWING
E EAST
EA EACH
EF EACH FACE
EL, ELEV ELEVATION
ELEC ELECTRICAL
EQ EQUAL
EQUIP EQUIPMENT
EW EACH WAY
EXST EXISTING
EXP EXPANSION
EXP JT EXPANSION JOINT
EXT EXTERIOR
FD FLOOR DRAIN
FDN FOUNDATION
FF FINISH FLOOR ELEVATION
FIN FINISH
FJ FELT JOINT
FL FLOOR
FS FAR SIDE
FT FOOT, FEET
FTG FOOTING
FV FIELD VERIFY
GA GAGE
GALV GALVANIZED
GL GIRT LINE
GRTG GRATING
HGT HEIGHT
HK HOUSEKEEPING
HORIZ HORIZONTAL
HP HIGH POINT
HSS HOLLOW STRUCTURAL SECTION
IJ ISOLATION JOINT
IN INCH
INSUL INSULATION
INT INTERIOR
INV INVERT
JT JOINT
LB POUND
L LENGTH, LONG
Ld REINFORCING DEVELOPMENT
LENGTH, EMBEDMENT LENGTH
LP LOW POINT
LLBB LONG LEG BACK TO BACK
LLV LONG LEG VERTICAL
LSH LONG SLOTTED HOLE
MATL MATERIAL
MAX MAXIMUM
MECH MECHANICAL
MFR MANUFACTURER
MH MANHOLE
MIN MINIMUM
MISC MISCELLANEOUS
MTL METAL
N NORTH
NFS NON-FROST SUSCEPTIBLE
NO, # NUMBER
NTS NOT TO SCALE
NS NEAR SIDE
OC ON CENTER
OD OUTSIDE DIAMETER
OPNG OPENING
OPP OPPOSITE
PERP PERPENDICULAR
PL PLATE
PLCS PLACES
PLF POUNDS PER LINEAR FOOT
PROJ PROJECTION
PSF POUND FORCE PER SQUARE FOOT
PSI POUND FORCE PER SQUARE INCH
PVC POLYVINYL CHLORIDE
R RADIUS
RAF RAISED ACCESS FLOOR
RCSC RESEARCH COUNCIL ON
STRUCTURAL CONNECTIONS
RD ROOF DRAIN
RECT RECTANGULAR
REF REFERENCE
REINF REINFORCED OR REINFORCING
REQD REQUIRED
RGS RIGID GALVANIZED STEEL CONDUIT
RO ROUGH OPENING
S SOUTH
SDI STEEL DECK INSTITUTE
SECT SECTION
SHT, SH SHEET
SIM SIMILAR
SLV SHORT LEG VERTICAL
SOG SLAB ON GROUND
SPEC SPECIFICATION
SPCS SPACES
SPS STRUCTURAL PIPE SUPPORT
SQ SQUARE
SQ FT SQUARE FOOT
SS STAINLESS STEEL
SSH SHORT SLOTTED HOLE
SSPC SOCIETY FOR PROTECTIVE COATINGS
ST SINGLE TEE
STA STATION
STD STANDARD
STL STEEL
STR STRUCTURAL
T&B TOP AND BOTTOM
TC TOP OF CURB
TEMP TEMPERATURE
TFF TOP OF FINISH FLOOR
THK THICK
THRD THREAD
TD TIE DOWN
TO TOP OF
TOC TOP OF CONCRETE
TOF TOP OF FOOTING
TOG TOP OF GRATING
TOPL TOP OF PLATE
TOS TOP OF STEEL
TOW TOP OF WALL
TYP TYPICAL
UNO UNLESS NOTED OTHERWISE
UFC UNIFIED FACILITIES CRITERIA
VERT VERTICAL
W WEST
W/ WITH
W/O WITHOUT
WP WORK POINT
WT WEIGHT
WWF WELDED WIRE FABRIC
XFMR TRANSFORMER
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L
F A
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S Y
S T
E M
S C
O M
M A
N D
DRAWFORM REVISION: 25 AUGUST 2020
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
N A
V F
A C
P A
C
IF
IC
M
A K
A L A
P A
H
A W
A
II
AS NOTED
F Y
P
R O
J E
C T
G D
S C
O M
M A
N D
C E
N T
E R
N A
V F
A C
P A
C
IF
IC
1764210
KYM
JC
Jacobs/B&V, A Joint Venture (Federal Services) 1003 Bishop Street Suite 1340 Honolulu, HI 96813
BC
A/E Task Order No. N6274223F0324
FOR REVIEW
ONLY
Name
Registration Number #
These documents are for Design Review and not intended for
Construction Bidding or Permit Purposes. They were prepared by, or under the supervision of:
Date
SEAL
24 JUN 2024
A N
D E
R S
E N
A
IR
F O
R C
E B
A S
E
AWK/DMK
/2
/2
:5 :3
P
M
C R e v it \l o c a l_
\P
G k a m a ra d
.r v t
14GI-S-010
G E
N E
R A
L
A B
B R
E V
IA
T
IO
N
S
L E
G E
N D
KMOAOB ARK
G U
A M
G I-
S -0
100% DESIGN SUBMITTAL
S Y
M D
E S
C R
IP
TI
O N
D A
TE
A
P P
R
P R
O J E
C T
S
IT
E
C O
M M
A N
D C
E N
T E
R
A N
D E
R S
E N
A
IR
F O
R C
E B
A S
E G
U
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L
F A
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S Y
S T
E M
S C
O M
M A
N D
DRAWFORM REVISION: 25 AUGUST 2020
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
N A
V F
A C
P A
C
IF
IC
M
A K
A L A
P A
H
A W
A
II
AS NOTED
F Y
P
R O
J E
C T
G D
S C
O M
M A
N D
C E
N T
E R
N A
V F
A C
P A
C
IF
IC
1764210
KYM
JC
Jacobs/B&V, A Joint Venture (Federal Services) 1003 Bishop Street Suite 1340 Honolulu, HI 96813
BC
A/E Task Order No. N6274223F0324
FOR REVIEW
ONLY
Name
Registration Number #
These documents are for Design Review and not intended for
Construction Bidding or Permit Purposes. They were prepared by, or under the supervision of:
