This document is an amendment (Amendment 0003) to a solicitation for a Design-Build contract to construct a Live Fire Shoot House (MOUT) at Fort Magsaysay in Laur, Nueva Ecija, Philippines. The key changes made in this amendment include:

The proposal due date remains 1 August 2024, with no extension. The technical solution submission requirements have been updated to focus on the design and installation of the ballistic range system, and the qualifications of the potential ballistic expert installer. Detailed specifications for the ballistic wall cladding, movable ballistic rubber panels/bullet traps, and other architectural and structural requirements have been revised. Host nation requirements related to contractor licensing, permit compliance, temporary construction facilities, and biosecurity have been incorporated. The solicitation is being issued by the Department of the Navy's Naval Facilities Engineering Command, with an estimated project value between $1-5 million.

View the file

Other files

File Type Posted
N6274224R6710_0002 extend due date.pdf PDF
N6274224R6710_0001 extend due date.pdf PDF
24R6710 released w attachments.pdf PDF
24R6710 draft.pdf PDF
Exhibi D - Blank BOQ.xlsx XLSX spreadsheet
Exhibit A Pre Proposal Inquiry Form.xlsx XLSX spreadsheet
EXHIBIT A-D.pdf PDF
PHIL_BAR_Base Access Request Form.xlsx XLSX spreadsheet

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ACQR6061642

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

N6274224R6710 /B UFC Construction of Live Fire Shoot House (MOUT) Fort Magsaysay Laur, Nueva Ecija, Philippines.

Detail of Amendment 0003 begins on the next page.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 10

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 30-Jul-2024

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X N6274224R6710

X 9B. DATED (SEE ITEM 11)

19-Jun-2024

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

30-Jul-2024

CODE

NAVFAC ROICC THAILAND (US EMBASSY)

7 SATHORN TAI ROAD

BANGKOK THAILAND 10120

N62742 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

N6274224R6710

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)

The following have been added by full text:

AMD 0003 PPIS ND SOW

The following changes will be considered part of this solicitation:

A. Proposal due date is unchanged and remains 1 August 2024, no later than 11:00 a.m. Thailand time.

B. The following changes are hereby incorporated to Parts 1, 3, 4, and 6 under this solicitation.

AMENDMENT 0002

SUMMARY OF CHANGES

PART 1

PROPOSAL FORMS AND DOCUMENTS

1. Page 20 of 37, Part 1, 2.3 EVALUATION FACTORS AND PROPOSAL SUBMISSION REQUIREMENTS, (2.4 Non-Cost Factor 4 – Technical Solution Submittal Requirements: i. Provide a narrative describing the technical solution to the project that meets the requirements of the RFP. Include the following:

Change from:

1. Outline a comprehensive plan and schedule for the procurement and installation of the ballistic range system, highlighting the supervisory role of the ballistic expert to ensure safety and compliance.

To:

1. Outline a comprehensive technical description of the design and installation of the ballistic range system, highlighting the system's components and the potential ballistic expert installer's qualification and track record to ensure compliance with project requirements.

2. Section 070000, add Clause 52.236-7 Permits and Responsibilities. (Nov 1991) in full text.

3. Section 073000, add Host Nation Requirements.

PART 3

STATEMENT OF WORK

4. Page 7 of 20, Part 3, Section 5, WORK/ROOM REQUIREMENTS, 5.1.2 UTILITIES

a. Connect to shore power located at the DCAU Compound approximately 800 meters from the project site. Provide and install electric poles including all electrical cabling requirements.

To:

a. Connect to shore power l ocated at the DCAU Compound approximately 850 meters from the project site. Provide and install electric poles including all electrical cabling requirements.

5. Page 7 of 20, Part 3, Section 5, WORK/ROOM REQUIREMENTS, 5.1.3 LIVE FIRE SHOOTHOUSE a.

Architectural and Structural Work, 2. At a minimum the Live Fire Shoothouse shall have the following requirements:

Add:

• There shall be at least 8 training rooms of various configurations.

6. Page 7 of 20, Part 3, Section 5, WORK/ROOM REQUIREMENTS, 5.1.3 LIVE FIRE SHOOTHOUSE a.

Architectural and Structural Work, 2. At a minimum the Live Fire Shoothouse shall have the following requirements:

2. At a minimum the live fire shoothouse shall have the following features:

• Exterior Walls: Walls shall be 4.572 m. high, 8” thick reinforced concrete with ballistic cladding. The ballistic cladding shall consist of 3/8" AR500 Steel plate, with A300 Z brackets.

Use Hilti for anchorage of bracket to the concrete wall. Connections for the plates can be welded or bolted or as designed by the ballistic installer.

• Interior Walls: Walls shall be 3.05 m. high, 8” thick reinforced concrete with ballistic cladding at both sides. The ballistic cladding shall consist of 3/8" AR500 Steel plate, with A300 Z brackets. Use Hilti for anchorage of bracket to the concrete wall. Connections for the plates can be welded or bolted or as designed by the ballistic installer.

• Ceiling at corridors: Provide the same ballistic cladding provided for the walls.

To:

2. At a minimum the live fire shoothouse shall have the following features:

• Exterior Walls: Walls shall be 4.572 m. high, 8” thick reinforced concrete. At the interior face, provide ballistic wall cladding, min. 3/8" Stl. AR500 Steel plate, min of 45 mm. thick anti ricochet panel on both sides of 104mm x 104mm x 6mm(4"x4"x1/4") tube frame OR as designed by the Ballistic expert.

• Interior Walls: Walls shall be 3.05 m. high, 8” thick reinforced concrete with ballistic cladding at the exterior side.

• Partition walls of the training rooms shall be constructed with ballistic wall cladding, min. 3/8" Stl. AR500 Steel plate, min of 45 mm. thick anti ricochet panel on both sides of 104mm x 104mm x 6mm(4"x4"x1/4") tube frame OR as designed by the Ballistic expert.

• Ceiling at corridors: Provide the same ballistic cladding provided for the walls. Include the ceiling below the catwalk platform.

7. Page 8 of 20, Part 3, Section 5, WORK/ROOM REQUIREMENTS, 5.1.3 LIVE FIRE SHOOTHOUSE a.

Architectural and Structural Work,

6. Floor slab: Reinforced concrete, minimum thickness of 15 cm. and covered with 2” ballistic rubber tiles.

To:

6. Floor slab: Reinforced concrete, minimum thickness of 15 cm. and covered with 2” ballistic rubber tiles. The finished elevation shall be 30 cm. higher than the centerline of the road fronting the project which shall be the reference zero elevation.

8. Page 8 of 20, Part 3, Section 5, WORK/ROOM REQUIREMENTS, 5.1.3 LIVE FIRE SHOOTHOUSE a.

Remove:

11. Roof heat insulation: Double-sided aluminum foil back thermal insulation with minimum thickness of 50 mm, or with density of 12 kg/m3 or equivalent. This will be provided at all roofing area.

9. Page 8 of 20, Part 3, Section 5, WORK/ROOM REQUIREMENTS, 5.1.3 LIVE FIRE SHOOTHOUSE a.

Architectural and Structural Work, Section

12. Painting: Provide field applied exterior coatings for all items that are not prefinished, and to prefinished items when required to provide a color other than a standard prefinished color.

To:

12. Painting: Provide field applied exterior coatings for all items that are not prefinished, and to prefinished items when required to provide a color other than a standard prefinished color. Color shall be approved by the COR.

10. Page 8 of 20, Part 3, Section 5, WORK/ROOM REQUIREMENTS, 5.1.3 LIVE FIRE SHOOTHOUSE a.

Change from:

13. Means of egress: The egresses shall include exit doors, emergency lights, exit signs and fire-rated exit passageways which must discharge directly to the exterior to public ways. The egresses shall comply with the NFPA 101, Chapters 7 and 38.

To:

13. Means of egress: The egresses shall include the four exit doors shown in the Conceptual Layout

(Part 6, Fig. 5.1), emergency lights, exit signs and fire-rated exit passageways which must discharge directly to the exterior to public ways. The egresses shall comply with the NFPA 101, Chapters 7 and 38.

11. Page 8 of 20, Part 3, Section 5, WORK/ROOM REQUIREMENTS, 5.1.3 LIVE FIRE SHOOTHOUSE e.

Miscellaneous, Add:

3. Prior to mobilization, provide a project sign at a conspicuous place within the project site. Project sign shall follow the NAVFAC format.

12. Page 9 of 20, Part 3, Section 5, WORK/ROOM REQUIREMENTS, 5.1.3 LIVE FIRE SHOOTHOUSe, b.

Electrical

5. Provide and install universal type duplex power outlets (120V 50HZ and 220V) in compliance with

NEC per below table.

To:

5. Provide and install universal type duplex power outlets 220V in compliance with NEC per below table.

13. Page 10 of 20, Part 3, Section 5, WORK/ROOM REQUIREMENTS, 5.1.2 UTILITIES,

5.2 CLIN 0002: OPTION ITEM 01: PROVIDE MOVABLE BALLISTIC RUBBER PLATES AND

SPARE RUBBER TILES

a. Provide movable targets in the form of ballistic rubber plates with interlocking patterns for the total length of the inside walls for each training room and 8 layers high. The targets can be reconfigured to change training scenarios which help to deploy blocks faster and quicker.

Refer to Part 4, RFP for detailed specifications.

5.2 CLIN 0002: OPTION ITEM 01: PROVIDE MOVABLE BALLISTIC RUBBER PLATES

a. Provide movable targets in the form of ballistic rubber plates for at least 18 lineal meters of the total length of the inside walls of the training rooms and at least 2 meters high. The targets can be reconfigured to change training scenarios which help to deploy blocks faster and quicker. Refer to Part 4, RFP for detailed specifications.

