N6274224R6719_0003 PPIs and SOW.pdf
PDF 10 MB Posted
- Attached to
- D/B UFC Renovate Operations Building and Transient Barracks at Basa Air Base, Floridablanca, Philippines
- Solicitation number
- N6274224R6719
About this file
This document appears to be the Proposal Inquiry form (Exhibit A) and Statement of Work (Exhibit D) for Solicitation N6274224R6719 to renovate the Operations Building and Transient Barracks at Basa Air Base in Floridablanca, Philippines.
The solicitation is being issued by the Department of the Navy Naval Facilities Engineering Command for design-build construction services. A pre-solicitation site visit is scheduled for August 8, 2024, and proposals are due by August 19, 2024. The renovation work includes upgrading the operations building and transient barracks facilities at the Basa Air Base. Pricing is to be provided in the form of a blank Bill of Quantity. No set-asides or incumbent information is provided. The Statement of Work outlines the key technical requirements and objectives for the renovation project.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Exhibit D Blank BOQ rev. AMD 0003.xlsx | XLSX spreadsheet | |
| N6274224R6719 _0002 released.pdf | ||
| N6274224R6719-0001_released.pdf | ||
| N6274224R6719-0001 Schedule of Prices.pdf | ||
| Exhibit D Blank BOQ rev 1..xlsx | XLSX spreadsheet | |
| Exhibit D Blank BOQ.xlsx | XLSX spreadsheet | |
| N6274224R6719 Released w Attachments.pdf | ||
| EXHIBIT A-D.pdf | ||
| Exhibit A - Pre Proposal Inquiry Form.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ACQR6064313
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
N6274224R6719 D/B UFC Renovate Operations Building and Transient Barracks at Basa Air Base, Floridablanca, Philippines.
Detail of Amendment 0003 begins on the next page.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 7
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 21-Aug-2024
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X N6274224R6719
X 9B. DATED (SEE ITEM 11)
19-Jul-2024
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
20-Aug-2024
CODE
NAVFAC ROICC THAILAND (US EMBASSY)
7 SATHORN TAI ROAD
BANGKOK THAILAND 10120
N62742 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N6274224R6719
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)
The following have been added by full text:
AMD 0003 PPIS
The following changes will be considered part of this solicitation:
A. Proposal due date is extended to 26 August 2024, no later than 11:00 a.m. Thailand time.
B. The following changes are hereby incorporated to solicitation Parts 1, 3 and 6 under this solicitation.
AMENDMENT 0003
SUMMARY OF CHANGES
PART 1
PROPOSAL, FORMS & DOCUMENTS
1. Section 002100, Page 6, 1. Pre-Proposal Site Visit (PPSV), Change:
a. The Contracting Office intends to host a Pre-Proposal Site Visit (PPSV). The PPSV is scheduled on 8
August 2024, at 08:00 a.m. local time, meeting at Base Basa Air Base Main Gate, GPS Coordinate 14°58'40.77"N, 120°30'10.32"E. Reference clause 52.236-27 SITE VISIT (CONSTRUCTION) – ALTERNATE I in this solicitation.
2. Section 002100, Page 12, 52.232-19 AVAILABILITY OF FUNDS FOR THE NEXT FISCAL YEAR (APR
1984) - update to read ‘FY2024’.
3. Section 002100, Page 13, 52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) – ALTERNATE I (FEB 1995), paraghaph c.
Change:
(c) Participants will meet at--
Base Basa Air Base Main Gate GPS coordinate: 14°58'40.77"N, 120°30'10.32"E
4. Section 002200, Page 19-20 of 34 under item 2.4 Non-Cost Factor 4 – Technical Solution;
Change from:
i. Provide the following conceptual design drawing details:
1. Site layout plan showing footprint of proposed building, internal road, locations of transformer, generator house, pump house, septic tank, and existing road within 50 m radius from the proposed buildings. The drawing shall also include connecting point of main water supply system, connecting point of main power supply system, and discharge point of wastewater treatment system.
2. Floor plan and roof plan of for proposed buildings. The drawings shall include dimensions, items to be renovated to illustrate understanding of the statement of requirements.
To:
i. Provide the following conceptual design drawing details:
1. Conceptual of new ADAC door plan. The drawings shall include dimensions, motor location, and steel supporting structures.
2. Floor plan for proposed buildings. The drawings shall include dimensions, items to be renovated to illustrate understanding of the statement of requirements.
3. New roof plan for Operations Building. The drawings shall include dimensions, items to be renovated to illustrate understanding of the statement of requirements.
5. Section 00700, Page 31, 52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK
(APR 1984)
Deleted wording:
The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the Contract Award Document (SF1442), (b) prosecute the work diligently, and (c) complete the entire work for both Base Bid and Option items ready for use not later than three hundred (300) calendar days after Contract Award. The time stated for completion shall include final cleanup of the premises.
PART 3
STATEMENT OF WORKS
6. On Page 6 of 16 under item KEY PERSONNEL;
This project will require the following management personnel (check one):
Dedicated Superintendent, Dedicated Quality Control Manager, and Dedicated Site Safety Health Officer (3 different people on site during production at all times)
Dedicated Superintendent and Dedicated Quality Control Manager; Superintendent may serve as Site
Safety Health Officer if qualified but not Quality Control Manager (2 different people on site during production at all times)
Triple-Hat Superintendent, Quality Control Manager, and Site Safety Health Officer (1 person on site during production at all times)
This project will require two (2) groups of the following management personnel (check one):
Dedicated Superintendent, Dedicated Quality Control Manager, and Dedicated Site Safety Health Officer (3 different people on site during production at all times)
Dedicated Superintendent and Dedicated Quality Control Manager; Superintendent may serve as Site
Safety Health Officer if qualified but not Quality Control Manager (2 different people on site during production at all times)
Triple-Hat Superintendent, Quality Control Manager, and Site Safety Health Officer (1 person on site during production at all times)
One set of key personnel will be designated for CLIN 001: Renovate Operation Building and CLIN 002:
Renovate Transient Barrack and Latrine Facilities, while another set of key personnel will be designated for CLIN 003: Fabricate and Install Hangar Door and CLIN 004: Improve Hangar Storm Water Drainage.
7. On Page 7 of 16 under section 5.2.2 LATRINE FACILITY;
Replaced all damaged plumbing fixtures.
Replace all water closets, toilet doors, urinals, and exhaust fans.
Replace loose or damaged electrical outlets and lighting fixtures.
Repair and replace damaged electrical wiring.
Repair and refinish all the exterior doors.
Replaced all damaged plumbing fixtures.
Replace all water closets, toilet doors, urinals, and exhaust fans.
Replace loose or damaged electrical outlets and lighting fixtures.
Replace all soap holders and shower partitions.
Repair and replace damaged electrical wiring.
Repair and refinish all the exterior doors.
8. On Page 8 of 16 under item 5.4.2 STORM DRAINAGE IMPROVEMENT;
Sawcut the existing concrete apron and remove it. Excavate two trenches, each approximately 2.5 feet (0.76 meters) wide by 3.5 feet (1.0 meters) deep, with a total length of 732 feet (223 meters).
Install eight 1-meter-tall reinforced concrete manholes / drop inlets with grates. Inlet dimension shall be no less than 25 inches x 25 inches (0.6 meters x 0.6 meters).
Install 223 meters of 15-inch (375 mm) reinforced concrete pipe with a minimum slope of 0.2%.
Backfill with free draining angular ¾ inch aggregate and place a reinforced concrete pad to meet design requirements for the airport apron. Install 20-inch-long dowels at 12 inches on center spacing to connect the existing concrete with the new reinforced concrete pad.
Remove existing grates and infill with concrete to meet design requirements for the airport apron. Install 20-inch-long dowels on 12-inch center spacing to connect the existing concrete with the new reinforced concrete pad.
Remove existing grates and drop inlet covers and replace it with reinforced concrete cover.
Sawcut and remove concrete as required to install new drainage grates and drop inlet covers to ensure the grates are flush with existing apron concrete.
Contractor shall design, provide and install new ductile iron or stainless-steel drainage grates and drop inlets to withstand required loads.
9. On Page 9 of 16 under item B10 SUPERSTRUCTURE;
Add:
B102001 FACADE FRAMING SYSTEM
a. Design the facade framing system to support various loads, including wind loads, dead loads (self-weight of the materials), live loads (temporary loads such as maintenance workers), and impact loads.
The system must ensure structural stability and integrity under all conditions, including extreme weather events.
10. On Page 10 of 16 under item B2030 EXTERIOR DOOR;
B203005 HANGAR DOOR
a. Equip the door system with a reliable power supply, including backup systems such as generators or uninterruptible power supplies (UPS) to ensure operation during power outages.
b. Include safety features in the hangar door system, such as emergency stop buttons, safety sensors, and obstruction detection systems, to prevent accidents during operation.
c. Design the door system for smooth and efficient operation, minimizing noise and vibration.
d. Use a basic wind speed of 260 kph (162 mph) for determining the design wind load of the hangar door, based on the Structural Load Data Tool for UFC 3-301-01, Risk Category III, and the National Structural Code of the Philippines (NSCP 2015).
