This document contains several exhibits related to a federal solicitation for the D/B UFC Construction of Entry Control Point, Perimeter Wall, and Access Roads in Basa Air Base, Floridablanca, Pampanga, Philippines (Solicitation N6274224R6720).
Exhibit A is a Pre-Proposal Inquiry Form for the opportunity. Exhibit B is an Offeror Experience Project Data Sheet that contractors can use to provide details on their past experience. Exhibit C contains a Past Performance Questionnaire (PPQ) that clients can complete to evaluate a contractor's past performance. Exhibit D is a blank Bill of Materials/Quantities that contractors can use to provide pricing for the construction work, which includes foundations, superstructure, exterior closure, roofing, interior finishes, HVAC, fire protection, and electrical systems, as well as site preparation and improvements. The solicitation has a pre-solicitation site visit scheduled for August 8, 2024 and a proposal due date of August 26, 2024. The work is being procured by the Department of the Navy Naval Facilities Engineering Command.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| N6274224R6720_0003 Released.pdf | ||
| N6274224R6720_0002 - Exhibit D BOQ rev..xlsx | XLSX spreadsheet | |
| N6274224R6720_0002 released.pdf | ||
| N6274224R6720 Amd 0001 released.pdf | ||
| N6274224R6720 Released w attachments.pdf | ||
| Exhibit D Blank BOQ.xlsx | XLSX spreadsheet | |
| Exhibit A Pre Proposal Inquiry Form.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PRE PROPOSAL INQUIRY FORM N62742224R6720
Exhibit A.
DATE:
Question No. Reference (Sect/Para/Page)
QUESTION GOVERNMENT RESPONSE
EMAIL:
OFFEROR NAME:
ADDRESS:
PHONE NUMBER:
SOURCE SELECTION INFORMATION - SEE FAR 2.101 AND 3.104
D/B UFC Construction of Entry Control Point, Perimeter Wall, and Access Roads N6274224R6720 Basa Air Base, Floridablanca, Pampanga, Philippines Page 1 of 1
EXHIBIT B - OFFEROR EXPERIENCE PROJECT DATA SHEET
Provide the following information on projects to demonstrate past experience on recent, relevant construction projects. Use continuation sheets, if needed.
PLACE PHOTO HERE
Offeror Name: ______________________________
Contract Number: ___________________________ Project Title/Location: ________________________ Short Project Description: ________________________
Effort involved Design Build:
___Yes, self-performed as the Prime contractor ___Yes, subcontracted and managed by the Prime contractor ___No, did not include DB
Contract Amount: __________________
Original Contract Completion Date: __________________ Final Contract Completion Date: __________________ Date Completed: __________________
Percentage of Work Performed: __________________
Prime or Subcontract Work: __________________
Customer/Client: __________________
Customer/Client Contact Information: (include for each POC: NAME, PHONE NUMBER, EMAIL
ADDRESS, AND MAILING ADDRESS)
D/B UFC Construction of Entry Control Point, Perimeter Wall, and Access Roads N6274224R6720 Basa Air Base, Floridablanca, Pampanga, Philippines Exhibit C
EXHIBIT C – PAST PERFORMANCE QUESTIONNAIRE
1. The NAVFAC Form PPQ shall be utilized for all evaluations that require a Past Performance Questionnaire (PPQ).
2. Offerors should submit the PPQ with their offer. If the offeror is unable to obtain a completed PPQ from a client for a project(s) before proposal closing date, the offeror should complete and submit with the proposal the first page of the PPQ, which will provide contract and client information for the respective project(s). Offerors should follow-up with clients/references to ensure timely submittal of questionnaires. If the client requests, questionnaires may be submitted directly to the Government’s point of contact, Artitar Udit via email at artitar@state.gov prior to proposal closing date.
3. Offerors should provide PPQs with their proposal as required by RFP. Offerors shall not incorporate by reference into their proposal PPQs previously submitted for other RFPs. However, this does not preclude the Government from utilizing previously submitted PPQ information in the past performance evaluation."
mailto:artitar@state.gov
D/B UFC Construction of Entry Control Point, Perimeter Wall, and Access Roads N6274224R6720
EXHIBIT C
NAVFAC/USACE PAST PERFORMANCE QUESTIONNAIRE (Form PPQ-0)
CONTRACT INFORMATION (Contractor to complete Blocks 1-4)
1. Contractor Information Firm Name: CAGE Code:
Address: DUNs Number:
Phone Number:
Email Address:
Point of Contact: Contact Phone Number:
2. Work Performed as: Prime Contractor Sub Contractor Joint Venture Other (Explain) Percent of project work performed:
If subcontractor, who was the prime (Name/Phone #):
3. Contract Information Contract Number:
Delivery/Task Order Number (if applicable):
Contract Type: Firm Fixed Price Cost Reimbursement Other (Please specify):
Contract Title:
Contract Location:
Award Date (mm/dd/yy):
Contract Completion Date (mm/dd/yy):
Actual Completion Date (mm/dd/yy):
Explain Differences:
Original Contract Price (Award Amount):
Final Contract Price (to include all modifications, if applicable):
Explain Differences:
4. Project Description:
Complexity of Work High Med Routine How is this project relevant to project of submission? (Please provide details such as similar equipment, requirements, conditions, etc.)
CLIENT INFORMATION (Client to complete Blocks 5-8)
5. Client Information Name:
Title:
Phone Number:
Email Address:
6. Describe the client’s role in the project:
7. Date Questionnaire was completed (mm/dd/yy):
8. Client’s Signature:
NOTE: NAVFAC REQUESTS THAT THE CLIENT COMPLETES THIS QUESTIONNAIRE AND SUBMITS DIRECTLY BACK TO THE OFFEROR. THE OFFEROR WILL SUBMIT THE COMPLETED QUESTIONNAIRE TO NAVFAC WITH THEIR PROPOSAL, AND MAY DUPLICATE THIS QUESTIONNAIRE FOR FUTURE SUBMISSION ON NAVFAC SOLICITATIONS. CLIENTS ARE HIGHLY ENCOURAGED TO SUBMIT QUESTIONNAIRES DIRECTLY TO THE OFFEROR. HOWEVER, QUESTIONNAIRES MAY BE SUBMITTED DIRECTLY TO NAVFAC. PLEASE CONTACT THE OFFEROR FOR NAVFAC POC INFORMATION. THE GOVERNMENT RESERVES THE RIGHT TO VERIFY ANY
AND ALL INFORMATION ON THIS FORM.
D/B UFC Construction of Entry Control Point, Perimeter Wall, and Access Roads N6274224R6720
ADJECTIVE RATINGS AND DEFINITIONS TO BE USED TO BEST REFLECT
YOUR EVALUATION OF THE CONTRACTOR’S PERFORMANCE
RATING DEFINITION NOTE
(E) Exceptional Performance meets contractual requirements and exceeds many to the Government/Owner’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with few minor problems for which corrective actions taken by the contractor was highly effective.
An Exceptional rating is appropriate when the Contractor successfully performed multiple significant events that were of benefit to the Government/Owner. A singular benefit, however, could be of such magnitude that it alone constitutes an Exceptional rating.
Also, there should have been NO significant weaknesses identified.
(VG) Very Good Performance meets contractual requirements and exceeds some to the Government’s/Owner’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with some minor problems for which corrective actions taken by the contractor were effective.
A Very Good rating is appropriate when the Contractor successfully performed a significant event that was a benefit to the Government/Owner. There should have been no significant weaknesses identified.
(S) Satisfactory Performance meets minimum contractual requirements. The contractual performance of the element or sub-element contains some minor problems for which corrective actions taken by the contractor appear or were satisfactory.
A Satisfactory rating is appropriate when there were only minor problems, or major problems that the contractor recovered from without impact to the contract.
There should have been NO significant weaknesses identified. Per DOD policy, a fundamental principle of assigning ratings is that contractors will not be assessed a rating lower than Satisfactory solely for not performing beyond the requirements of the contract.
(M) Marginal Performance does not meet some contractual requirements. The contractual performance of the element or sub-element being assessed reflects a serious problem for which the contractor has not yet identified corrective actions. The contractor's proposed actions appear only marginally effective or were not fully implemented.
A Marginal is appropriate when a significant event occurred that the contractor had trouble overcoming which impacted the Government/Owner.
(U) Unsatisfactory Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the element or sub-element contains serious problem(s) for which the contractor's corrective actions appear or were ineffective.
An Unsatisfactory rating is appropriate when multiple significant events occurred that the contractor had trouble overcoming and which impacted the Government/Owner. A singular problem, however, could be of such serious magnitude that it alone constitutes an unsatisfactory rating.
(N) Not Applicable No information or did not apply to your contract
Rating will be neither positive nor negative.
D/B UFC Construction of Entry Control Point, Perimeter Wall, and Access Roads N6274224R6720
Contractor Information (Firm Name): ________________________________________________ Client Information (Name): ________________________________________________________
TO BE COMPLETED BY CLIENT
PLEASE CIRCLE THE ADJECTIVE RATING WHICH BEST REFLECTS
YOUR EVALUATION OF THE CONTRACTOR’S PERFORMANCE.
1. QUALITY:
a) Quality of technical data/report preparation efforts E VG S M U N
b) Ability to meet quality standards specified for technical performance E VG S M U N
c) Timeliness/effectiveness of contract problem resolution without extensive customer guidance E VG S M U N
d) Adequacy/effectiveness of quality control program and adherence to contract quality assurance requirements (without adverse effect on performance)
E VG S M U N
2. SCHEDULE/TIMELINESS OF PERFORMANCE:
a) Compliance with contract delivery/completion schedules including any significant intermediate milestones. (If liquidated damages were assessed or the schedule was not met, please address below)
E VG S M U N
b) Rate the contractor’s use of available resources to accomplish tasks identified in the contract E VG S M U N
3. CUSTOMER SATISFACTION:
a) To what extent were the end users satisfied with the project? E VG S M U N
b) Contractor was reasonable and cooperative in dealing with your staff (including the ability to successfully resolve disagreements/disputes;
responsiveness to administrative reports, businesslike and communication)
E VG S M U N
c) To what extent was the contractor cooperative, businesslike, and concerned with the interests of the customer? E VG S M U N
d) Overall customer satisfaction E VG S M U N
4. MANAGEMENT/ PERSONNEL/LABOR
a) Effectiveness of on-site management, including management of subcontractors, suppliers, materials, and/or labor force? E VG S M U N
b) Ability to hire, apply, and retain a qualified workforce to this effort E VG S M U N
c) Government Property Control E VG S M U N
d) Knowledge/expertise demonstrated by contractor personnel E VG S M U N
e) Utilization of Small Business concerns E VG S M U N
f) Ability to simultaneously manage multiple projects with multiple disciplines E VG S M U N
g) Ability to assimilate and incorporate changes in requirements and/or priority, including planning, execution and response to Government changes E VG S M U N
h) Effectiveness of overall management (including ability to effectively lead, manage and control the program) E VG S M U N
5. COST/FINANCIAL MANAGEMENT
a) Ability to meet the terms and conditions within the contractually agreed price(s)? E VG S M U N
D/B UFC Construction of Entry Control Point, Perimeter Wall, and Access Roads N6274224R6720
Contractor Information (Firm Name): ________________________________________________ Client Information (Name): ________________________________________________________
b) Contractor proposed innovative alternative methods/processes that reduced cost, improved maintainability or other factors that benefited the client E VG S M U N
c) If this is/was a Government cost type contract, please rate the Contractor’s timeliness and accuracy in submitting monthly invoices with appropriate back-up documentation, monthly status reports/budget variance reports, compliance with established budgets and avoidance of significant and/or unexplained variances (under runs or overruns)
E VG S M U N
d) Is the Contractor’s accounting system adequate for management and tracking of costs? If no, please explain in Remarks section. Yes No
e) If this is/was a Government contract, has/was this contract been partially or completely terminated for default or convenience or are there any pending terminations? Indicate if show cause or cure notices were issued, or any default action in comment section below.
Yes No
f) Have there been any indications that the contractor has had any financial problems? If yes, please explain below. Yes No
6. SAFETY/SECURITY
a) To what extent was the contractor able to maintain an environment of safety, adhere to its approved safety plan, and respond to safety issues?
(Includes: following the users rules, regulations, and requirements regarding housekeeping, safety, correction of noted deficiencies, etc.)
E VG S M U N
b) Contractor complied with all security requirements for the project and personnel security requirements. E VG S M U N
7. GENERAL
a) Ability to successfully respond to emergency and/or surge situations (including notifying COR, PM or Contracting Officer in a timely manner regarding urgent contractual issues).
E VG S M U N
b) Compliance with contractual terms/provisions (explain if specific issues) E VG S M U N
c) Would you hire or work with this firm again? (If no, please explain below) Yes No
d) In summary, provide an overall rating for the work performed by this contractor. E VG S M U N
Please provide responses to the questions above (if applicable) and/or additional remarks. Furthermore, please provide a brief narrative addressing specific strengths, weaknesses, deficiencies, or other comments which may assist our office in evaluating performance risk (please attach additional pages if necessary):
D/B UFC Construction of Entry Control Point, Perimeter Wall, and Access Roads in Basa
Basa Air BAse, Floridablanca, Pampanga, Philippines
N6274224R6720
Exhibit D.
BILL OF MATERIALS
CLIN0001, Base Bid Item 0001: CONSTRUCTION OF ECP AND REINFORCED CMU PERIMETER WALL EAST OF GATE 25
NUMBER UNIT UNIT COST TOTAL ($) UNIT COST TOTAL ($) UNIT COST TOTAL ($)
A10 FOUNDATIONS
A1010 Standard Foundations - search area canopy footing (concrete) CM footing (rebar) KG grade beam (concrete) CM grade beam (rebar) KG
A1010 Standard Foundations - guard booth footing (concrete) CM footing (rebar) KG grade beam (concrete) CM grade beam (rebar) KG
A1030 Slab on Grade - guard booth Slab (concrete) CM Slab (rebars) KG floor moisture barrier SM
A1010 perimeter wall footing / foundation rebar kg form sqm floor moisture barrier SM Pour concrete, 24MPa cu.m
A1010 perimeter wall pedestal rebar kg form sqm Pour concrete, 24MPa cu.m
A1010 CMU grade beam rebar kg form sqm floor moisture barrier SM Pour concrete, 24MPa cu.m
A1010 U/G CMU wall CHB 6"x8"x16", 7MPa sqm Masonry (Rebars) KG CHB Grout Fill CM Masonry wall (plastering) sqm
B10 SUPERSTRUCTURE
Search area canopy Column - structural steel kg Beam - structural steel KG Purlins - structural steel KG Accessories KG Guard Booth Columns (concrete) CM Columns (rebars) KG Structural Frames (concrete Beam) CM Structural Frames (beam rebars) KG Forms and Scaffoldings SM roof deck (concrete) CM roof deck (rebar) KG lintel (concrete) CM lintel (rebar) KG
B1010 perimeter wall columns rebar kg form sqm Pour concrete, 24MPa cu.m
B20 EXTERIOR CLOSURE
B2010 Exterior Walls
CHB Grout Fill CM Masonry (Rebars) KG CHB 8", 7MPa SM Painting Skim Coat SM Plastering SM Top Coat (2 coats ) SM
B2020 Exterior Windows General Area - Windows (aluminum framed sliding, glass) and hardware with screens; 1.2m x 1.6m (powder coated) EA
B2030 Exterior Doors metal door panel with door closer and lockset on 2"x4" galvanized door jamb (paint finished. set
B2010 perimeter wall CHB 6"x8"x16", 7MPa sqm Masonry (Rebars) KG CHB Grout Fill CM Masonry wall (plastering) sqm
B30 ROOFING
B3010 Roof Coverings & Roof Drains
LEVEL 2 GROUP ELEMENTS QUANTITY MATERIAL COST LABOR COST ENGINEERING ESTIMATE
Level 3 Element
N6274224R6720
Exhibit D.
Steel Roof Structure SM Roofing, Cliplock type, including accessories SM Insulation, Rockwool SM
C30 INTERIOR FINISHES
C3010 Wall Finishes guard booth - paint
Skim Coat SM Plastering SM Top Coat (2 coats ) SM
C3020 Floor Finishes guard booth - sealed concrete SM
C3030 Ceiling Finishes guard booth - paint
Skim Coat SM Plastering SM Top Coat (2 coats ) SM
D30 HVAC
D3030 Cooling Generating Systems
Ceiling fans EA window type AC EA
D40 FIRE PROTECTION
D4090 Other Fire Protection Systems portable fire extinguisher SM
D50 ELECTRICAL
D5010 Electrical Service and Distribution
Rough-ins SM Wiring SM Panel boards and circuit breakers Lot Transformer incl. accessories EA Electrical connection to base SM
D5020 Lighting & Branch Wiring Lights, fixures and wiring devices - include perimeter lighting SM
D5090 lightning arrester set D5010 Electrical Service & Distribution grounding SM Remove, store, and replace of existing UG electrical line SM
F10 Special Construction F1010 perimeter wall accessories blade wire, hot dipped galvanized kg double extension arm, hot-dipped galvanized ea
Table 2: SITEWORK
NUMBER UNIT UNIT COST TOTAL ($) UNIT COST TOTAL ($) UNIT COST TOTAL ($)
G10 SITE PREPARATION
G1010 Site Clearing
Clearing, grubbing and Tree Cutting SM G1030 Site Earthwork
Excavation CM Backfilling and Compaction CM
G20 SITE IMPROVEMENTS
Road (concrete) CM Road (rebar) KG forms sqm compacted gravel CM
X FIELD REQUIREMENTS, OFFICE OVERHEAD & PROFIT
X10 Field Requirements
Mobilization / Demobilization LS Predesign surveys, capability assessment, etc LS Detailed Engineering Design Package, and Project Management LS
X20 Office Overhead TempFacil, permits, and utilities months LS
CLIN0001 Total CLIN0002, Base Bid Item 0002: CONSTRUCTION OF REINFORCED CMU PERIMETER WALL WEST OF GATE 25
NUMBER UNIT UNIT COST TOTAL ($) UNIT COST TOTAL ($) UNIT COST TOTAL ($)
A10 FOUNDATIONS
A1010 Standard Foundation perimeter wall foundation rebar kg form sqm Pour concrete, 24MPa cu.m
A1010 perimeter wall pedestal rebar kg form sqm Pour concrete, 24MPa cu.m
A1010 CMU grade beam rebar kg form sqm Pour concrete, 24MPa cu.m
A1010 U/G CMU wall
Level 3 Element
LEVEL 2 GROUP ELEMENTS QUANTITY MATERIAL COST LABOR COST ENGINEERING ESTIMATE
ENGINEERING ESTIMATELEVEL 2 GROUP ELEMENTS QUANTITY MATERIAL COST LABOR COST
N6274224R6720
Exhibit D.
CHB 6"x8"x16", 7MPa sqm Masonry (Rebars) KG CHB Grout Fill CM Masonry wall (plastering) sqm
B10 SUPERSTRUCTURE
B1010 perimeter wall columns rebar kg form sqm Pour concrete, 24MPa cu.m
B20 EXTERIOR CLOSURE
B2010 perimeter wall
CHB 6"x8"x16", 7MPa sqm Masonry (Rebars) KG CHB Grout Fill CM Masonry wall (plastering) sqm
D50 ELECTRICAL
D5010 Electrical Service & Distribution grounding SM Remove, store, and replace of existing UG electrical line SM
F10 Special Construction perimeter wall accessories blade wire, hot dipped galvanized kg double extension arm, hot-dipped galvanized ea
Table 2: SITEWORK
NUMBER UNIT UNIT COST TOTAL ($) UNIT COST TOTAL ($) UNIT COST TOTAL ($)
G10 SITE PREPARATION
G1010 Site Clearing
Clearing, grubbing and Tree Cutting SM G1030 Site Earthwork
Excavation CM Backfilling and Compaction CM
X FIELD REQUIREMENTS, OFFICE OVERHEAD & PROFIT
X10 Field Requirements
Mobilization / Demobilization LS Predesign surveys, capability assessment, etc LS Detailed Engineering Design Package, and Project Management LS
X20 Office Overhead TempFacil, permits, and utilities months LS
CLIN0002 Total CLIN0003, Base Bid Item 0003: CONSTRUCTION OF REINFORCED CONCRETE ACCESS ROADS
NUMBER UNIT UNIT COST TOTAL ($) UNIT COST TOTAL ($) UNIT COST TOTAL ($)
G10 SITE PREPARATION
G1010 Site Clearing
Clearing and grubbing SM Demolition / Removal CUM
G1030 Site Earthwork Excavation CUM Grading, Backfilling, and Compaction CUM
G20 SITE IMPROVEMENTS
G2010.a Road
Concrete CM dowels KG Formworks LM 1-m shoulder - compacted gravel SM
G2010.b Slope Protection - riprap Concrete CM Steel bars KG Formworks LM
G2050 Culvert (cross drains) R.C. Culvert Pipes EA Manhole EA
X FIELD REQUIREMENTS, OFFICE OVERHEAD & PROFIT
X10 Field Requirements
Mobilization / Demobilization LS Predesign surveys, capability assessment, etc LS Project Management LS Detailed Engineering Design Package including certified as-built drawings, survey, soil boring, etc. LS Testing and Commissioning LS
X20 Office Overhead TempFacil, permits, and utilities months LS
CLIN0003 Total CLIN0004, Option Item 0001: CONSTRUCTION OF ADDITIONAL REINFORCED CMU PERIMETER WALL WEST OF GATE 20
NUMBER UNIT UNIT COST TOTAL ($) UNIT COST TOTAL ($) UNIT COST TOTAL ($)
A10 FOUNDATIONS
A1010 Standard Foundation
Level 3 Element
ENGINEERING ESTIMATE
Level 3 Element
LEVEL 2 GROUP ELEMENTS QUANTITY MATERIAL COST LABOR COST ENGINEERING ESTIMATE
Level 3 Element
LEVEL 2 GROUP ELEMENTS QUANTITY MATERIAL COST LABOR COST
ENGINEERING ESTIMATELEVEL 2 GROUP ELEMENTS QUANTITY MATERIAL COST LABOR COST
N6274224R6720
Exhibit D.
perimeter wall foundation rebar kg form sqm Pour concrete, 24MPa cu.m
A1010 perimeter wall pedestal rebar kg form sqm Pour concrete, 24MPa cu.m
A1010 CMU grade beam rebar kg form sqm Pour concrete, 24MPa cu.m
A1010 U/G CMU wall CHB 6"x8"x16", 7MPa sqm Masonry (Rebars) KG CHB Grout Fill CM Masonry wall (plastering) sqm
B10 SUPERSTRUCTURE
B1010 perimeter wall columns rebar kg form sqm Pour concrete, 24MPa cu.m
B20 EXTERIOR CLOSURE
B2010 perimeter wall
CHB 6"x8"x16", 7MPa sqm Masonry (Rebars) KG CHB Grout Fill CM Masonry wall (plastering) sqm
D50 ELECTRICAL
D5010 Electrical Service & Distribution grounding SM Remove, store, and replace of existing UG electrical line SM
F10 Special Construction perimeter wall accessories blade wire, hot dipped galvanized kg double extension arm, hot-dipped galvanized ea
Table 2: SITEWORK
NUMBER UNIT UNIT COST TOTAL ($) UNIT COST TOTAL ($) UNIT COST TOTAL ($)
G10 SITE PREPARATION
G1010 Site Clearing
Clearing, grubbing and Tree Cutting SM G1030 Site Earthwork
Excavation CM Backfilling and Compaction CM
X FIELD REQUIREMENTS, OFFICE OVERHEAD & PROFIT
X10 Field Requirements
Mobilization / Demobilization LS Predesign surveys, capability assessment, etc LS Detailed Engineering Design Package, and Project Management LS
X20 Office Overhead TempFacil, permits, and utilities months LS
CLIN0004 Total Grand Total Cost
LEVEL 2 GROUP ELEMENTS QUANTITY MATERIAL COST LABOR COST ENGINEERING ESTIMATE