Date
SEAL
24 JUN 2024
A N
D E
R S
E N
A
IR
F O
R C
E B
A S
E
AWK/DMK
/1
/2
:5 :5
P
M
C R e v it \l o c a l_
\P
P P
A
S k a m a ra d
.r v t
14PP-S-001
P O
W E
R P
LA
N
T
G E
N E
R A
L N
O T
E S
KMOAJT SBR
G U
A M
P P
-S -0
100% DESIGN SUBMITTAL
M. ENVIRONMENTAL SEVERITY CLASSIFICATION (ESC) IN ACCORDANCE WITH UFC 1-200-01: ESC C5 (VERY HIGH)
L. SEE 14GI-S-010 FOR STRUCTURAL ELEMENT, MEMBER, AND CONNECTION NOTATIONS.
K. BASE OF FOUNDATIONS AND CONCRETE PADS ON STRUCTURAL DRAWINGS ARE BASED OFF OF ELEVATIONS SHOWN ON CIVIL
DRAWINGS.
J. ALL SUBSTITUTIONS AND VARIATIONS MUST BE APPROVED BY THE GOVERNMENT.
I. CONSTRUCTION MATERIALS MUST BE SPREAD OUT IF PLACED ON FLOORS OR ROOF. LOAD MUST NOT EXCEED THE DESIGN LIVE LOAD PER SQUARE FOOT. PROVIDE ADEQUATE SHORING AND/OR BRACING WHERE STRUCTURE HAS NOT ATTAINED
DESIGN STRENGTH.
H. NOTES AND DETAILS ON SHEETS TAKE PRECEDENCE OVER GENERAL NOTES AND TYPICAL DETAILS.
G. DIMENSIONS TAKE PRECEDENCE OVER SCALE SHOWN ON DRAWINGS.
F. COORDINATE ALL CONSTRUCTION ACTIVITIES WITH CONTRACTING OFFICER TO MINIMIZE DISRUPTION OF EXISTING FACILITIES.
E. SHOP DRAWINGS AND SUPPORTING DATA MUST BE SUBMITTED FOR APPROVAL IN ACCORDANCE WITH THE SUBMITTAL SECTION OF THE SPECIFICATIONS. NO FABRICATION MUST PROCEED BEFORE SHOP DRAWINGS AND REQUESTED SUBMITTALS
COVERING THAT WORK HAVE BEEN APPROVED.
D. THE CONTRACT STRUCTURAL DRAWINGS AND SPECIFICATIONS REPRESENT THE FINISHED STRUCTURE. THEY DO NOT INDICATE THE METHOD OF CONSTRUCTION. THE CONTRACTOR MUST PROVIDE ALL MEASURES NECESSARY TO PROTECT THE STRUCTURE DURING CONSTRUCTION. SUCH MEASURES INCLUDE, BUT NOT BE LIMITED TO, BRACING, SHORING FOR LOADS DUE TO CONSTRUCTION EQUIPMENT, ETC. OBSERVATION VISITS TO THE SITE BY THE STRUCTURAL ENGINEER MUST NOT
INCLUDE INSPECTION OF THE ABOVE STRUCTURAL MEMBERS.
C. DESIGN DRAWINGS SHOW THE INTENT OF REQUIRED CONSTRUCTION AND SPECIFIC CONSTRUCTION AS NEEDED TO FACILITATE CLEAR DETAILING. FOR SPECIFIC CONDITIONS NOT SHOWN, THE CONTRACTOR MUST PROVIDE DETAILS OF CONSTRUCTION SIMILAR TO THOSE SHOWN. VERIFY ALL EXISTING CONDITIONS, DIMENSIONS, AND ELEVATIONS PRIOR TO COMMENCING WORK. NOTIFY THE GOVERNMENT IN WRITING OF DISCREPANCIES OR CONTRADICTIONS ENCOUNTERED PRIOR
TO EXECUTING ANY AFFECTED CONSTRUCTION.
B. PENETRATIONS IN CONCRETE WALLS, SLABS, AND FOOTINGS ARE SHOWN FOR REFERENCE. SMALL BORE PIPING, CONDUIT, AND OTHER MISCELLANEOUS PENETRATIONS ARE NOT SHOWN. COORDINATE WITH ALL CONTRACT DRAWINGS TO VERIFY
PENETRATION LOCATIONS AND ASSOCIATED DETAILS.
