Exhibit D Blank BOQ rev. AMD 0003.xlsx
XLSX spreadsheet 40 KB Posted
- Attached to
- D/B UFC Renovate Operations Building and Transient Barracks at Basa Air Base, Floridablanca, Philippines
- Solicitation number
- N6274224R6719
About this file
This document is an Exhibit D - Blank Bill of Quantities (BOQ) for a federal construction contract opportunity. The contract is for the renovation of the Operations Building and Transient Barracks at Basa Air Base in the Philippines, under Solicitation Number N6274224R6719.
The BOQ provides detailed line items and estimates for the required construction work, including superstructure, exterior closure, roofing, interior finishes, plumbing, HVAC, and electrical systems. It also includes site preparation, civil/mechanical utilities, and field requirements. The total estimated cost is provided for each contract line item (CLIN) as well as the overall contract. A pre-solicitation site visit is scheduled for August 8, 2024, and proposals are due by August 19, 2024. The contract will be awarded by the Department of the Navy Naval Facilities Engineering Command.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| N6274224R6719_0003 PPIs and SOW.pdf | ||
| N6274224R6719 _0002 released.pdf | ||
| N6274224R6719-0001_released.pdf | ||
| N6274224R6719-0001 Schedule of Prices.pdf | ||
| Exhibit D Blank BOQ rev 1..xlsx | XLSX spreadsheet | |
| Exhibit D Blank BOQ.xlsx | XLSX spreadsheet | |
| N6274224R6719 Released w Attachments.pdf | ||
| EXHIBIT A-D.pdf | ||
| Exhibit A - Pre Proposal Inquiry Form.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
BILL OF QUANTITIES DATE PREPARED
| ACTIVITY AND LOCATION: | CONSTRUCTION CONTRACT NO. | ID NO. | |||||||
| Basa Air Base, Floridablanca, Pampanga, Philippines | N6274224R6719 | ||||||||
| ESTIMATED BY | CATEGORY CODE | ||||||||
| PROJECT TITLE: | NO | ||||||||
| D/B UFC Renovate Operations Building and Transient Barrack | STATUS OF DESIGN | JOB ORDER NO. | |||||||
| CLIN 001 Renovation of Operation Building | QUANTITY | MATERIAL COST | LABOR COST | ENGINEERING ESTIMATE | |||||
| NUMBER | UNIT | UNIT COST | TOTAL ($) | UNIT COST | TOTAL ($) | UNIT COST | TOTAL ($) | ||
| B10 | SUPERSTRUCTURE | ||||||||
| Construct new roof structure, including support for the antenna | sq.m | ||||||||
| B20 | EXTERIOR CLOSURE | ||||||||
| Repair and repaint the wall ( include removal of existing paint and finishes) | sq.m | ||||||||
| B30 | ROOFING | ||||||||
| B3010 | Roof coverings | sq.m | |||||||
| Rood insulation | sq.m | ||||||||
| Roof drains | ls | ||||||||
| C30 | INTERIOR FINISHES | ||||||||
| C3010 | Repair and repaint the wall ( include removal of existing paint and finishes) | sq.m | |||||||
| C3030 | Repair and repaint ceiling | sq.m | |||||||
| D20 | PLUMBING | ||||||||
| D2010 | Water Closet with the accessories | units | |||||||
| Lavatory with the structures, accessories, and finish | units | ||||||||
| Urinoir | units | ||||||||
| D2020 | Repair clean water distribution lines | ls | |||||||
| Elevated water tank with supporting structure | units | ||||||||
| Water pumps | units | ||||||||
| D2030 | Waste water distribution lines | ls | |||||||
| D2040 | Rainwater Drainage | ls | |||||||
| D30 | HVAC | ||||||||
| Air Conditioning | BTU | ||||||||
| D50 | ELECTRICAL | ||||||||
| D5010 | Replace Electrical Service and Distribution | ls | |||||||
| D5020 | Lighting & Branch Wiring | ls | |||||||
| Electrical wires relocation | ls | ||||||||
| F10 | SPECIAL CONSTRUCTION | ||||||||
| Project plaque | ls | ||||||||
| X | FIELD REQUIREMENTS, OFFICE OVERHEAD & PROFIT | ||||||||
| X10 | Field Requirements | ||||||||
| X20 | Office Overhead | ||||||||
| X30 | Profit | ||||||||
| Total |
| Table 2: SITEWORK | |||||||||
| CLIN 001 Renovation of Operation Building | QUANTITY | MATERIAL COST | LABOR COST | ENGINEERING ESTIMATE | |||||
| NUMBER | UNIT | UNIT COST | TOTAL ($) | UNIT COST | TOTAL ($) | UNIT COST | TOTAL ($) | ||
| G10 | SITE PREPARATION | ||||||||
| G1010 | Site Clearing | sq.m | |||||||
| G1030 | Mobilization | ls | |||||||
| De-mobilization | ls | ||||||||
| Design and drawing | ls | ||||||||
| Construction of temporary facilities | ls | ||||||||
| G30 | SITE CIVIL/ MECHANICAL UTILITIES | ||||||||
| Water supply and electricity connection | units | ||||||||
| X | FIELD REQUIREMENTS, OFFICE OVERHEAD & PROFIT | ||||||||
| X20 | Office Overhead | ||||||||
| X30 | Profit | ||||||||
| Total | |||||||||
| Total CLIN 001 |
| CLIN 002 Renovation of Transient Barrack and Latrine Facility | QUANTITY | MATERIAL COST | LABOR COST | ENGINEERING ESTIMATE | |||||
| NUMBER | UNIT | UNIT COST | TOTAL ($) | UNIT COST | TOTAL ($) | UNIT COST | TOTAL ($) | ||
| B20 | EXTERIOR CLOSURE | ||||||||
| Repaint the wall ( include removal of existing paint and finishes) | sq.m | ||||||||
| Repair and refinish exterior door | units | ||||||||
| C10 | INTERIOR CONSTRUCTION | ||||||||
| Repair main double doors | units | ||||||||
| Toilet doors | units | ||||||||
| C30 | INTERIOR FINISHES | ||||||||
| C3010 | Repaint the wall ( include removal of existing paint and finishes) | sq.m | |||||||
| C3030 | Repair and repaint ceiling | sq.m | |||||||
| D20 | PLUMBING | ||||||||
| D2010 | Water Closet with the accessories | units | |||||||
| Lavatory with the structures, accessories, and finish | units | ||||||||
| Urinoir | units | ||||||||
| Soap holders | units | ||||||||
| Shower partitions | units | ||||||||
| D2020 | Repair clean water distribution lines | ls | |||||||
| D2030 | Waste water distribution lines | ls | |||||||
| D30 | HVAC | ||||||||
| Exhaust fan in the latrine facility | units | ||||||||
| Ceiling Fan | units | ||||||||
| Air Conditioning | BTU | ||||||||
| D50 | ELECTRICAL | ||||||||
| D5010 | Replace Electrical Service and Distribution | ls | |||||||
| D5020 | Lighting & Branch Wiring | ls | |||||||
| F10 | SPECIAL CONSTRUCTION | ||||||||
| Project plaque | ls | ||||||||
| X | FIELD REQUIREMENTS, OFFICE OVERHEAD & PROFIT | ||||||||
| X10 | Field Requirements | ||||||||
| X20 | Office Overhead | ||||||||
| X30 | Profit | ||||||||
| Total |
| Table 2: SITEWORK | |||||||||
| CLIN 002 Renovation of Transient Barrack and Latrine Facility | QUANTITY | MATERIAL COST | LABOR COST | ENGINEERING ESTIMATE | |||||
| NUMBER | UNIT | UNIT COST | TOTAL ($) | UNIT COST | TOTAL ($) | UNIT COST | TOTAL ($) | ||
| G10 | SITE PREPARATION | ||||||||
| G1030 | Mobilization | ls | |||||||
| De-mobilization | ls | ||||||||
| Design and drawing | ls | ||||||||
| Construction of temporary facilities | ls | ||||||||
| G20 | SITE IMPROVEMENT | ||||||||
| Deep cleaning | ls | ||||||||
| G30 | SITE CIVIL/ MECHANICAL UTILITIES | ||||||||
| Water supply and electricity connection | units | ||||||||
| X | FIELD REQUIREMENTS, OFFICE OVERHEAD & PROFIT | ||||||||
| X20 | Office Overhead | ||||||||
| X30 | Profit | ||||||||
| Total | |||||||||
| Total CLIN 002 |
| CLIN 003 Installation of Hangar Door | QUANTITY | MATERIAL COST | LABOR COST | ENGINEERING ESTIMATE | |||||
| NUMBER | UNIT | UNIT COST | TOTAL ($) | UNIT COST | TOTAL ($) | UNIT COST | TOTAL ($) | ||
| A10 | FOUNDATIONS | ||||||||
| Construct foundation for new hangar door | ls | ||||||||
| B10 | SUPERSTRUCTURE | ||||||||
| Construct new hangar door | ls | ||||||||
| D50 | ELECTRICAL | ||||||||
| New door motors including installation | unit | ||||||||
| F10 | SPECIAL CONSTRUCTION | ||||||||
| Project plaque | ls | ||||||||
| X | FIELD REQUIREMENTS, OFFICE OVERHEAD & PROFIT | ||||||||
| X10 | Field Requirements | ||||||||
| X20 | Office Overhead | ||||||||
| X30 | Profit | ||||||||
| Total |
| Table 2: SITEWORK | |||||||||
| CLIN 003 Installation of Hangar Door | QUANTITY | MATERIAL COST | LABOR COST | ENGINEERING ESTIMATE | |||||
| NUMBER | UNIT | UNIT COST | TOTAL ($) | UNIT COST | TOTAL ($) | UNIT COST | TOTAL ($) | ||
| G10 | SITE PREPARATION | ||||||||
| G1010 | Site Clearing | ls | |||||||
| G1030 | Mobilization | ls | |||||||
| Demolition: Sawcut removal of 0.3m deep exsiting concrete slab | ls | ||||||||
| De-mobilization | ls | ||||||||
| Design and drawing | ls | ||||||||
| Construction of temporary facilities | ls | ||||||||
| G30 | SITE CIVIL/ MECHANICAL UTILITIES | ||||||||
| Maintenance of existing hanger door including motors | ls | ||||||||
| X | FIELD REQUIREMENTS, OFFICE OVERHEAD & PROFIT | ||||||||
| X20 | Office Overhead | ||||||||
| X30 | Profit | ||||||||
| Total | |||||||||
| Total CLIN 003 |
| CLIN 004 Stormwater Drainage Improvement | QUANTITY | MATERIAL COST | LABOR COST | ENGINEERING ESTIMATE | |||||
| NUMBER | UNIT | UNIT COST | TOTAL ($) | UNIT COST | TOTAL ($) | UNIT COST | TOTAL ($) | ||
| B10 | SUPERSTRUCTURE | ||||||||
| Mark and load test existing and new aircraft tie-down points | ls | ||||||||
| D50 | ELECTRICAL | ||||||||
| Test existing tie downs for grounding and bonding compliance | ls | ||||||||
| Install grounding rods and tie them to the new tie downs | ls | ||||||||
| G30 | SITE CIVIL/MECHANICAL UTILITIES | ||||||||
| Maintenance of existing hanger door including motors | ls | ||||||||
| F10 | SPECIAL CONSTRUCTION | ||||||||
| Project plaque | ls | ||||||||
| X | FIELD REQUIREMENTS, OFFICE OVERHEAD & PROFIT | ||||||||
| X10 | Field Requirements | ||||||||
| X20 | Office Overhead | ||||||||
| X30 | Profit | ||||||||
| Total |
| Table 2: SITEWORK | |||||||||
| CLIN 004 Stormwater Drainage Improvement | QUANTITY | MATERIAL COST | LABOR COST | ENGINEERING ESTIMATE | |||||
| NUMBER | UNIT | UNIT COST | TOTAL ($) | UNIT COST | TOTAL ($) | UNIT COST | TOTAL ($) | ||
| G10 | SITE PREPARATION | ||||||||
| G1010 | Site Clearing | ls | |||||||
| G1030 | Mobilization | ls | |||||||
| De-mobilization | ls | ||||||||
| Construction of temporary facilities | ls | ||||||||
| G30 | SITE CIVIL/ MECHANICAL UTILITIES | ||||||||
| Stormwater Drainage Improvement | units | ||||||||
| Drainage clearing, cleaning, inspection, and reporting | units | ||||||||
| X | FIELD REQUIREMENTS, OFFICE OVERHEAD & PROFIT | ||||||||
| X20 | Office Overhead | ||||||||
| X30 | Profit | ||||||||
| Total | |||||||||
| Total CLIN 004 |
Total CLIN 001+002+003+004
&"Times New Roman,Regular"&10N6274224R6719_0003 Exhibit D rev.
&P
_x000D_&1#&"Calibri"&14&K000000 SENSITIVE BUT UNCLASSIFIED
Sheet2
_x000D_&1#&"Calibri"&14&K000000 SENSITIVE BUT UNCLASSIFIED
Sheet3
_x000D_&1#&"Calibri"&14&K000000 SENSITIVE BUT UNCLASSIFIED
File details come from the government source that posted it. Updated .