Exhibit D Blank BOQ.xlsx
XLSX spreadsheet 28 KB Posted
- Attached to
- D/B UFC Renovate Operations Building and Transient Barracks at Basa Air Base, Floridablanca, Philippines
- Solicitation number
- N6274224R6719
About this file
This document appears to be an Exhibit D - Blank Bill of Quantities (BOQ) for a federal contract opportunity to renovate the Operations Building and Transient Barracks at Basa Air Base in the Philippines. The related federal contract opportunity is solicitation N6274224R6719, posted by the Department of the Navy Naval Facilities Engineering Command, to conduct a Design-Build UFC (Unified Facilities Criteria) renovation project.
The BOQ includes detailed line items and estimated quantities, material costs, labor costs, and total engineering estimates for various construction, plumbing, HVAC, and electrical work required for the renovation of the Operations Building (CLIN 001) and the Transient Barracks and Latrine Facility (CLIN 002). A pre-solicitation site visit is scheduled for August 8, 2024, and proposal submission is due by August 19, 2024.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| N6274224R6719_0003 PPIs and SOW.pdf | ||
| Exhibit D Blank BOQ rev. AMD 0003.xlsx | XLSX spreadsheet | |
| N6274224R6719 _0002 released.pdf | ||
| N6274224R6719-0001_released.pdf | ||
| N6274224R6719-0001 Schedule of Prices.pdf | ||
| Exhibit D Blank BOQ rev 1..xlsx | XLSX spreadsheet | |
| N6274224R6719 Released w Attachments.pdf | ||
| EXHIBIT A-D.pdf | ||
| Exhibit A - Pre Proposal Inquiry Form.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
BILL OF QUANTITIES DATE PREPARED
| ACTIVITY AND LOCATION: | CONSTRUCTION CONTRACT NO. | ID NO. | |||||||
| Basa Air Base, Floridablanca, Pampanga, Philippines | N62742R246719 | ||||||||
| ESTIMATED BY | CATEGORY CODE | ||||||||
| PROJECT TITLE: | NO | ||||||||
| D/B UFC Renovate Operations Building and Transient Barrack | STATUS OF DESIGN | JOB ORDER NO. | |||||||
| CLIN 001 Renovation of Operation Building | QUANTITY | MATERIAL COST | LABOR COST | ENGINEERING ESTIMATE | |||||
| NUMBER | UNIT | UNIT COST | TOTAL ($) | UNIT COST | TOTAL ($) | UNIT COST | TOTAL ($) | ||
| B10 | SUPERSTRUCTURE | ||||||||
| Construct new roof structure, including support for the antenna | sq.m | ||||||||
| B20 | EXTERIOR CLOSURE | ||||||||
| Repair and repaint the wall ( include removal of existing paint and finishes) | sq.m | ||||||||
| B30 | ROOFING | ||||||||
| B3010 | Roof coverings | sq.m | |||||||
| Rood insulation | sq.m | ||||||||
| Roof drains | ls | ||||||||
| C30 | INTERIOR FINISHES | ||||||||
| C3010 | Repair and repaint the wall ( include removal of existing paint and finishes) | sq.m | |||||||
| C3030 | Repair and repaint ceiling | sq.m | |||||||
| D20 | PLUMBING | ||||||||
| D2010 | Water Closet with the accessories | units | |||||||
| Lavatory with the structures, accessories, and finish | units | ||||||||
| Urinoir | units | ||||||||
| D2020 | Repair clean water distribution lines | ls | |||||||
| Elevated water tank with supporting structure | units | ||||||||
| Water pumps | units | ||||||||
| D2030 | Waste water distribution lines | ls | |||||||
| D2040 | Rainwater Drainage | ls | |||||||
| D30 | HVAC | ||||||||
| Air Conditioning | BTU | ||||||||
| D50 | ELECTRICAL | ||||||||
| D5010 | Replace Electrical Service and Distribution | ls | |||||||
| D5020 | Lighting & Branch Wiring | ls | |||||||
| Electrical wires relocation | ls | ||||||||
| F10 | SPECIAL CONSTRUCTION | ||||||||
| Project plaque | ls | ||||||||
| X | FIELD REQUIREMENTS, OFFICE OVERHEAD & PROFIT | ||||||||
| X10 | Field Requirements | ||||||||
| X20 | Office Overhead | ||||||||
| X30 | Profit | ||||||||
| Total |
| Table 2: SITEWORK | |||||||||
| CLIN 001 Renovation of Operation Building | QUANTITY | MATERIAL COST | LABOR COST | ENGINEERING ESTIMATE | |||||
| NUMBER | UNIT | UNIT COST | TOTAL ($) | UNIT COST | TOTAL ($) | UNIT COST | TOTAL ($) | ||
| G10 | SITE PREPARATION | ||||||||
| G1010 | Site Clearing | sq.m | |||||||
| G1030 | Mobilization | ls | |||||||
| De-mobilization | ls | ||||||||
| Design and drawing | ls | ||||||||
| Construction of temporary facilities | ls | ||||||||
| G30 | SITE CIVIL/ MECHANICAL UTILITIES | ||||||||
| Water supply and electricity connection | units | ||||||||
| X | FIELD REQUIREMENTS, OFFICE OVERHEAD & PROFIT | ||||||||
| X20 | Office Overhead | ||||||||
| X30 | Profit | ||||||||
| Total | |||||||||
| Total CLIN 001 |
| CLIN 002 Renovation of Transient Barrack and Latrine Facility | QUANTITY | MATERIAL COST | LABOR COST | ENGINEERING ESTIMATE | |||||
| NUMBER | UNIT | UNIT COST | TOTAL ($) | UNIT COST | TOTAL ($) | UNIT COST | TOTAL ($) | ||
| B20 | EXTERIOR CLOSURE | ||||||||
| Repaint the wall ( include removal of existing paint and finishes) | sq.m | ||||||||
| Repair and refinish exterior door | units | ||||||||
| C10 | INTERIOR CONSTRUCTION | ||||||||
| Repair main double doors | units | ||||||||
| Toilet doors | units | ||||||||
| C30 | INTERIOR FINISHES | ||||||||
| C3010 | Repaint the wall ( include removal of existing paint and finishes) | sq.m | |||||||
| C3030 | Repair and repaint ceiling | sq.m | |||||||
| D20 | PLUMBING | ||||||||
| D2010 | Water Closet with the accessories | units | |||||||
| Lavatory with the structures, accessories, and finish | units | ||||||||
| Urinoir | units | ||||||||
| D2020 | Repair clean water distribution lines | ls | |||||||
| D2030 | Waste water distribution lines | ls | |||||||
| D30 | HVAC | ||||||||
| Exhaust fan in the latrine facility | units | ||||||||
| Ceiling Fan | units | ||||||||
| Air Conditioning | BTU | ||||||||
| D50 | ELECTRICAL | ||||||||
| D5010 | Replace Electrical Service and Distribution | ls | |||||||
| D5020 | Lighting & Branch Wiring | ls | |||||||
| F10 | SPECIAL CONSTRUCTION | ||||||||
| Project plaque | ls | ||||||||
| X | FIELD REQUIREMENTS, OFFICE OVERHEAD & PROFIT | ||||||||
| X10 | Field Requirements | ||||||||
| X20 | Office Overhead | ||||||||
| X30 | Profit | ||||||||
| Total |
| Table 2: SITEWORK | |||||||||
| CLIN 002 Renovation of Transient Barrack and Latrine Facility | QUANTITY | MATERIAL COST | LABOR COST | ENGINEERING ESTIMATE | |||||
| NUMBER | UNIT | UNIT COST | TOTAL ($) | UNIT COST | TOTAL ($) | UNIT COST | TOTAL ($) | ||
| G10 | SITE PREPARATION | ||||||||
| G1030 | Mobilization | ls | |||||||
| De-mobilization | ls | ||||||||
| Design and drawing | ls | ||||||||
| Construction of temporary facilities | ls | ||||||||
| G30 | SITE CIVIL/ MECHANICAL UTILITIES | ||||||||
| Water supply and electricity connection | units | ||||||||
| X | FIELD REQUIREMENTS, OFFICE OVERHEAD & PROFIT | ||||||||
| X20 | Office Overhead | ||||||||
| X30 | Profit | ||||||||
| Total | |||||||||
| Total CLIN 002 |
Total CLIN 001+002
_x000D_&1#&"Calibri"&14&K000000 SENSITIVE BUT UNCLASSIFIED
Sheet2
_x000D_&1#&"Calibri"&14&K000000 SENSITIVE BUT UNCLASSIFIED
Sheet3
_x000D_&1#&"Calibri"&14&K000000 SENSITIVE BUT UNCLASSIFIED
File details come from the government source that posted it. Updated .