Exhibit D Blank BOQ.xlsx

XLSX spreadsheet 46 KB Posted

Attached to
D/B UFC Entry Control Point, Perimeter Wall, and Access Roads, Basa Air Base, Philippines Federal contract opportunity
Solicitation number
N6274224R6720
Issued by
Department of the Navy Naval Facilities Engineering Command

About this file

This document is a Bill of Quantities (BOQ) for Solicitation N6274224R6720 for the D/B UFC Construction of Entry Control Point, Perimeter Wall, and Access Roads at Basa Air Base in the Philippines. The BOQ provides a detailed breakdown of the construction work required, including foundations, superstructure, exterior closure, roofing, electrical, and site work. The solicitation has four construction line items: (1) Construction of ECP and Reinforced CMU Perimeter Wall East of Gate 25, (2) Construction of Reinforced CMU Perimeter Wall West of Gate 25, (3) Construction of Reinforced Concrete Access Roads, and (4) Construction of Additional Reinforced CMU Perimeter Wall West of Gate 20. The total estimated cost is not provided. The solicitation is issued by the Department of the Navy Naval Facilities Engineering Command. The due date for proposal submission is August 26, 2024 by 11:00 AM Thailand time. A pre-solicitation site visit is scheduled for August 8, 2024.

View the file

Other files for this federal contract opportunity

Other files attached to D/B UFC Entry Control Point, Perimeter Wall, and Access Roads, Basa Air Base, Philippines, newest first.
File Type Posted
N6274224R6720_0003 Released.pdf PDF
N6274224R6720_0002 released.pdf PDF
N6274224R6720_0002 - Exhibit D BOQ rev..xlsx XLSX spreadsheet
N6274224R6720 Amd 0001 released.pdf PDF
Exhibit A Pre Proposal Inquiry Form.xlsx XLSX spreadsheet
N6274224R6720 Released w attachments.pdf PDF
EXHIBIT A-D.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Blank BOQ

BILL OF MATERIALS

CLIN0001, Base Bid Item 0001: CONSTRUCTION OF ECP AND REINFORCED CMU PERIMETER WALL EAST OF GATE 25$0.00
LEVEL 2 GROUP ELEMENTSQUANTITYMATERIAL COSTLABOR COSTENGINEERING ESTIMATETOTAL, US $
Level 3 ElementNUMBERUNITUNIT COSTTOTAL ($)UNIT COSTTOTAL ($)UNIT COSTTOTAL ($)
A10FOUNDATIONSERROR:#REF!
A1010Standard Foundations - search area canopyERROR:#REF!
footing (concrete)CMERROR:#REF!
footing (rebar)KGERROR:#REF!
grade beam (concrete)CMERROR:#REF!
grade beam (rebar)KGERROR:#REF!
A1010Standard Foundations - guard boothERROR:#REF!
footing (concrete)CMERROR:#REF!
footing (rebar)KGERROR:#REF!
grade beam (concrete)CMERROR:#REF!
grade beam (rebar)KGERROR:#REF!
A1030Slab on Grade - guard boothERROR:#REF!
Slab (concrete)CMERROR:#REF!
Slab (rebars)KGERROR:#REF!
floor moisture barrierSMERROR:#REF!
A1010perimeter wall footing / foundation
rebarkg
formsqm
floor moisture barrierSMERROR:#REF!
Pour concrete, 24MPacu.m
A1010perimeter wall pedestalERROR:#REF!
rebarkgERROR:#REF!
formsqmERROR:#REF!
Pour concrete, 24MPacu.mERROR:#REF!
A1010CMU grade beam
rebarkg
formsqm
floor moisture barrierSMERROR:#REF!
Pour concrete, 24MPacu.m
A1010U/G CMU wallERROR:#REF!
CHB 6"x8"x16", 7MPasqmERROR:#REF!
Masonry (Rebars)KGERROR:#REF!
CHB Grout FillCMERROR:#REF!
Masonry wall (plastering)sqmERROR:#REF!
B10SUPERSTRUCTUREERROR:#REF!
Search area canopy
Column - structural steelkgERROR:#REF!
Beam - structural steelKGERROR:#REF!
Purlins - structural steelKGERROR:#REF!
AccessoriesKG
Guard Booth
Columns (concrete)CMERROR:#REF!
Columns (rebars)KGERROR:#REF!
Structural Frames (concrete Beam)CMERROR:#REF!
Structural Frames (beam rebars)KGERROR:#REF!
Forms and ScaffoldingsSMERROR:#REF!
roof deck (concrete)CMERROR:#REF!
roof deck (rebar)KGERROR:#REF!
lintel (concrete)CM
lintel (rebar)KG
B1010perimeter wall columnsERROR:#REF!
rebarkgERROR:#REF!
formsqmERROR:#REF!
Pour concrete, 24MPacu.mERROR:#REF!
B20EXTERIOR CLOSUREERROR:#REF!
B2010Exterior WallsERROR:#REF!
CHB Grout FillCMERROR:#REF!
Masonry (Rebars)KGERROR:#REF!
CHB 8", 7MPaSMERROR:#REF!
PaintingERROR:#REF!
Skim CoatSMERROR:#REF!
PlasteringSMERROR:#REF!
Top Coat (2 coats )SMERROR:#REF!
B2020Exterior WindowsERROR:#REF!
General Area - Windows (aluminum framed sliding, glass) and hardware with screens; 1.2m x 1.6m (powder coated)EAERROR:#REF!
B2030Exterior DoorsERROR:#REF!
metal door panel with door closer and lockset on 2"x4" galvanized door jamb (paint finished.setERROR:#REF!
B2010perimeter wall
CHB 6"x8"x16", 7MPasqmERROR:#REF!
Masonry (Rebars)KGERROR:#REF!
CHB Grout FillCMERROR:#REF!
Masonry wall (plastering)sqmERROR:#REF!
B30ROOFINGERROR:#REF!
B3010Roof Coverings & Roof DrainsERROR:#REF!
Steel Roof StructureSMERROR:#REF!
Roofing, Cliplock type, including accessoriesSMERROR:#REF!
Insulation, RockwoolSMERROR:#REF!
C30INTERIOR FINISHES- 0
C3010Wall FinishesERROR:#REF!
guard booth - paint
Skim CoatSM
PlasteringSM
Top Coat (2 coats )SM
C3020Floor Finishes- 0
guard booth - sealed concreteSM
C3030Ceiling FinishesERROR:#REF!
guard booth - paint
Skim CoatSM
PlasteringSM
Top Coat (2 coats )SM
D30HVACERROR:#REF!
D3030Cooling Generating SystemsERROR:#REF!
Ceiling fansEAERROR:#REF!
window type ACEAERROR:#REF!
D40FIRE PROTECTIONERROR:#REF!
D4090Other Fire Protection SystemsERROR:#REF!
portable fire extinguisherSMERROR:#REF!
D50ELECTRICALERROR:#REF!
D5010Electrical Service and DistributionERROR:#REF!
Rough‐insSMERROR:#REF!
WiringSMERROR:#REF!
Panel boards and circuit breakersLotERROR:#REF!
Transformer incl. accessoriesEAERROR:#REF!
Electrical connection to baseSMERROR:#REF!
D5020Lighting & Branch WiringERROR:#REF!
Lights, fixures and wiring devices - include perimeter lightingSMERROR:#REF!
D5090lightning arrestersetERROR:#REF!
D5010Electrical Service & DistributionERROR:#REF!
groundingSMERROR:#REF!
Remove, store, and replace of existing UG electrical lineSMERROR:#REF!
F10Special ConstructionERROR:#REF!
F1010perimeter wall accessories
blade wire, hot dipped galvanizedkg
double extension arm, hot-dipped galvanizedea
Table 2: SITEWORK
LEVEL 2 GROUP ELEMENTSQUANTITYMATERIAL COSTLABOR COSTENGINEERING ESTIMATE
Level 3 ElementNUMBERUNITUNIT COSTTOTAL ($)UNIT COSTTOTAL ($)UNIT COSTTOTAL ($)
G10SITE PREPARATIONERROR:#REF!
G1010Site ClearingERROR:#REF!
Clearing, grubbing and Tree CuttingSMERROR:#REF!
G1030Site EarthworkERROR:#REF!
ExcavationCMERROR:#REF!
Backfilling and CompactionCMERROR:#REF!
G20SITE IMPROVEMENTSERROR:#REF!
Road (concrete)CMERROR:#REF!
Road (rebar)KGERROR:#REF!
formssqmERROR:#REF!
compacted gravelCMERROR:#REF!
XFIELD REQUIREMENTS, OFFICE OVERHEAD & PROFITERROR:#REF!
X10Field RequirementsERROR:#REF!
Mobilization / DemobilizationLSERROR:#REF!
Predesign surveys, capability assessment, etcLSERROR:#REF!
Detailed Engineering Design Package, and Project ManagementLSERROR:#REF!
X20Office OverheadERROR:#REF!
TempFacil, permits, and utilities monthsLSERROR:#REF!
CLIN0001 TotalERROR:#REF!
CLIN0002, Base Bid Item 0002: CONSTRUCTION OF REINFORCED CMU PERIMETER WALL WEST OF GATE 25ERROR:#REF!
LEVEL 2 GROUP ELEMENTSQUANTITYMATERIAL COSTLABOR COSTENGINEERING ESTIMATETOTAL, US $
Level 3 ElementNUMBERUNITUNIT COSTTOTAL ($)UNIT COSTTOTAL ($)UNIT COSTTOTAL ($)
A10FOUNDATIONSERROR:#REF!
A1010Standard FoundationERROR:#REF!
perimeter wall foundation
rebarkg
formsqm
Pour concrete, 24MPacu.m
A1010perimeter wall pedestalERROR:#REF!
rebarkgERROR:#REF!
formsqmERROR:#REF!
Pour concrete, 24MPacu.mERROR:#REF!
A1010CMU grade beam
rebarkg
formsqm
Pour concrete, 24MPacu.m
A1010U/G CMU wallERROR:#REF!
CHB 6"x8"x16", 7MPasqmERROR:#REF!
Masonry (Rebars)KGERROR:#REF!
CHB Grout FillCMERROR:#REF!
Masonry wall (plastering)sqmERROR:#REF!
B10SUPERSTRUCTUREERROR:#REF!
B1010perimeter wall columnsERROR:#REF!
rebarkgERROR:#REF!
formsqmERROR:#REF!
Pour concrete, 24MPacu.mERROR:#REF!
B20EXTERIOR CLOSUREERROR:#REF!
B2010perimeter wall
CHB 6"x8"x16", 7MPasqmERROR:#REF!
Masonry (Rebars)KGERROR:#REF!
CHB Grout FillCMERROR:#REF!
Masonry wall (plastering)sqmERROR:#REF!
D50ELECTRICALERROR:#REF!
D5010Electrical Service & DistributionERROR:#REF!
groundingSMERROR:#REF!
Remove, store, and replace of existing UG electrical lineSMERROR:#REF!
F10Special ConstructionERROR:#REF!
perimeter wall accessories
blade wire, hot dipped galvanizedkg
double extension arm, hot-dipped galvanizedea
Table 2: SITEWORK
LEVEL 2 GROUP ELEMENTSQUANTITYMATERIAL COSTLABOR COSTENGINEERING ESTIMATE
Level 3 ElementNUMBERUNITUNIT COSTTOTAL ($)UNIT COSTTOTAL ($)UNIT COSTTOTAL ($)
G10SITE PREPARATIONERROR:#REF!
G1010Site ClearingERROR:#REF!
Clearing, grubbing and Tree CuttingSMERROR:#REF!
G1030Site EarthworkERROR:#REF!
ExcavationCMERROR:#REF!
Backfilling and CompactionCMERROR:#REF!
XFIELD REQUIREMENTS, OFFICE OVERHEAD & PROFITERROR:#REF!
X10Field RequirementsERROR:#REF!
Mobilization / DemobilizationLSERROR:#REF!
Predesign surveys, capability assessment, etcLSERROR:#REF!
Detailed Engineering Design Package, and Project ManagementLSERROR:#REF!
X20Office OverheadERROR:#REF!
TempFacil, permits, and utilities monthsLSERROR:#REF!
CLIN0002 TotalERROR:#REF!
CLIN0003, Base Bid Item 0003: CONSTRUCTION OF REINFORCED CONCRETE ACCESS ROADS$0.00
LEVEL 2 GROUP ELEMENTSQUANTITYMATERIAL COSTLABOR COSTENGINEERING ESTIMATETOTAL, US $
Level 3 ElementNUMBERUNITUNIT COSTTOTAL ($)UNIT COSTTOTAL ($)UNIT COSTTOTAL ($)
G10SITE PREPARATIONERROR:#REF!
G1010Site ClearingERROR:#REF!
Clearing and grubbingSMERROR:#REF!
Demolition / RemovalCUMERROR:#REF!
G1030Site EarthworkERROR:#REF!
ExcavationCUMERROR:#REF!
Grading, Backfilling, and CompactionCUMERROR:#REF!
G20SITE IMPROVEMENTSERROR:#REF!
G2010.aRoadERROR:#REF!
ConcreteCMERROR:#REF!
dowelsKGERROR:#REF!
FormworksLMERROR:#REF!
1-m shoulder - compacted gravelSMERROR:#REF!
G2010.bSlope Protection - riprapERROR:#REF!
ConcreteCMERROR:#REF!
Steel barsKGERROR:#REF!
FormworksLMERROR:#REF!
G2050Culvert (cross drains)ERROR:#REF!
R.C. Culvert PipesEAERROR:#REF!
ManholeEAERROR:#REF!
XFIELD REQUIREMENTS, OFFICE OVERHEAD & PROFITERROR:#REF!
X10Field RequirementsERROR:#REF!
Mobilization / DemobilizationLSERROR:#REF!
Predesign surveys, capability assessment, etcLSERROR:#REF!
Project ManagementLSERROR:#REF!
Detailed Engineering Design Package including certified as-built drawings, survey, soil boring, etc.LSERROR:#REF!
Testing and CommissioningLSERROR:#REF!
X20Office OverheadERROR:#REF!
TempFacil, permits, and utilities monthsLSERROR:#REF!
CLIN0003 TotalERROR:#REF!
CLIN0004, Option Item 0001: CONSTRUCTION OF ADDITIONAL REINFORCED CMU PERIMETER WALL WEST OF GATE 20$0.00
LEVEL 2 GROUP ELEMENTSQUANTITYMATERIAL COSTLABOR COSTENGINEERING ESTIMATETOTAL, US $
Level 3 ElementNUMBERUNITUNIT COSTTOTAL ($)UNIT COSTTOTAL ($)UNIT COSTTOTAL ($)
A10FOUNDATIONSERROR:#REF!
A1010Standard FoundationERROR:#REF!
perimeter wall foundation
rebarkg
formsqm
Pour concrete, 24MPacu.m
A1010perimeter wall pedestalERROR:#REF!
rebarkgERROR:#REF!
formsqmERROR:#REF!
Pour concrete, 24MPacu.mERROR:#REF!
A1010CMU grade beam
rebarkg
formsqm
Pour concrete, 24MPacu.m
A1010U/G CMU wallERROR:#REF!
CHB 6"x8"x16", 7MPasqmERROR:#REF!
Masonry (Rebars)KGERROR:#REF!
CHB Grout FillCMERROR:#REF!
Masonry wall (plastering)sqmERROR:#REF!
B10SUPERSTRUCTUREERROR:#REF!
B1010perimeter wall columnsERROR:#REF!
rebarkgERROR:#REF!
formsqmERROR:#REF!
Pour concrete, 24MPacu.mERROR:#REF!
B20EXTERIOR CLOSUREERROR:#REF!
B2010perimeter wall
CHB 6"x8"x16", 7MPasqmERROR:#REF!
Masonry (Rebars)KGERROR:#REF!
CHB Grout FillCMERROR:#REF!
Masonry wall (plastering)sqmERROR:#REF!
D50ELECTRICALERROR:#REF!
D5010Electrical Service & DistributionERROR:#REF!
groundingSMERROR:#REF!
Remove, store, and replace of existing UG electrical lineSMERROR:#REF!
F10Special ConstructionERROR:#REF!
perimeter wall accessories
blade wire, hot dipped galvanizedkg
double extension arm, hot-dipped galvanizedea
Table 2: SITEWORK
LEVEL 2 GROUP ELEMENTSQUANTITYMATERIAL COSTLABOR COSTENGINEERING ESTIMATE
Level 3 ElementNUMBERUNITUNIT COSTTOTAL ($)UNIT COSTTOTAL ($)UNIT COSTTOTAL ($)
G10SITE PREPARATIONERROR:#REF!
G1010Site ClearingERROR:#REF!
Clearing, grubbing and Tree CuttingSMERROR:#REF!
G1030Site EarthworkERROR:#REF!
ExcavationCMERROR:#REF!
Backfilling and CompactionCMERROR:#REF!
XFIELD REQUIREMENTS, OFFICE OVERHEAD & PROFITERROR:#REF!
X10Field RequirementsERROR:#REF!
Mobilization / DemobilizationLSERROR:#REF!
Predesign surveys, capability assessment, etcLSERROR:#REF!
Detailed Engineering Design Package, and Project ManagementLSERROR:#REF!
X20Office OverheadERROR:#REF!
TempFacil, permits, and utilities monthsLSERROR:#REF!
CLIN0004 TotalERROR:#REF!
Grand Total CostERROR:#REF!