A. BEFORE EXECUTING ANY WORK, THE CONTRACTOR MUST EXAMINE ACTUAL JOB CONDITIONS AND REPORT TO THE CONTRACTING OFFICER ANY ERROR, OMISSION, OR DISCREPANCY AFFECTING WORK. REFER TO ARCHITECTURAL, SITE, ELECTRICAL, MECHANICAL, AND VENDOR SUPPLIED DRAWINGS FOR INSERTS, SLEEVES, OPENINGS, EMBEDMENTS, PADS, CURBS, ATTACHMENTS, AND OTHER ITEMS NOT SHOWN HEREIN AFFECTING CONSTRUCTION.
GENERAL
TMS 402/602, BUILDING CODE REQUIREMENTS AND SPECIFICATIONS FOR
MASONRY STRUCTURES
AISC 341, SEISMIC PROVISIONS FOR STRUCTURAL STEEL BUILDINGS 2016
AISC 370, SPECIFICATION FOR STRUCTURAL STAINLESS STEEL BUILDINGS 2021
AISC 360, SPECIFICATION FOR STRUCTURAL STEEL BUILDINGS 2016
AISC 325, MANUAL OF STEEL CONSTRUCTION 15TH
ACI 357.3R DESIGN AND CONSTRUCTION OF WATERFRONT AND COASTAL
CONCRETE MARINE STRUCTURES
ACI 318, BUILDING CODE REQUIREMENTS FOR STRUCTURAL CONCRETE 2019
ACI 301, SPECIFICATIONS FOR CONCRETE CONSTRUCTION 2020
UFC 3-320-06A, CONCRETE FLOOR SLABS ON GRADE SUBJECTED TO
HEAVY LOADS
1 MARCH 2005
ASCE 7, MINIMUM DESIGN LOADS AND ASSOCIATED CRITERIA FOR
BUILDINGS AND OTHER STRUCTURES
ASCE 7, MINIMUM DESIGN LOADS AND ASSOCIATED CRITERIA FOR
BUILDINGS AND OTHER STRUCTURES
UFC 4-010-01, DoD MINIMUM ANTITERRORISM STANDARDS FOR BUILDINGS
12 DECEMBER 2018
CHANGE 2, 30 JULY 2022
UFC 3-220-01, GEOTECHNICAL ENGINEERING
1 NOVEMBER 2012
CHANGE 1, 3 NOVEMBER 2021
UFC 3-301-01, STRUCTURAL ENGINEERING 11 APRIL 2023
FC 1-300-09N, NAVY AND MARINE CORPS DESIGN PROCEDURES
1 MAY 2014
CHANGE 6, 9 JULY 2021
MARIANAS NAVY AND MARINE CORPS DESIGN AND CONSTRUCTION
STANDARDS
SEPTEMBER 2017 WITH AMENDMENT 001 (22
OCTOBER 2019)
21 GCA REAL PROPERTY, CH. 67 THE BUILDING CODE OF GUAM 2017
GUAM AAFB ARCHITECTURAL BASE DESIGN STANDARDS FINAL MAY 2013
GUAM DEFENSE SYSTEM ENHANCED INTEGRATED AIR AND MISSILE
DEFENSE SYSTEM FACILITIES REQUIREMENTS DOCUMENT (FRD)
19 JAN 2024
ICC 500 ICC/NSSA STANDARD FOR THE DESIGN AND CONSTRUCTION OF
STORM SHELTERS
IBC (AS AMENDED BY UFC 1-200-01) 2021
UFC 1-200-01, DoD BUILDING CODE
1 SEPTEMBER 2022
CHANGE 2, 12 JUNE 2023
DESIGN CODES, STANDARDS, & REFERENCES
D. STRUCTURAL STEEL FRAMING AND STRUCTURAL STEEL CONNECTION SHOP DRAWINGS MUST BE THE RESPONSIBILITY
OF THE CONTRACTOR.
C. ANCHOR ROD SHOP DRAWINGS MUST BE THE RESPONSIBILITY OF THE CONTRACTOR.
B. CONCRETE REINFORCEMENT SHOP DRAWINGS MUST BE THE RESPONSIBILITY OF THE CONTRACTOR.
A. THE CONTRACTOR MUST EMPLOY OR RETAIN A REGISTERED PROFESSIONAL ENGINEER LICENSED IN A STATE WITHIN THE UNITED STATES AND/OR TERRITORY OF GUAM TO DESIGN AND DETAIL DELEGATED ITEMS TO MEET THE PERFORMANCE AND DESIGN CRITERIA ESTABLISHED AS PART OF THE BASE BUILDING STRUCTURE INDICATED IN THE
CONTRACT DOCUMENTS.
DELEGATED ITEMS
J. ALL EXISTING INFORMATION SHOWN IS REFERENCED FROM FIELD MEASUREMENTS AND MUST BE VERIFIED BY THE CONTRACTOR PRIOR TO THE ALTERATION, FABRICATION, OR INSTALLATION OF ANY EXISTING OR NEW BUILDING COMPONENTS.
I. ALL OPENINGS IN EXISTING CONSTRUCTION MUST BE SAW CUT OR DRILLED.
H. ANY DAMAGE OCCURRING TO THE EXISTING STRUCTURE, ADJACENT STRUCTURES, STREETS, SIDEWALKS, UTILITY LINES OR ANY OTHER PUBLIC OR PRIVATE PROPERTY, MUST BE REINSTALLED TO THE ORIGINAL CONDITION BY THE CONTRACTOR AT NO COST
TO THE OWNER OR THE ENGINEER.
