BOQ
ACTIVITY AND LOCATION :
Chiang Mai, TH
CONSTRUCTION CONTRACT NUMBER :
N6274224R6708
PROJECT TITLE :
D/B AT-6 Facility, Wing 41, Chiang Mai, Thailand
ESTIMATED BY :
ITEM DESCRIPTION TOTAL
| 1 | CLIN 0001: RENOVATION OF THE EXISTING REVETMENTS |
| 2 | CLIN 0002: CONSTRUCTION OF AN EGRESS BUILDING AND ACCESS ROAD |
| 3 | CLIN 0003:CONSTRUCTION OF A MAINTENANCE BACK-SHOP MJ-1 |
| 4 | CLIN 0004 OPTION 0001: CONSTRUCTION OF AN AIRCRAFT WASH RACK WITHIN AN EXISTING REVETMENT |
| 5 | CLIN 0005 OPTION 0002: RENOVATE SIX EXISTING TIE DOWNS AT THE EXISTING APRON |
| GRANDTOTAL (INCLUDED VAT) | |
BOQ CLIN 0001 Revetment
BOQ DATE PREPARED :
ACTIVITY AND LOCATION :
Chiang Mai, TH
CONSTRUCTION CONTRACT NUMBER :
N6274224R6708
| PROJECT TITLE : | |
| D/B AT-6 Facility, Wing 41, Chiang Mai, Thailand | | ESTIMATED BY : |
| ITEM | DESCRIPTION | QUANTITY | | MATERIAL COST | | LABOR COST | | TOTAL |
| | NUMBER | UNIT | UNIT COST | TOTAL (USD) | UNIT COST | TOTAL (USD) | USD |
| CLIN 0001: RENOVATION OF THE EXISTING REVETMENTS | | | | | | | | |
| B30 | ROOFING | | | | | | | |
| - Remove existing roofings | | SM | | | | | |
| - Metal sheet roofing with PU heat insulation | | SM | | | | | |
| - Stainless steel roof gutter | | M | | | | | |
| - Side Wall | | SM | | | | | |
| - Galvanized steel wire mesh | | SM | | | | | |
| - Miscellaneous | | Lot | | | | | |
| - Other if any | | | | | | | |
| | Total B30 | | |
| C30 | INTERIOR FINISHES | | |
| | Painting | | |
| | - Repaint roof steel structure | | SM |
| | - Repair and repaint all existing steel bunkers between the existing revetment and | | |
| along the east and west sides of the existing revetment | | | SM | |
| | - Repair and repaint jet blast deflectors | | Ea |
| | - Other if any | | |
| Total C30 | |
| D20 | PLUMBING | |
| Rain Water Drainage | |
| - Roof Drain, rainleader | Lot |
| - Miscellaneous | Lot |
| - Other if any | |
| Total D20 | |
| D50 | ELECTRICAL | |
| Electrical Service & Distribution | |
| - LV electrical cable | Ea |
| - 220 V Main Distribution Board with all related Work | Ea |
| - 15 kW stepdown transformer 380V /3P to 220/110 V | Ea |
| - Miscellaneous | Lot |
| Lighting & Branch Wiring | |
| - Weather proof LED Floodlight and Accessories | Ea |
| - Conduit and Wiring for Lighting and Power Outlets | EA |
| - Miscellaneous | Lot |
| - Lightning protection | EA |
| - Other if any | |
| | Total D50 | |
| G10 | | |
| G1010 | SITE PREPARATIONS | | |
| | Site Clearing | |
| | - Remove all existing utilities from construction site. | Lot |
| | - Other if any | |
| Total G10 | |
| G20 | SITE IMPROVEMENTS | |
| - Remove existing paint marking | SM |
| - Restripe guidelines and ground static symbol | SM |
| - Building name sign | Ea |
| - Dedication plaque | Ea |
| - Other if any | |
| Total G20 | |
| G30 | SITE CIVIL/MECHANICAL UTILITIES | |
| Strom Sewer | |
| - Concrete gutter | m |
| - Manhole with Covers | set |
| - Concrete pipes | m |
| - Other if any | |
| Total G30 | |
| TOTAL A to G | |
| X10 | FIELD REQUIREMENTS | |
| Mobilization | |
| - Temporary Fence | Ea |
| - Project Signboard | Ea |
| - Temporary Site Office | Ea |
| - Temporary Site Storage | Ea |
| - Temporary Toilets | Ea |
| - Worker Camp | Ea |
| Topographic Survey | Ea |
| Temporary Utilities | Ea |
| - Electrical supply | Ea |
| - Water supply | Ea |