11. On Page 10 of 16 under item C1020 INTERIOR DOORS;
a. Replace all the existing toilet doors of the latrine facility and add as necessary to provide a fully functioning facility as per project objectives.
b. Door frames shall be made of aluminum with solid wood filled inside and door leaves shall be made of solid wood in paint finishes or tempered glass.
c. No CMU brick can be placed directly on top of the aluminum frame structure.
d. All interior edges of the door frame shall be completely sealed with approved weather proof, UV resistant, non-hardening silicon sealant of an appropriate color.
e. All interior doors shall be lockable from inside only.
f. Door jambs at toilets area shall be elevated 5 mm above finished floor level of the toilets.
To:
a. Replace all the existing toilet doors of the latrine facility and add as necessary to provide a fully functioning facility as per project objectives.
b. Door frames shall be made of aluminum with solid wood filled inside and door leaves shall be made of solid wood in paint finishes or tempered glass.
c. No CMU brick can be placed directly on top of the aluminum frame structure.
d. All interior edges of the door frame shall be completely sealed with approved weather proof, UV resistant, non-hardening silicon sealant of an appropriate color.
e. All interior doors shall be lockable from inside only.
f. Door jambs at toilets area shall be elevated 5 mm above finished floor level of the toilets.
g. Replace all the shower partitions in the latrine facility.
12. On Page 13 of 16 under item D2040 RAIN WATER DRAINAGE;
D204090 RAINWATER CONCRETE COVER
a. Determine the expected load-bearing capacity based on the types of vehicles or equipment that will pass over the drain. Design accordingly a concrete cover to withstand these loads.
b. Provide manholes to allow for cleaning and debris removal. This ensures the drainage system remains functional and efficient over time.
13. On Page 16 of 16 under item G20 SITE IMRPROVEMENT;
a. Perform a deep cleaning inside the latrine facility, to include floor, wall, and all fixtures.
b. A disinfectant cleaner shall be used to clean the latrine facility.
PART 6
ATTACHMENTS
14. Add pictures.
15. Add following documents:
1. Enclosure 3: As-Built Drawing of Operations Building
2. Enclosure 4: As-Built Drawing of Transient Barrack and Latrine Facility.
C. The following attachments are incorporated to the RFP.
- Attachment A – PPIs and Answers.
- Exhibit D. Revised BOQ.
D. All other terms and conditions remain the same.
SECTION 00 10 00 - SOLICITATION
The required response date/time has changed from 22-Aug-2024 11:00 AM to 26-Aug-2400 11:00 AM.
SECTION 00 21 00 - INSTRUCTIONS
The following have been modified:
52.232-19 AVAILABILITY OF FUNDS FOR THE NEXT FISCAL YEAR (APR 1984)
Funds are not presently available for performance under this contract beyond FY2024. The Government's obligation for performance of this contract beyond that date is contingent upon the availability of appropriated funds from which payment for contract purposes can be made. No legal liability on the part of the Government for any payment may arise for performance under this contract beyond FY2024, until funds are made available to the Contracting Officer for performance and until the Contractor receives notice of availability, to be confirmed in writing by the Contracting Officer.
(End of clause)
SECTION 00 70 00 - CONDITIONS OF THE CONTRACT
The following have been modified:
52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)
The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the Contract Award Document (SF1442), (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than three hundred (300) calendar days after Contract Award. The time stated for completion shall include final cleanup of the premises.
CLIN 0001: Renovation of Operation Building – 300 calendar days CLIN 0002: Renovation of Transient Barrack and Latrine Facilities – 300 calendar days.
CLIN 0003: Fabricate and Install Hangar Door – 300 calendar days CLIN 0004: Improve Hangar Storm Water Drainage – 300 calendar days
(End of clause)
(End of Summary of Changes)
D/B UFC Renovate Operations Building and Transient Barracks N6274224R6719_0003 Basa Air Base, Floridablanca, Philippines Part 6
AMENDMENT 0003
PART 6
ATTACHMENT
1. Add following pictures:
Figure 31 Front View of the Existing Adjacent Hangar for reference
Figure 32 Rear View of the Existing Hangars
Figure 33 Front View of the ADAC Hangar
Figure 34 Upper and Lower Tracks of Existing Hangar for reference
Figure 35 Pocket Door at Existing Hangar for reference
Figure 36 Structural Truss at Existing Hangar for reference
Figure 37 Existing Foundation for Installation of Hangar Door
Figure 38 Steel Grating at the back and Front of ADAC Hangar
Figure 39 Existing Panel Board at ADAC Hangar
Figure 40 Aircraft Hangar Mooring and Grounding
Figure 41 Existing Lights Inside Hangar
Figure 42 Mechanical Motor for the front door of the existing hangar adjacent to the project site.
Figure 43 Mechanical Motor of the ADAC hangar door (back door of the hangar where the door will be installed)
Figure 44 Reference of heavy- duty Reinforced Concrete Drain Cover
Basa Air Base, Floridablanca, Philippines
ENCLOSURE 3
AS-BUILT DRAWING OF OPERATIONS BUILDING
ENDEC IN
C
SENSITIVE BUT UNCLASSIFIED
Basa Air Base, Floridablanca, Philippines
ENCLOSURE 4
AS-BUILT DRAWING OF TRANSIENT BARRACK AND LATRINE FACILITY
MUNICIPALITY OF FLORIDA BLANCA
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
R E P U B L I C O F T H E P H I L I P P I N E S
MECHANICAL
SANITARY
ELECTRICAL
STRUCTURAL
ARCHITECTURAL
LINE AND GRADE
LAND USE AND ZONING
T A B L E O F C O N T E N T S
ARCHITECTURAL
A 001 PERSPECTIVE
SITE DEVELOPMENT PLAN
LOCATION MAP
A 002 BARRACKS FLOOR PLAN
STRUCTURAL
S 001 STRUCTURAL NOTES
ELECTRICAL
E 001 E 002
E 003
PLUMBING
O F F I C E O F T H E B U I L D I N G O F F I C I A L
SCALE NTSA-001
SCALE 1:600 metersA-001
A 003
A 004
BARRACKS FRONT ELEVATION
BARRACKS REAR ELEVATION
A 006
BARRACKS LEFT SIDE ELEVATION
BARRACKS RIGHT SIDE ELEVATION
BARRACKS SECTION THRU AA
BARRACKS SECTION BB
SCHEDULE OF DOORS
BARRACKS ROOF PLAN
S 002
S 003 BARRACKS FOUNDATION PLAN
WELD LENGHT
E 002-B
SCHEDULE OF WINDOWS
BARRACKS REFLECTED CEILING PLAN
A 005
BARRACKS GFCI LAYOUT FOR 220 VOLTS
BARRACKS CEILING FAN LAY-OUT
BARRACKS ELECTRICAL LIGHTING LAY-OUT 2
BARRACKS POWER LAY-OUT FOR 220 VOLTS
BARRACKS ELECTRICAL LIGHTING LAY-OUT 1
E 004
BARRACKS STORM DRAIN PLAN LAY-OUTP 001
P 003
BARRACKS ISOMETRIC STORM DRAIN LAY-OUTP 002
LOAD SCHEDULE AND COMPUTATION FOR LIGHTING PANEL BOARD-110VAC(PB3-110V)
E 005
LATRINE FLOOR PLAN
LATRINE FRONT ELEVATION
LATRINE REAR ELEVATION
LATRINE LEFT SIDE ELEVATION
LATRINE RIGHT SIDE ELEVATION
LATRINE ROOF FRAMING PLAN
LATRINE SECTION THRU AA
LATRINE SECTION BB
A 007
A 008
A 009
E 006
BARRACKS GFCI LAYOUT FOR 110 VOLTS
LATRINE ELECTRICAL REFLECTED LAY-OUT
E 007
LATRINE EXHAUST FAN LAY-OUT
BARRACKS ROOF FRAMING PLAN
TYPICAL ROOF BEAM (RB1) DETAILS
SCHEDULE OF BEAM
TYPICAL TIE BEAM (TB) DETAILS
S 004
LATRINE LIGHTING LAY-OUT
E 008 E 009
LATRINE SEWER AND DRAINAGE PLAN LAY-OUT
LATRINE WATER LINE PLAN LAY-OUT
P 004
P 005
P 006
P 007
LATRINE DETAIL OF ABSORPTION & DRAIN FIELD
LATRINE PLAN DETAIL OF WASTE WATER HOLDING TANK
LATRINE WASTE WATER HOLDING TANK SECTION DETAIL THRU AA
STORM WELL DRAINAGE
LATRINE PLAN DETAIL OF CATCH BASIN
PROJECT NUMBERDATECADD BYREVISIONSCADD BYENGINEERSHEET CONTENTSCLIENTPROJECTThese drawings are documents of
REFERENCE SHEET NO.
DATE
CHECKED
DATE:
DATE ISSUED
VALID UNTIL
PRC NO.
:PLACE
DATE
PTR NO. :
LOCATION :
They are the sole property of and cannot be copied nor reproduced without their written permission.
Designer and the General Contractor.