G. IF SAFETY OR INTEGRITY OF STRUCTURAL SYSTEM APPEARS TO BE COMPROMISED, CEASE OPERATIONS IMMEDIATELY AND NOTIFY THE OWNER AND THE ENGINEER. PROPERLY BRACE AND SUPPORT STRUCTURE BEFORE RESUMING OPERATIONS.
F. STORE AND PROTECT ALL MATERIAL TO BE REMOVED AND REUSED.
E. PROVIDE AND MAINTAIN BRACING AND SHORING AS NEEDED. KEEP SUPPORTING STRUCTURE IN PLACE DURING NEW
CONSTRUCTION AND UNTIL NEW STRUCTURE IS COMPLETED.
D. BEFORE UNDERTAKING ANY DEMOLITION WORK OR ORDERING MATERIAL ASCERTAIN BY SURVEY THE EXISTING CONDITIONS OF THE PROPERTIES AND BUILDINGS ADJOINING OR IN CLOSE PROXIMITY TO THE PREMISES. THE ARCHITECT MUST BE NOTIFIED OF
ANY DISCREPANCY.
C. CONTRACTOR MUST BE SOLELY RESPONSIBLE FOR THE PROTECTION AND STABILITY OF EXISTING STRUCTURES AND UTILITIES
DURING CONSTRUCTION.
B. CONTRACTOR MUST RETAIN, AT THEIR EXPENSE, A REGISTERED PROFESSIONAL ENGINEER LICENSED IN A STATE WITHIN THE UNITED STATES AND/OR TERRITORY OF GUAM, TO DETERMINE ALL CONSTRUCTION PHASE SHORING REQUIREMENTS.
CONTRACTOR MUST SUBMIT TO THE OWNER AND THE ENGINEER OF RECORD, SIGNED AND SEALED DRAWINGS, OUTLINING OPERATIONAL SEQUENCES, SHORING CONCEPTUAL PLANS, METHODS USED FOR THE PROTECTION OF STRUCTURES TO REMAIN
AND NEIGHBORING STRUCTURES.
A. THE CONTRACTOR MUST NOTIFY ALL LOCAL AGENCIES HAVING JURISDICTION, AND MUST OBTAIN ALL NECESSARY PERMITS REQUIRED FOR THE DEMOLITION AND REMOVAL OF THE DEBRIS RESULTING FROM THE DEMOLITION.
DEMOLITION
B. SEE SPECIFICATION SECTION 01 45 35.00 14 SPECIAL INSPECTION FOR STATEMENT AND SCHEDULE OF SPECIAL
INSPECTION FOR FURTHER CLARIFICATION OF RESPONSIBILITIES.
A. IBC CODE REQUIRED SPECIAL INSPECTIONS AND TESTS MUST BE CONDUCTED BY APPROVED AGENCIES EMPLOYED BY THE PRIME CONTRACTOR IN ACCORDANCE WITH IBC CHAPTER 17 AS MODIFIED BY UFC 3-301-01 AND UFC 1-200-01.
SPECIAL INSPECTIONS
S Y
M D
E S
C R
IP
TI
O N
D A
TE
A
P P
R
P R
O J E
C T
S
IT
E
C O
M M
A N
D C
E N
T E
R
A N
D E
R S
E N
A
IR
F O
R C
E B
A S
E G
U
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L
F A
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S Y
S T
E M
S C
O M
M A
N D
DRAWFORM REVISION: 25 AUGUST 2020
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
N A
V F
A C
P A
C
IF
IC
M
A K
A L A
P A
H
A W
A
II
AS NOTED
F Y
P
R O
J E
C T
G D
S C
O M
M A
N D
C E
N T
E R
N A
V F
A C
P A
C
IF
IC
1764210
KYM
JC
Jacobs/B&V, A Joint Venture (Federal Services) 1003 Bishop Street Suite 1340 Honolulu, HI 96813
BC
A/E Task Order No. N6274223F0324
FOR REVIEW
ONLY
Name
Registration Number #
These documents are for Design Review and not intended for
Construction Bidding or Permit Purposes. They were prepared by, or under the supervision of:
Date
SEAL
24 JUN 2024
A N
D E
R S
E N
A
IR
F O
R C
E B
A S
E
AWK/DMK
/1
/2
:5 :5
P
M
C R e v it \l o c a l_
\P
P P
A
S k a m a ra d
.r v t
14PP-S-002
P O
W E
R P
LA
N
T
G E
N E
R A
L N
O T
E S
KMOAJT SBR
G U
A M
P P