| Safety Implementation | Ea |
| Transportation | Ea |
| Repair Damages | Ea |
| Technical Training for Enduser | Ea |
| Asbuilt Drawing, O&MN | Ea |
| Key personnel (Project manager, safety officer and QC manager) | Ea |
| Other if any | |
| Total X10 | |
| X20 | OFFICE EXPENSES | |
| - Design Fee | Lot |
| - Home Office Operation | Lot |
| -Other if any | |
| Total X20 | | |
| X30 | Profit | | |
| Total X30 | | |
| Total X | | |
| VAT | VAT | Included |
| TOTAL CLIN 0001 | | |
BOQ CLIN 0002 Egress
BOQ DATE PREPARED :
ACTIVITY AND LOCATION :
Chiang Mai, TH
CONSTRUCTION CONTRACT NUMBER :
N6274224R6708
| PROJECT TITLE : | |
| D/B AT-6 Facility, Wing 41, Chiang Mai, Thailand | | ESTIMATED BY : |
| ITEM | DESCRIPTION | | QUANTITY | | MATERIAL COST | | | LABOR COST | TOTAL |
| | | | NUMBER | UNIT | UNIT COST | TOTAL | | | |
| (USD) | | | UNIT COST | | | TOTAL (USD) | | USD | | |
| CLIN 0002: CONSTRUCTION OF AN EGRESS BUILDING AND ACCESS ROAD | | | | | | | | | |
| A10 | FOUNDATIONS | | | | | | | | |
| | Geotechnical Work & Report | | | Ea | | | | | |
| | Piling work | | | | | | | | |
| | - Pile position marking, pile and pile head triming | | | Ea | | | | | |
| | Earth work | | | | | | | | |
| | - Excavation, back fill and compaction | | | Cu.m | | | | | |
| | Concrete work | | | | | | | | |
| | - Lean concrete and structural concrete | | | Cu.m | | | | | |
| | Reinforcing Bar | | | | | | | | |
| | - Round Bar & Deformed Bar | | | Kg | | | | | |
| | - Binding wire | | | Kg | | | | | |
| | Form work | | | | | | | | |
| | - Formwork | | | SM | | | | | |
| | Miscellaneous | | | | | | | | |
| | - Pile Test | | | Ea | | | | | |
| | - Other if any | | | | | | | | |
| Total A10 | |
| B10 | SUPERSTRUCTURE | |
| Concrete work | |
| - Lean and structural concrete | Cu.m |
| - Excavation and back fill | Cu.m |
| - Damp proof membrane | SM |
| Reinforcing Bar | |
| - Round Bar & Deformed Bar | Kg |
| - Binding wire | Kg |
| Form work | |
| - Falswork and Formwork | SM |
| Miscellaneous | |
| - Termite Treatment | SM |
| - Other if any | |
| Total B10 | |
| B20 | EXTERIOR CLOSURE | |
| - Concrete Gutter | m |
| - Steel Grating | m |
| - Manholes and piping to collect storm sewer from both rain leaders and storm water run-off from the walkway. | m |
| Exterior Walls | |
| - Exterior blast-resistant wall | SM |
| - Exterior CMU Wall 150 mm. Thk. | SM |
| - Vertical Tie-column 100x200 mm. | m |
| - Horizontal Lintel 100x200 mm. | m |
| - Dia 6 mm Dowel | Kg |
| - Dia 6 mm Dowel ( Plug through R.C) | Ea |
| Plaster work | |
| - Exterior wall plaster | SM |
| Miscellaneous | |
| - Scaffolding | Ea |
| Window | |
| - Aluminum sliding window with integral insect screen, 6 mm black tinted glass, and office style curtain | Ea |
| Exterior Door | |
| - Double steel door | Ea |
| - Single steel door | Ea |
| - Blast-resistant door | Ea |
| - Other if any | |
| Total B20 | |
| B30 | ROOFING | |
| - Roof steel structure | SM |
| - Metal roof panel and thermal insulation | SM |
| - Roof gutter and down spout | M |
| - Miscellaneous | Lot |
| - Other if any | |
| Total B30 | |
| C10 | INTERIOR CONSTRUCTION | |
| Partitions | |
| Interior CMU Wall 100 mm. Thk. | SM |
| - Vertical Tie-column 100x150 mm. | m |
| - Horizontal Lintel 100x150 mm. | m |
| Plaster work | |
| - Interior wall plaster | SM |
| Toilet Partition w/Door and Accessories | Ea |
| Interior Doors | |
| - Single steel door | Ea |
| - Double steel door | Ea |
| - Master keys | Ea |
| - Other if any | |
| Total C10 | |
| C30 | INTERIOR FINISHES | |
| Wall Finishes | |
| - Ceramic Tile Wall | SM |
| - Wall Skirting Work | m |
| - Miscellaneous | Lot |
| Floor Finishes | |
| - Concrete Floor with Epoxy Coating | SM |
| - Ceramic Floor Tile 600 x 600 MM. | SM |
| - Ceramic Floor Tile 300 x 300 MM. | SM |
| - Miscellaneous | Lot |
| Ceiling Finishes | |
| - Gypsum Ceiling and Steel Frame Work | SM |
| Painting | |
| - Exterior Painting Work | SM |
| - Interior Painting Work | SM |
| - Ceiling Painting Work | SM |
| - Other if any | |
| Total C30 | |
| D20 | PLUMBING | |
| Plumbing Fixtures | |
| - Water Closet | Ea |
| - Tissue Holder | Ea |
| - Rinsing Spray | Ea |
| - Urinal with partition | Ea |
| - Sink with faucet | Ea |
| -Countertop for sinks | Ea |
| - Hose bib | Ea |
| - Mirror with its Accessories | Ea |
| Domestic Water Equipment | |
| - Ground Water Storage Tank | Ea |
| - Control Valve and its related Work | Ea |
| - Water Pressure Pump | Ea |
| - Control Panel | Ea |
| - Pipe & Fitting | Lot |
| - Concrete Pad & Pump Housing Work | SM |
| - Miscellaneous | Lot |
| Sanitary Waste & Vent | |
| - Waste Pipe & Fitting | Lot |
| - Vent Pipe & Fitting | Lot |
| - Floor Drain | Ea |
| - Valve | Lot |
| - Miscellaneous | Lot |
| Rain Water Drainage | |
| - Roof Drain, rainleader | Lot |
| - Miscellaneous | Lot |
| - Other if any | |
| | Total D20 | |
| D30 | HVAC & VENTILATION | |
| | Cooling Generating Systems | |
| | -Split-type air conditioning unit with all wiring, hang | |
| support and all accessories | | | Ea |
| Other HVAC System & Equipment | |
| - Exhaust fan with its related work | Ea |
| - Adjustable Speed Rotation/Oscillation Fan with its related Work | Ea |
| - Other if any | |
| Total D30 | |
| D40 | FIRE PROTECTION | |
| OTHER FIRE PROTECTION SYSTEM | |
| - Wall mounted fire extinguisher ABC-dry chemical type | Ea |
| Total D40 | |
| D50 | ELECTRICAL | |
| Electrical Service & Distribution | |
| - HV electrical cable, pole and other if required | Ea |
| - Transformer if required | Ea |
| - LV electrical cable | Ea |
| - kWH meter | Ea |
| Lighting & Branch Wiring | |
| - Explosive proof LED Lighting Fixture and Accessories | Ea |
| - LED Lighting Fixture and Accessories | Ea |
| - Weather proof LED Lighting Fixture and Accessories | Ea |
| - Explosive proof Emergency light | Ea |
| - Emergency light | Ea |
| - Exit sign | Ea |
| - Explosion proof exit sign | Ea |
| - 220 V Receptacle Outlet, Box, Plate and Accessories | Ea |
| -Explosive proof 220 V Receptacle Outlet, Box, Plate and Accessories | Ea |
| -Explosive proof 380 V Receptacle Outlet, Box, Plate and Accessories | Ea |
| - Conduit and Wiring for Lighting and Power Outlets | Ea |
| - Static grounding | Ea |
| Communication and Security | |
| - Fire Alarm Control Panel | Ea |
| -Explosion proof Manual Station | Ea |
| - Manual Station | Ea |
| - Bell | Ea |
| - Explosion Proof Smoke Detector | Ea |
| - Smoke Detector | Ea |
| -FRC cable, THW cable and Conduit | Lot |
| - Miscellaneous | Lot |
| - LAN Outlets RJ45 CAT6 | Ea |
| - LAN cable and Conduit | Lot |
| - Miscellaneous | Lot |
| - TEL Outles 6P4C | Ea |
| - MDF | Ea |
