Exhibit D - Blank BOQ.xlsx
XLSX spreadsheet 44 KB Posted
- Solicitation number
- N6274224R6712
About this file
This document appears to be an Exhibit D - Blank BOQ (Bill of Quantities) for a federal contract opportunity related to the construction of a Vehicle Maintenance Facility and Covered Training Area at Fort Magsaysay, Nueva Ecija, Philippines.
The key details are as follows: The opportunity is a Design-Build project for the construction of a single-story pre-engineered metal building (PEMB) structure for a Covered Training Area Facility, as well as two single-story concrete-frame structures with steel truss roofs for 1BCT Maintenance Parking Bay Facility and Airfield Maintenance Parking Bay Facility. The projects must be designed and constructed in accordance with Unified Facilities Criteria (UFC), International Building Codes (IBC), or Philippines Codes. The estimated project magnitudes are between $250,000 - $500,000 for the Covered Training Area Facility, and between $500,000 - $1,000,000 for each of the Maintenance Parking Bay Facilities. A pre-proposal site visit is tentatively scheduled for June-July 2024, and contractors are required to submit a Base Access Request by May 21, 2024. The solicitation is expected to be issued by the Department of the Navy Naval Facilities Engineering Command in June or July 2024.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| N627424R6712 Amd0003 Released.pdf | ||
| N6274224R6712_0002 extend due date.pdf | ||
| N6274224R6712_0001 extend due date.pdf | ||
| 24R6712 Released w attachments.pdf | ||
| Exhibit A Pre Proposal Inquiry Form.xlsx | XLSX spreadsheet | |
| 24R6712 draft.pdf | ||
| Exhibic A-D.pdf | ||
| PHIL_BAR_Base Access Request Form.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BOQ
| BILL OF QUANTITIES | ||||||||||
| QUANTITY | MATERIAL COST | LABOR/EQUIPMENT COST | TOTAL ESTIMATE | |||||||
| NUMBER | UNIT | UNIT, USD | TOTAL | UNIT, USD | TOTAL | UNIT, USD | TOTAL, USD | |||
| CLIN 0001 | MAINTENANCE PARKING BAY FACILLITY | |||||||||
| A10 | FOUNDATIONS | - 0 | ||||||||
| Special Foundations | ||||||||||
| 1 | Pedestal Columns and Foundation for Maintenance Bay | EA | ||||||||
| Slab on Grade (cast-in-place slab-on-grade reinforced concrete slab with breathable water-resistant concrete sealer), 10.5x40 | ||||||||||
| 2 | Slab on Grade | SM | ||||||||
| 3 | Compacted base course 30 cm. thick | CM | ||||||||
| 4 | Geotextile Cover (for 7 parking bays only) | SM | ||||||||
| 5 | Floor moisture barrier for covered area (Office, NCO Quarters, Tool House, Toilet) | SM | ||||||||
| B10 | SUPERSTRUCTURE | |||||||||
| 6 | Structural steel (columns and roof frame) including purlins and bracings | EA | ||||||||
| B20 | EXTERIOR CLOSURE | |||||||||
| Exterior Walls | ||||||||||
| 7 | CHB Walls for Office with toilet, NCO Sleeping Quarters with attached toilet and bath, and office tools room (incl. rebars, mortar & plaster) | SM | ||||||||
| Exterior Windows | ||||||||||
| 8 | Window, including hardware for Office and Quarters | EA | ||||||||
| 9 | Window, including hardware for Toilets | EA | ||||||||
| Exterior Doors | ||||||||||
| 10 | Solid Core Door, including Hardware for office | EA | ||||||||
| Column Protection | ||||||||||
| 11 | Provide 6" diameter concrete filled steel bollards at each side of the columns of 5 parking bays | EA | ||||||||
| B30 | ROOFING | |||||||||
| Roof Coverings & Roof Drains | ||||||||||
| 12 | Steel Roof covering (Kliplock type) incl. accessories, gutters, downspouts and Rockwool insulation and wire mesh for maintenance and parking bays | SM | ||||||||
| 13 | Roof Truss incl. purlins for enclosed area (office, quarters, latrines) | SM | ||||||||
| 14 | Steel Roof covering (Kliplock type) incl. accessories, gutters, downspouts and Rockwool insulation and wire mesh for enclosed area | SM | ||||||||
| C30 | INTERIOR FINISHES | |||||||||
| 15 | Floor finishes for office, quarters, toilets and storage room - smooth concrete finish | SM | ||||||||
| 16 | Floor finishes for Parking and Maintenance/Repair Bays - trowel finish | SM | ||||||||
| 17 | Painting | SM | ||||||||
| 18 | Ceiling: Ficem Boards on Metal Furring (For Office, Quarters, Toilets and Tools Room) | SM | ||||||||
| 19 | Ceiling: Spandrel on Metal Furring (For Exterior ceiling eaves) | SM | ||||||||
| Interior Doors | ||||||||||
| 20 | Solid Core Door, including Hardware for office, Quarters & storage room | EA | ||||||||
| 21 | Solid Core Door, including Hardware for toilet | EA | ||||||||
| D20 | PLUMBING | |||||||||
| PLUMBING FIXTURES | ||||||||||
| 22 | Through Type Lavatory (Stainless) | EA | ||||||||
| 23 | Water Closet with Bidet | EA | ||||||||
| 24 | Toilet Paper Holder | EA | ||||||||
| 25 | Lavatories | EA | ||||||||
| 26 | Urinals | EA | ||||||||
| 27 | Shower assembly | EA | ||||||||
| 28 | Mirrors | EA | ||||||||
| 29 | Slop Sink | EA | ||||||||
| 30 | Service Faucets with Hose Bibbs at maintenance bays | EA | ||||||||
| 31 | Oil Separator | EA | ||||||||
| WATER SUPPLY | ||||||||||
| 32 | Water supply pipes | Lot | ||||||||
| 33 | Pump to lift water from cistern tank to pressure tank and to latrines | Lot | ||||||||
| 34 | Pressure Tank 82 Gal. | Lot | ||||||||
| 35 | Pump House for pressure tank and motor pump | Lot | ||||||||
| SANITARY SYSTEM | ||||||||||
| 36 | Sanitary Pipes | Lot | ||||||||
| 37 | Septic Tank & Leech Field | Lot | ||||||||
| RAINWATER COLLECTION | ||||||||||
| 38 | Rainwater Pipes | Lot | ||||||||
| D30 | HVAC & Mechanical | |||||||||
| 39 | Compressed Air System | Lot | ||||||||
| Cooling Generating Systems | ||||||||||
| 40 | Industrial Fans | EA | ||||||||
| 41 | Oscillating fans | EA | ||||||||
| 42 | Split Type Air-Conditioning Unit - 2 HP | EA | ||||||||
| D40 | FIRE PROTECTION | |||||||||
| Fire Alarm and Detection | ||||||||||
| 43 | Fire Alarm and Detection | Lot | ||||||||
| Other Fire Protection Systems | ||||||||||
| 44 | Portable fire extinguisher with cabinet | EA | ||||||||
| 45 | Smoke Detector | Lot | ||||||||
| 46 | Fire Alarm & Manual Pull Station | Lot | ||||||||
| 47 | Fire Exit Signage | EA | ||||||||
| D50 | ELECTRICAL | |||||||||
| Electrical service and distribution system including lightning protection system, and testing and commissioning | ||||||||||
| 48 | Rough‐ins | SM | ||||||||
| 49 | Wiring | Lot | ||||||||
| 50 | Panel boards and circuit breakers | Lot | ||||||||
| 51 | Manual Transfer Switch | EA | ||||||||
| 52 | Electrical Outlets | Lot | ||||||||
| 53 | Lightning Protection | LS | ||||||||
| Lighting & Branch Wiring | ||||||||||
| 54 | Lights, fixtures and wiring devices - include perimeter lighting | Lot | ||||||||
| E10 | EQUIPMENT | |||||||||
| Working bay: | ||||||||||
| 55 | Provide and install 2-post 12,000 lbs lift | EA | ||||||||
| 56 | Provide welding machine | EA | ||||||||
| 57 | Provide 4,500 lbs engine hoist | EA | ||||||||
| 58 | Provide and install parts washer | EA | ||||||||
| 59 | Provide tool cabinet | EA | ||||||||
| 60 | Provide foldable work bench | EA | ||||||||
| 61 | Provide and instal heavy-duty truck tire changer | EA | ||||||||
| Common comfort room: | ||||||||||
| 62 | Provide and install stainless steel combination shower with hand operated eye wash | EA | ||||||||
| 63 | Provide and install 50kVA backup generator, include genset house | EA | ||||||||
| E20 | FURNISHINGS | |||||||||
| Working bay: | ||||||||||
| 64 | Provide and install 2.5mx1.5m white board | EA | ||||||||
| 65 | Provide and install 2m bench | EA | ||||||||
| Tool storage: | ||||||||||
| 66 | Provide and install heavy-duty 5-tier shelf | EA | ||||||||
| Office area: | ||||||||||
| 67 | Provide and install office working table with chair | EA | ||||||||
| 68 | Provide and install ceiling-high filing cabinet | EA | ||||||||
| 69 | Provide and install coffee table and chairs for six people | EA | ||||||||
| Common comfort room: | ||||||||||
| 70 | Provide and install wall-hung cabinet | EA | ||||||||
| NCO's toilet: | ||||||||||
| 71 | Provide and install wall-hung cabinet | EA | ||||||||
| 72 | Provide room key tags | EA | ||||||||
| 73 | Provide wall-mounted locable key cabinet | EA | ||||||||
| G10 | SITE PREPARATION | |||||||||
| 74 | Clearing, grubbing, tree cutting | SM | ||||||||
| 75 | Excavation of Footing trenches and grid beams | CM | ||||||||
| 76 | Backfilling, levelling, Compaction | CM | ||||||||
| G20 | SITE IMPROVEMENT | |||||||||
| Gravel Cover for Open Area (50mx27m less bldg. footprint and concrete ramp) | ||||||||||
| 77 | Gravel Cover (4" of 3/4" thick crushed gravel) | SM | ||||||||
| 78 | Compacted based course, 200 cm. thick | CM | ||||||||
| 79 | Geotextile | SM | ||||||||
| Gravel Access Road 6 m. wide, approx 100 m. long (with 30 cm. compacted base course and geotextile fabric) | ||||||||||
| 80 | Gravel Cover (6" of 3/4" thick crushed gravel) | SM | ||||||||
| 81 | Compacted based course, 30 cm. thick | CM | ||||||||
| 82 | Geotextile | SM | ||||||||
| Concrete Ramp (30.1mx4.5m) | ||||||||||
| 83 | Reinforced concrete | SM | ||||||||
| 84 | Compacted based course, 30 cm. thick | CM | ||||||||
| 85 | Geotextile | SM | ||||||||
| G30 | SITE CIVIL/ MECHANICAL UTILITIES | |||||||||
| Site Water Supply System | ||||||||||
| 86 | Water Lines from existing water mains | Lot | ||||||||
| Site Storm Drainage System | ||||||||||
| 87 | Site Storm Drainage System including catch basins/manholes | Lot | ||||||||
| G40 | SITE ELECTRICAL UTILITIES | |||||||||
| Electrical connection to base including posts, electrical cables and required transformers | ||||||||||
| 88 | Transformer (50KVa) | EA | ||||||||
| 89 | Electrical Posts & Accessories | EA | ||||||||
| 90 | Cabling | LM | ||||||||
| G90 | OTHER SITE CONSTRUCTION | |||||||||
| Construct Pump House for water Pump and Pressure Tank | ||||||||||
| 91 | Construct Pump House for water Pump and Pressure Tank | Lot | ||||||||
| X | FIELD REQUIREMENTS, OFFICE OVERHEAD & PROFIT | |||||||||
| X10 | Field Requirements | |||||||||
| 92 | Mobilization | LS | ||||||||
| 93 | Demobilization | LS | ||||||||
| 94 | Project Management & Supervision, QC, Safety | Months | ||||||||
| 95 | Design, Construction Plans incl Rendering | LS | ||||||||
| 96 | Topographic & Geotech Survey | LS | ||||||||
| 97 | Closeout Requirements | LS | ||||||||
| X20 | Office Overhead | |||||||||
| 98 | TempFacil, permits, Utilities, Field Office, Environment Protection, Clean-Up | Months | ||||||||
| SUBTOTAL FOR CLIN 001 | ||||||||||
| CLIN 0002 | COVERED TRAINING AREA | |||||||||
| A10 | FOUNDATIONS | |||||||||
| A1010 | Special Foundations | |||||||||
| 99 | Pedestal Columns and Foundation for Open Area /Baskdtball Court | EA | ||||||||
| 100 | Pedestal Columns and Foundation for Bleachers | EA | ||||||||
| A1030 | Slab on Grade (cast-in-place slab-on-grade reinforced concrete slab with breathable water-resistant concrete sealer), 10.5x40 | |||||||||
| 101 | Slab on Grade (including temperature bars) | SM | ||||||||
| 102 | Compacted base course 30 cm. thick | CM | ||||||||
| 103 | Geotextile Cover | SM | ||||||||
| B10 | SUPERSTRUCTURE | |||||||||
| 104 | Structural steel for open area/basketball court (columns and roof frame) including purlins and bracings | EA | ||||||||
| 105 | Structural steel for bleachers (columns and roof frame) including purlins and bracings | EA | ||||||||
| 106 | Tie Beams for open area and bleachers | LM | ||||||||
| 107 | Bleachers 4 levels, 0.80m. Thread, 0.50m rise (concrete & rebar) | SM | ||||||||
| 108 | Stone Fill/Engineered fill below bleachers | CM | ||||||||
| 109 | Perimeter railings at the back of the bleachers | LM | ||||||||
| 110 | 15 cm. thick walls at ends of bleachers | SM | ||||||||
| 111 | Railings (hot dip galvanized) | EA | ||||||||
| B20 | EXTERIOR CLOSURE | |||||||||
| Exterior Walls | ||||||||||
| 112 | CMU Walls for bleachers (incl. rebars, mortar & plaster) | SM | ||||||||
| B30 | ROOFING | |||||||||
| Roof Coverings & Roof Drains | ||||||||||
| 113 | Steel Roof covering (Kliplock type) incl. accessories, gutters, downspouts and Rockwool insulation and wire mesh - Open Area/Basketball Court | SM | ||||||||
| 114 | Steel Roof covering (Kliplock type) incl. accessories, gutters, downspouts and Rockwool insulation and wire mesh - Bleachers | SM | ||||||||
| C30 | INTERIOR FINISHES | |||||||||
| 115 | Floor finishes (for Basketball Court) - smooth concrete painted with polyurethane based paint | SM | ||||||||
| D20 | PLUMBING | |||||||||
| PLUMBING FIXTURES | ||||||||||
| 116 | Water Closet with Bidet | EA | ||||||||
| 117 | Toilet Paper Holder | EA | ||||||||
| 118 | Lavatories | EA | ||||||||
| 119 | Urinals | EA | ||||||||
| 120 | Mirrors | EA | ||||||||
| 121 | Service Faucets with Hose Bibbs | EA | ||||||||
| 122 | Oil Separator | EA | ||||||||
| WATER SUPPLY | ||||||||||
| 123 | Water supply pipes to connect to Pressure tank/water cistern from VMPB | Lot | ||||||||
| SANITARY SYSTEM | ||||||||||
| 124 | Sanitary Pipes | Lot | ||||||||
| 125 | Septic Tank & Leech Field | Lot | ||||||||
| RAINWATER COLLECTION | ||||||||||
| 126 | Rainwater Pipes | Lot | ||||||||
| D50 | ELECTRICAL | |||||||||
| Electrical service and distribution system including lightning protection system, and testing and commissioning | ||||||||||
| 127 | Rough‐ins | SM | ||||||||
| 128 | Wiring | Lot | ||||||||
| 129 | Panel boards and circuit breakers | Lot | ||||||||
| 130 | Manual Transfer Switch | EA | ||||||||
| 131 | Electrical Outlets | Lot | ||||||||
| 132 | Lightning Protection | LS | ||||||||
| Lighting & Branch Wiring | ||||||||||
| 133 | Lights, fixtures and wiring devices - include perimeter lighting | Lot | ||||||||
| E20 | FURNISHINGS | |||||||||
| 134 | Portable adjustable basketball goal: 36”x60” acrylic backboard, heavy duty flex goal. Adjustable height from 7’ to 10’ in 6” increments | EA | ||||||||
| G10 | SITE PREPARATION | |||||||||
| 135 | Clearing, grubbing, tree cutting | SM | ||||||||
| 136 | Excavation of Footing trenches and grid beams | CM | ||||||||
| 137 | Backfilling, levelling, Compaction | CM | ||||||||
| G20 | SITE IMPROVEMENT | |||||||||
| Gravel Access Road 6 m. wide, approx 40 m. long (with 30 cm. compacted base course and geotextile fabric) | ||||||||||
| 138 | Gravel Cover (6" of 3/4" thick crushed gravel) | SM | ||||||||
| 139 | Compacted based course, 30 cm. thick | CM | ||||||||
| 140 | Geotextile | SM | ||||||||
| Gravel Cover for open area (Open Area = 32m. X 40m. Less bldg footprint) | ||||||||||
| 141 | Gravel Cover (4" of 3/4" thick crushed gravel) | SM | ||||||||
| 142 | Compacted based course, 20 cm. thick | CM | ||||||||
| 143 | Geotextile | SM | ||||||||
| Parking (15mx4.5m) | ||||||||||
| 144 | Reinforced concrete, 6" thick | SM | ||||||||
| 145 | Compacted based course, 30 cm. thick | CM | ||||||||
| 146 | Geotextile | SM | ||||||||
| G30 | SITE CIVIL/ MECHANICAL UTILITIES | |||||||||
| Site Storm Drainage System | ||||||||||
| 147 | Site Storm Drainage System | Lot | ||||||||
| SUBTOTAL FOR CLIN 002 | ||||||||||
| TOTAL ESTIMATED COST |
| NOTE: | Only numbered items 1-147 shall be priced. |
| Add items as necessary after every CLIN | |
| Do not change the unit of measurement. |
File details come from the government source that posted it. Updated .