J A M A R I C O N S T R U C T I O N
REP. ACT 545
Information to be used only by the
D:\jamari\NAVFAC\NAVFAC LOGO.jpg
ADUANA BLDG., CAMP AGUINALDO, PHILIPPINES
SHERYL BRIONES-GO
CONTRACTING OFFICERS AUTHORIZED REPRESENTATIVE
FRANCIS RICHARD A. ENRIQUEZ, CEPERSPECTIVE
SITE DEVELOPMENT PLAN
LOCATION MAP
0669387
JANUARY 21, 2013
ZAMBOANGA CITY
061047 04/11/2013 03/17/2016
11-C-6727
A 001
BARRACKS AND LATRINE
N62742-11-C-6727
BASA AIRBASE, FLORIDA BLANCA
PAMPANGA, PHILIPPINES
S 005
S 006 LATRINE ROOF FRAMING PLAN
LATRINE FOUNDATION PLAN
BAY SECTION DETAIL
S 007 POWER HOUSE WITH GEN. PAD PLAN DETAIL
POWER HOUSE WITH GEN. PAD SECTION PLAN DETAIL
WASH BAY PLAN VIEW
WASHBAY FRONT, REAR, SIDE ELEVATION
S 008 POWER HOUSE ROOF FRAMING PLAN
TYPICAL SIDE ELEVATION
FRONT ELEVATION
REAR ELEVATION
WASHBAY SECTION DETAIL
LATRINE (MALE TOILET)
A 010
A 011
A 012
A 001-A A 001-B A 001-C
SITE DEVELOPMENT PLAN
TOPOGRAPHIC PLAN
TOPOGRAPHIC PLAN ON NATURAL GRADE LINE
LATRINE (FEMALE TOILET)A 013
LATRINE REFLECTED CEILING PLAN
E:\ALL FILE\basa jpeg\NAVFAC LOGO.jpg
E 010
E 011
E 012
BARRACKS REFLECTED ELECTRICAL LAY-OUT
BARRACKS AIRCON POWER LAY-OUT
BARRACKS POWER LAYOUT FOR 110 VOLTS
LATRINE GFCI LAY-OUT FOR 220 VOLTS
LOAD SCHEDULE AND COMPUTATION FOR PANEL BOARD-1(PB1)
E 013 PANEL BOARD-1(PB1) ONE LINE DIARAM
LOAD SCHEDULE AND COMPUTATION FOR PANEL BOARD-4(PB4)
E 014 ONE LINE DIAGRAM (OPTION 1)
E 015 SCHEMATIC DIAGRAM
E 017 LATRINE LIGHTNING ARRESTER DETAIL
LATRINE ISOMETRIC LAY-OUT OF SEWER AND DRAINAGE
LATRINE ISOMETRIC LAY-OUT OF WATER LINE
P 008 LATRINE STORM DRAIN PLAN
P 09 LATRINE STORM DRAIN ISOMETRIC LAY-OUT
M 001 BARRACKS MECHANICAL PLAN
E 016 RISER DIAGRAM
SCALE NTSA-001
31000
2000 2000
45000
27990
BARRACKS FACILITY
BUILDING LINE
LATRINE
BUILDING LINE
MULTIPURPOSE FACILITY (by others)
LATRINE (by others)
ELEVATED WATER TANK
DEEP WELL
(BY OTHERS)
WASTE WATER HOLDING TANK
(BY OTHERS)
BARRACKS FACILITY
LATRINE
2000 16000 2000
EXISTING TWO STOREY FACILITY
6.0 m
W
ID
E
AS
PH
AL
T
PA
VE
ME
NT
A
CC
ES
S
RO
AD
(e xis tin g)
PARKING (by others) PARKING/LAYDOWN AREA
O
N
R
E
T
A
D
WASTE WATER
HOLDING TANK
LATRINE
WASH BAY
CONCRETE PAD
FOR GENERATOR
12750
PARKING AREA
PR
OP
OS
ED
3M E
AR
TH
E
MB
AN
KM
EN
T
PR
OP
OS
ED
3M E
AR
TH
E
MB
AN
KM
EN
T
EX
IS
TI
NG
R
OA
D
PR
OP
OS
ED
3M E
AR
TH
E
MB
AN
KM
EN
T
PROPOSED 3M EARTH EMBARKMENT
ELEV. 43.00M
GR
AD
ED
G
RO
UN
D
LIN
E
N E
W S
STREET LIGHT
DINING FACILITY
CO
NC
RE
TE
P
AT
HW
AY
(B Y
OT
HE
RS
ELECTRICAL POSTELECTRICAL POST
ELECTRICAL POST
PROPOSED REPLACEMENT
STREET LIGHT
STREET LIGHTSTREET LIGHT
STREET LIGHT
STREET LIGHT
STREET LIGHT
PARKING AREA
( AVILA BUILDING )
STREET LIGHT
STREET LIGHT
STREET LIGHT
STREET LIGHT
COLUMN AND FOOTING DEATIL
SCHEDULE OF COLUMN AND FOOTING
TYPICAL TRUSS CONNECION DETAILS
SPLICING DETAIL
TYPICAL BASE PLATE DETAILS
TYP.PURLINS-TRUSS CONNECTION DETAIL
TRUSS PANEL JT. CONNECTION DETAIL
BARRACKS FULL TRUSS - 1
BARRACKS HALF TRUSS - 2
BARACKS HALF TRUSS - 1
BARRACKS HALF TRUSS - 3
LATRINE HALF TRUSS-2 & TYP. LINTEL BEAM
FULL TRUSS - 1 AND LATRINE HALF TRUSS - 1
VENTILATOR DETAIL
SECTION L
SECTION I
SECTION J
SECTION K
SECTION M
SECTION N
SECTION O
SECTION P
SECTION Q
SECTION R
SECTION S AND T
SECTION A AND B
SECTION C AND D
SECTION E AND F
SECTION G AND H
LOAD SCHEDULE AND COMPUTATION FOR PANEL BOARD-2(PB2)
PANEL BOARD-4(PB-4) ONE LINE DIARAM
PANEL BOARD-2(PB2) ONE LINE DIAGRAM
3A- PANEL BOARD(PB3)110V @ 220V ONE LINE DIARAM
3B- PANEL BOARD(PB3)110V @ 110V ONE LINE DIARAM
BARRACKS LIGHTNING ARRESTER DETAIL
GROUND ROD CONNECTION DETAIL
M 002 LATRINE EXHAUST FAN LAY-OUT
M 003 BARRACKS FIRE PROTECTION PLAN
M 004 LATRINE FIRE PROTECTION PLAN LAY-OUT
P 010 BRANCH DRAIN LINE DETAILS
MECHANICAL
A 007-A DOOR SCHEDULES AND ACCESSORIES
CT-S 001 CISTERN TANK PLAN DETAIL
CISTERN TANK PLAN @ MID-HEIGHT
CISTERN TANK WATER TOWER FOUNDATION PLAN
CISTERN TANK SECTION THRU XX
DETAIL "2' AND DETAIL "1"
COLUMN SECTION DETAIL
CT-S 002 CISTERN TANK FRONT,REAR ELEVATION
CISTERN TANK RIGHT SIDE AND LEFT SIDE ELEVATION
H2O TOP SLAB PLAN
CISTERN TANK PLAN VIEW
DETAIL OF CAGE AND LADDER PLAN
CAGE AND LADDER SIDE ELEVATION
CT-S 003 COLUMN SCHEDULE
TYPICAL BASE PLATE DEATAIL
RAILINGS DETAIL
3D DRAWING MANHOLE AND RUNGS
CT-S 004 H2O TANK TOP SLAB REINFORCING DETAIL
SECTION THRU AA AND MANHOLE DETAIL
TYPICAL COLUMN /BRACE BEAM DETAIL
DISTRIBUTION LINE OF H2O
TYPICAL BRACE BEAM SECTION
CT-S 005 STRUCTURAL NOTES
CONCRETE PAD
FOR GENERATOR
M 005 SCHEMATIC ONE LINE PIPING DIAGRAM
31000
2000 2000
45000
27990
10000
BARRACKS FACILITY
BUILDING LINE
LATRINE
BUILDING LINE
MULTIPURPOSE FACILITY (by others)
LATRINE (by others)
DEEP WELL
(BY OTHERS)
WASTE WATER HOLDING TANK
(BY OTHERS)
BARRACKS FACILITY
LATRINE
2000 16000 2000
EXISTING TWO STOREY FACILITY
6.0 m
W
ID
E
AS
PH
AL
T
PA
VE
ME
NT
A
CC
ES
S
RO
AD
(e xis tin g)
PARKING (by others) PARKING/LAYDOWN AREA
HOLDING TANK
ACACIA TREE
MAHOGANY TREE
MANGO TREE
LEGEND:
SCALE 1:300M
SITE DEVELOPMENT PLAN
PROJECT NUMBERDATECADD BYREVISIONSCADD BYENGINEERSHEET CONTENTSCLIENTPROJECTThese drawings are documents of
REFERENCE SHEET NO.
DATE
CHECKED
DATE:
DATE ISSUED
VALID UNTIL
PRC NO.
:PLACE
DATE
PTR NO. :
LOCATION :
They are the sole property of and cannot be copied nor reproduced without their written permission.
Designer and the General Contractor.