14. Page 12 of 20, Part 3, Section 6, ENGINEERING SYSTEM REQUIREMENTS, B2010 FLOOR

CONSTRUCTION, Item, a.2, Add:

“For preparation of bid, a conservative value of 1500 psf maybe assumed”. After the first sentence.

15. Page 14 of 20, Part 3, Section 6, ENGINEERING SYSTEM REQUIREMENTS (ESR), B2010 EXTERIOR WALLS

a. The primary exterior wall material of the building shall be reinforced concrete 205 mm (8”) thick, 4750 mm height, with ballistic cladding on the Interior Side. CMU walls are not allowed.

B2010 EXTERIOR WALLS

a. The primary exterior wall material of the building shall be reinforced concrete 205 mm (8”) thick, 4752 mm height, with ballistic cladding on the Interior Side. CMU walls are not allowed.

b. The interior face of the exterior wall shall be provided with ballistic wall cladding, min. 3/8" Stl

AR500 Steel plate, min of 45 mm. thick anti ricochet panel on both sides of 104mm x 104mm x 6mm(4"x4"x1/4") tube frame OR as designed by the Ballistic expert.

16. Page 15 of 20, Part 3, Section 6, ENGINEERING SYSTEM REQUIREMENTS (ESR), C1010 PARTITIONS

The primary interior wall material of the building shall be reinforced concrete 205 mm (8”) thick, 3050 mm height, with ballistic cladding on both sides. CMU walls are not allowed.

To:

C1010 PARTITIONS

The primary interior perimeter wall material of the building shall be reinforced concrete 205 mm (8”) thick, 3050 mm height, with ballistic cladding on the exterior face. CMU walls are not allowed.

The training room partitions shall be provided with ballistic wall cladding, min. 3/8" Steel AR500 Steel plate, with a min of 45 mm. thick anti ricochet panel on both sides of 104mm x 104mm x 6mm(4"x4"x1/4") tube frame OR as designed by the Ballistic expert.

17. Page 17 of 20, Part 3, Section 6, ENGINEERING SYSTEM REQUIREMENTS (ESR), E20, FURNISHINGS, Add the following requirements:

Provide 10 foot high flagpole at the northeast corner of the project site.

18. Page 17 of 20, Part 3, Section 6, ENGINEERING SYSTEM REQUIREMENTS (ESR), F10 SPECIAL CONSTRUCTION

BALLISTIC WALL CLADDING: Ballistic cladding shall consist of 3/8” inch (10mm) thick steel plating (AR-500, 500 Brinell hardness) and 2-inch thick durapanel (anti-ricochet ballistic rubber) installed on all interior walls to prevent ricochets. The ballistic cladding shall consist of 3/8" AR500 Steel plate, with A300 Z brackets. Use Hilti for anchorage of bracket to the concrete wall. Connections for the plates can be welded or bolted or as designed by the ballistic installer.

To:

F10 SPECIAL CONSTRUCTION

BALLISTIC WALL CLADDING: Ballistic cladding shall consist of a min. 3/8” inch (10mm) thick steel plating (AR-500, 500 Brinell hardness) and 2-inch thick durapanel (anti-ricochet ballistic rubber) installed on the interior face of the exterior wall and exterior face of the interior walls. For the partitions of the training walls, the same ballistic cladding shall be installed on both sides of structural frames designed by the Ballistic expert.

19. Page 18 of 20, Part 3, Section 6, ENGINEERING SYSTEM REQUIREMENTS (ESR), G1010 SITE PREPARATION

b. The contractor shall apply and obtain all appropriate permits and clearances from local governing authority and pay fees including but are not limited to environmental preservation and social fees due to secure permits and approvals and other services from the local governing authority and comply with all other related laws and regulations applicable in Indonesia before commencement of any part of the work.

b. The contractor shall apply and obtain all appropriate permits and clearances from local governing authority and/or base commander and pay fees including but are not limited to environmental preservation and social fees due to secure permits and approvals and other services from the local governing authority and comply with all other related laws and regulations applicable in Philippines before commencement of any part of the work.

20. Page 19 of 20, Part 3, Section 6, ENGINEERING SYSTEM REQUIREMENTS (ESR), CLIN 0002, OPTION ITEM 01 – PROVISION OF MOVABLE BALLISTIC RUBBER BLOCKS

F10 SPECIAL CONSTRUCTION

a. Provide and install 8 layers of movable ballistic rubber panels along interior walls of each training room The ballistic rubber blocks shall have the following characteristics:

• Durable and the type that are used for live firing shooting ranges, tactical shoot house and portable bullet traps.

• Approximate Length, Width Height of 500mm x 500mm x 300mm, weight of 37 Kg.

• Shall have good elasticity and stability.

• Interlocking pattern that would help to deploy blocks faster and quicker.

• The locking system can turn into an impermeable solid defense wall.

• The ballistic defense block when interlocks provides protective wall and potential shelter during harsh military conditions.

• Capable of thousands of firing rounds that can be trapped inside the rubber blocks.

• Ballistic rubber blocks shall pass penetration and anti-ricochet ballistic testing.

To:

a. Provide and install 2 meters high of movable ballistic rubber panels/bullet trap along interior walls of each training room approximately 18 lineal meters.

The ballistic rubber blocks shall have the following characteristics:

• Durable and the type that are used for live firing shooting ranges, tactical shoot house and portable bullet traps.

• Min. depth shall be 20 inches. Min. height shall be 79”.

• Tubular steel base features heavy-duty locking casters for mobility

• Four side handles assist with maneuvering the trap into location

• Shall have good elasticity and stability.

• Capable of thousands of firing rounds that can be trapped inside the rubber blocks.

• Ballistic rubber blocks shall pass penetration and anti-ricochet ballistic testing.

PART 4

PERFORMANCE TECHNICAL SPECIFICATIONS

21. Page 16 of 23, Part 4, MOVABLE BALISTIC BLOCKS

The ballistic rubber blocks shall have the following characteristics:

• Durable and the type that are used for live firing shooting ranges, tactical shoot house and portable bullet traps.

• Approximate Length, Width Height of 500mm x 500mm x 300mm, weight of 37 Kg.

• Shall have good elasticity and stability.

• Interlocking pattern that would help to deploy blocks faster and quicker.

• The locking system can turn into an impermeable solid defense wall.

• The ballistic defense block when interlocks provides protective wall and potential shelter during harsh military conditions.

• Capable of thousands of firing rounds that can be trapped inside the rubber blocks.

• Ballistic rubber blocks shall pass penetration and anti-ricochet ballistic testing.

To:

• The ballistic rubber blocks shall have the following characteristics:

• Durable and the type that are used for live firing shooting ranges, tactical shoot house and portable bullet traps.

• Min. depth shall be 20 inches. Min. height shall be 79”.

• Tubular steel base features heavy-duty locking casters for mobility

• Four side handles assist with maneuvering the trap into location

• Shall have good elasticity and stability.

• Capable of thousands of firing rounds that can be trapped inside the rubber blocks.

• Ballistic rubber blocks shall pass penetration and anti-ricochet ballistic testing.

PART 6

ATACHMENTS

22. Page 7 of 32, Replace the photo in Figure 5.1 with the photo below:

23. Page 18 of 32, Replace the photo in Figure 8.1 with the photo below:

24. Page 33: Add the following photo (Checklist of Building Permit requirements):

C. The following attachments are incorporated to the RFP.

- Attachment 1. PPIs and Answers.

- Part 6 Attachments AMD 0003.

SECTION 00 70 00 - CONDITIONS OF THE CONTRACT

52.236-7 PERMITS AND RESPONSIBILITIES (NOV 1991)

The Contractor shall, without additional expense to the Government, be responsible for obtaining any necessary licenses and permits, and for complying with any Federal, State, and municipal laws, codes, and regulations applicable to the performance of the work. The Contractor shall also be responsible for all damages to persons or property that occur as a result of the Contractor's fault or negligence. The Contractor shall also be responsible for all materials delivered and work performed until completion and acceptance of the entire work, except for any completed unit of work which may have been accepted under the contract.

(End of clause)

The following have been deleted:

52.236-7 Permits and Responsibilities NOV 1991

SECTION 00 73 00 - SUPPLEMENTARY CONDITIONS

HOST NATION REQUIREMENTS

Contractor Licensing and Hiring Requirements

Contractors must be duly authorized to operate and conduct business in any host country and must fully comply with all laws, decrees, labor standards, and regulations of the host country during the performance of the contract. The United States has established international agreements with the Philippines that include provisions relating to the procurement of supplies, employment preferences and use of local and U.S. contractors, as well as restrictions on hiring of third country nationals or utilization of third country contractors. Offerors are expected to comply with all controlling international agreements and with the laws of host nations whether the United States Government provides notice of the existence of such requirements. The contractor will not be permitted use of third country personnel or contractors in the performance of this contract without a demonstration that reasonable efforts to employ citizens, nationals, and permanent residents of host nation and the United States, or contractors of the host nation and the United States, have been made and that wages competitive with or higher than those being paid for similar work performed in the host nation by citizens of the host nation or of the United States are being offered.

The contractor shall not employee third country personnel or contractors without written notification of United States approval from the Contracting Officer.

Permit Compliance

The United States does not directly hold environmental permits in the host nation. The contractor shall comply with environmental permits held by the host nation for the benefit of a DoD project even if the contractor is not named in the permit. Contractor shall document general procedures and their implementation for compliance with permit conditions, Best Management Practices, and required mitigations. Contractor shall be responsible for any required corrective actions. Contractor shall provide permit compliance and corrective action documentation to the COR and any additional Government and Host Nation representatives as requested by the COR.

Temporary Construction Facilities Physical Appearance

Be aware of local sensitivities and cultural values. Temporary facilities and visible components thereof shall be of solid color without visible markings, graphics, and/or text.

Biosecurity for Construction Contracts

Invasive species can be purposefully or inadvertently moved with construction equipment, personal protective equipment and hand tools, foot traffic, vehicles and vessels, raw construction materials, and packing materials.

Invasive species can become pests and affect the economy, ecology, and human health. It is critically important to be aware of ways to prevent the movement of invasive species and implement best management practices. The Contractor shall take all practicable measures to prevent introduction or spread of invasive species in association with contract performance, including importation of supplies, equipment or personnel and movement of supplies, equipment, or personnel between locations. At a minimum, all activities shall comply with U.S. and host nation biosecurity laws and regulations, shall include 100 percent inspection of equipment and supplies. If the contract performance results in introduction or spread of invasive species, the contractor shall be responsible for taking appropriate measures, in consultation with appropriate authorities, to contain and prevent contract related spread of such species at no additional cost to the government. In addition, the Contractor shall:

a. Comply with all necessary inspections of raw construction materials, equipment, and vehicles for invasive and pest species prior to entering of the project site and prior to moving equipment offsite. The Contractor is responsible for any cleaning or inspection fees.

b. Non-native invasive species can be inadvertently moved with construction equipment, Personal protective equipment, hand tools, foot traffic, vehicles, vessels, raw construction materials, and packing materials.

c. Conduct vehicle washdown and inspection for soil and other material to prevent the inadvertent movement of invasive species from the project site to other locations. Establish appropriate facilities that comply with all environmental laws and regulations, and promptly take corrective or preventative actions for noncompliance. Include these details in a biosecurity/Hazard Analysis and Critical Control Point (HACCP) plan and environmental briefs.

d. Submit a biosecurity/HACCP Plan, prepared in accordance with USFWS HACCP Manual for all imported equipment and imported construction materials and supplies. The HACCP plan must address, as a minimum, the identification and control of invasive and non-native species in construction equipment and construction materials and supplies.

e. Implement and update the HACCP plan accordingly to reduce the risk of spreading invasive species. The HACCP development team should include at least two members, one member with biological expertise with invasive species and one member from the project team who has a clear understanding of the project activities and requirements. Contractor is responsible for training all personnel on the project specific HACCP requirements once the plan is approved by the Government.

f. The Contractor must compile all supporting documentation (e.g. reports, checklists and logs) required under their HACCP Plan and submit such documents to the Contracting Officer on a monthly basis. Once all HACCP plan activities are complete, bound hardcopies of the plan and all supporting documentation and submit to the Contracting Officer.

(End of Summary of Changes)

D/B UFC Construction of Live Fire Shoot House (MOUT) Fort Magsaysay Laur, Nueva Ecija, Philippines

N6274224R6710_0003 Attachment 1.

Question No.

Reference (Sect/Para/Page) QUESTION GOVERNMENT ANSWER

1 Extension of Time Please advise if a 1-week EOT can be provided given the building needs to be designed and no quantities were provided for the BOQ?

The date of the submission of proposal is 1 August 2024, no later than 11:00 AM. Thailand time, per Amendment 0002.

2 SF1442, Block 13 Regarding the due date for the mentioned solicitation, we kindly request a two-weeks extension to accurately prepare the price and technical proposal.

The date of the submission of proposal is 1 August 2024, no later than 11:00 AM. Thailand time, per Amendment 0002.

3 Section 00 21 00 PPSV is only highly encouraged and not mandatory. We did not attend the scheduled PPSV. Are we still eligible for the award? (Yes or No)

Yes, per Section 00 21 00 - Instructions to Offerors, 1. Pre-Proposal Site Visit (PPSV), item b.Pre- Proposal Site Visit (PPSV) attendance is highly encouraged to ensure full understanding of the logistical challenges involved with this project and decrease risk of unsuccessful completion or financial hardship for contractors.

4 Part 2, 2 (f), Page 4 of 46 and Part 6 Please provide soils report. The Government does not have a soils report. Per Part 3 Section 5.1.1, Civil Work paragraph e., The Contractor is required to retain a Geotechnical Engineer experienced and licensed in the geographic region of the project to develop geotechnical requirements to support design and construction. The Contractor's Geotechnical Engineer must perform subsurface investigation/testing as required to adequately determine all applicable geotechnical factors related to type and capacity of the project foundations which are provided by the contractor DOR's.

5 Part 2, 2 (f), Page 4 of 46 and Part 6 Please provide geotechnical report. The Government does not have a geotechnical report. Per Part 3 Section 5.1.1, Civil Work paragraph e., The Contractor is required to retain a Geotechnical Engineer experienced and licensed in the geographic region of the project to develop geotechnical requirements to support design and construction. The Contractor's Geotechnical Engineer must perform subsurface investigation/testing as required to adequately determine all applicable geotechnical factors related to type and capacity of the project foundations which are provided by the contractor DOR's.

6 Part 2, 2 (f), Page 4 of 46 and Part 6 Please provide environmental documentation. There are no additional environmental documents to provide Per Part 3 Section 2.1 Applicable Codes and Standards, the design and construction shall be in accordance with referenced codes and standards r. All applicable standards and codes required by the Philippine Government.

This includes all applicable Philippine environmental laws and decrees.

7 Part 2, 2 (f), Page 4 of 46 and Part 6 Please provide as-built drawings. There are no as-built drawings to provide. Per Part 3 Section 4. Project Requirements, the Designer of Record (DOR) shall be responsible for professional quality, technical accuracy, and the coordination of all final designs, drawings, and specifications.

8 Part 6 ATTACHMENTS, Figure 5.6 Foundation Plan and Figure 5.7 Slab on Grade Plan page 10 of 32, states “Concrete Tie Beam See 5/S-5 Typical”

Please provide S-5 drawings and other structural drawings for reference.

There are no reference drawings to provide. Per Part 3 Section 4. Project Requirements, the Designer of Record (DOR) shall be responsible for professional quality, technical accuracy, and the coordination of all final designs, drawings, and specifications.

9 5.1.2 Utilities Please provide the existing utilities As-Built drawings for the site location showing all underground services?

Refer to Answer in question #7

10 General Please provide the contractor with information on a live shoot house building constructed nearby the RFP site for reference purposes including design drawings and materials.

Refer to Answer in question #8

N6274224R6710_0003 Attachment 1.

Question No.

Reference (Sect/Para/Page) QUESTION GOVERNMENT ANSWER

11 Section C Interior Construction / C1010 Partitions / Page 15 of 20 / Part 3

Can steel framing for the interior partitions be an option aside from concrete walls?

Yes. The interior partitions can be steel framing as designed by the Ballistic expert/installer.

Per Amendment 0003, Section 6, Engineering Systems Requirements (ESR), Subsection C1010 PARTITIONS is changed to:

The primary interior perimeter wall material of the building shall be reinforced concrete 205 mm (8”) thick, 3050 mm height, with ballistic cladding on both sides. CMU walls are not allowed.

The training room partitions shall be provided with ballistic wall cladding, min. 3/8" Steel AR500 Steel plate, with a min of 45 mm. thick anti ricochet panel on both sides of 104mm x 104mm x 6mm(4"x4"x1/4") tube frame OR as designed by the Ballistic expert.

12 Section 2.3 / Volume 2 / Para 2.1 / Page 16 of 35 / Part 1

Can a Design-Bid Build project of the same type be used as past experience?

No, the submitted projects must be Design-Build construction projects.

Per RFP Part 1, Section 2.3 EVALUATION FACTORS AND PROPOSAL SUBMISSION REQUIREMENTS (2.1) Non-Cost Factor 1) Offeror Experience, item (a), Page 16 of 35: Submittal Requirements: Submit a minimum of three (3) and a maximum of five (5) construction projects for the Offeror that best demonstrates Offeror experience on relevant projects that are similar size, scope, and complexity to the RFP. For purposes of this evaluation, a relevant project is further defined as similar design-build construction.

13 Do we need to construct a Generator Pad? No, there is no requirement for a generator pad in the RFP.

14 Do we need to add Generator unit in our proposal? No. There is no requirement to provide a generator in the RFP.

15 PART 3, PROJECT PROGRAM

5. WORK/ROOM REQUIREMENTS:

5.1.3 LIVE FIRE SHOOTHOUSE

a. Architectural and structural work

2. At a minimum the live fire shoothouse shall have the following features:

-Exterior Walls: Walls shall be 4.572 m.

high, 8” thick reinforced concrete with ballistic cladding.

Please confirm which wall height to follow, 4572mm or 4750mm?

Wall height requirement is 4750 mm high at 6.

ENGINEERING SYSTEM REQUIREMENTS (ESR, B20

EXTERIOR ENCLOSURE, B2010 EXTERIOR WALLS,

page 14 of 20. See item 04 below.

Exterior wall height shall be 4.572 m.

Per Amendment 0003 of the RFP, 6. ESR, B2010 EXTERIOR WALLS, is changed to: a. The primary exterior wall material of the building shall be reinforced concrete 205 mm (8”) thick, 4752 mm height, with ballistic cladding on the Interior Side. CMU walls are not allowed.

16 PART 3, PROJECT PROGRAM

5. WORK/ROOM REQUIREMENTS:

5.1.3 LIVE FIRE SHOOTHOUSE

a. Architectural and structural work

2. At a minimum the live fire shoothouse shall have the following features:

-Ceiling at corridors: Provide the same ballistic cladding provided for the walls.

Please confirm that ballistic cladding at ceiling is only at the bottom of catwalk platforms and ceiling entrances.

Per Amendment 0003, Part 3, 5. WORK/ROOM REQUIREMENTS:5.1.13 LIVE FIRE SHOOTHOUSE a.Architectural and structural work, fifth bullet, the word "Include the ceiling below the catwalk platform" is added.

N6274224R6710_0003 Attachment 1.

Question No.

Reference (Sect/Para/Page) QUESTION GOVERNMENT ANSWER

17 PART 3, PROJECT PROGRAM

5. WORK/ROOM REQUIREMENTS:

5.1.3 LIVE FIRE SHOOTHOUSE

a. Architectural and structural work

12. Painting: Provide field applied exterior coatings for all items that are not prefinished, and to prefinished items when required to provide a color other than a standard prefinished color.

Please provide exterior coating color for all items that are not prefinished.

Per Amendment 0003, Part 3, 5. WORK/ROOM REQUIREMENTS, 5.1.3 LIVE FIRE SHOOTHOUSE,

a. Architectural and Structural work, Section 12, is changed to: 12. Painting: Provide field applied exterior coatings for all items that are not prefinished, and to prefinished items when required to provide a color other than a standard prefinished color. Color shall be approved by the COR.

18 PART 3, PROJECT PROGRAM

6. ENGINEERING SYSTEM

REQUIREMENTS (ESR)

B20 EXTERIOR ENCLOSURE

B2010 EXTERIOR WALLS

a. The primary exterior wall material of the building shall be reinforced concrete 205 mm (8”) thick, 4750 mm height, with ballistic cladding on the Interior Side. CMU walls are not allowed.

Please confirm which wall height to follow, 4572mm or 4750mm?

Wall height requirement is 4572 mm high at 5. WORK/ROOM REQUIREMENTS: 5.1.3 LIVE FIRE SHOOTHOUSE a.

Architectural and structural work, page 7 of 20. See item 01 above.

Refer to answer in Question #15.

19 Part 3, 5.1.3 Live Fire Shoot house, Section B Electrical Works, Point 5

Please confirm that the client requires all duplex outlets to be 110V, 50Hz.

Per Amendment 0003, Part 3, Section 5, WORK/ROOM REQUIREMENTS, 5.1.3 LIVE FIRE SHOOTHOUSE e. electrical Work, 5. Power Outlets, a. is revised to read:

5. Provide and install universal type duplex power outlets 220V in compliance with NEC per below table.

20 Part 3, 5.1.3 Live Fire Shoot house, Section D, Fire Alarm System

Please confirm that the fire alarm system needs to be a standalone system, with no interfacing to any existing system required.

Yes. Per Amendment 0003, Part 3, 5. WORK/ROOM REQUIREMENTS:5.1.13 LIVE FIRE SHOOTHOUSE, d. Fire Alarm System and Fire Fighting System: 4.5. "The Fire alarm system shall be stand-alone with no interfacing to any existing system."

21 Part 3, 5.1.3 Live Fire Shoot house, B1010 Floor Construction, Section 1

Please confirm that the contractor must enhance the soil's load-bearing capacity to achieve 1500 PSF.

Yes. Per RFP Part 3, 5.1.3 Live Fire Shoothouse, B1010 Floor construction, Section 1".. Provide sub-base consisting of compacted soil with a minimum soil bearing capacity of 1500 PSF."

22 Part 3, 5.1.3 Live Fire Shoot house, G10 Site Preparation, Section A & B

Please confirm that the contractor is required to obtain a permit only from the Base Commander.

It will be obtained from the base commander.

Per Amendment 0003, Part 3, Section 6, Subsection G10 Site Preparation, b is changed to "b. The contractor shall apply and obtain all appropriate permits and clearances from the base commander and pay fees including but are not limited to environmental preservation and social fees due to secure permits and approvals and other services from the local governing authority and comply with all other related laws and regulations applicable in Philippines before commencement of any part of the work."

N6274224R6710_0003 Attachment 1.

Question No.

Reference (Sect/Para/Page) QUESTION GOVERNMENT ANSWER

23 Part 3, 5.1.3 Live Fire Shoot house, G10 Site Preparation, Section E

Please confirm that the client will provide the contractor with land for a laydown area and storage near the construction site at no cost.

Per RFP, Part 2, 13. PRECONSTRUCTION CONFERENCE:"Prior to construction or demolition start, meet with Contracting Officer Representative (COR) to discuss, and develop mutual understanding relative to administration of the safety programs, environmental issues, safety of building occupants and surrounding area, hazardous materials, waste disposal, construction QC procedures, construction schedule, labor provisions and other construction phase contract procedures."

In the said Preconstruction meeting that will also be attended by the end-user, all logistics concerns and constract procedures will be discussed including determining where the lay-down area is, safety regulations by the camp, gate pass for workers and equipment, route of delivery trucks, etc.

24 Part 3, 5.1.3 Live Fire Shoot house, G10 Site Preparation, Section F

Please confirm that the client will provide the contractor with utilities (electricity, water, and sewage connection) at no cost.

Per RFP Part 3, Section 6, Subsection G10 SITE PREPARATION, "f. The contractor shall provide temporary utility services (i.e., water, electric, etc.) required for construction and to support temporary facilities and bear all associated costs for connection, installation, and usage bills to include administration fees and coordination effort with local authorities."

25 Part 3, 5.1.3 Live Fire Shoot house, G1010 Site Clearing

Please confirm that the contractor is required to obtain a permit only from the Base Commander.

Refer to answer in Question #22.

26 Part 3, 5.1.3 Live Fire Shoot house, X10 Field Requirements, Section A

Please confirm that the contractor is required to obtain a permit only from the Base Commander.

Refer to answer in Question #22.

27 Part 4, Performance Technical Specifications, D5090 Other Electrical Services, Point 8

Please confirm contractor is responsible for getting the Professional engineer design approval and Installation approval.

Per RFP Part 4, D5090, a. 8. "A licensed electrical worker or professional engineer shall test and report on the adequacy and success of the earthing and lightning protection works. The test results and reports shall be submitted to the COR as part of the acceptance of the works."

28 General Please confirm that the client will issue a permanent access pass to the contractor, including labor and machinery, for the construction period.

Refer to answer in Question #23.

29 General Please confirm that the existing roads inside the base are suitable for transporting heavy-duty construction equipment and materials trucks and if not the client will improve the roads where required at the clients cost?

Refer to answer in Question #23. The end-user will identify the access road but the contractor will be responsible for improving and maintaining the access road at its own expense.

30 3.2 Site Development Please provide the soil investigation report or topographical site survey for the proposed site location to be in a position to quote for the ground works given no quantities have been provided in the BOQ?

Soil investigation report and topographic survey report are not available. For preparing bid documents, you may consider a conservative value of 1500 psf for the soil bearing capacity.

In Amendment 0003, Part 3, Section 6, Subsection B2010, a.2 add the phrase " For preparation of bid, a conservative valued of 1500 psf maybe assumed" after the first sentence.

31 8.3.3 Testing a) ACCREDITATION

REQUIREMENTS

Please confirm if the construction materials require an additional 3rd party test over and above if the supplied material is already in conformance with a recognized international standard and the same is specified on the material data sheet?

Yes. Per RFP, Part 2, 8.3.3 TESTING, third party testing shall be done by accredited testing authorities.

32 B20 Exterior Enclosure Please confirm all external steel fixtures, fasteners and accessories can be hot dip galvanized materials?

Yes. Per RFP Part 3, Section 5, 5.1.3 LIVE FIRE SHOOTHOUSE, a.Architectural and Structural work 1.

All PEB and structural steel should be hot-dip galvanized.

N6274224R6710_0003 Attachment 1.

Question No.

Reference (Sect/Para/Page) QUESTION GOVERNMENT ANSWER

33 Exhibit D, Item 30 What is the height of the flagpole? Where is the pole located? Per Amendment 0003, Part 3, E20 FURNISHINGS, add "Provide 10 feet high flagpole at the northeast corner of the project site. "

34 Part 3 Please advise for substation, where we can tap off power for new building.

Per Amendment 0003, Part 3, Sec. 5. WORK/ROOM REQUIREMENTS:5.1.13 LIVE FIRE SHOOTHOUSE,5, 5.1.2 UTILITIES, a. Connect to shore power located at the DCAU compound approximately 850 meters from the project site. Provide and install electric poles including all electrical cabling requirements.

35 Part 2, 9.1 page 15-18 Please elaborate the NCF #4 - Technical Solution : Provide a narrative describing the technical solution to the project that meets the requirements of the RFP.

Per Amendment 0003, NCF #4 - Technical Solution (a) Submittal Requirements (i) Provide a narrative describing the technical solution to the project that meets the requirements of the RFP, is changed to:

"Outline a comprehensive technical description of the design and installation of the ballistic range system highlighting the components of the system and the qualification and track record of the potential ballistic expert installer to ensure compliance to project requirements."

D/B UFC Construction of Live Fire Shoothouse (MOUT) N6274224R6710_0003 Fort Magsaysay, Laur, Nueva Ecija, Philippines Part 6

1 2024 v1 03062024

PART 6

ATTACHMENT

1. Page 7 of 32, Replace the photo in Figure 5.1 with the photo below:

Fort Magsaysay, Laur, Nueva Ecija, Philippines Part 6

2 2024 v1 03062024

2. Page 18 of 32, Replace the photo in Figure 8.1 with the photo below:

Fort Magsaysay, Laur, Nueva Ecija, Philippines Part 6

3 2024 v1 03062024

3. Page 33: Add the following photo (Checklist of Building Permit requirements):

Attachment 0001 - PPIs and Answers.pdf