This document appears to be an Exhibit D - Blank BOQ (Bill of Quantities) for a federal contract opportunity related to the construction of a Vehicle Maintenance Facility and Covered Training Area at Fort Magsaysay, Nueva Ecija, Philippines.

The key details are as follows: The opportunity is a Design-Build project for the construction of a single-story pre-engineered metal building (PEMB) structure for a Covered Training Area Facility, as well as two single-story concrete-frame structures with steel truss roofs for 1BCT Maintenance Parking Bay Facility and Airfield Maintenance Parking Bay Facility. The projects must be designed and constructed in accordance with Unified Facilities Criteria (UFC), International Building Codes (IBC), or Philippines Codes. The estimated project magnitudes are between $250,000 - $500,000 for the Covered Training Area Facility, and between $500,000 - $1,000,000 for each of the Maintenance Parking Bay Facilities. A pre-proposal site visit is tentatively scheduled for June-July 2024, and contractors are required to submit a Base Access Request by May 21, 2024. The solicitation is expected to be issued by the Department of the Navy Naval Facilities Engineering Command in June or July 2024.

View the file

Other files

File Type Posted
N627424R6712 Amd0003 Released.pdf PDF
N6274224R6712_0002 extend due date.pdf PDF
N6274224R6712_0001 extend due date.pdf PDF
24R6712 Released w attachments.pdf PDF
Exhibit A Pre Proposal Inquiry Form.xlsx XLSX spreadsheet
24R6712 draft.pdf PDF
Exhibic A-D.pdf PDF
PHIL_BAR_Base Access Request Form.xlsx XLSX spreadsheet