J A M A R I C O N S T R U C T I O N
SHERYL BRIONES-GO
CONTRACTING OFFICERS AUTHORIZED REPRESENTATIVE
FRANCIS RICHARD A. ENRIQUEZ, CESITE DEVELOPMENT PLAN
0669387
JANUARY 21, 2013
ZAMBOANGA CITY
061047 04/11/2013 03/17/2016
11-C-6727
A 001-A
BARRACKS AND LATRINE
N62742-11-C-6727
BASA AIRBASE, FLORIDA BLANCA
PAMPANGA, PHILIPPINES
LATRINE
WASH BAY
CONCRETE PAD
FOR GENERATOR
12750
ACCESS ROAD
PR
OP
OS
ED
3M E
AR
TH
E
MB
AN
KM
EN
T
PR
OP
OS
ED
3M E
AR
TH
E
MB
AN
KM
EN
T
3M E
AR
TH
E
MB
AN
KM
EN
T
EX
IS
TI
NG
R
OA
D
PR
OP
OS
ED
3M E
AR
TH
E
MB
AN
KM
EN
T
3 E
AR
TH
E
MB
AN
KM
EN
T
3M E
AR
TH
E
MB
AN
KM
EN
T
3M EARTH EMBANKMENT
3M EARTH EMBANKMENT
3M EARTH EMBANKMENT
3M EARTH EMBANKMENT
3M EARTH EMBANKMENT 3M EARTH EMBANKMENT
3M EARTH EMBANKMENT
3M E
AR
TH
E
MB
AN
KM
EN
T
3M E
AR
TH
E
MB
AN
KM
EN
T
3M E
AR
TH
E
MB
AN
KM
EN
T
PROPOSED 3M EARTH EMBARKMENT
2M WALKWAY
2M WALKWAY
2M WALKWAY
2M WALKWAY
2M W
AL
KW
AY
2M W
AL
KW
AY
2M W
AL
KW
AY
ELEV. 44.15M
ELEV. 44.05M
ELEV. 44.00M
ELEV. 43.85M
ELEV. 43.85M
ELEV. 44.3M
ELEV. 43.57M
ELEV. 43.77M
ELEV. 43.00M
ELEV. 43.80M
ELEV. 43.50M
EL
EV
. 4 3.8
5M
EL
EV
. 4 3.8
5M
EL
EV
. 4
3.8 5M
GRADED GROUND LINE
ELEV. 43.50M
GRADED GROUND LINE
ELEV. 43.50M
GR
AD
ED
G
RO
UN
D
LIN
E
EL
EV
. 4
3.7 0M
GR
AD
ED
G
RO
UN
D
LIN
E
EL
EV
. 4
3.5 0M
E:\ALL FILE\basa jpeg\NAVFAC LOGO.jpgC:\Documents and Settings\User\Desktop\NAVFAC LOGO.jpg
N E
W S
STREET LIGHT
DINING FACILITY
3M E
AR
TH
E
MB
AN
KM
EN
T
3M EARTH EMBANKMENT
CO
NC
RE
TE
P
AT
HW
AY
(B Y
OT
HE
RS
ELECTRICAL POSTELECTRICAL POST
ELECTRICAL POST
PROPOSED REPLACEMENT
STREET LIGHT
STREET LIGHTSTREET LIGHT
STREET LIGHT
STREET LIGHT
STREET LIGHT
PARKING AREA
( AVILA BUILDING )
STREET LIGHT
STREET LIGHT
STREET LIGHT
STREET LIGHT
MANGO TREE
POWER HOUSE
20000
2000 3000
ELEVATED WATER TANK
3M E
AR
TH
E
MB
AN
KM
EN
31000
2000 2000
45000
27990
BARRACKS FACILITY
BUILDING LINE
LATRINE
BUILDING LINE
MULTIPURPOSE FACILITY (by others)
LATRINE (by others)
ELEVATED WATER TANK
DEEP WELL
(BY OTHERS)
WASTE WATER HOLDING TANK
(BY OTHERS)
BARRACKS FACILITY
LATRINE
2000 16000 2000
EXISTING TWO STOREY FACILITY
6.0 m
W
ID
E
AS
PH
AL
T
PA
VE
ME
NT
A
CC
ES
S
RO
AD
(e xis tin g)
PARKING (by others) PARKING/LAYDOWN AREA
HOLDING TANK
ACACIA TREE
MAHOGANY TREE
MANGO TREE
LEGEND:
LATRINE
WASH BAY
12750
ACCESS ROAD
PR
OP
OS
ED
3M E
AR
TH
E
MB
AN
KM
EN
T
PR
OP
OS
ED
3M E
AR
TH
E
MB
AN
KM
EN
T
3M E
AR
TH
E
MB
AN
KM
EN
T
EX
IS
TI
NG
R
OA
D
PR
OP
OS
ED
3M E
AR
TH
E
MB
AN
KM
EN
T
3M E
AR
TH
E
MB
AN
KM
EN
T
3M E
AR
TH
E
MB
AN
KM
EN
T
3M EARTH EMBANKMENT
3M EARTH EMBANKMENT
3M EARTH EMBANKMENT
3M EARTH EMBANKMENT
3M EARTH EMBANKMENT 3 EARTH EMBANKMENT
3M EARTH EMBANKMENT
3M E
AR
TH
E
MB
AN
KM
EN
T
3M E
AR
TH
E
MB
AN
KM
EN
T
3M E
AR
TH
E
MB
AN
KM
EN
T
PROPOSED 3M EARTH EMBARKMENT
2M WALKWAY
2M WALKWAY
2M WALKWAY
2M WALKWAY
2M W
AL
KW
AY
2M W
AL
KW
AY
2M W
AL
KW
AY
ELEV. 44.05M
ELEV. 44.05M
ELEV. 44.00M
ELEV. 43.85M
ELEV. 43.85M
GRADED ELEV. 43.8M
ELEV. 44.30M
ELEV. 43.57M
ELEV. 43.77M
ELEV. 43.00M
ELEV. 43.80M
ELEV. 43.50M
EL
EV
. 4 3.8
5M
EL
EV
. 4 3.8
5M
EL
EV
. 4
3.8 5M
GRADED GROUND LINE
ELEV. 43.50M
GRADED GROUND LINE
ELEV. 43.50M
GR
AD
ED
G
RO
UN
D
LIN
E
EL
EV
. 4
3.7 0M
GR
AD
ED
G
RO
UN
D
LIN
E
EL
EV
. 4
3.5 0M
N E
W S
STREET LIGHT
DINING FACILITY
3M E
AR
TH
E
MB
AN
KM
EN
T
3M EARTH EMBANKMENT
CO
NC
RE
TE
P
AT
HW
AY
(B Y
OT
HE
RS
ELECTRICAL POSTELECTRICAL POST
ELECTRICAL POST
PROPOSED REPLACEMENT
STREET LIGHT
STREET LIGHTSTREET LIGHT
STREET LIGHT
STREET LIGHT
STREET LIGHT
PARKING AREA
( AVILA BUILDING )
STREET LIGHT
STREET LIGHT
STREET LIGHT
STREET LIGHT
MANGO TREE
SCALE 1:300M
PROFILE SECTION THRU NORTH TO SOUTH-1
PROJECT NUMBERDATECADD BYREVISIONSCADD BYENGINEERSHEET CONTENTSCLIENTPROJECTThese drawings are documents of
REFERENCE SHEET NO.
DATE
CHECKED
DATE:
DATE ISSUED
VALID UNTIL
PRC NO.
:PLACE
DATE
PTR NO. :
LOCATION :
They are the sole property of and cannot be copied nor reproduced without their written permission.
Designer and the General Contractor.
J A M A R I C O N S T R U C T I O N
SHERYL BRIONES-GO
CONTRACTING OFFICERS AUTHORIZED REPRESENTATIVE
FRANCIS RICHARD A. ENRIQUEZ, CETOPOGRAPHIC PLAN
0669387
JANUARY 21, 2013
ZAMBOANGA CITY
061047 04/11/2013 03/17/2016
11-C-6727
A 001-B
BARRACKS AND LATRINE
N62742-11-C-6727
BASA AIRBASE, FLORIDA BLANCA
PAMPANGA, PHILIPPINES
NA
TU
RA
L G
RA
DE
LI
NE
PR
OP
OS
ED
G
RA
DE
LI
NE
BA
RR
AC
KS
F
AC
ILI
TY
LA
TR
IN
E
PR
OP
OS
ED
P
AR
KI
NG
/ L
AY
DO
W
N
AR
EA
NA
TU
RA
L G
RA
DE
LI
NE
PA
TH
W
AY
E
LE
V.
44.30 m.
44.20 44.10 44.00 43.90 43.80 43.70 43.60 43.50 43.40 43.30 43.20 43.10
43.00 m.
BARRACKS FACILITY
WALK WAYPATH WAY
EMBANKMENT
45000 2000 30006000 1000 14479
SC
AL
E 1:
0M
PR
O
FI
LE
S
EC
TI
O
N T
H R
U W
ES
T
TO
E
AS
T
PR
OP
OS
ED
G
RA
DE
LI
NE
PROPOSED GRADE LINE
EM
BA
NK
ME
NT
44.30 m.
44.20 44.10 44.00 43.90 43.80 43.70 43.60 43.50 43.40 43.30 43.20 43.10
43.00 m.
ELEV.= 44.00 M.
ELEV. 43.85M
.3
M
.2
.1
.0
.9
.8
.7
.6
.5
.4
.3
.2
.1
.0
M
.3
M
.2
.1
.0
.9
.8
.7
.6
.5
.4
.3
.2
.1
.0
M
76875
ELEV. 43.85M
G R
AD
ED
E
LE
V.
.5
M
44.30 m.
44.20 44.10 44.00 43.90 43.80 43.70 43.60 43.50 43.40 43.30 43.20 43.10
43.00 m.
LATRINE
ROAD
PATH WAY ELEV.44.05 M.
EMBANKMENT
3000 200010875 6000 1000 2000
PROPOSED GRADE LINE
NATURAL GRADE LINE
44.30 m.
44.20 44.10 44.00 43.90 43.80 43.70 43.60 43.50 43.40 43.30 43.20 43.10
43.00 m.
ELEV. = 44.15 M
PATHWAY ELEV. = 44.05 M
ELEV.= 43.65 M.
SCALE 1:300M
PROFILE SECTION THRU NORTH TO SOUTH-2
16000 3000
ELEV. = 43.85 M
0 10 m. 20m. 30m. 40m. 50m. 60m. 70m. 80m. 90m. 100m. 110m. 120m.
ELEV.= 43.20 M.
NATURAL GRADE LINE
ELEV. = 43.80 M
ELEV. = 43.45 M
GRADED ELEV. LATRINE = 43.65 M.
GRADED ELEV. BARRACKS = 43.50 M.
ELEV.= 43.35 M.
LATRINE
ELEV. = 44.15 MEXISTING ELEVATION OF ROAD = 44.30 M
ELEV. = 43.45 M
G R
AD
E
EL
EV
3.
M
N
AT
U R
AL
G
R
AD
E
EL
EV
3.
M
E X
I S T
I N G
L I
E
E:\ALL FILE\basa jpeg\NAVFAC LOGO.jpgC:\Documents and Settings\User\Desktop\NAVFAC LOGO.jpg
SCALE 1:300M
TOPOGRAPHIC PLAN
10875
ELEV. 44.15M
CONCRETE PAD
FOR GENERATOR
POWER HOUSE
30002000
20000
3M E
AR
TH
E
MB
AN
KM
EN
T
2M W
AL
KW
AY
3M EARTH EMBANKMENT
SCALE 1:300M
PROFILE SECTION THRU NORTH TO SOUTH
30000
33530
EXISTING TWO STOREY FACILITY
6.0 m
W
ID
E
AS
PH
AL
T
PA
VE
ME
NT
A
CC
ES
S
RO
AD
(e xis tin g)
PARKING (by others)
PROPOSED PARKING/LAYDOWN AREA
ELECTRICAL POST
ELECTRICAL POST
EX
IS
TI
NG
D
IR
T
RO
AD
ACACIA TREE
MAHOGANY TREE
KALIBANG-BANG TREE
LEGEND:
SCALE 1:300M
TOPOGRAPHIC PLAN
PROJECT NUMBERDATECADD BYREVISIONSCADD BYENGINEERSHEET CONTENTSCLIENTPROJECTThese drawings are documents of
REFERENCE SHEET NO.
DATE
CHECKED
DATE:
DATE ISSUED
VALID UNTIL
PRC NO.
:PLACE
DATE
PTR NO. :
LOCATION :
They are the sole property of and cannot be copied nor reproduced without their written permission.
Designer and the General Contractor.
J A M A R I C O N S T R U C T I O N
SHERYL BRIONES-GO
CONTRACTING OFFICERS AUTHORIZED REPRESENTATIVE
FRANCIS RICHARD A. ENRIQUEZ, CETOPOGRAPHIC PLAN ON NATURAL GRADE LINE
0669387
JANUARY 21, 2013
ZAMBOANGA CITY
061047 04/11/2013 03/17/2016
11-C-6727
A 001-C
BARRACKS AND LATRINE
N62742-11-C-6727
BASA AIRBASE, FLORIDA BLANCA
PAMPANGA, PHILIPPINES
ACCESS ROAD
PR
OP
OS
ED
3M E
AR
TH
E
MB
AN
KM
EN
T
PR
OP
OS
ED
3M E
AR
TH
E
MB
AN
KM
EN
T
PROPOSED 3M EARTH EMBARKMENT
ELEV. 43.57M
ELEV. 43.77M
ELEV. 43.00M
ELEV. 43.50M
NA
TU
RA
L G
RA
DE
LI
NE
NA
TU
RA
L G
RA
DE
LI
NE
44.30 m.
44.20 44.10 44.00 43.90 43.80 43.70 43.60 43.50 43.40 43.30 43.20 43.10
43.00 m.
ELEV. = 43.85 M
ELEV.= 43.80 M.
ELEV.= 43.77 M.
ELEV.= 43.00 M.
ELEV.= 43.57 M.
ROAD
10875
SC
AL
E 1:
0M
PR
O
FI
LE
S
EC
TI
O
N T
H R
U W
ES
T
TO
E
AS
T
44.30 m.
44.20 44.10 44.00 43.90 43.80 43.70 43.60 43.50 43.40 43.30 43.20 43.10
43.00 m.
.3
M
.2
.1
.0
.9
.8
.7
.6
.5
.4
.3
.2
.1
.0
M
.3
M
.2
.1
.0
.9
.8
.7
.6
.5
.4
.3
.2
.1
.0
M
EL
EV
3.
M
EXISTING ELEVATION OF ROAD = 44.30 M
0 10 m. 20m. 30m. 40m. 50m. 60m. 70m. 80m. 90m. 100m. 110m. 120m.
ELEV.= 43.00 M.
ELEV.= 43.10 M.
NATURAL GRADE LINE
EL
EV
3.
M
EL
EV
3.
M
EL
EV
3.
M
ELEV.= 43.40 M.
ELEV.= 43.60 M.
ELEV.= 44.30 M.
ON NATURAL GRADE LINE
ELEV.= 43.00 M.
ELEV. = 43.45 M
ELEV.= 43.10 M.
ELEV. = 43.80 M
ELEV. = 43.45 M
ELEV. = 43.65 M
ELEV.= 43.50 M.
ELEV.= 43.35 M.
E:\ALL FILE\basa jpeg\NAVFAC LOGO.jpg C:\Documents and Settings\User\Desktop\NAVFAC LOGO.jpg
N E
W S
45000 2000 3000412526000 1000 144792000
76875
BA C D E F G H I J
5000 5000 5000 5000 5000 5000 5000 5000 5000
45000
5000 5000 5000 5000 5000 5000 5000 5000 5000
45000
1300 1300 24001300 1300 24001300 1300 24001300 1300 24001300 1300 24001300 1300 24001300 1300 24001300 1300
24001300 1300 24001300 1300 24001300 1300 24001300 1300 24001300 1300
S I D E W A L K S I D E W A L K S I D E W A L K S I D E W A L KS I D E W A L K
S I D E W A L K S I D E W A L K S I D E W A L K S I D E W A L KS I D E W A L K
BA C D E F G H I J
24001300 1300 24001300 1300 24001300 1300
A
B
ROOF LINE
ROOF LINE
D-02 A-7
D-01 A-4
W-02 A-7
W-01 A-7
D-02 A-7
SCALE 1:100M
BARRACKS FLOOR PLAN
15021502 2000
1502 15022000
63 10
A-7
A-002
PROJECT NUMBERDATECADD BYREVISIONSCADD BYENGINEERSHEET CONTENTSCLIENTPROJECTThese drawings are documents of
REFERENCE SHEET NO.
DATE
CHECKED
DATE:
DATE ISSUED
VALID UNTIL
PRC NO.
:PLACE
DATE
PTR NO. :
LOCATION :
They are the sole property of and cannot be copied nor reproduced without their written permission.
Designer and the General Contractor.
J A M A R I C O N S T R U C T I O N
SHERYL BRIONES-GO
CONTRACTING OFFICERS AUTHORIZED REPRESENTATIVE
FRANCIS RICHARD A. ENRIQUEZ, CEBARRACKS FLOOR PLAN
0669387
JANUARY 21, 2013
ZAMBOANGA CITY
061047 04/11/2013 03/17/2016
11-C-6727
A 002
BARRACKS AND LATRINE
N62742-11-C-6727
BASA AIRBASE, FLORIDA BLANCA
PAMPANGA, PHILIPPINES
D-01 A-4
2000 2000
2000 2000
12001200
1200 1200
E:\ALL FILE\basa jpeg\NAVFAC LOGO.jpgC:\Documents and Settings\User\Desktop\NAVFAC LOGO.jpg
N E
W S
W-01 A-7
W-02 A-7
W-01 A-7
W-01 A-7
W-02 A-7
W-02 A-7
W-01 A-7
W-01 A-7
W-01 A-7
W-01 A-7
W-01 A-7
W-01 A-7
W-01 A-7
W-01 A-7
W-01 A-7
W-01 A-7
W-01 A-7
W-01 A-7
W-01 A-7
W-01 A-7
W-01 A-7
W-01 A-7
5000 50005000 5000 50005000 5000
45000
2400 1300 1300 2400 1300 13001300 24001300 1300 24001300 130024001300 240024001300 1300 1300 1300
BA C D E F G H I J
5000 5000 5000 5000 5000 5000 5000 5000 5000
45000
W-01 A-7
ROOF EXHAUST VENTILATOR(SEE DETAIL)
STEEL DOOR POWDER COAT-FINISH
SCALE 1:100M
BARRACKS FRONT ELEVATION
SCALE 1:100M
BARRACKS REAR ELEVATION
24001300 1300
CLIP LOCK PREPAINTED ROOF
CEMENT PLASTER & PAINT FINISH
1477 2000 1477
D-01 A-4
A-003
A-003
PROJECT NUMBERDATECADD BYREVISIONSCADD BYENGINEERSHEET CONTENTSCLIENTPROJECTThese drawings are documents of
REFERENCE SHEET NO.
DATE
CHECKED
DATE:
DATE ISSUED
VALID UNTIL
PRC NO.
:PLACE
DATE
PTR NO. :
LOCATION :
They are the sole property of and cannot be copied nor reproduced without their written permission.
Designer and the General Contractor.
J A M A R I C O N S T R U C T I O N
SHERYL BRIONES-GO
CONTRACTING OFFICERS AUTHORIZED REPRESENTATIVE
FRANCIS RICHARD A. ENRIQUEZ, CEBARRACKS FRONT ELEVATION
BARRACKS REAR ELEVATION
0669387
JANUARY 21, 2013
ZAMBOANGA CITY
061047 04/11/2013 03/17/2016
WEATHER PROOF C.O COVER
11-C-6727
A 003
BARRACKS AND LATRINE
N62742-11-C-6727
BASA AIRBASE, FLORIDA BLANCA
PAMPANGA, PHILIPPINES
1200 1200
2000 2000
5000 5000 5000 5000 5000 5000 5000 5000
45000
24001300 1300 24001300 1300 1300 24001300 1300 24001300 130024001300 1300 24001300 1300 24001300 1300
BA C D E F G H I J
5000 5000 5000 5000 5000 5000 5000 5000 5000
45000
ROOF EXHAUST VENTILATOR(SEE DETAIL)
STEEL DOOR POWDER COAT-FINISH
24001300 1300
CLIP LOCK PREPAINTED ROOF
CEMENT PLASTER & PAINT FINISH
1477 2000 1477
D-01 A-490
1200 1200
2000 2000
FINISHED CEILING LINE
FINISHED FLOOR LINE
GRADED GROUND LINE
ROOF APEX LINE
E:\ALL FILE\basa jpeg\NAVFAC LOGO.jpg
4" PVC SLEEVES
C:\Documents and Settings\User\Desktop\NAVFAC LOGO.jpg
W-01 A-7
W-01 A-7
W-01 A-7
W-01 A-7
W-01 A-7
W-01 A-7
W-01 A-7
W-01 A-7
W-01 A-7
W-01 A-7
W-01 A-7
W-01 A-7
W-01 A-7
W-01 A-7
W-01 A-7
SLIDING GLASS WINDOW IN ALUMINUM FRAME
WITH 6.0mm THICK GLASS AND INSECT SCREEN
SLIDING GLASS WINDOW IN ALUMINUM FRAME
WITH 6.0mm THICK GLASS AND INSECT SCREEN
FINISHED CEILING LINE
FINISHED FLOOR LINE
GRADED GROUND LINE
ROOF APEX LINE
ELEV. 47.30M
ELEV. 44.00M
ELEV. 43.50M
ELEV. 48.62M
w/ CHAIN COVER HOLDER
4" PVC SLEEVES
w/ CHAIN COVER HOLDER
ELEV. 47.30M
ELEV. 44.00M
ELEV. 43.50M
ELEV. 48.62M
WEATHER PROOF C.O COVER
WEATHER PROOF C.O COVER
W-02 A-7
ROOF EXHAUST VENTILATOR(SEE DETAIL)
STEEL DOOR POWDER COAT-FINISH
W-02 A-7
1 2 3 4
ROOF EXHAUST VENTILATOR(SEE DETAIL)
STEEL DOOR POWDER
14000
24001050 105024001050
SCALE
BARRACKS LEFT-SIDE ELEVATION
SCALE 1:100M
BARRACKS RIGHT-SIDE ELEVATION
SCALE 1:100M
BARRACKS SECTION THRU BB
SCALE 1:100M
BARRACKS SECTION THRU AA
APEX LINE
FINISHED CEILING LINE
FINISHED FLOOR LINE
NATURAL GROUND LINE
W-02 A-7
ROOF EXHAUST VENTILATOR(SEE DETAIL)
STEEL DOOR POWDER COAT-FINISH
W-02 A-7
1:100M
1 2 3 4
50004500 4500
14000
1000 1000 438438
24001050 10502400
1 2 3 4
50004500 4500
14000
SEE TRUSS DETAIL
1200 5631200 120010001000 563
CLIP LOCK PREPAINTED ROOF
CEMENT PLASTER & PAINT FINISH
CLIP LOCK PREPAINTED ROOF
CEMENT PLASTER & PAINT FINISH
D-02 A-7
D-02 A-4
D-03 A-7
A-004
A-004
A-004
A-004
PROJECT NUMBERDATECADD BYREVISIONSCADD BYENGINEERSHEET CONTENTSCLIENTPROJECTThese drawings are documents of
REFERENCE SHEET NO.
DATE
CHECKED
DATE:
DATE ISSUED
VALID UNTIL
PRC NO.
:PLACE
DATE
PTR NO. :
LOCATION :
They are the sole property of and cannot be copied nor reproduced without their written permission.
Designer and the General Contractor.
J A M A R I C O N S T R U C T I O N
SHERYL BRIONES-GO
CONTRACTING OFFICERS AUTHORIZED REPRESENTATIVE
FRANCIS RICHARD A. ENRIQUEZ, CEBARRACKS RIGHT SIDE ELEVATION
BARRACKS LEFT SIDE ELEVATION
BARRACKS SECTION THRU BB
BARRACKS SECTION THRU AA
VENTILATOR DETAIL
0669387
JANUARY 21, 2013
ZAMBOANGA CITY
061047 04/11/2013 03/17/2016
WEATHER PROOF C.O COVER
11-C-6727
A 004
BARRACKS AND LATRINE
N62742-11-C-6727
BASA AIRBASE, FLORIDA BLANCA
PAMPANGA, PHILIPPINES
5000 5000 5000 5000 5000 5000 5000 5000
45000
24001300 1300 24001300 1300 1300 24001300 1300 24001300 130024001300 1300 24001300 1300 24001300 1300
BA C D E F G H I J
5000 5000 5000 5000 5000 5000 5000 5000 5000
45000
ROOF EXHAUST VENTILATOR(SEE DETAIL)
STEEL DOOR POWDER COAT-FINISH
24001300 1300
CEMENT PLASTER & PAINT FINISH
1477 2000 1477
D-01 A-790
1200 1200
2000 2000
SEE TRUSS DETAIL
2000 200014000
0 2000 200014000
2000 200014000
FINISHED CEILING LINE
FINISHED FLOOR LINE
GRADED GROUND LINE
ROOF APEX LINE
0m m
600mm
ROOF EXHAUST VENTILATOR
(WELDED @ ROOF TOP)
VENTILATOR DETAIL
E:\ALL FILE\basa jpeg\NAVFAC LOGO.jpg
4" PVC SLEEVES
C:\Documents and Settings\User\Desktop\NAVFAC LOGO.jpg
W-01 A-7
W-01 A-7
W-01 A-7
W-01 A-7
W-01 A-7
W-01 A-7
W-01 A-7
W-01 A-7
W-01 A-7
W-01 A-7
W-01 A-7
W-01 A-7
SLIDING GLASS WINDOW IN ALUMINUM FRAME
WITH 6.0mm THICK GLASS AND INSECT SCREEN
SLIDING GLASS WINDOW IN ALUMINUM FRAME
WITH 6.0mm THICK GLASS AND INSECT SCREEN
SLIDING GLASS WINDOW IN ALUMINUM FRAME
WITH 6.0mm THICK GLASS AND INSECT SCREEN
FINISHED CEILING LINE
FINISHED FLOOR LINE
GRADED GROUND LINE
ROOF APEX LINE
FINISHED CEILING LINE
FINISHED FLOOR LINE
GRADED GROUND LINE
ROOF APEX LINE
Base Board Paint Line Interrior Wall
Base Board Paint Line Interrior Wall
SMOOTH COATED FINISH
w/ CHAIN COVER HOLDER
4" PVC SLEEVES
w/ CHAIN COVER HOLDER
SEE TRUSS DETAIL
W/ STAINLESS KICK PLATE AND PUSH PLATE
W/ STAINLESS KICK PLATE AND PUSH PLATE
A-004
2-2 GANG CONVENIENCE OUTLET
110V AND 220V
2-2 GANG CONVENIENCE OUTLET
110V AND 220V
200035
ELEV. 47.30M
ELEV. 44.00M
ELEV. 43.50M
ELEV. 48.62M
ELEV. 47.30M
ELEV. 44.00M
ELEV. 43.50M
ELEV. 48.62M
ELEV. 47.30M
ELEV. 44.00M
ELEV. 43.50M
ELEV. 48.62M
WEATHER PROOF C.O COVER
4" PVC SLEEVES
w/ CHAIN COVER HOLDER
WEATHER PROOF C.O COVER
5000 5000 5000 5000 5000 5000 5000
45000
5000 5000
Ga # 24, pre-painted clip lock type
ROOF EXHAUST VENTILATOR
SCALE 1:100M
BARRACKS ROOF PLAN
1200 1200
12001200
DS DS DS DS DS DS DS DS
DS
DS
DS DS DS DS DS DS DS DS
DS
DS
DS
DS
DS
DS
DS
DS
DS
DS
A-005
PROJECT NUMBERDATECADD BYREVISIONSCADD BYENGINEERSHEET CONTENTSCLIENTPROJECTThese drawings are documents of
REFERENCE SHEET NO.
DATE
CHECKED
DATE:
DATE ISSUED
VALID UNTIL
PRC NO.
:PLACE
DATE
PTR NO. :
LOCATION :
They are the sole property of and cannot be copied nor reproduced without their written permission.
Designer and the General Contractor.
J A M A R I C O N S T R U C T I O N
SHERYL BRIONES-GO
CONTRACTING OFFICERS AUTHORIZED REPRESENTATIVE
FRANCIS RICHARD A. ENRIQUEZ, CEBARRACKS ROOF PLAN
0669387
JANUARY 21, 2013
ZAMBOANGA CITY
061047 04/11/2013 03/17/2016
11-C-6727
A 005
BARRACKS AND LATRINE
N62742-11-C-6727
BASA AIRBASE, FLORIDA BLANCA
PAMPANGA, PHILIPPINES
Ga # 24, pre-painted roofing sheet (clip lock type)
LIGHTNING ARRESTER(SEE DETAIL, E-011)
4" O LEADER/
4" O LEADER/
4" O LEADER/
4" O LEADER/
4" O
L
EA
D
ER
4" O
L
EA
D
ER
4" O
L
EA
D
ER
4" O
L
EA
D
ER
4" O
L
EA
D
ER
4" O
L
EA
D
ER
4" O
L
EA
D
ER
4" O
L
EA
D
ER
4" O
L
EA
D
ER
4" O
L
EA
D
ER
Ga # 24, pre-painted GUTTER(6" x 12")
E:\ALL FILE\basa jpeg\NAVFAC LOGO.jpgC:\Documents and Settings\User\Desktop\NAVFAC LOGO.jpg
N E
W S
45000
5000 5000 5000 5000 5000 5000 5000 5000 5000
45000
S I D E W A L K S I D E W A L K S I D E W A L K S I D E W A L KS I D E W A L K
S I D E W A L K S I D E W A L K S I D E W A L K S I D E W A L KS I D E W A L K
BA C D E F G H I J
SCALE 1:100M
BARRACKS REFLECTED CEILING PLAN
CEILING BOARD
LEGEND:
2400 2400 2400 2400 2400 2400 24002400 2400 2400 24002400 2400 2400 2400 2400 24002400 900900
A-006
PROJECT NUMBERDATECADD BYREVISIONSCADD BYENGINEERSHEET CONTENTSCLIENTPROJECTThese drawings are documents of
REFERENCE SHEET NO.
DATE
CHECKED
DATE:
DATE ISSUED
VALID UNTIL
PRC NO.
:PLACE
DATE
PTR NO. :
LOCATION :
They are the sole property of and cannot be copied nor reproduced without their written permission.
Designer and the General Contractor.
J A M A R I C O N S T R U C T I O N
SHERYL BRIONES-GO
CONTRACTING OFFICERS AUTHORIZED REPRESENTATIVE
FRANCIS RICHARD A. ENRIQUEZ, CEBARRACKS REFLECTED CEILING PLAN
0669387
JANUARY 21, 2013
ZAMBOANGA CITY
061047 04/11/2013 03/17/2016
ACCESS PANEL IN SETS
11-C-6727
A 006
BARRACKS AND LATRINE
N62742-11-C-6727
BASA AIRBASE, FLORIDA BLANCA
PAMPANGA, PHILIPPINES
CEILING VENT
5000 5000 5000 5000 5000 5000 500050003325
900mm X 250mm
7000 7000 7000 7000 7000
7000 7000 7000 7000 7000
0 ACCESS PANEL
700mm X 700mm
6mm THICK FICE BOARD
E:\ALL FILE\basa jpeg\NAVFAC LOGO.jpgC:\Documents and Settings\User\Desktop\NAVFAC LOGO.jpg
N E
W S
FINISH FLOOR LINE
W-03 W-04
OPERATION :
LOCATION :
QUANTITY :
LATRINE
7 SETS
OPERATION :
LOCATION :
QUANTITY :
LATRINE
3 SETS
600600600600600600600600600600600600
360024001200
W-05
OPERATION :
LOCATION :
QUANTITY :
LATRINE
2 SETS
D-01 A-7
OPERATION :
LOCATION :
QUANTITY : 2 SET
D-03
STEEL DOOROPERATION :
LOCATION :
QUANTITY :
BARRACKS
1 SET
D-02
OPERATION :
LOCATION :
QUANTITY : 2 SET
STEEL DOOR
BARRACKS
STEEL DOOR
BARRACKS
FINISH FLOOR LINE
OPERATION :
LOCATION :
QUANTITY : 4 SETS
2400 1000
BARRACKS
D-04
OPERATION :
LOCATION :
QUANTITY : 1 SET
STEEL DOOR
D-05
STEEL DOOROPERATION :
LOCATION :
QUANTITY : 1 SET
800 800
LATRINE LATRINE
FINISH FLOOR LINE
W-01 W-02
SCALE 1:20M
SCHEDULE OF DOORS
A-007
SCALE 1:20M
SCHEDULE OF WINDOWS
A-007
W/ GLASS VISION PANEL W/ GLASS VISION PANEL
A-7 A-7 A-7 A-7
A-7A-7A-7
A-7A-7
PROJECT NUMBERDATECADD BYREVISIONSCADD BYENGINEERSHEET CONTENTSCLIENTPROJECTThese drawings are documents of
REFERENCE SHEET NO.
DATE
CHECKED
DATE:
DATE ISSUED
VALID UNTIL
PRC NO.
:PLACE
DATE
PTR NO. :
LOCATION :
They are the sole property of and cannot be copied nor reproduced without their written permission.
Designer and the General Contractor.
J A M A R I C O N S T R U C T I O N
SHERYL BRIONES-GO
CONTRACTING OFFICERS AUTHORIZED REPRESENTATIVE
FRANCIS RICHARD A. ENRIQUEZ, CESCHEDULE OF DOORS
SCHEDULE OF WINDOWS
0669387
JANUARY 21, 2013
ZAMBOANGA CITY
061047 04/11/2013 03/17/2016
11-C-6727
A 007
BARRACKS AND LATRINE
N62742-11-C-6727
BASA AIRBASE, FLORIDA BLANCA
PAMPANGA, PHILIPPINES
6mm annealed glass 6mm annealed glass
BOTTOM LOUVER
E:\ALL FILE\basa jpeg\NAVFAC LOGO.jpgC:\Documents and Settings\User\Desktop\NAVFAC LOGO.jpg
OPERATION :
LOCATION :
QUANTITY : 4 SETS
SLIDING GLASS WINDOW IN ALUMINUM FRAME
BARRACKS
WITH 6.0mm THICK GLASS AND INSECT SCREEN STELL CASEMENT WINDOW
STELL CASEMENT WINDOW STELL CASEMENT WINDOW
SLIDING GLASS WINDOW IN ALUMINUM FRAME
WITH 6.0mm THICK GLASS AND INSECT SCREEN
W/ ALUMINUM FRAME
MOSQUITO SCREEN
W/ STAINLESS KICK PLATE
AND EMERGENCY PUSH BAR
W/ STAINLESS KICK PLATE
AND PANIC DOOR DEVICE
W/ STAINLESS KICK PLATE
AND PUSH PLATE
W/ AWNING ARM DEVICE
W/ AWNING ARM DEVICE W/ AWNING ARM DEVICE
Emergency Push BarEmergency Push Bar
Schlage Door Lockset Schlage Door LocksetSS- Push Plate
Schlage Door Lockset
Emergency Push Bar
Schlage Door Lockset
200x300
W/ SS- EMERGENCY PUSH BAR W/ SS- EMERGENCY PUSH BAR
DOOR SCHEDULE DIMENSION HARDWARE / ACCESSORIES
D1
IN
OUT
D2
IN
OUT
IN
OUT
D3
IN
OUT
D4
IN
OUT
D5
IN
OUT
2.0m W x 2.10m H
Glass Vision Panel, Concealed Door Closer w/ Hold open function 4pcs-SS ball bearing butterfly hinges each leaf , SS Kick Plate, Emergency Push Bar, Concealed Barrel Bolt (top) at fixed leaf, mortise lock for the opening leaf
1.0m W x 2.10m H Glass Vision Panel, Concealed Door Closer w/ Hold open function 4pcs-SS ball bearing butterfly hinges, SS Kick Plate , Panic device
1.0m W x 2.10m H Concealed Door Closer w/ Hold open function
4pcs-SS ball bearing butterfly hinges, SS Kick Plate, SS Push plate, mortise lock
1.60m W x 2.10m H
Bottom Louver 4pcs-SS ball bearing butterfly hinges each leaf Concealed Barrel Bolt (top) at fixed leaf,Emergency Push Bar, mortise lock for the opening leaf
1.0m W x 2.10m H Bottom Louver 4pcs-SS ball bearing butterfly hinges,Emergency Push Bar
NOTE:
LOCKSETS ARE S-SERIES ENTRANCE LOCK by SCHLAGE WITH MASTER KEY CAPABLE OF OPENING ALL DOOR LOCKS
PROJECT NUMBERDATECADD BYREVISIONSCADD BYENGINEERSHEET CONTENTSCLIENTPROJECTThese drawings are documents of
REFERENCE SHEET NO.
DATE
CHECKED
DATE:
DATE ISSUED
VALID UNTIL
PRC NO.
:PLACE
DATE
PTR NO. :
LOCATION :
They are the sole property of and cannot be copied nor reproduced without their written permission.
Designer and the General Contractor.
J A M A R I C O N S T R U C T I O N
SHERYL BRIONES-GO
CONTRACTING OFFICERS AUTHORIZED REPRESENTATIVE
FRANCIS RICHARD A. ENRIQUEZ, CEDOOR SCHEDULES AND ACCESSORIES
0669387
JANUARY 21, 2013
ZAMBOANGA CITY
061047 04/11/2013 03/17/2016
11-C-6727
A 007-A
BARRACKS AND LATRINE
N62742-11-C-6727
BASA AIRBASE, FLORIDA BLANCA
PAMPANGA, PHILIPPINES
C:\Documents and Settings\JAMARI\Desktop\basa jpeg\NAVFAC LOGO.jpgE:\ALL FILE\basa jpeg\NAVFAC LOGO.jpgC:\Documents and Settings\User\Desktop\NAVFAC LOGO.jpg
N T S
DOOR SCHEDULES AND ACCESSORIES
A-007-A
SCALE 1:100M
LATRINE FLOOR PLAN
600 600 600 600
SCALE 1:100M
LATRINE LEFT SIDE ELEVATION
SCALE 1:100M
LATRINE RIGHT SIDE ELEVATION
APEX LINE
FINISHED CEILING LINE
FINISHED FLOOR LINE
NATURAL GROUND LINE
A B C
A B C
A
B
D
D
CLIP LOCK PREPAINTED ROOF
CEMENT PLASTER & PAINT FINISH
ROOF EXHAUST VENTILATOR(SEE DETAIL)
STEEL CASEMENT WINDOW
WITH 1/4" THK ANNEALED GLASS
SCALE 1:100M
LATRINE FRONT ELEVATION
600600600600600600
36004550 3135
SCALE 1:100M
LATRINE REAR ELEVATION
APEX LINE
FINISHED CEILING LINE
FINISHED FLOOR LINE
GRADED GROUND LINE
STEEL CASEMENT WINDOW
WITH 1/4" THK ANNEALED GLASS
ROOF EXHAUST VENTILATOR(SEE DETAIL)
CLIP LOCK PREPAINTED ROOF
CEMENT PLASTER & PAINT FINISH
A-008
A-008
A-008
A-008
A-008
15001500
360016001600
64664550
1500 1550 1500 6001800600
3000 3000
1500 15001500
600600600600
965 2400 965 9652400965 300 3004630
12004780
300300
6166 4550
5834 6166
600 600
600 600
25171216
17150 17150
16900
17200
1200 12001200 3693 1200
16900
600 600
9652400965
2400 1530300 300 4630
1200 4780
36939764 3693 36939764
PROJECT NUMBERDATECADD BYREVISIONSCADD BYENGINEERSHEET CONTENTSCLIENTPROJECTThese drawings are documents of
REFERENCE SHEET NO.
DATE
CHECKED
DATE:
DATE ISSUED
VALID UNTIL
PRC NO.
:PLACE
DATE
PTR NO. :
LOCATION :
They are the sole property of and cannot be copied nor reproduced without their written permission.
Designer and the General Contractor.
J A M A R I C O N S T R U C T I O N
SHERYL BRIONES-GO
CONTRACTING OFFICERS AUTHORIZED REPRESENTATIVE
FRANCIS RICHARD A. ENRIQUEZ, CELATRINE FLOOR PLAN
LATRINE LEFT SIDE ELEVATION
LATRINE RIGHT SIDE ELEVATION
LATRINE FRONT ELEVATION
LATRINE REAR ELEVATION
0669387
JANUARY 21, 2013
ZAMBOANGA CITY
061047 04/11/2013 03/17/2016
MALE AND FEMALE LATRINE MAP WASH DRAWING
MALE LATRINE URINAL POSITIONG 11-C-6727
A 008
BARRACKS AND LATRINE
N62742-11-C-6727
BASA AIRBASE, FLORIDA BLANCA
PAMPANGA, PHILIPPINES
D-05 A-7
D-04 A-7
W-04 A-7
W-04 A-7
W-05 A-7
W-05 A-7
W-03 A-7
W-03 A-7
W-04 A-7
W-04 A-7
W-03 A-7
W-05 A-7
W-05 A-7 W-03
A-7
D-04
450mm reinforced concrete bench
2000 2000 2000 2000
20002000 2000
ELEV. 47.99M
ELEV. 46.85M
ELEV. 44.15M
ELEV. 43.65M
5 15
2000 2000
2000 2000
STAINLESS STEEL
6" X 6" FLR. DRAIN
STAINLESS STEEL
6" X 6" FLR. DRAIN
PAIL-FLUSH TYPE
TOILET BOWL
(ELONGATED WHITE)
PAIL-FLUSH TYPE
TOILET BOWL
(ELONGATED WHITE)
PUSH BUTTON LAV.
FAUCET.
FIXED SHOWER HEAD
STAINLESS STEEL,
INDUSTRIAL-TYPE.
ROOF EXHAUST VENTILATOR(SEE DETAIL)
STEEL DOOR POWDER COAT-FINISH
STEEL CASEMENT WINDOW
WITH 1/4" THK ANNEALED GLASS
CLIP LOCK PREPAINTED ROOF
CEMENT PLASTER & PAINT FINISH
D-05
C:\Documents and Settings\User\Desktop\NAVFAC LOGO.jpg
N E
W S
W-03 A-7
W-03 A-7
W-04 A-7
W-03 A-7
W-03 A-7
W-03 A-7
W-03 A-7
W-04 A-7
W-03 A-7
W-03 A-7
W-03 A-7
W-03 A-7
600600600600
ELEV. 47.99M
ELEV. 46.85M
ELEV. 44.15M
ELEV. 43.65M
30003000295015001550150015001500
17150
300 300
12001200120012001200
APEX LINE
FINISHED CEILING LINE
FINISHED FLOOR LINE
NATURAL GROUND LINE
SCALE
LATRINE SECTION THRU BB
1:50
SCALE
LATRINE SECTION THRU AA
1:50
A-009
A-009
APEX LINE
FINISHED CEILING LINE
FINISHED FLOOR LINE
NATURAL GROUND LINE
4780 4780
1200 12003693 36939764
SEE TRUSS DETAIL
SEE TRUSS DETAIL
PROJECT NUMBERDATECADD BYREVISIONSCADD BYENGINEERSHEET CONTENTSCLIENTPROJECTThese drawings are documents of
REFERENCE SHEET NO.
DATE
CHECKED
DATE:
DATE ISSUED
VALID UNTIL
PRC NO.
:PLACE
DATE
PTR NO. :
LOCATION :
They are the sole property of and cannot be copied nor reproduced without their written permission.
Designer and the General Contractor.
J A M A R I C O N S T R U C T I O N
SHERYL BRIONES-GO
CONTRACTING OFFICERS AUTHORIZED REPRESENTATIVE
FRANCIS RICHARD A. ENRIQUEZ, CELATRINE SECTION THRU AA
LATRINE SECTION THRU BB
0669387
JANUARY 21, 2013
ZAMBOANGA CITY
061047 04/11/2013 03/17/2016
11-C-6727
A 009
BARRACKS AND LATRINE
N62742-11-C-6727
BASA AIRBASE, FLORIDA BLANCA
PAMPANGA, PHILIPPINES
Note:
For more information about water closet, shower, urinal, lavatory etc..
see LATRINE toilet detail
00 1/2" O
1/2" O
1/2" O
1/2" O
1/2" O
3/4" O
3/4" O
3/4" O
3/4" O
3/4" O
3/4" O
TO 1" O SUPPLY
5 80
FIXED SHOWER HEAD
STAINLESS STEEL,
INDUSTRIAL-TYPE.
SHOWER CONTROL VALVE
300mm X 300mm
WALL GLAZED TILES
PAIL-FLUSH TYPE
TOILET BOWL
(ELONGATED WHITE)
20002000
2000 2000
E:\ALL FILE\basa jpeg\NAVFAC LOGO.jpg
C:\Documents and Settings\User\Desktop\NAVFAC LOGO.jpg
W-03 A-7
W-03 A-7
W-03 A-7
W-03 A-7
W-03 A-7
ELEV. 47.99M
ELEV. 46.85M
ELEV. 44.15M
ELEV. 43.65M
ELEV. 47.99M
ELEV. 46.85M
ELEV. 44.15M
ELEV. 43.65M
SCALE 1:100M
LATRINE REFLECTED CEILING PLAN
A B C
D
16900
4550 6466 5884
A B C D
16900
4550 6466 5884
4799 4799 45824582
4799 4799 45824582
12001200
12001200
0 900
0 900
A-010
18700
A B C D
DS DS DS DS
A B C D
DS DS DS DS
5284 6466 4550
163001200 1200
DS
DS
DS
DS
DS
DS
SCALE 1:100M
LATRINE ROOF FRAMING PLAN
A-010
ROOF EXHAUST VENTILATOR(SEE DETAIL)
LIGHTNING ARRESTER(SEE DETAIL, E-011)
PROJECT NUMBERDATECADD BYREVISIONSCADD BYENGINEERSHEET CONTENTSCLIENTPROJECTThese drawings are documents of
REFERENCE SHEET NO.
DATE
CHECKED
DATE:
DATE ISSUED
VALID UNTIL
PRC NO.
:PLACE
DATE
PTR NO. :
LOCATION :
They are the sole property of and cannot be copied nor reproduced without their written permission.
Designer and the General Contractor.
J A M A R I C O N S T R U C T I O N
SHERYL BRIONES-GO
CONTRACTING OFFICERS AUTHORIZED REPRESENTATIVE
FRANCIS RICHARD A. ENRIQUEZ, CELATRINE ROOF FRAMING PLAN
LATRINE REFLECTED CEILING PLAN
0669387
JANUARY 21, 2013
ZAMBOANGA CITY
061047 04/11/2013 03/17/2016
11-C-6727
A 010
BARRACKS AND LATRINE
N62742-11-C-6727
BASA…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .