Exhibi D - Blank BOQ.xlsx

XLSX spreadsheet 26 KB Posted

Attached to
D/B UFC Live Fire Shoot House (MOUT), Fort Magsaysay Laur, Nueva Ecija, Philippines
Solicitation number
N6274224R6710
Issued by

About this file

This document is a bill of quantities (BOQ) for a federal design-build contract opportunity to construct a live-fire shoot house facility at Fort Magsaysay in the Philippines. The project consists of site preparation, construction of a two-story reinforced concrete structure with steel plating and anti-ricochet ballistic rubber interior walls, electrical systems, and special construction items like a catwalk and ladder. The contract will be awarded as a Design-Build project with an estimated value between $1-5 million. A pre-proposal site visit is tentatively scheduled for June-July 2024, and interested contractors must submit a Base Access Request by May 21, 2024 to attend. The Naval Facilities Engineering Command is the procuring agency.

View the file

Other files

File Type Posted
N6274224R6710 Amd 0003 released.pdf PDF
N6274224R6710_0002 extend due date.pdf PDF
N6274224R6710_0001 extend due date.pdf PDF
24R6710 released w attachments.pdf PDF
24R6710 draft.pdf PDF
Exhibit A Pre Proposal Inquiry Form.xlsx XLSX spreadsheet
EXHIBIT A-D.pdf PDF
PHIL_BAR_Base Access Request Form.xlsx XLSX spreadsheet

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BOQ

BILL OF QUANTITIES
ITEM NO.ITEMQUANTITYMATERIAL COSTLABOR COSTTOTAL ESTIMATE
CLIN 0001BASE BID ITEM 0001NUMBERUNITUNIT COSTTOTAL (USD)UNIT COSTTOTAL (USD)UNIT COSTTOTAL (USD)
A10FOUNDATIONS- 0
`Special Foundations
1Excavation/Backfilling/DisposalCM
2Column Pedestal and Foundation (concrete)CM
3Column Pedestal and Foundation (rebars)KG
Slab on Grade (cast-in-place slab-on-grade reinforced concrete slab )
4Slab (concrete)CM
5Slab (rebars)KG
6Slab Base CourseCM
7Damp Proof Membrane (for Shoothouse)SM
8Geotextile Fabric (For open areas)SM
B10SUPERSTRUCTURE
9Structural steel (Includes Exterior & Interior columns, Roof Truss and Rafters)SM
B20EXTERIOR CLOSURE
10Exterior Walls (concrete)SM
11Exterior Walls (rebars)KG
12Bal Wall Cladding 3/8" Stl, including AR500 Steel plate, with AR 300 Z brackets. Use Hilti for anchorage of bracket to the concrete wall. Connections for the plates can be welded or bolted.SM
132" Rubber 500mmx500mm for wallsSM
Exterior Doors
14Steel doors 1.80 m. widthEA
B30ROOFING
15Pre-Finished Metal RoofingSM
16Roofing Accessories Incl. Gutters, downspouts etc.SM
C10INTERIOR CONSTRUCTION
Partitions
17`Interior Walls (concrete)SM
18Interior Walls (rebars)KG
19Bal Wall Cladding 3/8" Stl/ including AR500 Steel plate, with A300 Z brackets. Use Hilti for anchorage of bracket to the concrete wall. Connections for the plates can be welded or bolted. Consider additional area of the Ceiling at corridors and 1 m. side baffles at both sides of the catwalkSM
202" Rubber 500mmx500mm for walls and ceilingSM
212" Rubber 500mmx500mm for floorsSM
C30INTERIOR FINISHES
Painting
22Interior and Exterior PaintSM
23Painting of all exposed steel framesLot
D50ELECTRICAL
Electrical service and distribution
24Rough‐insSM
25Panel boards and circuit breakersLot
26Electrical OutletsLot
27Lights, fixtures and wiring devicesLot
28Perimeter lightingLot
29Grounding SystemEA
30Lightning ArresterEA
31TestingEA
E20FURNISHINGS
Fix Furnishings
32Flag PoleEA
33Red No Shoot LineSM
34Signages & MarkingsLot
35Project PlaqueEA
F10SPECIAL CONSTRUCTION
36Catwalk Steel Frame including handrailsLot
37Catwalk FlooringLot
38LadderEA
39Ladder CageEA
G10SITE PREPARATION
Site Clearing
40Clearing/Grubbing & Tree CuttingSM
Site Earthwork
41Levelling/Cut-fillSM
42Soil TreatmentSM
G20SITE IMPROVEMENTS
Gravel Cover at all open areas (30mx40m less bldg. footprint)
43Gravel (4" thick)SM
44Compacted base courseCM
Rip-rap & Slope Protection
45Construct grouted riprapLM
Landscaping
46CL FencingLM
47Cl DBL Gate 6.1 MEA
Roadways
48Construct compacted gravel road 5 m. wide approx. 50 LMSM
49Compacted base courseCM
50Geotextile FabricSM
G40SITE ELECTRICAL
Connection to base power (at DCAU)
51Transformer min. 25 KVAEA
52Electrical Posts (Concrete) & Lights - max. 30 m. spacingEA
53Cabling and other accessoriesLM
XFIELD REQUIREMENTS, OFFICE OVERHEAD & PROFIT
X10Field Requirements including testing
54MobilizationLS
55DemobilizationLS
56Supervision, QC, Safety, Project Managementmonths
57Design and On-site project supervision of ballistic installerLS
58Construction Plans, Closeout RequirementsLS
59Training, O&M Manuals, As-BuiltsLS
X20Office Overhead
60TempFacil, permits, and utilities months, , Field Office, Portalet, Environment Protection, Clean-Up, Formworkmonths
Total for CLIN 0001
CLIN 0002OPTION ITEM 0001
E20FURNISHINGS (LWH = 50cmx50cmx30cm)
61Movable ballistic rubber blocks (8 layers high, approx. 70 LM)EA
Total for CLIN 0002
TOTAL COST OF PROJECT (Base Bid + Option Item)
NOTE:1. Provide price only for numbered items 1-61
2. Add items as necessary after each CLIN
3. Do not change the unit of measurement

File details come from the government source that posted it. Updated .