-S -0
100% DESIGN SUBMITTAL
ADDITIONAL DRIFT PERFORMANCE REQUIREMENTS
ELASTIC DRIFT LIMIT 0.5% FOR SERVICE
LEVEL EARTHQUAKE
NA NA NA
IMPOSED 0.00% 0.00% 0.00% 0.00%
REQUIREMENT ASCE 7 TABLE 12.12-1 2.00% NA NA NA
ALLOWABLE STORY DRIFT
DEFLECTION AMPLIFICATION FACTOR, Cd ASCE 7 4.00 NA 2.50 2.50
OVERSTRENGTH FACTOR(S), Ω0 ASCE 7 2.50 2.00 2.00 2.00
REDUNDANCY FACTOR, ρ ASCE 7 12.3.4 1.3 1.3 1.0 1.0
DESIGN BASE SHEAR(S), V KIP 1007 110 84 7.2 KIP/FT
SEISMIC RESPONSE COEFFICIENT(S), Cs 0.653 NA 0.123 2.072
RESPONSE MODIFICATION FACTOR(S), R 4.00 2.50 3.00 1.25
SEISMIC FORCE RESISTING SYSTEM(S)
TABLE 12.2-1: A. BEARING WALL SYSTEMS
- INTERMEDIATE PRECAST SHEAR WALLS
(WALLS ON GRIDS 1 & 2)
TABLE 13.6-1: MECHANICAL AND
ELECTRICAL COMPONENTS -
GENERATORS, BATTERIES, INVERTERS,
MOTORS, TRANSFORMERS, AND OTHER
ELECTRICAL COMPONENTS
CONSTRUCTED OF
HIGH-DEFORMABILITY MATERIALS
TABLE 15.4-2: HORIZONTAL,
SADDLE-SUPPORTED WELDED
STEEL VESSELS
TABLE 15.4-2:
GROUND-SUPPORTED
CANTILEVER WALLS OR FENCES
E3. SEISMIC - PLAN NORTH / SOUTH DIRECTION
ADDITIONAL DRIFT PERFORMANCE REQUIREMENTS
ELASTIC DRIFT LIMIT 0.5% FOR SERVICE
LEVEL EARTHQUAKE
NA NA NA
IMPOSED 0.00% 0.00% 0.00% 0.00%
REQUIREMENT ASCE 7 TABLE 12.12-1 2.00% NA NA NA
ALLOWABLE STORY DRIFT
DEFLECTION AMPLIFICATION FACTOR, Cd ASCE 7 4.00 NA 2.50 2.50
OVERSTRENGTH FACTOR(S), Ω0 ASCE 7 2.50 2.00 2.00 2.00
REDUNDANCY FACTOR, ρ ASCE 7 12.3.4 1.3 1.3 1.0 1.0
DESIGN BASE SHEAR(S), V KIP 1007 110 84 7.2 KIP/FT
SEISMIC RESPONSE COEFFICIENT(S), Cs 0.653 NA 0.123 2.072
RESPONSE MODIFICATION FACTOR(S), R 4.00 2.50 3.00 1.25
SEISMIC FORCE RESISTING SYSTEM(S)
REFERENCED ASCE 7 TABLE TO THE
RIGHT IS USED FOR DETERMINING
RESPONSE MODIFICATION,
OVERSTRENGTH, DEFLECTION
AMPLIFICATION FACTORS BELOW
TABLE 12.2-1: A. BEARING WALL SYSTEMS
- INTERMEDIATE PRECAST SHEAR WALLS
(WALLS ON GRIDS A, B, & C)
TABLE 13.6-1: MECHANICAL AND
ELECTRICAL COMPONENTS -
GENERATORS, BATTERIES, INVERTERS,
MOTORS, TRANSFORMERS, AND OTHER
ELECTRICAL COMPONENTS
CONSTRUCTED OF
HIGH-DEFORMABILITY MATERIALS
TABLE 15.4-2: HORIZONTAL,
SADDLE-SUPPORTED WELDED
STEEL VESSELS
TABLE 15.4-2:
GROUND-SUPPORTED
CANTILEVER WALLS OR FENCES
E2. SEISMIC - PLAN EAST / WEST DIRECTION
SERVICE LEVEL EARTHQUAKE (SLE):
AISC DESIGN
GUIDE 3, 2ND ED.
72 YEAR RETURN PERIOD 50% CHANCE
OF EXCCEDENCE IN 50 YEAR PERIOD
72 YEAR RETURN PERIOD 50% CHANCE
OF EXCCEDENCE IN 50 YEAR PERIOD
72 YEAR RETURN PERIOD 50%
CHANCE OF EXCCEDENCE IN 50
YEAR PERIOD
72 YEAR RETURN PERIOD 50%
CHANCE OF EXCCEDENCE IN 50
YEAR PERIOD
ANALYSIS PROCEDURE ASCE 7 12.6 ELF ELF ELF ELF
SNOW LOAD INCLUDED IN SEISMIC MASS ASCE 7 12.7.2 PSF NA NA NA NA
SEISMIC DESIGN CATEGORY ASCE 7 Table 11.6-1 and 11.6-2 D D D D
E. SEISMIC - GENERAL
BASE SHEAR KIP 274 145 42 2.2 KIP/FT
SEE 600 SHEET SERIES FOR COMPONENT & CLADDING PRESSURES NA NA NA NA
MAXIMUM ALLOWANCE IMPOSED
AISC DESIGN
GUIDE 3, 2ND ED.
CHAPTER 1, 4 NA NA NA NA
MAXIMUM ALLOWED (FOR 10 YEAR WIND EVENT) UFC 3-301-01 2-4.2 H/480 NA NA NA
ALLOWABLE STORY DRIFT
SERVICEABILITY WIND SPEED MINIMUM MPH 110 110 110 110
SERVICEABILITY WIND MRI MINIMUM YEARS 10 10 10 10
INTERNAL PRESSURE CLASSIFICATION (AND COEFFICIENT +/- AS
APPLICABLE)
ENCLOSED(0.18) NA NA NA
TOPOGRAPHIC FACTOR ASCE 7 CHAPTER 26 1.01 1.01 1.01 1.01
EXPOSURE CATEGORY ASCE 7 CHAPTER 26 C C C C
TERRAIN CATEGORY ASCE 7 CHAPTER 26 C C C C
NOMINAL DESIGN WIND SPEED, Vasd MPH 182 182 170 151
BASIC WIND SPEED (3 SEC GUST), Vult MPH 235 235 220 195
WIND DESIGN CRITERIA ICC 500 WIND SPEED ICC 500 WIND SPEED IV II
D. WIND ASCE 7 CHAPTER 26
(INCLUDES MIN LOW SLOPE SNOW, Pm WHEN APPLICABLE)
FLAT ROOF SNOW LOAD, Pf PSF N/A N/A N/A N/A
THERMAL FACTOR, Ct N/A N/A N/A N/A
SNOW EXPOSURE FACTOR, Ce N/A N/A N/A N/A
C. SNOW ASCE 7 CHAPTER 7
ICE NA NA NA NA
SEISMIC 1.50 1.50 1.50 1.00
WIND - - - -
SNOW NA NA NA NA
B. RISK CATEGORY & IMPORTANCE FACTORS UFC 3-301-01 TABLE 2-2 IV IV IV II
A. STRUCTURE(S) SOURCE
U N
IT
S
U N
O SWITCHGEAR BUILDING
(SEE S-101)
GENERATOR ENCLOSURE
(SEE S-101)
FUEL TANKS
(SEE S-101)
BALLISTIC WALL
(SEE S-101)
THE INFORMATION IN THIS SECTION PROVIDE BUILDING SPECIFIC ENVIRONMENTAL LOAD AND PERFORMANCE CRITERIA WHICH IS A FUNCTION OF RISK CATEGORY, SEISMIC DESIGN CATEGORY, AND OTHER BUILDING CHARACTERISTICS. SEE "DESIGN LOADS AND CRITERIA - GENERAL ENVIRONMENTAL LOAD DATA" FOR GENERIC ENVIRONMENTAL LOADING DATA SPECIFIC TO THE PROJECT
LOCATION.
DESIGN LOADS & CRITERIA - STRUCTURE SPECIFIC ENVIRONMENTAL LOAD DATA
B. PROGRESSIVE COLLAPSE (UFC 4-010-01 STANDARD 6) - NOT APPLICABLE
FUEL TRANSFER STATION LOW OCCUPANCY BUILDINGS
a. POWER PLANT LOW OCCUPANCY BUILDINGS
STRUCTURES: SECTION 1-6
2. EXCEPTION(S) PER UFC 4-010-01 (SECTION 1-6)
1. UFC 4-010-01 STANDARDS APPLY TO ALL DoD COMPONENTS, TO ALL DoD INHABITED BUILDINGS AND HIGH OCCUPANCY FAMILY HOUSING, TO ALL INHABITED TENANT BUILDINGS ON DoD INSTALLATIONS, AND TO ALL DoD EXPEDITIONARY STRUCTURES. EXCEPTIONS ARE PROVIDED (IF APPLICABLE) IN THE FOLLOWING NOTE.
A. UFC 4-010-01 APPLICABILITY (SECTION 1-5)
DESIGN LOADS AND CRITERIA - ATFP
1. SITE SPECIFIC SEISMIC HAZARD ANALYSIS BY AECOM WILL BE UTILIZED WHEN IT IS FINALIZED.
NOTES:
PEAK VERTICAL RESPONSE, SV 2.230 g Preliminary Values SPECTRAL RESPONSE ACCELERATION, SM1 0.770 g Preliminary Values SPECTRAL RESPONSE ACCELERATION, SMS 2.610 g Preliminary Values
SITE SPECIFIC MCER RESPONSE SPECTRA
D. SEISMIC SITE SPECIFIC STUDY Preliminary Values
DESIGN SPECTRAL RESPONSE ACCELERATION, Sd1 0.636 g DESIGN SPECTRAL RESPONSE ACCELERATION, Sds 2.233 g SITE CLASS C Geotech Report
LONG-PERIOD TRANSITION PERIOD, TL 12 SEC ASCE 7 Fig. 22-14 THROUGH Fig. 22-17 MAPPED SPECTRAL RESPONSE ACCELERATION, S1 0.681 g UFC 3-301-01 2-4.7 MAPPED SPECTRAL RESPONSE ACCELERATION, Ss 2.791 g UFC 3-301-01 2-4.7
C. SEISMIC MAPPED PARAMETERS (RC I, II, III, IV)
TOPOGRAPHIC FACTOR STR SPECIFIC ASCE 7 26.8.2
EXPOSURE CATEGORY STR SPECIFIC ASCE 7 26.7.3
10 110 MPH
25 132 MPH
50 146 MPH
100 163 MPH
MRI
ADDITIONAL WIND SPEEDS FOR SERVICEABILITY
ICC 500 WIND SPEED 235 MPH
V 10000 250 MPH
IV 3000 220 MPH
III 1700 210 MPH
II 700 195 MPH
I 300 180 MPH
LIFE SAFETY 195 MPH
DESIGN LEVEL
BASIC WIND SPEED, V UFC 3-301-01 2-4.6
B. WIND
*NOTE: "P" INDICATES PERMAFROST
REQUIRED DESIGN FOOTING DEPTH DUE TO FROST* NA IN UFC 3-301-01 B-2.3, FIGURE B-1
FROST LINE DEPTH (FROST PENETRATION)* NA IN UFC 3-301-01 2-6.2
TERRAIN CATEGORY STR SPECIFIC ASCE 7 26.7.2
GROUND SNOW LOAD, Pg 0 PSF UFC 3-301-01 2-4.5
A. SNOW & FROST PENETRATION - NOT APPLICABLE
VALUE UNITS SOURCE PROVISION/SECTION
THE CRITERIA IN THIS SECTION REPRESENT GENERAL ENVIRONMENTAL LOADING DATA SPECIFIC TO THE PROJECT SITE AND DO NOT LIST BUILDING SPECIFIC CRITERA. BUILDING SPECIFIC CRITERIA IS A FUNCTION OF RISK CATEGORY, SEISMIC DESIGN CATEGORY, AND OTHER BUILDING CHARACTERISTICS. SEE "DESIGN LOADS & CRITERIA - STRUCTURE SPECIFIC ENVIRONMENTAL LOAD DATA" FOR
BUILDING SPECIFIC ENVIRONMENTAL LOAD AND PERFORMANCE CRITERIA.
