N6274224R6720_0003 Released.pdf
PDF 389 KB Posted
- Attached to
- D/B UFC Entry Control Point, Perimeter Wall, and Access Roads, Basa Air Base, Philippines
- Solicitation number
- N6274224R6720
About this file
This document is an amendment (Amendment 0003) to Solicitation N6274224R6720 for the construction of an Entry Control Point, Perimeter Wall, and Access Roads at Basa Air Base in Floridablanca, Pampanga, Philippines.
The key changes made in this amendment include: 1) extending the proposal due date from August 29, 2024 to September 9, 2024 by 11:00 AM Thailand time; 2) modifying the evaluation factors for Non-Cost Factor 1 (Offeror Experience) to increase the acceptable construction project size range from $400,000 - $1,500,000 to $400,000 - $5,000,000, with at least one project over $1,000,000; and 3) revising the technical solution requirements for the Conceptual Design Drawings under Non-Cost Factor 4. All other terms and conditions of the solicitation remain unchanged.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| N6274224R6720_0002 released.pdf | ||
| N6274224R6720_0002 - Exhibit D BOQ rev..xlsx | XLSX spreadsheet | |
| N6274224R6720 Amd 0001 released.pdf | ||
| EXHIBIT A-D.pdf | ||
| Exhibit D Blank BOQ.xlsx | XLSX spreadsheet | |
| Exhibit A Pre Proposal Inquiry Form.xlsx | XLSX spreadsheet | |
| N6274224R6720 Released w attachments.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ACQR6065299
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
N6274224R6720 D/B UFC Construction of Entry Control Point, Perimeter Wall, and Access Roads in Basa Air Base, Floridablanca, Pampanga, Philippines.
Detail of Amendment 0003 begins on the follow ing page.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 4
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 04-Sep-2024
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X N6274224R6720
X 9B. DATED (SEE ITEM 11)
26-Jul-2024
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
04-Sep-2024
CODE
NAVFAC ROICC THAILAND (US EMBASSY)
7 SATHORN TAI ROAD
BANGKOK THAILAND 10120
N62742 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N6274224R6720
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)
The following have been added by full text:
AMD 0003 NCF
The following changes will be considered part of this solicitation:
A. Proposal due date is changed from 29 August 2024 to 9 September 2024, no later than 11:00 a.m. Thailand time.
B. The following changes are hereby incorporated to this solicitation, Part 1 under this solicitation.
AMENDMENT 0003
SUMMARY OF CHANGES
PART 1
PROPOSAL FORMS AND DOCUMENTS
1. Section 00 22 00 - 2.3 EVALUATION FACTORS AND PROPOSAL SUBMISSION REQUIREMENTS, Volume 2:
(2.1) Non-Cost Factor 1 - Offeror Experience:
Change from
a. Similar in Size: Construction Projects between $400,000 and $1,500,000 in final construction cost. One project must be at least $1,000,000. Any project outside this range may not be considered.
b. Similar in Scope: Construction projects involving civil work that includes reinforced concrete road, minimum area of 500 square meter.
c. Similar in Complexity: Construction projects involving [site development or civil work] performed in Southeast Asia, Nepal, Maldives, and Timor Leste.
To
a. Similar in Size: Construction Projects between $400,000 and $5,000,000 in final construction cost. One (1) project must be at least $1,000,000. Any project outside this range may not be considered.
b. Similar in Scope: At least one (1) construction of a reinforced concrete pavement with a minimum area of 500 square meter and at least one (1) of a reinforced concrete structure, steel structure, or prefabricated engineering building with a minimum gross area of 200 square meter.
c. Similar in Complexity: Construction projects involving [site development or civil work] performed in Southeast Asia, Nepal, Maldives, and Timor Leste.
2. Section 00 22 00 - 2.3 EVALUATION FACTORS AND PROPOSAL SUBMISSION REQUIREMENTS, Volume 2:
(2.4) Non-Cost Factor 4 – Technical Solution:
Change from:
(c) Submittal Requirements:
i. Provide the following conceptual design drawing details:
1. Site layout plan showing footprint of proposed building, perimeter fence, entrance gates, internal road, locations of transformer, and existing road within 50 m radius from the proposed buildings. The drawing shall also include connecting point of main power supply system.
(d) Basis of Evaluation: The Government will evaluate the narrative, and conceptual drawings considering the extent to which the Offeror demonstrates a clear understanding of the architectural and engineering requirements of the project. The Government will evaluate the Offeror's technical solution to determine adherence to the technical requirements of the RFP.
i. Acceptable. Narrative, and all required drawings, are submitted; the narrative accurately describes the requirements, the drawings address all key aspects of the project and are adequate to use for creating detailed design drawings, The Offeror illustrates understanding of the statement of the requirements.
ii. Unacceptable. The Offeror did not submit a narrative, all required drawings or the drawings submitted do not address all key aspects of the project or are not adequate to use for creating detailed design drawings. The Offeror did not illustrate understanding of the statement of the requirements.
To
(c)(a) Submittal Requirements:
i. Provide the following conceptual design drawing details:
1. Site layout plan showing footprint of proposed building, perimeter fence, entrance gates, internal road, locations of transformer, and existing road within 50 m radius from the proposed buildings.
The drawing shall also include connecting point of main power supply system.
(d)(b) Basis of Evaluation: The Government will evaluate the narrative, and conceptual drawings considering the extent to which the Offeror demonstrates a clear understanding of the architectural and engineering requirements of the project. The Government will evaluate the Offeror's technical solution to determine adherence to the technical requirements of the RFP.
i. Acceptable. Narrative, and all required Conceptual design drawings, are submitted; the narrative accurately describes the requirements, the drawings address all key aspects of the project and are adequate to use for creating detailed design drawings,. The Offeror illustrates understanding of the statement of the requirements.
ii. Unacceptable. The Offeror did not submit a narrative, all required conceptual design drawings or the drawings submitted do not address all key aspects of the project or are not adequate to use for creating detailed design drawings. The Offeror did not illustrate understanding of the statement of the requirements.
C. All other terms and conditions remain unchanged.
SECTION 00 10 00 - SOLICITATION
The required response date/time has changed from 29-Aug-2024 11:00 AM to 09-Sep-2024 11:00 AM.
(End of Summary of Changes)