Exhibit D Blank BOQ.xlsx
XLSX spreadsheet 46 KB Posted
- Attached to
- D/B UFC Entry Control Point, Perimeter Wall, and Access Roads, Basa Air Base, Philippines Federal contract opportunity
- Solicitation number
- N6274224R6720
About this file
This document is a Bill of Quantities (BOQ) for Solicitation N6274224R6720 for the D/B UFC Construction of Entry Control Point, Perimeter Wall, and Access Roads at Basa Air Base in the Philippines. The BOQ provides a detailed breakdown of the construction work required, including foundations, superstructure, exterior closure, roofing, electrical, and site work. The solicitation has four construction line items: (1) Construction of ECP and Reinforced CMU Perimeter Wall East of Gate 25, (2) Construction of Reinforced CMU Perimeter Wall West of Gate 25, (3) Construction of Reinforced Concrete Access Roads, and (4) Construction of Additional Reinforced CMU Perimeter Wall West of Gate 20. The total estimated cost is not provided. The solicitation is issued by the Department of the Navy Naval Facilities Engineering Command. The due date for proposal submission is August 26, 2024 by 11:00 AM Thailand time. A pre-solicitation site visit is scheduled for August 8, 2024.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| N6274224R6720_0003 Released.pdf | ||
| N6274224R6720_0002 released.pdf | ||
| N6274224R6720_0002 - Exhibit D BOQ rev..xlsx | XLSX spreadsheet | |
| N6274224R6720 Amd 0001 released.pdf | ||
| Exhibit A Pre Proposal Inquiry Form.xlsx | XLSX spreadsheet | |
| N6274224R6720 Released w attachments.pdf | ||
| EXHIBIT A-D.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Blank BOQ
BILL OF MATERIALS
| CLIN0001, Base Bid Item 0001: CONSTRUCTION OF ECP AND REINFORCED CMU PERIMETER WALL EAST OF GATE 25 | $0.00 | |||||||||
| LEVEL 2 GROUP ELEMENTS | QUANTITY | MATERIAL COST | LABOR COST | ENGINEERING ESTIMATE | TOTAL, US $ | |||||
| Level 3 Element | NUMBER | UNIT | UNIT COST | TOTAL ($) | UNIT COST | TOTAL ($) | UNIT COST | TOTAL ($) | ||
| A10 | FOUNDATIONS | ERROR:#REF! | ||||||||
| A1010 | Standard Foundations - search area canopy | ERROR:#REF! | ||||||||
| footing (concrete) | CM | ERROR:#REF! | ||||||||
| footing (rebar) | KG | ERROR:#REF! | ||||||||
| grade beam (concrete) | CM | ERROR:#REF! | ||||||||
| grade beam (rebar) | KG | ERROR:#REF! | ||||||||
| A1010 | Standard Foundations - guard booth | ERROR:#REF! | ||||||||
| footing (concrete) | CM | ERROR:#REF! | ||||||||
| footing (rebar) | KG | ERROR:#REF! | ||||||||
| grade beam (concrete) | CM | ERROR:#REF! | ||||||||
| grade beam (rebar) | KG | ERROR:#REF! | ||||||||
| A1030 | Slab on Grade - guard booth | ERROR:#REF! | ||||||||
| Slab (concrete) | CM | ERROR:#REF! | ||||||||
| Slab (rebars) | KG | ERROR:#REF! | ||||||||
| floor moisture barrier | SM | ERROR:#REF! | ||||||||
| A1010 | perimeter wall footing / foundation | |||||||||
| rebar | kg | |||||||||
| form | sqm | |||||||||