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BOQ

BILL OF QUANTITIES
QUANTITYMATERIAL COSTLABOR/EQUIPMENT COSTTOTAL ESTIMATE
NUMBERUNITUNIT, USDTOTALUNIT, USDTOTALUNIT, USDTOTAL, USD
CLIN 0001MAINTENANCE PARKING BAY FACILLITY
A10FOUNDATIONS- 0
Special Foundations
1Pedestal Columns and Foundation for Maintenance BayEA
Slab on Grade (cast-in-place slab-on-grade reinforced concrete slab with breathable water-resistant concrete sealer), 10.5x40
2Slab on GradeSM
3Compacted base course 30 cm. thickCM
4Geotextile Cover (for 7 parking bays only)SM
5Floor moisture barrier for covered area (Office, NCO Quarters, Tool House, Toilet)SM
B10SUPERSTRUCTURE
6Structural steel (columns and roof frame) including purlins and bracingsEA
B20EXTERIOR CLOSURE
Exterior Walls
7CHB Walls for Office with toilet, NCO Sleeping Quarters with attached toilet and bath, and office tools room (incl. rebars, mortar & plaster)SM
Exterior Windows
8Window, including hardware for Office and QuartersEA
9Window, including hardware for ToiletsEA
Exterior Doors
10Solid Core Door, including Hardware for officeEA
Column Protection
11Provide 6" diameter concrete filled steel bollards at each side of the columns of 5 parking baysEA
B30ROOFING
Roof Coverings & Roof Drains
12Steel Roof covering (Kliplock type) incl. accessories, gutters, downspouts and Rockwool insulation and wire mesh for maintenance and parking baysSM
13Roof Truss incl. purlins for enclosed area (office, quarters, latrines)SM
14Steel Roof covering (Kliplock type) incl. accessories, gutters, downspouts and Rockwool insulation and wire mesh for enclosed areaSM
C30INTERIOR FINISHES
15Floor finishes for office, quarters, toilets and storage room - smooth concrete finishSM
16Floor finishes for Parking and Maintenance/Repair Bays - trowel finishSM
17PaintingSM
18Ceiling: Ficem Boards on Metal Furring (For Office, Quarters, Toilets and Tools Room)SM
19Ceiling: Spandrel on Metal Furring (For Exterior ceiling eaves)SM
Interior Doors
20Solid Core Door, including Hardware for office, Quarters & storage roomEA
21Solid Core Door, including Hardware for toiletEA
D20PLUMBING
PLUMBING FIXTURES
22Through Type Lavatory (Stainless)EA
23Water Closet with BidetEA
24Toilet Paper HolderEA
25LavatoriesEA
26UrinalsEA
27Shower assemblyEA
28MirrorsEA
29Slop SinkEA
30Service Faucets with Hose Bibbs at maintenance baysEA
31Oil SeparatorEA
WATER SUPPLY
32Water supply pipesLot
33Pump to lift water from cistern tank to pressure tank and to latrinesLot
34Pressure Tank 82 Gal.Lot
35Pump House for pressure tank and motor pumpLot
SANITARY SYSTEM
36Sanitary PipesLot
37Septic Tank & Leech FieldLot
RAINWATER COLLECTION
38Rainwater PipesLot
D30HVAC & Mechanical
39Compressed Air SystemLot
Cooling Generating Systems
40Industrial FansEA
41Oscillating fansEA
42Split Type Air-Conditioning Unit - 2 HPEA
D40FIRE PROTECTION
Fire Alarm and Detection
43Fire Alarm and DetectionLot
Other Fire Protection Systems
44Portable fire extinguisher with cabinetEA
45Smoke DetectorLot
46Fire Alarm & Manual Pull StationLot
47Fire Exit SignageEA
D50ELECTRICAL
Electrical service and distribution system including lightning protection system, and testing and commissioning
48Rough‐insSM
49WiringLot
50Panel boards and circuit breakersLot
51Manual Transfer SwitchEA
52Electrical OutletsLot
53Lightning ProtectionLS
Lighting & Branch Wiring
54Lights, fixtures and wiring devices - include perimeter lightingLot
E10EQUIPMENT
Working bay:
55Provide and install 2-post 12,000 lbs liftEA
56Provide welding machineEA
57Provide 4,500 lbs engine hoistEA
58Provide and install parts washerEA
59Provide tool cabinetEA
60Provide foldable work benchEA
61Provide and instal heavy-duty truck tire changerEA
Common comfort room:
62Provide and install stainless steel combination shower with hand operated eye washEA
63Provide and install 50kVA backup generator, include genset houseEA
E20FURNISHINGS
Working bay:
64Provide and install 2.5mx1.5m white boardEA
65Provide and install 2m benchEA
Tool storage:
66Provide and install heavy-duty 5-tier shelfEA
Office area:
67Provide and install office working table with chairEA
68Provide and install ceiling-high filing cabinetEA
69Provide and install coffee table and chairs for six peopleEA
Common comfort room:
70Provide and install wall-hung cabinetEA
NCO's toilet:
71Provide and install wall-hung cabinetEA
72Provide room key tagsEA
73Provide wall-mounted locable key cabinetEA
G10SITE PREPARATION
74Clearing, grubbing, tree cuttingSM
75Excavation of Footing trenches and grid beamsCM
76Backfilling, levelling, CompactionCM
G20SITE IMPROVEMENT
Gravel Cover for Open Area (50mx27m less bldg. footprint and concrete ramp)
77Gravel Cover (4" of 3/4" thick crushed gravel)SM
78Compacted based course, 200 cm. thickCM
79GeotextileSM
Gravel Access Road 6 m. wide, approx 100 m. long (with 30 cm. compacted base course and geotextile fabric)
80Gravel Cover (6" of 3/4" thick crushed gravel)SM
81Compacted based course, 30 cm. thickCM
82GeotextileSM
Concrete Ramp (30.1mx4.5m)
83Reinforced concreteSM
84Compacted based course, 30 cm. thickCM
85GeotextileSM
G30SITE CIVIL/ MECHANICAL UTILITIES
Site Water Supply System
86Water Lines from existing water mainsLot
Site Storm Drainage System
87Site Storm Drainage System including catch basins/manholesLot
G40SITE ELECTRICAL UTILITIES
Electrical connection to base including posts, electrical cables and required transformers
88Transformer (50KVa)EA
89Electrical Posts & AccessoriesEA
90CablingLM
G90OTHER SITE CONSTRUCTION
Construct Pump House for water Pump and Pressure Tank
91Construct Pump House for water Pump and Pressure TankLot
XFIELD REQUIREMENTS, OFFICE OVERHEAD & PROFIT
X10Field Requirements
92MobilizationLS
93DemobilizationLS
94Project Management & Supervision, QC, SafetyMonths
95Design, Construction Plans incl RenderingLS
96Topographic & Geotech SurveyLS
97Closeout RequirementsLS
X20Office Overhead
98TempFacil, permits, Utilities, Field Office, Environment Protection, Clean-UpMonths
SUBTOTAL FOR CLIN 001
CLIN 0002COVERED TRAINING AREA
A10FOUNDATIONS
A1010Special Foundations
99Pedestal Columns and Foundation for Open Area /Baskdtball CourtEA
100Pedestal Columns and Foundation for BleachersEA
A1030Slab on Grade (cast-in-place slab-on-grade reinforced concrete slab with breathable water-resistant concrete sealer), 10.5x40
101Slab on Grade (including temperature bars)SM
102Compacted base course 30 cm. thickCM
103Geotextile CoverSM
B10SUPERSTRUCTURE
104Structural steel for open area/basketball court (columns and roof frame) including purlins and bracingsEA
105Structural steel for bleachers (columns and roof frame) including purlins and bracingsEA
106Tie Beams for open area and bleachersLM
107Bleachers 4 levels, 0.80m. Thread, 0.50m rise (concrete & rebar)SM
108Stone Fill/Engineered fill below bleachersCM
109Perimeter railings at the back of the bleachersLM
11015 cm. thick walls at ends of bleachersSM
111Railings (hot dip galvanized)EA
B20EXTERIOR CLOSURE
Exterior Walls
112CMU Walls for bleachers (incl. rebars, mortar & plaster)SM
B30ROOFING
Roof Coverings & Roof Drains
113Steel Roof covering (Kliplock type) incl. accessories, gutters, downspouts and Rockwool insulation and wire mesh - Open Area/Basketball CourtSM
114Steel Roof covering (Kliplock type) incl. accessories, gutters, downspouts and Rockwool insulation and wire mesh - BleachersSM
C30INTERIOR FINISHES
115Floor finishes (for Basketball Court) - smooth concrete painted with polyurethane based paintSM
D20PLUMBING
PLUMBING FIXTURES
116Water Closet with BidetEA
117Toilet Paper HolderEA
118LavatoriesEA
119UrinalsEA
120MirrorsEA
121Service Faucets with Hose BibbsEA
122Oil SeparatorEA
WATER SUPPLY
123Water supply pipes to connect to Pressure tank/water cistern from VMPBLot
SANITARY SYSTEM
124Sanitary PipesLot
125Septic Tank & Leech FieldLot
RAINWATER COLLECTION
126Rainwater PipesLot
D50ELECTRICAL
Electrical service and distribution system including lightning protection system, and testing and commissioning
127Rough‐insSM
128WiringLot
129Panel boards and circuit breakersLot
130Manual Transfer SwitchEA
131Electrical OutletsLot
132Lightning ProtectionLS
Lighting & Branch Wiring
133Lights, fixtures and wiring devices - include perimeter lightingLot
E20FURNISHINGS
134Portable adjustable basketball goal: 36”x60” acrylic backboard, heavy duty flex goal. Adjustable height from 7’ to 10’ in 6” incrementsEA
G10SITE PREPARATION
135Clearing, grubbing, tree cuttingSM
136Excavation of Footing trenches and grid beamsCM
137Backfilling, levelling, CompactionCM
G20SITE IMPROVEMENT
Gravel Access Road 6 m. wide, approx 40 m. long (with 30 cm. compacted base course and geotextile fabric)
138Gravel Cover (6" of 3/4" thick crushed gravel)SM
139Compacted based course, 30 cm. thickCM
140GeotextileSM
Gravel Cover for open area (Open Area = 32m. X 40m. Less bldg footprint)
141Gravel Cover (4" of 3/4" thick crushed gravel)SM
142Compacted based course, 20 cm. thickCM
143GeotextileSM
Parking (15mx4.5m)
144Reinforced concrete, 6" thickSM
145Compacted based course, 30 cm. thickCM
146GeotextileSM
G30SITE CIVIL/ MECHANICAL UTILITIES
Site Storm Drainage System
147Site Storm Drainage SystemLot
SUBTOTAL FOR CLIN 002
TOTAL ESTIMATED COST
NOTE:Only numbered items 1-147 shall be priced.
Add items as necessary after every CLIN
Do not change the unit of measurement.