Exhibit D Blank BOQ rev 1..xlsx

XLSX spreadsheet 46 KB Posted

Attached to
D/B UFC Renovate Operations Building and Transient Barracks at Basa Air Base, Floridablanca, Philippines
Solicitation number
N6274224R6719
Issued by

About this file

This document is an Exhibit D - Blank Bill of Quantities (BOQ) related to a federal contract opportunity for the renovation of an Operations Building and Transient Barracks at Basa Air Base in the Philippines.

The BOQ provides detailed line item cost estimates for the renovation work, including repairs and repainting of walls and ceilings, plumbing upgrades, HVAC replacement, electrical work, and sitework. The total contract is broken down into 4 CLINs covering the Operations Building, Transient Barracks, Installation of a Hangar Door, and Stormwater Drainage Improvements. The BOQ includes quantity, material cost, labor cost, and total engineering estimate for each line item. The related federal contract opportunity, Solicitation N6274224R6719, is for design-build services for these renovations, with a site visit scheduled for August 8, 2024 and proposals due by August 19, 2024. The contract will be awarded by the Department of the Navy Naval Facilities Engineering Command.

View the file

Other files

File Type Posted
N6274224R6719_0003 PPIs and SOW.pdf PDF
Exhibit D Blank BOQ rev. AMD 0003.xlsx XLSX spreadsheet
N6274224R6719 _0002 released.pdf PDF
N6274224R6719-0001_released.pdf PDF
N6274224R6719-0001 Schedule of Prices.pdf PDF
Exhibit D Blank BOQ.xlsx XLSX spreadsheet
N6274224R6719 Released w Attachments.pdf PDF
EXHIBIT A-D.pdf PDF
Exhibit A - Pre Proposal Inquiry Form.xlsx XLSX spreadsheet

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

BILL OF QUANTITIES DATE PREPARED

ACTIVITY AND LOCATION:CONSTRUCTION CONTRACT NO.ID NO.
Basa Air Base, Floridablanca, Pampanga, PhilippinesN6274224R6719
ESTIMATED BYCATEGORY CODE
PROJECT TITLE:NO
D/B UFC Renovate Operations Building and Transient BarrackSTATUS OF DESIGNJOB ORDER NO.
CLIN 001 Renovation of Operation BuildingQUANTITYMATERIAL COSTLABOR COSTENGINEERING ESTIMATE
NUMBERUNITUNIT COSTTOTAL ($)UNIT COSTTOTAL ($)UNIT COSTTOTAL ($)
B10SUPERSTRUCTURE
Construct new roof structure, including support for the antennasq.m
B20EXTERIOR CLOSURE
Repair and repaint the wall ( include removal of existing paint and finishes)sq.m
B30ROOFING
B3010Roof coveringssq.m
Rood insulationsq.m
Roof drainsls
C30INTERIOR FINISHES
C3010Repair and repaint the wall ( include removal of existing paint and finishes)sq.m
C3030Repair and repaint ceilingsq.m
D20PLUMBING
D2010Water Closet with the accessoriesunits
Lavatory with the structures, accessories, and finishunits
Urinoirunits
D2020Repair clean water distribution linesls
Elevated water tank with supporting structureunits
Water pumpsunits
D2030Waste water distribution linesls
D2040Rainwater Drainagels
D30HVAC
Air ConditioningBTU
D50ELECTRICAL
D5010Replace Electrical Service and Distributionls
D5020Lighting & Branch Wiringls
Electrical wires relocationls
F10SPECIAL CONSTRUCTION
Project plaquels
XFIELD REQUIREMENTS, OFFICE OVERHEAD & PROFIT
X10Field Requirements
X20Office Overhead
X30Profit
Total
Table 2: SITEWORK
CLIN 001 Renovation of Operation BuildingQUANTITYMATERIAL COSTLABOR COSTENGINEERING ESTIMATE
NUMBERUNITUNIT COSTTOTAL ($)UNIT COSTTOTAL ($)UNIT COSTTOTAL ($)
G10SITE PREPARATION
G1010Site Clearingsq.m
G1030Mobilizationls
De-mobilizationls
Design and drawingls
Construction of temporary facilitiesls
G30SITE CIVIL/ MECHANICAL UTILITIES
Water supply and electricity connectionunits
XFIELD REQUIREMENTS, OFFICE OVERHEAD & PROFIT
X20Office Overhead
X30Profit
Total
Total CLIN 001
CLIN 002 Renovation of Transient Barrack and Latrine FacilityQUANTITYMATERIAL COSTLABOR COSTENGINEERING ESTIMATE
NUMBERUNITUNIT COSTTOTAL ($)UNIT COSTTOTAL ($)UNIT COSTTOTAL ($)
B20EXTERIOR CLOSURE
Repaint the wall ( include removal of existing paint and finishes)sq.m
Repair and refinish exterior doorunits
C10INTERIOR CONSTRUCTION
Repair main double doorsunits
Toilet doorsunits
C30INTERIOR FINISHES
C3010Repaint the wall ( include removal of existing paint and finishes)sq.m
C3030Repair and repaint ceilingsq.m
D20PLUMBING
D2010Water Closet with the accessoriesunits
Lavatory with the structures, accessories, and finishunits
Urinoirunits
D2020Repair clean water distribution linesls
D2030Waste water distribution linesls
D30HVAC
Exhaust fan in the latrine facilityunits
Ceiling Fanunits
Air ConditioningBTU
D50ELECTRICAL
D5010Replace Electrical Service and Distributionls
D5020Lighting & Branch Wiringls
F10SPECIAL CONSTRUCTION
Project plaquels
XFIELD REQUIREMENTS, OFFICE OVERHEAD & PROFIT
X10Field Requirements
X20Office Overhead
X30Profit
Total
Table 2: SITEWORK
CLIN 002 Renovation of Transient Barrack and Latrine FacilityQUANTITYMATERIAL COSTLABOR COSTENGINEERING ESTIMATE
NUMBERUNITUNIT COSTTOTAL ($)UNIT COSTTOTAL ($)UNIT COSTTOTAL ($)
G10SITE PREPARATION
G1030Mobilizationls
De-mobilizationls
Design and drawingls
Construction of temporary facilitiesls
G30SITE CIVIL/ MECHANICAL UTILITIES
Water supply and electricity connectionunits
XFIELD REQUIREMENTS, OFFICE OVERHEAD & PROFIT
X20Office Overhead
X30Profit
Total
Total CLIN 002
CLIN 003 Installation of Hangar DoorQUANTITYMATERIAL COSTLABOR COSTENGINEERING ESTIMATE
NUMBERUNITUNIT COSTTOTAL ($)UNIT COSTTOTAL ($)UNIT COSTTOTAL ($)
A10FOUNDATIONS
Construct foundation for new hangar doorls
B10SUPERSTRUCTURE
Construct new hangar doorls
D50ELECTRICAL
New door motors including installationunit
F10SPECIAL CONSTRUCTION
Project plaquels
XFIELD REQUIREMENTS, OFFICE OVERHEAD & PROFIT
X10Field Requirements
X20Office Overhead
X30Profit
Total
Table 2: SITEWORK
CLIN 003 Installation of Hangar DoorQUANTITYMATERIAL COSTLABOR COSTENGINEERING ESTIMATE
NUMBERUNITUNIT COSTTOTAL ($)UNIT COSTTOTAL ($)UNIT COSTTOTAL ($)
G10SITE PREPARATION
G1010Site Clearingls
G1030Mobilizationls
Demolition: Sawcut removal of 0.3m deep exsiting concrete slabls
De-mobilizationls
Design and drawingls
Construction of temporary facilitiesls
G30SITE CIVIL/ MECHANICAL UTILITIES
Maintenance of existing hanger door including motorsls
XFIELD REQUIREMENTS, OFFICE OVERHEAD & PROFIT
X20Office Overhead
X30Profit
Total
Total CLIN 003
CLIN 004 Stormwater Drainage ImprovementQUANTITYMATERIAL COSTLABOR COSTENGINEERING ESTIMATE
NUMBERUNITUNIT COSTTOTAL ($)UNIT COSTTOTAL ($)UNIT COSTTOTAL ($)
B10SUPERSTRUCTURE
Mark and load test existing and new aircraft tie-down pointsls
D50ELECTRICAL
Test existing tie downs for grounding and bonding compliancels
Install grounding rods and tie them to the new tie downsls
G30SITE CIVIL/MECHANICAL UTILITIES
Maintenance of existing hanger door including motorsls
F10SPECIAL CONSTRUCTION
Project plaquels
XFIELD REQUIREMENTS, OFFICE OVERHEAD & PROFIT
X10Field Requirements
X20Office Overhead
X30Profit
Total
Table 2: SITEWORK
CLIN 004 Stormwater Drainage ImprovementQUANTITYMATERIAL COSTLABOR COSTENGINEERING ESTIMATE
NUMBERUNITUNIT COSTTOTAL ($)UNIT COSTTOTAL ($)UNIT COSTTOTAL ($)
G10SITE PREPARATION
G1010Site Clearingls
G1030Mobilizationls
De-mobilizationls
Construction of temporary facilitiesls
G30SITE CIVIL/ MECHANICAL UTILITIES
Stormwater Drainage Improvementunits
Drainage clearing, cleaning, inspection, and reportingunits
XFIELD REQUIREMENTS, OFFICE OVERHEAD & PROFIT
X20Office Overhead
X30Profit
Total
Total CLIN 004

Total CLIN 001+002+003+004

&"Times New Roman,Regular"&10N6274224R6719_0001 Exhibit D rev.

&P

_x000D_&1#&"Calibri"&14&K000000 SENSITIVE BUT UNCLASSIFIED

Sheet2

_x000D_&1#&"Calibri"&14&K000000 SENSITIVE BUT UNCLASSIFIED

Sheet3

_x000D_&1#&"Calibri"&14&K000000 SENSITIVE BUT UNCLASSIFIED

File details come from the government source that posted it. Updated .