| floor moisture barrier | SM | ERROR:#REF! | ||||||||
| Pour concrete, 24MPa | cu.m | |||||||||
| A1010 | perimeter wall pedestal | ERROR:#REF! | ||||||||
| rebar | kg | ERROR:#REF! | ||||||||
| form | sqm | ERROR:#REF! | ||||||||
| Pour concrete, 24MPa | cu.m | ERROR:#REF! | ||||||||
| A1010 | CMU grade beam | |||||||||
| rebar | kg | |||||||||
| form | sqm | |||||||||
| floor moisture barrier | SM | ERROR:#REF! | ||||||||
| Pour concrete, 24MPa | cu.m | |||||||||
| A1010 | U/G CMU wall | ERROR:#REF! | ||||||||
| CHB 6"x8"x16", 7MPa | sqm | ERROR:#REF! | ||||||||
| Masonry (Rebars) | KG | ERROR:#REF! | ||||||||
| CHB Grout Fill | CM | ERROR:#REF! | ||||||||
| Masonry wall (plastering) | sqm | ERROR:#REF! | ||||||||
| B10 | SUPERSTRUCTURE | ERROR:#REF! | ||||||||
| Search area canopy | ||||||||||
| Column - structural steel | kg | ERROR:#REF! | ||||||||
| Beam - structural steel | KG | ERROR:#REF! | ||||||||
| Purlins - structural steel | KG | ERROR:#REF! | ||||||||
| Accessories | KG | |||||||||
| Guard Booth | ||||||||||
| Columns (concrete) | CM | ERROR:#REF! | ||||||||
| Columns (rebars) | KG | ERROR:#REF! | ||||||||
| Structural Frames (concrete Beam) | CM | ERROR:#REF! | ||||||||
| Structural Frames (beam rebars) | KG | ERROR:#REF! | ||||||||
| Forms and Scaffoldings | SM | ERROR:#REF! | ||||||||
| roof deck (concrete) | CM | ERROR:#REF! | ||||||||
| roof deck (rebar) | KG | ERROR:#REF! | ||||||||
| lintel (concrete) | CM | |||||||||
| lintel (rebar) | KG | |||||||||
| B1010 | perimeter wall columns | ERROR:#REF! | ||||||||
| rebar | kg | ERROR:#REF! | ||||||||
| form | sqm | ERROR:#REF! | ||||||||
| Pour concrete, 24MPa | cu.m | ERROR:#REF! | ||||||||
| B20 | EXTERIOR CLOSURE | ERROR:#REF! | ||||||||
| B2010 | Exterior Walls | ERROR:#REF! | ||||||||
| CHB Grout Fill | CM | ERROR:#REF! | ||||||||
| Masonry (Rebars) | KG | ERROR:#REF! | ||||||||
| CHB 8", 7MPa | SM | ERROR:#REF! | ||||||||
| Painting | ERROR:#REF! | |||||||||
| Skim Coat | SM | ERROR:#REF! | ||||||||
| Plastering | SM | ERROR:#REF! | ||||||||
| Top Coat (2 coats ) | SM | ERROR:#REF! | ||||||||
| B2020 | Exterior Windows | ERROR:#REF! | ||||||||
| General Area - Windows (aluminum framed sliding, glass) and hardware with screens; 1.2m x 1.6m (powder coated) | EA | ERROR:#REF! | ||||||||
| B2030 | Exterior Doors | ERROR:#REF! | ||||||||
| metal door panel with door closer and lockset on 2"x4" galvanized door jamb (paint finished. | set | ERROR:#REF! | ||||||||
| B2010 | perimeter wall | |||||||||
| CHB 6"x8"x16", 7MPa | sqm | ERROR:#REF! | ||||||||
| Masonry (Rebars) | KG | ERROR:#REF! | ||||||||
| CHB Grout Fill | CM | ERROR:#REF! | ||||||||
| Masonry wall (plastering) | sqm | ERROR:#REF! | ||||||||
| B30 | ROOFING | ERROR:#REF! | ||||||||
| B3010 | Roof Coverings & Roof Drains | ERROR:#REF! | ||||||||
| Steel Roof Structure | SM | ERROR:#REF! | ||||||||
| Roofing, Cliplock type, including accessories | SM | ERROR:#REF! | ||||||||
| Insulation, Rockwool | SM | ERROR:#REF! | ||||||||
| C30 | INTERIOR FINISHES | - 0 | ||||||||
| C3010 | Wall Finishes | ERROR:#REF! | ||||||||
| guard booth - paint | ||||||||||
| Skim Coat | SM | |||||||||
| Plastering | SM | |||||||||
| Top Coat (2 coats ) | SM | |||||||||
| C3020 | Floor Finishes | - 0 | ||||||||
| guard booth - sealed concrete | SM | |||||||||
| C3030 | Ceiling Finishes | ERROR:#REF! | ||||||||
| guard booth - paint | ||||||||||
| Skim Coat | SM | |||||||||
| Plastering | SM | |||||||||
| Top Coat (2 coats ) | SM | |||||||||
| D30 | HVAC | ERROR:#REF! | ||||||||
| D3030 | Cooling Generating Systems | ERROR:#REF! | ||||||||
| Ceiling fans | EA | ERROR:#REF! | ||||||||
| window type AC | EA | ERROR:#REF! | ||||||||
| D40 | FIRE PROTECTION | ERROR:#REF! | ||||||||
| D4090 | Other Fire Protection Systems | ERROR:#REF! | ||||||||
| portable fire extinguisher | SM | ERROR:#REF! | ||||||||
| D50 | ELECTRICAL | ERROR:#REF! | ||||||||
| D5010 | Electrical Service and Distribution | ERROR:#REF! | ||||||||
| Rough‐ins | SM | ERROR:#REF! | ||||||||
| Wiring | SM | ERROR:#REF! | ||||||||
| Panel boards and circuit breakers | Lot | ERROR:#REF! | ||||||||
| Transformer incl. accessories | EA | ERROR:#REF! | ||||||||
| Electrical connection to base | SM | ERROR:#REF! | ||||||||
| D5020 | Lighting & Branch Wiring | ERROR:#REF! | ||||||||
| Lights, fixures and wiring devices - include perimeter lighting | SM | ERROR:#REF! | ||||||||
| D5090 | lightning arrester | set | ERROR:#REF! | |||||||
| D5010 | Electrical Service & Distribution | ERROR:#REF! | ||||||||
| grounding | SM | ERROR:#REF! | ||||||||
| Remove, store, and replace of existing UG electrical line | SM | ERROR:#REF! | ||||||||
| F10 | Special Construction | ERROR:#REF! | ||||||||
| F1010 | perimeter wall accessories | |||||||||
| blade wire, hot dipped galvanized | kg | |||||||||
| double extension arm, hot-dipped galvanized | ea | |||||||||
| Table 2: SITEWORK | ||||||||||
| LEVEL 2 GROUP ELEMENTS | QUANTITY | MATERIAL COST | LABOR COST | ENGINEERING ESTIMATE | ||||||
| Level 3 Element | NUMBER | UNIT | UNIT COST | TOTAL ($) | UNIT COST | TOTAL ($) | UNIT COST | TOTAL ($) | ||
| G10 | SITE PREPARATION | ERROR:#REF! | ||||||||
| G1010 | Site Clearing | ERROR:#REF! | ||||||||
| Clearing, grubbing and Tree Cutting | SM | ERROR:#REF! | ||||||||
| G1030 | Site Earthwork | ERROR:#REF! | ||||||||
| Excavation | CM | ERROR:#REF! | ||||||||
| Backfilling and Compaction | CM | ERROR:#REF! | ||||||||
| G20 | SITE IMPROVEMENTS | ERROR:#REF! | ||||||||
| Road (concrete) | CM | ERROR:#REF! | ||||||||
| Road (rebar) | KG | ERROR:#REF! | ||||||||
| forms | sqm | ERROR:#REF! | ||||||||
| compacted gravel | CM | ERROR:#REF! | ||||||||
| X | FIELD REQUIREMENTS, OFFICE OVERHEAD & PROFIT | ERROR:#REF! | ||||||||
| X10 | Field Requirements | ERROR:#REF! | ||||||||
| Mobilization / Demobilization | LS | ERROR:#REF! | ||||||||
| Predesign surveys, capability assessment, etc | LS | ERROR:#REF! | ||||||||
| Detailed Engineering Design Package, and Project Management | LS | ERROR:#REF! | ||||||||
| X20 | Office Overhead | ERROR:#REF! | ||||||||
| TempFacil, permits, and utilities months | LS | ERROR:#REF! |
| CLIN0001 Total | ERROR:#REF! | |||||||||
| CLIN0002, Base Bid Item 0002: CONSTRUCTION OF REINFORCED CMU PERIMETER WALL WEST OF GATE 25 | ERROR:#REF! | |||||||||
| LEVEL 2 GROUP ELEMENTS | QUANTITY | MATERIAL COST | LABOR COST | ENGINEERING ESTIMATE | TOTAL, US $ | |||||
| Level 3 Element | NUMBER | UNIT | UNIT COST | TOTAL ($) | UNIT COST | TOTAL ($) | UNIT COST | TOTAL ($) | ||
| A10 | FOUNDATIONS | ERROR:#REF! | ||||||||
| A1010 | Standard Foundation | ERROR:#REF! | ||||||||
| perimeter wall foundation | ||||||||||
| rebar | kg | |||||||||
| form | sqm | |||||||||
| Pour concrete, 24MPa | cu.m | |||||||||
| A1010 | perimeter wall pedestal | ERROR:#REF! | ||||||||
| rebar | kg | ERROR:#REF! | ||||||||
| form | sqm | ERROR:#REF! | ||||||||
| Pour concrete, 24MPa | cu.m | ERROR:#REF! | ||||||||
| A1010 | CMU grade beam | |||||||||
| rebar | kg | |||||||||
| form | sqm | |||||||||
| Pour concrete, 24MPa | cu.m | |||||||||
| A1010 | U/G CMU wall | ERROR:#REF! | ||||||||
| CHB 6"x8"x16", 7MPa | sqm | ERROR:#REF! | ||||||||
| Masonry (Rebars) | KG | ERROR:#REF! | ||||||||
| CHB Grout Fill | CM | ERROR:#REF! | ||||||||
| Masonry wall (plastering) | sqm | ERROR:#REF! | ||||||||
| B10 | SUPERSTRUCTURE | ERROR:#REF! | ||||||||
| B1010 | perimeter wall columns | ERROR:#REF! | ||||||||
| rebar | kg | ERROR:#REF! | ||||||||
| form | sqm | ERROR:#REF! | ||||||||
| Pour concrete, 24MPa | cu.m | ERROR:#REF! | ||||||||
| B20 | EXTERIOR CLOSURE | ERROR:#REF! | ||||||||
| B2010 | perimeter wall | |||||||||
| CHB 6"x8"x16", 7MPa | sqm | ERROR:#REF! | ||||||||
| Masonry (Rebars) | KG | ERROR:#REF! | ||||||||
| CHB Grout Fill | CM | ERROR:#REF! | ||||||||
| Masonry wall (plastering) | sqm | ERROR:#REF! | ||||||||
| D50 | ELECTRICAL | ERROR:#REF! | ||||||||
| D5010 | Electrical Service & Distribution | ERROR:#REF! | ||||||||
| grounding | SM | ERROR:#REF! | ||||||||
| Remove, store, and replace of existing UG electrical line | SM | ERROR:#REF! | ||||||||
| F10 | Special Construction | ERROR:#REF! | ||||||||
| perimeter wall accessories | ||||||||||
| blade wire, hot dipped galvanized | kg | |||||||||
| double extension arm, hot-dipped galvanized | ea | |||||||||
| Table 2: SITEWORK | ||||||||||
| LEVEL 2 GROUP ELEMENTS | QUANTITY | MATERIAL COST | LABOR COST | ENGINEERING ESTIMATE | ||||||
| Level 3 Element | NUMBER | UNIT | UNIT COST | TOTAL ($) | UNIT COST | TOTAL ($) | UNIT COST | TOTAL ($) | ||
| G10 | SITE PREPARATION | ERROR:#REF! | ||||||||
| G1010 | Site Clearing | ERROR:#REF! | ||||||||
| Clearing, grubbing and Tree Cutting | SM | ERROR:#REF! | ||||||||
| G1030 | Site Earthwork | ERROR:#REF! | ||||||||
| Excavation | CM | ERROR:#REF! | ||||||||
| Backfilling and Compaction | CM | ERROR:#REF! | ||||||||
| X | FIELD REQUIREMENTS, OFFICE OVERHEAD & PROFIT | ERROR:#REF! | ||||||||
| X10 | Field Requirements | ERROR:#REF! | ||||||||
| Mobilization / Demobilization | LS | ERROR:#REF! | ||||||||
| Predesign surveys, capability assessment, etc | LS | ERROR:#REF! | ||||||||
| Detailed Engineering Design Package, and Project Management | LS | ERROR:#REF! | ||||||||
| X20 | Office Overhead | ERROR:#REF! | ||||||||
| TempFacil, permits, and utilities months | LS | ERROR:#REF! |
| CLIN0002 Total | ERROR:#REF! | |||||||||
| CLIN0003, Base Bid Item 0003: CONSTRUCTION OF REINFORCED CONCRETE ACCESS ROADS | $0.00 | |||||||||
| LEVEL 2 GROUP ELEMENTS | QUANTITY | MATERIAL COST | LABOR COST | ENGINEERING ESTIMATE | TOTAL, US $ | |||||
| Level 3 Element | NUMBER | UNIT | UNIT COST | TOTAL ($) | UNIT COST | TOTAL ($) | UNIT COST | TOTAL ($) | ||
| G10 | SITE PREPARATION | ERROR:#REF! | ||||||||
| G1010 | Site Clearing | ERROR:#REF! | ||||||||
| Clearing and grubbing | SM | ERROR:#REF! | ||||||||
| Demolition / Removal | CUM | ERROR:#REF! | ||||||||
| G1030 | Site Earthwork | ERROR:#REF! | ||||||||
| Excavation | CUM | ERROR:#REF! | ||||||||
| Grading, Backfilling, and Compaction | CUM | ERROR:#REF! | ||||||||
| G20 | SITE IMPROVEMENTS | ERROR:#REF! | ||||||||
| G2010.a | Road | ERROR:#REF! | ||||||||
| Concrete | CM | ERROR:#REF! | ||||||||
| dowels | KG | ERROR:#REF! | ||||||||
| Formworks | LM | ERROR:#REF! | ||||||||
| 1-m shoulder - compacted gravel | SM | ERROR:#REF! | ||||||||
| G2010.b | Slope Protection - riprap | ERROR:#REF! | ||||||||
| Concrete | CM | ERROR:#REF! | ||||||||
| Steel bars | KG | ERROR:#REF! | ||||||||
| Formworks | LM | ERROR:#REF! | ||||||||
| G2050 | Culvert (cross drains) | ERROR:#REF! | ||||||||
| R.C. Culvert Pipes | EA | ERROR:#REF! | ||||||||
| Manhole | EA | ERROR:#REF! | ||||||||
| X | FIELD REQUIREMENTS, OFFICE OVERHEAD & PROFIT | ERROR:#REF! | ||||||||
| X10 | Field Requirements | ERROR:#REF! | ||||||||
| Mobilization / Demobilization | LS | ERROR:#REF! | ||||||||
| Predesign surveys, capability assessment, etc | LS | ERROR:#REF! | ||||||||
| Project Management | LS | ERROR:#REF! | ||||||||
| Detailed Engineering Design Package including certified as-built drawings, survey, soil boring, etc. | LS | ERROR:#REF! | ||||||||
| Testing and Commissioning | LS | ERROR:#REF! | ||||||||
| X20 | Office Overhead | ERROR:#REF! | ||||||||
| TempFacil, permits, and utilities months | LS | ERROR:#REF! |
| CLIN0003 Total | ERROR:#REF! | |||||||||
| CLIN0004, Option Item 0001: CONSTRUCTION OF ADDITIONAL REINFORCED CMU PERIMETER WALL WEST OF GATE 20 | $0.00 | |||||||||
| LEVEL 2 GROUP ELEMENTS | QUANTITY | MATERIAL COST | LABOR COST | ENGINEERING ESTIMATE | TOTAL, US $ | |||||
| Level 3 Element | NUMBER | UNIT | UNIT COST | TOTAL ($) | UNIT COST | TOTAL ($) | UNIT COST | TOTAL ($) | ||
| A10 | FOUNDATIONS | ERROR:#REF! | ||||||||
| A1010 | Standard Foundation | ERROR:#REF! | ||||||||
| perimeter wall foundation | ||||||||||
| rebar | kg | |||||||||
| form | sqm | |||||||||
| Pour concrete, 24MPa | cu.m | |||||||||
| A1010 | perimeter wall pedestal | ERROR:#REF! | ||||||||
| rebar | kg | ERROR:#REF! | ||||||||
| form | sqm | ERROR:#REF! | ||||||||
| Pour concrete, 24MPa | cu.m | ERROR:#REF! | ||||||||
| A1010 | CMU grade beam | |||||||||
| rebar | kg | |||||||||
| form | sqm | |||||||||
| Pour concrete, 24MPa | cu.m | |||||||||
| A1010 | U/G CMU wall | ERROR:#REF! | ||||||||
| CHB 6"x8"x16", 7MPa | sqm | ERROR:#REF! | ||||||||
| Masonry (Rebars) | KG | ERROR:#REF! | ||||||||
| CHB Grout Fill | CM | ERROR:#REF! | ||||||||
| Masonry wall (plastering) | sqm | ERROR:#REF! | ||||||||
| B10 | SUPERSTRUCTURE | ERROR:#REF! | ||||||||
| B1010 | perimeter wall columns | ERROR:#REF! | ||||||||
| rebar | kg | ERROR:#REF! | ||||||||
| form | sqm | ERROR:#REF! | ||||||||
| Pour concrete, 24MPa | cu.m | ERROR:#REF! | ||||||||
| B20 | EXTERIOR CLOSURE | ERROR:#REF! | ||||||||
| B2010 | perimeter wall | |||||||||
| CHB 6"x8"x16", 7MPa | sqm | ERROR:#REF! | ||||||||
| Masonry (Rebars) | KG | ERROR:#REF! | ||||||||
| CHB Grout Fill | CM | ERROR:#REF! | ||||||||
| Masonry wall (plastering) | sqm | ERROR:#REF! | ||||||||
| D50 | ELECTRICAL | ERROR:#REF! | ||||||||
| D5010 | Electrical Service & Distribution | ERROR:#REF! | ||||||||
| grounding | SM | ERROR:#REF! | ||||||||
| Remove, store, and replace of existing UG electrical line | SM | ERROR:#REF! | ||||||||
| F10 | Special Construction | ERROR:#REF! | ||||||||
| perimeter wall accessories | ||||||||||
| blade wire, hot dipped galvanized | kg | |||||||||
| double extension arm, hot-dipped galvanized | ea | |||||||||
| Table 2: SITEWORK | ||||||||||
| LEVEL 2 GROUP ELEMENTS | QUANTITY | MATERIAL COST | LABOR COST | ENGINEERING ESTIMATE | ||||||
| Level 3 Element | NUMBER | UNIT | UNIT COST | TOTAL ($) | UNIT COST | TOTAL ($) | UNIT COST | TOTAL ($) | ||
| G10 | SITE PREPARATION | ERROR:#REF! | ||||||||
| G1010 | Site Clearing | ERROR:#REF! | ||||||||
| Clearing, grubbing and Tree Cutting | SM | ERROR:#REF! | ||||||||
| G1030 | Site Earthwork | ERROR:#REF! | ||||||||
| Excavation | CM | ERROR:#REF! | ||||||||
| Backfilling and Compaction | CM | ERROR:#REF! | ||||||||
| X | FIELD REQUIREMENTS, OFFICE OVERHEAD & PROFIT | ERROR:#REF! | ||||||||
| X10 | Field Requirements | ERROR:#REF! | ||||||||
| Mobilization / Demobilization | LS | ERROR:#REF! | ||||||||
| Predesign surveys, capability assessment, etc | LS | ERROR:#REF! | ||||||||
| Detailed Engineering Design Package, and Project Management | LS | ERROR:#REF! | ||||||||
| X20 | Office Overhead | ERROR:#REF! | ||||||||
| TempFacil, permits, and utilities months | LS | ERROR:#REF! |
| CLIN0004 Total | ERROR:#REF! |
| Grand Total Cost | ERROR:#REF! |