DESIGN LOADS AND CRITERIA - GENERAL ENVIRONMENTAL LOAD DATA
S Y
M D
E S
C R
IP
TI
O N
D A
TE
A
P P
R
P R
O J E
C T
S
IT
E
C O
M M
A N
D C
E N
T E
R
A N
D E
R S
E N
A
IR
F O
R C
E B
A S
E G
U
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L
F A
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S Y
S T
E M
S C
O M
M A
N D
DRAWFORM REVISION: 25 AUGUST 2020
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
N A
V F
A C
P A
C
IF
IC
M
A K
A L A
P A
H
A W
A
II
AS NOTED
F Y
P
R O
J E
C T
G D
S C
O M
M A
N D
C E
N T
E R
N A
V F
A C
P A
C
IF
IC
1764210
KYM
JC
Jacobs/B&V, A Joint Venture (Federal Services) 1003 Bishop Street Suite 1340 Honolulu, HI 96813
BC
A/E Task Order No. N6274223F0324
FOR REVIEW
ONLY
Name
Registration Number #
These documents are for Design Review and not intended for
Construction Bidding or Permit Purposes. They were prepared by, or under the supervision of:
Date
SEAL
24 JUN 2024
A N
D E
R S
E N
A
IR
F O
R C
E B
A S
E
AWK/DMK
/1
/2
:5 :5
P
M
C R e v it \l o c a l_
\P
P P
A
S k a m a ra d
.r v t
14PP-S-003
P O
W E
R P
LA
N
T
G E
N E
R A
L N
O T
E S
KMOAJT SBR
G U
A M
P P
-S -0
100% DESIGN SUBMITTAL
UNIFORM LOAD 200 PSF
BALLISTIC WALL FOUNDATION
UNIFORM LOAD 200 PSF
FUEL TANKS FOUNDATION
UNIFORM LOAD 200 PSF
GENERATOR ENCLOSURE FOUNDATION
UNIFORM LOAD 200 PSF
SWITCHGEAR BUILDING FLOOR
B. LIVE
FOOTING OVERBURDEN SOIL WEIGHT, 3.5 FT THICK 427 PSF
STEM WALL WEIGHT, 24" THICK, 5.83' HEIGHT 1.75 KIP/FT
PRECAST WALL WEIGHT, 14" THICK, 19.17' HEIGHT 3.35 KIP/FT
BALLISTIC WALL
FUEL WEIGHT 7.2 LB/GAL
TANK WEIGHT, 30,000 GALLON, EMPTY (ASSUMED) 66 KIP
FUEL TANKS
1.825 MW PRIME POWER GENERATOR ENCLOSURE (ASSUMED) 140 KIP
GENERATOR ENCLOSURE
FOOTING OVERBURDEN SOIL WEIGHT, 3.5 FT THICK 427 PSF
INTERIOR CMU WALLS, 8" THICK, FULLY GROUTED 92 PSF
PRECAST CONCRETE WALLS, 12" THICK 150 PSF
PRECAST CONCRETE DOUBLE TEE, 8DT24 418 LB/FT
MEP LOADS ON ROOF 20 PSF
SPRAY-ON INSULATION, 8" THICK 5.5 PSF
WEIGHT APPLIED TO UNDERSIDE OF DOUBLE TEE ROOF MEMBERS
ROOF SLAB, 6" THICK 75 PSF
OTHER 2 PSF
EDPM 0.5 PSF
WEIGHT OF ROOF MATERIALS
SWITCHGEAR BUILDING
A. DEAD
ALL STRUCTURES UNO
DESIGN LOADS AND CRITERIA - GRAVITY LOADING, SERVICEABILITY, AND OTHER
PERFORMANCE CRITERIA
I. GROUND WATER ELEVATION - NOT ENCOUNTERED WITH 100' BORING >100 FT
H. FOOTINGS MUST BE PLACED ACCORDING TO DEPTHS SHOWN ON THE DRAWINGS.
G. ALL ABANDONED FOOTINGS, UTILITIES, ETC. THAT INTERFERE WITH NEW CONSTRUCTION MUST BE REMOVED.
F. FOOTING BACK FILL AND UTILITY TRENCH BACK FILL WITHIN BUILDING AREA MUST BE MECHANICALLY COMPACTED IN LAYERS.
FLOODING WILL NOT BE PERMITTED.
E. CONTRACTOR MUST PROVIDE FOR PROPER DE-WATERING OF EXCAVATIONS FROM SURFACE WATER, GROUND WATER, SEEPAGE, ETC.
D. REINFORCEMENT MUST BE PLACED IN SLABS-ON-GRADE AS SHOWN IN STANDARD DETAIL, UNO.
C. ALL FILL PLACED UNDER BUILDING SLABS MUST BE ENGINEERED STRUCTURAL FILL AND BE COMPACTED TO NOT LESS THAN 95
PERCENT MAXIMUM DENSITY.
B. A REGISTERED GEOTECHNICAL ENGINEER MUST INSPECT BEARING MATERIALS BEFORE CONCRETE IS PLACED. BACKFILL AGAINST ANY WALLS OR CONSTRUCTION MUST NOT BE PLACED UNLESS THE WALLS ARE ADEQUATELY BRACED TO WITHSTAND THE LOADS DUE TO BACKFILLING OPERATION. FOUNDATION CONSTRUCTION MUST BE ADJUSTED BY THE STRUCTURAL
ENGINEER IF REQUIRED BY THE INSPECTING GEOTECHNICAL ENGINEER.
2. DEEP FOUNDATION SYSTEM: NOT USED
1. ISOLATED SPREAD FOOTINGS ALLOWABLE BEARING 4200 PSF
A. GEOTECHNICAL REPORT: GEOTECHNICAL RECOMMENDATIONS FOR FLEMING HEIGHTS SITE (DOG 14 SITE) DATED 16-DEC-2023
FOUNDATIONS
S Y
M D
E S
C R
IP
TI
O N
D A
TE
A
P P
R
P R
O J E
C T
S
IT
E
C O
M M
A N
D C
E N
T E
R
A N
D E
R S
E N
A
IR
F O
R C
E B
A S
E G
U
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L
F A
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S Y
S T
E M
S C
O M
M A
N D
DRAWFORM REVISION: 25 AUGUST 2020
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
N A
V F
A C
P A
C
IF
IC
M
A K
A L A
P A
H
A W
A
II
AS NOTED
F Y
P
R O
J E
C T
G D
S C
O M
M A
N D
C E
N T
E R
N A
V F
A C
P A
C
IF
IC
1764210
KYM
JC
Jacobs/B&V, A Joint Venture (Federal Services) 1003 Bishop Street Suite 1340 Honolulu, HI 96813
BC
A/E Task Order No. N6274223F0324
FOR REVIEW
ONLY
Name
Registration Number #
These documents are for Design Review and not intended for
Construction Bidding or Permit Purposes. They were prepared by, or under the supervision of:
Date
SEAL
24 JUN 2024
A N
D E
R S
E N
A
IR
F O
R C
E B
A S
E
AWK/DMK
/1
/2
:5 :5
P
M
C R e v it \l o c a l_
\P
P P
A
S k a m a ra d
.r v t
14PP-S-004
P O
W E
R P
LA
N
T
G E
N E
R A
L N
O T
E S
KMOAJT SBR
G U
A M
P P
-S -0
100% DESIGN SUBMITTAL
W. ANY VERTICAL OR HORIZONTAL REINFORCING WHICH REQUIRES CUTTING DUE TO INTERFERENCE WITH A BOXOUT MUST BE REPLACED WITH AN EQUAL AREA OF STEEL REINFORCING. REPLACEMENT REINFORCING MUST BE PLACED PARALLEL TO ORIGINAL REINFORCING AND SYMMETRICALLY AROUND BOXOUT. THE REPLACEMENT
REINFORCING MUST EXTEND A CLASS A SPLICE LENGTH PAST THE BOXOUT.
V. DETAILS OF REINFORCEMENT FABRICATION MUST CONFORM TO ACI 301.
U. ALL REINFORCING BARS MUST BE EQUALLY SPACED UNLESS NOTED OTHERWISE. SPACING OF REINFORCEMENT IS NOMINAL AND MAY BE ADJUSTED AS NECESSARY TO AVOID INTERFERENCE WITH EMBEDMENTS. IF INTERFERENCES REQUIRE THE CUTTING OF REINFORCEMENT, ADDITIONAL REINFORCEMENT MUST BE ADDED TO MAINTAIN
THE QUANTITIES SHOWN ON THE DRAWINGS.
T. A 3” SEPARATION MUST BE MAINTAINED BETWEEN ALL METALLIC PIPING AND ALL OTHER METALS INCLUDING BUT NOT LIMTED TO THE GROUNDING SYSTEM.
S. ALL EXPANSION JOINT MATERIAL MUST BE 1/2” WIDE UNLESS NOTED OTHERWISE.
R. ALL SLAB DEPTH CHANGES MUST HAVE A ONE TO ONE SLOPE UNLESS NOTED OTHERWISE.
Q. ALL CONCRETE IS REINFORCED CONCRETE UNLESS SPECIFICALLY CALLED OUT AS UNREINFORCED. WHERE CONCRETE DETAILING DOES NOT PROVIDE REINFORCING AND IT IS NOT SPECIFICALLY INDICATED AS UNREINFORCED, REQUEST SPECIFIC DETAILING FROM GOVERNMENT.
P. REFER TO CONCRETE SPECIFICATION FOR CONCRETE FINISH REQUIREMENTS.
O. PROVIDE ADDITIONAL #4 BARS AT RE-ENTRANT CORNERS AND AT THE ENDS OF DISCONTINUOUS JOINTS PER THE TYPICAL DETAILS ON DRAWING S-502.
N. SOG CONTRACTION JOINTS MUST BE PLACED WITHIN 8 HOURS OF PLACING CONCRETE.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .