RELEASED AMD2_6714.pdf
PDF 6 MB Posted
- Solicitation number
- N6274224R6714
About this file
This document is an amendment to a solicitation for a design-build construction project to build a Live Fire Shoot House at Fort Magsaysay in Nueva Ecija, Philippines. The key details are:
The project will involve constructing a two-story pre-engineered metal building structure with a concrete slab-on-grade, approximately 62.3 ft x 59 ft in size. The facility will include ballistic wall cladding, movable ballistic rubber blocks/bullet traps, and a catwalk for observation. The project is estimated to cost between $1 million and $5 million.
This amendment revises various technical requirements, including the height and composition of the exterior and interior walls, the configuration of the movable ballistic rubber blocks, and the location of the electrical power connection. It also provides answers to pre-proposal inquiries and incorporates revised attachments, including a conceptual layout, photo of sample movable ballistic rubber blocks, and an updated bill of quantities. The proposal due date remains July 29, 2024 at 11:00 am Thailand Time.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment 4_Revised BOQ Amendment2_6714.xlsx | XLSX spreadsheet | |
| RELEASED_AMD1_24R6714.pdf | ||
| RELEASED_RFP 24R6714.pdf | ||
| Blank BOQ 24R6714 FMSS SOF LIVE FIRE SHOOTHOUSE.xlsx | XLSX spreadsheet | |
| Exhibit A_PPI_6714.docx | DOCX document | |
| PHIL_BAR_Base Access Request Form.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ACQR6061612
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
N6274224R6714 D/B UFC PC25-05 Live Fire Shoot House (SOF), FMSS, Nueva Ecija, Philippines
Amendment 0002 begins on the next page.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 11
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 24-Jul-2024
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N6274224R6714
X 9B. DATED (SEE ITEM 11)
25-Jun-2024
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
24-Jul-2024
CODE
NAVFAC ROICC THAILAND (US EMBASSY)
7 SATHORN TAI ROAD
BANGKOK 10120
N62742 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N6274224R6714
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)
The following have been added by full text:
AMENDMENT 0002
A. Part 1, Section 2.3 Evaluation Factors and Proposal Submission Requirements, Item a., Volume 2, Non-Cost Factor 4, Technical Solution, (a) Submittal Requirements, is revised per the following:
Changed from:
1. Outline a comprehensive plan and schedule for the procurement and installation of the ballistic range system, highlighting the supervisory role of the ballistic expert to ensure safety and compliance.
To:
1. Outline a comprehensive technical description of the design and installation of the ballistic range system, highlighting the system's components and the potential ballistic expert installer's qualification and track record to ensure compliance with project requirements.
B. Answers to Pre-Proposal Inquiries (PPIs) are provided in Attachment-01 Questions & Answers of this amendment. As a result of the provided answers, Attachment-02, summarizing changes under Parts 1, 3, 4, & 6, Attachment-03 Revised Part 6, and Attachment-04 Revised BOQ are hereby incorporated into the solicitation.
C. Additionally, this amendment incorporates the Host Nation Requirements under Section 00 73 00 - Supplementary Conditions.
The date set for receipt of proposals is unchanged and remains on July 29, 2024 at 1100am, Thailand Time.
All other paragraphs, provisions, and conditions remain unchanged.
The offeror must acknowledge receipt of this amendment.
SECTION 00 22 00 - SUPPLEMENTARY INSTRUCTIONS
The following have been modified:
EVALUATION FACTORS FOR AWARD
Section 002200 – Supplementary Instructions
PART I - GENERAL
1.1 SOURCE SELECTION
This competitive procurement uses source selection procedures to select the responsible Offeror whose proposal conforms to the requirements of the solicitation and is determined to provide the best value to the Government, price and other factors considered. The Government will use the Lowest Price Technically Acceptable (LPTA) method to evaluate proposals submitted in response to this solicitation. The Government reserves the right to eliminate from consideration for award any or all offers at any time prior to award of the contract; to negotiate with Offerors in the competitive range; and to award the contract to the Offeror submitting the lowest priced, technically acceptable (LPTA) proposal.
Per NPGI 15.101-2 (DFARS) Lowest price technically acceptable (LPTA) source selection process. (Business Rule), the number of proposals to be evaluated for technical acceptability may be limited to the lowest priced offers at the discretion of the Contracting Officer. If the number of proposals to be evaluated is limited, the technical proposal shall be provided to the evaluator(s) without any identification of price. If the lowest priced proposal is not found to be technically acceptable then the next lowest price proposal shall be evaluated. If that proposal is also not found to be technically acceptable, then the process described will be conducted again as many times as necessary, until such time as the Government identifies a technically acceptable proposal. The source selection method must be included in the request for proposal. If the Contracting Officer later determines that discussions are necessary, the procedures in FAR 15.306 shall be followed.
1.2 INTENT TO AWARD WITHOUT CONDUCTING DISCUSSIONS
The Government intends to evaluate proposals and award a contract without discussions with Offerors (except clarifications as described in FAR 15.306(a)). The Government reserves the right to conduct discussions if the Contracting Officer later determines it to be necessary.
1.3 BASIS OF AWARD
An overall non-price factor rating must be at least “ACCEPTABLE” in order to be eligible for award. An “UNACCEPTABLE” rating in any factor results in the overall non-price factor proposal being rated “UNACCEPTABLE” unless corrected through discussions. An overall non-price factor rating of “UNACCEPTABLE” make a proposal ineligible for award.
Definitions:
Technical Acceptable/Unacceptable Ratings:
Acceptable: Proposal clearly meets the minimum requirements of the solicitation.
Unacceptable: Proposal does not clearly meet the minimum requirements of the solicitation.
Past Performance Acceptable/Unacceptable Ratings:
Acceptable: Based on the Offeror’s performance record, the Government has a reasonable expectation that the offeror will successfully perform the required effort, or the Offeror’s performance record is unknown. Note: In the case of an Offeror without a record of relevant past performance or for whom information on past performance is not available or so sparse that no meaningful past performance rating can be reasonably assigned, the Offeror may not be evaluated favorably or unfavorably on pastperformance (see FAR 15.305(a)(2)(iv)). Therefore, the Offeror shall be determined to have unknown past performance.
In the context of acceptability/unacceptability “unknown” shall be considered “acceptable.”.
Unacceptable: Based on the Offeror’s performance record, the Government has no reasonable expectation that the Offeror will be able to successfully perform the required effort.
PART II - EVALUATION FACTORS FOR AWARD
2.1 EVALUATION CRITIERIA
a. The contract resulting from this solicitation will be awarded to the responsible Offeror whose offer, conforming to the solicitation, is determined to be the lowest price technically acceptable (LPTA) proposal based on the evaluation factors set forth in the solicitation.
b. “Relevant” means similar to the acquisition in terms of size, scope, and complexity and nature of the work being solicited. The Government will only consider projects for construction services of the type described in non-cost factor 1 – Offeror Experience, below.
c. Past performance information on “relevant projects” meeting the definition in paragraph (b) will constitute the primary consideration in the Government’s evaluation under non-cost factor 2 – Past Performance. The Government may, however, review and consider past performance information on other projects as made available to the Government from other sources such as the Contractor Performance Assessment Reporting System (CPARS) and inquiries with previous clients / owners. The Government will determine the relevance of the past performance information received on other projects, as well as consider the source, context and currency of such information in its evaluation.
d. Offerors who submit past performance and experience information of a parent, sister, predecessor or other affiliated company must describe what involvement such company will have on the acquisition. The proposal should clearly indicate how the resources of the parent, sister, predecessor or other affiliated company – its workforce, management, facilities, or other resources – will be provided or relied upon for contract performance.
e. The Contracting Officer may discount favorable past performance and experience of a subcontractor unless the prime contractor clearly provides, in its proposal, evidence of a binding teaming agreement or other contractual agreement which creates legal responsibility on the part of the subcontractors.
f. In the case of an Offeror without a record of relevant past performance or for whom information on past performance is not available or so sparse that no meaningful past performance rating can be reasonably assigned, the Offeror may not be evaluated favorably or unfavorably on past performance (see FAR 15.305(a)(2)(iv)). Therefore, the Offeror shall be determined to have unknown past performance. In the context of acceptability/unacceptability “unknown” shall be considered “acceptable.”
g. The Government, in compliance with FAR 15.305(a)(2)(ii), Offerors are authorized to provide information on problems encountered on the identified contracts and the Offeror’s corrective actions. The Government shall consider this information, as well as information obtained from any other sources, when evaluating the Offeror’s past performance.
2.2 PRICE EVALUATION
The price proposal will be evaluated to determine the reasonableness and completeness of the Offeror’s proposal.
The Contracting Officer may conduct price realism if the Contracting Officer determined that it is necessary.
Unrealistically low (or high) proposed price or unbalanced prices, may be grounds for eliminating a proposal from competition either on the basis that the Offeror does not understand the requirement or has made an unrealistic or unreasonable proposal.
2.3 EVALUATION FACTORS AND PROPOSAL SUBMISSION REQUIREMENTS
a. The Offeror’s proposal shall contain a response to each of the following evaluation factors and shall be in the form prescribed by this solicitation. The solicitation requires the evaluation of price and non-cost factors in two volumes listed below:
Volume 1: Price Factor Volume 2: Non-Cost Factor 1 – Offeror Experience
Non-Cost Factor 2 – Past Performance Non-Cost Factor 3 – Safety Non-Cost Factor 4 – Techinal Solution
b. The distinction between past performance and Offeror experience is experience pertains to the types of work and volume of work completed by a contractor that are comparable to the types of work covered by this requirement, in terms of size, scope, and complexity. Past performance relates to how well a contractor has performed.
c. The following describes each evaluation factor, submittal requirements and basis for assigning ratings:
Volume 1:
(1.1) Price Factor
(a) Solicitation Submittal Requirements:
i. The Standard Form 1442 with Blocks 14 through 20c completed, signed, and dated;
ii. Acknowledge any and all amendments issued under this solicitation either by annotating it in Block 19 of the SF 1442 or signing each SF 30
iii. A completed Price Schedule for all CLINs;
iv. A completed Bill of Quantities (BOQ, Exhibit D) showing price breakdown for CLINs.
Provide in both PDF and Excel formats;
v. Completed Representations and Certifications, to include a copy of the electronic annual representations and certifications thru System for Awards Management (SAM) at www.sam.gov;
vi. Responsibility Determination and Financial Capability, as specified in Paragraph 4;
vii. Evidence of active SAM.gov registration at www.sam.gov.
(b) Basis of Evaluation: The Government will evaluate price based on the total price of all priced
CLINS. Analysis will be performed by one or more of the following techniques to ensure a fair, reasonable and realistic price:
i. Comparison of proposed prices received in response to this RFP;
ii. Comparison of proposed prices with the Independent Government Estimate (IGE);
iii. Comparison of proposed prices with available historical information.
Volume 2:
(2.1) Non-Cost Factor 1 - Offeror Experience:
(a) Submittal Requirements: Submit a minimum of three (3) and a maximum of five (5) construction projects for the Offeror that best demonstrates Offeror experience on relevant projects that are similar size, scope, and complexity to the RFP. For purposes of this evaluation, a relevant project is further defined as similar design-build construction with the following relevant characteristics:
a. Similar in Size: Design-Build Construction Project between $500,000 and $2,500,000 in final construction cost. One project must be at least $1,000,000. Any project outside this range may not be considered.
b. Similar in Scope: Design-build construction of a single (or more) story reinforced concrete structure building with a minimum size of 500 SM. At least one of the projects is a PEB construction.
c. Similar in Complexity: Construction projects involving multiple trades performed in Southeast Asia, Nepal, Maldives, and Timor Leste.
Projects submitted for the Offeror shall be completed within the past (5) years of the date of issuance of this RFP. If submitting an ongoing construction project, the project should be at least 80% complete at the time of proposal submission. A project is defined as a construction project performed under a single contract.
The Offeror Experience Project Data Sheet in the form of Exhibit B is MANDATORY and SHALL be used to submit project information. Except as specifically requested, the Government will not consider information submitted in addition to this form. Individual blocks on the form may be expanded; however, total length for each Offeror Experience Project Data Sheet shall not exceed one (1) double-sided page (or two (2) single-sided pages) claimed for past performance. Data sheets for each project should not exceed two (2) pages.
For all submitted projects, the description of the project shall clearly describe the scope of work performed and the relevancy to the project requirements of this RFP (i.e., unique features, area, construction methods).
If the Offeror is a Joint Venture (JV), relevant project experience should be submitted for projects completed by the Joint Venture entity or the Joint Venture partners. Offerors are still limited to a total of five (5) projects combined.
If an Offeror is utilizing experience information of affiliates/subsidiaries/parent/LLC/LTD member companies (name is not exactly as stated on the SF1442), the proposal shall clearly demonstrate that the affiliate/subsidiary/parent firm will have meaningful involvement in the performance of the contract in order for the past performance information of the affiliate/subsidiary/parent/LLC/LTD member companies to be considered. The proposal shall state specific commitments of technical resources (e.g., personnel, equipment) that the affiliate/subsidiary/parent/LLC/LTD member companies commit to the performance of this contract. In particular, the proposal will clearly state the specific commitments of resources of the affiliate/subsidiary/parent/LLC/LTD member that will be located at the worksites and company offices in the city/area of the project. The proposal shall also describe specific roles of the affiliate/subsidiary/ parent/LLC/LTD member companies in terms of the work it will either self-perform or manage on behalf of the Offeror in performance of the contract. Any projects submitted in excess of the five (5) will not be considered.
(b) Basis of Evaluation: The basis of evaluation will include the Offeror’s demonstrated experience and depth of experience in performing similar design-build construction projects with the relevant characteristics defined in the solicitation submittal requirements for this non-cost factor above. The assessment of the Offeror’s relevant experience will be used as a means of evaluating the capability of the Offeror to successfully meet the requirements of the RFP. The Government will only review five (5) projects. Any projects submitted in excess of the five (5) for Offeror experience will not be considered. The Government will not evaluate information exceeding the first two (2) pages for each Project Data Sheet.
i. Acceptable. The contractor has demonstrated construction experience in performing similar design-build construction projects with the relevant characteristics defined in the solicitation submittal requirements for this non-cost factor.
ii. Unacceptable. The contractor did not submit Offeror Experience Project Data Sheets, the submitted data sheets did not demonstrate relevant construction experience performing similar design-build construction projects with the relevant characteristics defined in the solicitation submittal requirements for this non-cost factor, or the Offeror submitted less than three (3) relevant projects.
(1) Non-Cost Factor 2 - Past Performance:
(a) If a completed Contractor Performance Assessment Reporting System (CPARS) evaluation is available, it shall be submitted with the proposal for each project included in Factor 1 Offeror Experience. If there is not a completed CPARS evaluation, then submit Past Performance Questionnaires (Exhibit C) for each project included in Factor 1. The Offeror should provide completed Past Performance Questionnaires (PPQ) in the proposal. Offerors shall not incorporate by reference into their proposal PPQs previously submitted for other RFPs.
However, this does not preclude the Government from utilizing previously submitted PPQ information in the past performance evaluation. If the Offeror is unable to obtain a completed PPQ from a client for a project(s) before proposal closing date, the Offeror shall complete and submit with the proposal the first page of the PPQ, which will provide contract and client information for the respective project(s). The Government may make reasonable attempts to contact the client noted for that project(s) to obtain the PPQ information. However, Offerors should follow-up with clients/references to help ensure timely submittal of questionnaires. If the client requests, questionnaires may be submitted directly to the Government’s point of contact, Contract Specialist.
Offerors may provide any information on problems encountered and the corrective actions taken on projects submitted under Factor 1 – Offeror Experience. Offerors may also address any adverse past performance issues. Explanations shall not exceed two (2) double-sided pages (or four (4) single-sided pages) in total.
The Government reserves the right to contact references for verification or additional information. The Government’s inability to contact any of the Offeror’s references or the references unwillingness to provide the information requested may affect the Government’s evaluation of this factor.
Performance award or additional information submitted will not be considered.
(b) Basis of Evaluation: This evaluation will consider how well the Offeror’s team performed on relevant projects submitted under Factor 1 – Offeror Experience and may also consider past performance on other projects currently documented in known sources. In addition to the above, the Government reserves the right to obtain information for use in the evaluation of past performance from any and all sources including sources outside of the Government.
Other sources may include, but are not limited to, past performance information retrieved through the Past Performance Information Retrieval Systems (PPIRS) using all CAGE/UEI numbers of Contractors who are part of a partnership or joint venture identified in the offeror’s proposal, inquiries of owner representative(s), Federal Awardee Performance and Integrity Information System (FAPIIS), Electronic Subcontract Reporting System (eSRS), and any other known sources not provided by the offeror.
The Government will consider the recency and relevance of the information, the source of the information, context of the data, and general trends in the Contractor’s performance. This evaluation is separate and distinct from the Contracting Officer’s responsibility determination.
The assessment of the Offeror’s team’s past performance will be used as a means of evaluating the Offeror’s team’s probability to successfully meet the requirements of the RFP.
i. Acceptable. The Offeror has satisfactory or better ratings in the Contractor Performance
Assessment Reporting System (CPARS) or on Past Performance Questionnaires (PPQ) (Exhibit C) for at least three (3) projects rated acceptable in Factor 1. In the case of an Offeror without a record of recent and relevant past performance or for whom information on past performance is not available or so sparse that no meaningful past performance rating can be reasonably assigned, the Offeror may not be evaluated favorably or unfavorably on past performance. Therefore, the Offeror shall be determined to have “unknown” past performance. In the context of acceptability/unacceptability, “unknown” shall be considered “acceptable.”
ii. Unacceptable. The Offeror was not rated satisfactory or better in the Contractor Performance Assessment Reporting System (CPARS) or on Past Performance Questionnaires (PPQ) (Exhibit C) for at least three (3) of the projects determined to be relevant and acceptable under Factor 1 – Offeror Experience, or the Government has found less than satisfactory documentation for the contractor’s performance using
Government databases. Additionally, Offerors will be rated unacceptable if they do not provide a CPARS if it exists for any project submitted under Factor 1 – Offeror Experience. Submitting a PPQ in place of a CPARS when a CPARS exists will result in unacceptable rating.
(2) Non-Cost Factor 3 - Safety:
(a) Submittal Requirements: The Offeror shall submit a safety narrative that fully describes the safety management system that they will use to oversee the safety compliance and performance of self-performed and subcontractor (if utilized) performed work. The narrative should describe any innovative methods that will be employed to ensure and monitor safe work practices at self-performed and all subcontractor (if utilized) performed work. Additionally, the narrative should describe the methods Offeror will use to execute an effective safety program including mishap prevention techniques and processes, encouraging employee reporting of unsafe conditions, and preventing unsafe work activities that could lead to near-miss or injury mishaps. The technical approach to safety narrative shall be limited to five (5) pages.
(b) Basis of Evaluation: The Government will evaluate the narrative to determine how the Offeror will implement and oversee its safety program for protection of the prime contractor and subcontractor (if utilized) personnel. The Government will evaluate the Offeror’s plan to monitor safety performance of the prime contractor and all subcontractors (if utilized) during contract performance, with a focus on specific management practices that will be utilized for providing deliberate safety program management and mishap prevention. The Government will only evaluate up to the first five (5) pages submitted.
i. Acceptable. The Offeror demonstrates an understanding of the requirement to provide for the safety of prime and subcontractor (if utilized) personnel, the narrative describes the methods Offeror will use to execute an effective program that includes mishap prevention techniques and processes, encouraging employee reporting of unsafe conditions, and prevents unsafe work activities that could lead to near-miss or injury mishaps.
ii. Unacceptable. The Offeror’s narrative does not demonstrate an understanding of the requirement to provide for the safety of prime and subcontractor (if utilized) personnel, the narrative does not describe the methods Offeror will use to execute an effective program that includes mishap prevention techniques and processes, encouraging employee reporting of unsafe conditions, and does not prevent unsafe work activities that could lead to near-miss or injury mishaps, or the Offeror did not submit a sufficient narrative within the first five (5) pages.
(3) Non-Cost Factor 4 - Technical Solution:
(a) Submittal Requirements:
i. Provide a narrative describing the technical solution to the project that meets the requirements of the RFP. Include the following:
1. Outline a comprehensive plan and schedule for the procurement and installation of the ballistic range system, highlighting the supervisory role of the ballistic expert to ensure safety and compliance.Outline a comprehensive technical description of the design and installation of the ballistic range system, highlighting the system's components and the potential ballistic expert installer's qualification and track record to ensure compliance with project requirements.
Narrative shall not exceed two (2) double-sided pages (or four (4) single-sided pages).
ii. Provide the following conceptual design drawing details:
1. Site layout plan showing footprint of proposed buildings and access road.
2. Floor plan of the proposed building at first and second level.
3. Typical wall section showing ballistic cladding
(b) Basis of Evaluation: The Government will evaluate the narrative, and conceptual drawings considering the extent to which the Offeror demonstrates a clear understanding of the architectural and engineering requirements of the project. The Government will evaluate the Offeror's technical solution to determine adherence to the technical requirements of the RFP.
i. Acceptable. Narrative, and all required drawings, are submitted; the narrative accurately describes the requirements, the drawings address all key aspects of the project and are adequate to use for creating detailed design drawings, The Offeror illustrates understanding of the statement of the requirements.
ii. Unacceptable. The Offeror did not submit a narrative, all required drawings or the drawings submitted do not address all key aspects of the project or are not adequate to use for creating detailed design drawings. The Offeror did not illustrate understanding of the statement of the requirements.
2.4 FINAL SELECTION
All Offerors will be evaluated for each of the technical (non-cost) Factors and the responsible Offeror submitting the lowest priced technically acceptable offer will be selected for contract award. A responsibility determination shall be made for each presumed awardee. A presumed awardee may be determined to be non-responsible if it has an excessive amount of current awards or ongoing projects, is currently behind or has excessive rework issues on existing contracts, or is otherwise deemed an increased risk to the US Government for unsuccessful performance.
SECTION 00 73 00 - SUPPLEMENTARY CONDITIONS
The following have been added by full text:
HOST NATION REQUIREMENTS
52.236-7 Permits and Responsibilities. (Nov 1991)
The Contractor shall, without additional expense to the Government, be responsible for obtaining any necessary licenses and permits, and for complying with any Federal, State, and municipal laws, codes, and regulations applicable to the performance of the work. The Contractor shall also be responsible for all damages to persons or property that occur as a result of the Contractor’s fault or negligence. The Contractor shall also be responsible for all materials delivered and work performed until completion and acceptance of the entire work, except for any completed unit of work which may have been accepted under the contract.
(End of clause)
Contractor Licensing and Hiring Requirements
Contractors must be duly authorized to operate and conduct business in any host country and must fully comply with all laws, decrees, labor standards, and regulations of the host country during the performance of the contract. The United States has established international agreements with the Philippines that include provisions relating to the procurement of supplies, employment preferences and use of local and U.S. contractors, as well as restrictions on hiring of third country nationals or utilization of third country contractors. Offerors are expected to comply with all controlling international agreements and with the laws of host nations whether the United States Government provides notice of the existence of such requirements. The contractor will not be permitted use of third country personnel or contractors in the performance of this contract without a demonstration that reasonable efforts to employ citizens, nationals, and permanent residents of host nation and the United States, or contractors of the host nation and the United States, have been made and that wages competitive with or higher than those being paid for similar work performed in the host nation by citizens of the host nation or of the United States are being offered. The contractor shall not employee third country personnel or contractors without written notification of United States approval from the Contracting Officer.
Permit Compliance The United States does not directly hold environmental permits in the host nation. The contractor shall comply with environmental permits held by the host nation for the benefit of a DoD project even if the contractor is not named in the permit. Contractor shall document general procedures and their implementation for compliance with permit conditions, Best Management Practices, and required mitigations. Contractor shall be responsible for any required corrective actions. Contractor shall provide permit compliance and corrective action documentation to the COR and any additional Government and Host Nation representatives as requested by the COR.
Temporary Construction Facilities Physical Appearance Be aware of local sensitivities and cultural values. Temporary facilities and visible components thereof shall be of solid color without visible markings, graphics, and/or text.
Biosecurity for Construction Contracts Invasive species can be purposefully or inadvertently moved with construction equipment, personal protective equipment and hand tools, foot traffic, vehicles and vessels, raw construction materials, and packing materials. Invasive species can become pests and affect the economy, ecology, and human health.
It is critically important to be aware of ways to prevent the movement of invasive species and implement best management practices. The Contractor shall take all practicable measures to prevent introduction or spread of invasive species in association with contract performance, including importation of supplies, equipment or personnel and movement of supplies, equipment, or personnel between locations. At a minimum, all activities shall comply with U.S. and host nation biosecurity laws and regulations, shall include 100 percent inspection of equipment and supplies. If the contract performance results in introduction or spread of invasive species, the contractor shall be responsible for taking appropriate measures, in consultation with appropriate authorities, to contain and prevent contract related spread of such species at no additional cost to the government. In addition, the Contractor shall:
a. Comply with all necessary inspections of raw construction materials, equipment, and vehicles for invasive and pest species prior to entering of the project site and prior to moving equipment offsite. The Contractor is responsible for any cleaning or inspection fees.
b. Non-native invasive species can be inadvertently moved with construction equipment, Personal protective equipment, hand tools, foot traffic, vehicles, vessels, raw construction materials, and packing materials.
c. Conduct vehicle washdown and inspection for soil and other material to prevent the inadvertent movement of invasive species from the project site to other locations. Establish appropriate facilities that comply with all environmental laws and regulations, and promptly take corrective or preventative actions for noncompliance. Include these details in a biosecurity/Hazard Analysis and Critical Control Point (HACCP) plan and environmental briefs.
d. Submit a biosecurity/HACCP Plan, prepared in accordance with USFWS HACCP Manual for all imported equipment and imported construction materials and supplies. The HACCP plan must address, as a minimum, the identification and control of invasive and non-native species in construction equipment and construction materials and supplies.
e. Implement and update the HACCP plan accordingly to reduce the risk of spreading invasive species. The HACCP development team should include at least two members, one member with biological expertise with invasive species and one member from the project team who has a clear understanding of the project activities and requirements. Contractor is responsible for training all personnel on the project specific HACCP requirements once the plan is approved by the Government.
f. The Contractor must compile all supporting documentation (e.g. reports, checklists and logs) required under their HACCP Plan and submit such documents to the Contracting Officer on a monthly basis. Once all HACCP plan activities are complete, bound hardcopies of the plan and all supporting documentation and submit to the Contracting Officer.
(End of Summary of Changes)
Attachment 0001 - Answers to PPIs Amendment 0002 N6274224R6714
No. Reference (Sect/Para/Page) QUESTION GOVERNMENT ANSWER
1 Extension of Time Please advise if a 1-week EOT can be provided given the building needs to be designed and no quantities were provided for the BOQ?
Yes. Amendment 0001 extends the due date of proposal submission from July 24, 2024 to July 29, 2024 at 1100 am Thailand Time.
2 SF1442, Block 13 Regarding the due date for the mentioned solicitation, we kindly request a two-weeks extension to accurately prepare the price and technical proposal.
Yes. Amendment 0001 extends the due date of proposal submission from July 24, 2024 to July 29, 2024 at 1100 am Thailand Time.
3 Section 00 21 00 PPSV is only highly encouraged and not mandatory. We did not attend the scheduled PPSV. Are we still eligible for the award? (Yes or No)
Yes, even if you are not able to attend the PPSV you are still entitled for the award. Per Section 00 21 00 - Instructions to Offerors, 1. Pre-Proposal Site Visit (PPSV), item b.Pre- Proposal Site Visit (PPSV) attendance is highly encouraged to ensure full understanding of the logistical challenges involved with this project and decrease risk of unsuccessful completion or financial hardship for contractors.
4 Part 2, 2 (f), Page 4 of 46 and Part 6
Please provide soils report. The Government does not have a soils report. Per Part 3 Section 5.1.1, Civil Work paragraph e., the contractor is required to retain a Geotechnical Engineer experienced and licensed in the geographic region of the project to develop geotechnical requirements to support design and construction.
The Contractor's Geotechnical Engineer must perform subsurface investigation/testing as required to adequately determine all applicable geotechnical factors related to type and capacity of the project foundations which are provided by the contractor DOR's.
5 Part 2, 2 (f), Page 4 of 46 and Part 6
Please provide geotechnical report. The Government does not have a geotechnical report. Per Part 3 Section 5.1.1, Civil Work paragraph e., The Contractor is required to retain a Geotechnical Engineer experienced and licensed in the geographic region of the project to develop geotechnical requirements to support design and construction.
The Contractor's Geotechnical Engineer must perform subsurface investigation/testing as required to adequately determine all applicable geotechnical factors related to type and capacity of the project foundations which are provided by the contractor DOR's.
6 Part 2, 2 (f), Page 4 of 46 and Part 6
Please provide environmental documentation. There are no additional environmental documents to provide.
Per Part 3 Section 2.1 Applicable Codes and Standards, the design and construction shall be in accordance with referenced codes and standards r. All applicable standards and codes required by the Philippine Government. This includes all applicable Philippine environmental laws and decrees.
7 Section C Interior Construction / C1010 Partitions / Page 15 of 20 / Part 3
Can steel framing for the interior partitions be an option aside from concrete walls?
Yes. The interior partitions can be steel framing as designed by the Ballistic expert/installer.
Per Amendment 0002, Section 6, Engineering Systems Requirements (ESR), Subsection C1010 PARTITIONS is changed to:
The primary interior perimeter wall material of the building shall be reinforced concrete 205 mm (8”) thick, 3050 mm height, with ballistic cladding on both sides. CMU walls are not allowed.
The training room partitions shall be provided with ballistic wall cladding, min. 3/8" Steel AR500 Steel plate, with a min of 45 mm. thick anti ricochet panel on both sides of 104mm x 104mm x 6mm(4"x4"x1/4") tube frame OR as designed by the Ballistic expert.
8 Section 2.3 / Volume 2 / Para
2.1 / Page 16 of 35 / Part 1
Can a Design-Bid-Build project of the same type be used as past experience?
No, the submitted projects must be Design-Build construction projects.
Per RFP Part 1, Section 2.3 EVALUATION FACTORS AND PROPOSAL SUBMISSION REQUIREMENTS (2.1) Non- Cost Factor 1) Offeror Experience, item (a), Page 16 of 35:
Submittal Requirements: Submit a minimum of three (3) and a maximum of five (5) construction projects for the Offeror that best demonstrates Offeror experience on relevant projects that are similar size, scope, and complexity to the RFP. For purposes of this evaluation, a relevant project is further defined as similar design-build construction.
9 Do we need to construct a Generator Pad? No. There is no requirement to construct a generator pad in the
RFP.
10 Do we need to add Generator unit in our proposal?
No. There is no requirement to provide a generator in the RFP.
11 PART 3, PROJECT
PROGRAM
5. WORK/ROOM
REQUIREMENTS:
5.1.3 LIVE FIRE
SHOOTHOUSE
a. Architectural and structural work
2. At a minimum the live fire shoothouse shall have the following features:
-Exterior Walls: Walls shall be
4.572 m. high, 8” thick reinforced concrete with ballistic cladding.
Please confirm which wall height to follow, 4572mm or 4750mm?
Wall height requirement is 4750 mm high at 6.
ENGINEERING SYSTEM REQUIREMENTS
(ESR, B20 EXTERIOR ENCLOSURE, B2010
EXTERIOR WALLS, page 14 of 20. See item 04 below.
Exterior wall height shall be 4.572 m.
Per Amendment 0002 of the RFP, 6. ESR, B2010 EXTERIOR WALLS, is changed to: a. The primary exterior wall material of the building shall be reinforced concrete 205 mm (8”) thick, 4752 mm height, with ballistic cladding on the interior side.
CMU walls are not allowed.
12 PART 3, PROJECT
PROGRAM
5. WORK/ROOM
REQUIREMENTS:
5.1.3 LIVE FIRE
SHOOTHOUSE
a. Architectural and structural work
2. At a minimum the live fire shoothouse shall have the following features:
-Ceiling at corridors: Provide the same ballistic cladding provided for the walls.
Please confirm that ballistic cladding at ceiling is only at the bottom of catwalk platforms and ceiling entrances.
Per Amendment 0002, Part 3, 5. WORK/ROOM
REQUIREMENTS:5.1.13 LIVE FIRE SHOOTHOUSE
a.Architectural and structural work, fifth bullet, the word "Include the ceiling below the catwalk platform" is added.
13 PART 3, PROJECT
PROGRAM
5. WORK/ROOM
REQUIREMENTS:
5.1.3 LIVE FIRE
SHOOTHOUSE
a. Architectural and structural work
12. Painting: Provide field applied exterior coatings for all items that are not prefinished, and to prefinished items when required to provide a color other than a standard prefinished color.
Please provide exterior coating color for all items that are not prefinished.
Per Amendment 0002, Part 3, 5. WORK/ROOM REQUIREMENTS, 5.1.3 LIVE FIRE SHOOTHOUSE, a.
Architectural and Structural work, Section 12, is changed to:
12. Painting: Provide field applied exterior coatings for all items that are not prefinished, and to prefinished items when required to provide a color other than a standard prefinished color. Color shall be approved by the COR.
14 PART 3, PROJECT
PROGRAM
6. ENGINEERING SYSTEM
REQUIREMENTS (ESR)
B20 EXTERIOR
ENCLOSURE
B2010 EXTERIOR WALLS
a. The primary exterior wall material of the building shall be reinforced concrete 205 mm (8”) thick, 4750 mm height, with ballistic cladding on the Interior Side.
Please confirm which wall height to follow, 4572mm or 4750mm?
Wall height requirement is 4572 mm high at 5.
WORK/ROOM REQUIREMENTS: 5.1.3 LIVE
FIRE SHOOTHOUSE a. Architectural and structural work, page 7 of 20. See item 01 above.
Refer to answer in Question #11.
15 Part 3, 5.1.3 Live Fire Shoot house, Section B Electrical Works, Point 5
Please confirm that the client requires all duplex outlets to be 110V, 50Hz.
The requirement is only 220V.
Per Amednment 0002, Part 3, 5. WORK/ROOM REQUIREMENTS 5.1.3 LIVE FIRE SHOOTHOUSE, b.
electrical work, Section 5, is changed to: 5. Provide and install universal type duplex power outlets 220V in compliance with NEC per below table.
16 Part 3, 5.1.3 Live Fire Shoot house, Section D, Fire Alarm System
Please confirm that the fire alarm system needs to be a standalone system, with no interfacing to any existing system required.
This is confirmed. Per Amendment 0002, Part 3, 5.
WORK/ROOM REQUIREMENTS:5.1.13 LIVE FIRE
SHOOTHOUSE, d. Fire Alarm System and Fire Fighting System: 4.5. "The Fire alarm system shall be stand-alone with no interfacing to any existing system."
17 Part 3, 5.1.3 Live Fire Shoot house, B1010 Floor Construction, Section 1
Please confirm that the contractor must enhance the soil's load-bearing capacity to achieve 1500
PSF.
This is confirmed. Per RFP Part 3, 5.1.3 Live Fire Shoothouse, B1010 Floor construction, Section 1".. Provide sub-base consisting of compacted soil with a minimum soil bearing capacity of 1500 PSF."
18 Part 3, 5.1.3 Live Fire Shoot house, G10 Site Preparation, Section A & B
Please confirm that the contractor is required to obtain a permit only from the Base Commander.
This is confirmed. Per Amendment 0002, Part 3, Section 6, Subsection G10 Site Preparation, b is changed to "b. The contractor shall apply and obtain all appropriate permits and clearances from the base commander and pay fees including but are not limited to environmental preservation and social fees due to secure permits and approvals and other services from the local governing authority and comply with all other related laws and regulations applicable in Philippines before commencement of any part of the work."
19 Part 3, 5.1.3 Live Fire Shoot house, G10 Site Preparation, Section E
Please confirm that the client will provide the contractor with land for a laydown area and storage near the construction site at no cost.
Per RFP, Part 2, 13. PRECONSTRUCTION CONFERENCE:"Prior to construction or demolition start, meet with Contracting Officer Representative (COR) to discuss, and develop mutual understanding relative to administration of the safety programs, environmental issues, safety of building occupants and surrounding area, hazardous materials, waste disposal, construction QC procedures, construction schedule, labor provisions and other construction phase contract procedures."
In the said Preconstruction meeting that will also be attended by the end-user, all logistics concerns and constract procedures will be discussed including determining where the lay-down area is, safety regulations by the camp, gate pass for workers and equipment, route of delivery trucks, etc.
20 Part 3, 5.1.3 Live Fire Shoot house, G10 Site Preparation, Section F
Please confirm that the client will provide the contractor with utilities (electricity, water, and sewage connection) at no cost.
Per RFP Part 3, Section 6, Subsection G10 SITE PREPARATION, "f. The contractor shall provide temporary utility services (i.e., water, electric, etc.) required for construction and to support temporary facilities and bear all associated costs for connection, installation, and usage bills to include administration fees and coordination effort with local authorities."
21 Part 3, 5.1.3 Live Fire Shoot house, G1010 Site Clearing
Please confirm that the contractor is required to obtain a permit only from the Base Commander.
Refer to answer in Question #18.
22 Part 3, 5.1.3 Live Fire Shoot house, X10 Field Requirements, Section A
Please confirm that the contractor is required to obtain a permit only from the Base Commander.
Refer to answer in Question #18.
23 Part 4, Performance Technical Specifications, D5090 Other Electrical Services, Point 8
Please confirm contractor is responsible for getting the Professional engineer design approval and Installation approval.
This is confirmed. Per RFP Part 4, D5090, a. 8. "A licensed electrical worker or professional engineer shall test and report on the adequacy and success of the earthing and lightning protection works. The test results and reports shall be submitted to the COR as part of the acceptance of the works."
24 General Please confirm that the client will issue a permanent access pass to the contractor, including labor and machinery, for the construction period.
Refer to answer in Question #19
25 General Please confirm that the existing roads inside the base are suitable for transporting heavy-duty construction equipment and materials trucks and if not the client will improve the roads where required at the clients cost?
Refer to answer in Question #19
26 3.2 Site Development Please provide the soil investigation report or topographical site survey for the proposed site location to be in a position to quote for the ground works given no quantities have been provided in the BOQ?
Soil investigation report and topographic survey report are not available. For preparing bid documents, consider a conservative value of 1500 psf for the soil bearing capacity.
In Amendment 0002, Part 3, Section 6, Subsection B2010, a.2 add the phrase " For preparation of bid, a conservative valued of 1500 psf maybe assumed" after the first sentence.
27 8.3.3 Testing a)
ACCREDITATION
REQUIREMENTS
Please confirm if the construction materials require an additional 3rd party test over and above if the supplied material is already in conformance with a recognized international standard and the same is specified on the material data sheet?
This is confirmed. Per RFP, Part 2, 8.3.3 TESTING, third party testing shall be done by accredited testing authorities.
28 B20 Exterior Enclosure Please confirm all external steel fixtures, fasteners and accessories can be hot dip galvanized materials?
This is confirmed. Per RFP Part 3, Section 5, 5.1.3 LIVE FIRE SHOOTHOUSE, a.Architectural and Structural work 1. All PEB and structural steel should be hot-dip galvanized.
29 Part 6 Attachments, p. 130 FIGURE 4.3 – Photo showing the existing electric pole that will be the source of the electric power for the project
The pole is located near the proposed VMF (CLIN 001) of Project 6712, which is approximately 4.57km northwest of the site. As mentioned during the site visit, the tapping source for the electricity for this project is located 200m southwest of the site. Please see below the photo taken during the site visit for your reference. May we request a picture of the secondary electrical post mentioned during the site visit?
No photo available. Tapping point is approximately 350 meters from the project site.
Per Amendment 0002, Part 3, 5.1.2 UTILITIES
a. is changed to: "Connect to shore power located at the compound where the main building of the Special forces school is located which is about 350 meters from the project site. Provide and install electric poles including all electrical cabling requirements."
30 Part 3, Page 19, CLIN 0002, F10 (a.)
Ballistic robber panel Thickness and installation height mentioned in SOW and BOQ differ. Please clarify the thickness and installation height of Ballistic robber panel.
Thickness is min. of 20 inches, height is min. of 79".
Per Amendment 0002, Part 3, Section 6, Subsection F10 SPECIAL CONSTRUCTION (for CLIN 0002), the second bullet was changed…