| - TIEV Cable 4C -0.65 mm | Lot |
| - Miscellaneous | Lot |
| Lightning protection | Ea |
| - Other if any | |
| Total D50 | |
| E20 | FURNISHINGS | |
| Fixed Furnishing | |
| - Project Rendering | Ea |
| - Venetian blind curtain | Ea |
| - Key cabinet | Ea |
| - Commercial-grade work station | Ea |
| - Commercial-grade chair | Ea |
| - Commercial-grade portable air compressor reciprocation nitro 250 psi | Ea |
| - Commercial-grade portable air compressor 250 psi | Ea |
| -Type 2 Explosive Storage Magazine (12’x8’x8’) | Ea |
| - Other if any | |
| | Total E20 | |
| G10 | | |
| G1010 | SITE PREPARATIONS | | |
| | Site Clearing | |
| | - Remove all existing utilities from construction site and relocate drainage line | Lot |
| | - Other if any | |
| Total G10 | |
| G20 | SITE IMPROVEMENTS | |
| - Concrete road | SM |
| - Building name sign | Ea |
| - Dedication plaque | Ea |
| - Other if any | |
| Total G20 | |
| G30 | SITE CIVIL/MECHANICAL UTILITIES | |
| Water Supply | |
| - Water Metering Work | Ea |
| - Main Gate Valve & Accessories | Ea |
| - Main Pipe & Fitting | Lot |
| Sanitary Sewer | |
| - Septic Tank | Ea |
| - Concrete foundation | Ea |
| - Waste Pipe & Fitting | Ea |
| - Barricade for Septic Tank | Ea |
| - Miscellaneous | Lot |
| Strom Sewer | |
| - Excavation, Backfill and Compaction | Lot |
| - Manhole with Covers | Ea |
| - Concrete pipes | M |
| - Other if any | |
| Total G30 | |
| TOTAL A to G | |
| X10 | FIELD REQUIREMENTS | |
| Mobilization | |
| - Temporary Fence | Ea |
| - Project Signboard | Ea |
| - Temporary Site Office | Ea |
| - Temporary Site Storage | Ea |
| - Temporary Toilets | Ea |
| - Worker Camp | Ea |
| Topographic Survey | Ea |
| Temporary Utilities | Ea |
| - Electrical supply | Ea |
| - Water supply | Ea |
| Safety Implementation | Ea |
| Transportation | Ea |
| Repair Damages | Ea |
| Technical Training for Enduser | Ea |
| Asbuilt Drawing, O&MN | Ea |
| Key personnel (Project manager, safety officer and QC manager) | Ea |
| Other if any | |
| Total X10 | |
| X20 | OFFICE EXPENSES | |
| - Design Fee | Lot |
| - Home Office Operation | Lot |
| -Other if any | |
| Total X20 | | |
| X30 | Profit | | |
| Total X30 | | |
| Total X | | |
| VAT | VAT | Included |
| TOTAL CLIN 0002 | | |
BOQ CLIN 0003 Back shop
BOQ DATE PREPARED :
ACTIVITY AND LOCATION :
Chiang Mai, TH
CONSTRUCTION CONTRACT NUMBER :
N6274224R6708
| PROJECT TITLE : | |
| D/B AT-6 Facility, Wing 41, Chiang Mai, Thailand | | ESTIMATED BY : |
| ITEM | DESCRIPTION | QUANTITY | | MATERIAL COST | | LABOR COST | | TOTAL |
| | NUMBER | UNIT | UNIT COST | TOTAL (USD) | UNIT COST | TOTAL (USD) | USD |
| CLIN 0003: CONSTRUCTION OF A MAINTENANCE BACK-SHOP MJ-1 | | | | | | | | |
| A10 | FOUNDATIONS | | | | | | | |
| Geotechnical Work & Report | | Ea | | | | | |
| Piling work | | | | | | | |
| - Pile position marking, pile and pile head triming | | Ea | | | | | |
| Earth work | | | | | | | |
| - Excavation, back fill and compaction | | Cu.m | | | | | |
| Concrete work | | | | | | | |
| - Lean concrete and structural concrete | | Cu.m | | | | | |
| Reinforcing Bar | | | | | | | |
| - Round Bar & Deformed Bar | | Kg | | | | | |
| - Binding wire | | Kg | | | | | |
| Form work | | | | | | | |
| - Formwork | | SM | | | | | |
| Miscellaneous | | | | | | | |
| - Pile Test | | Ea | | | | | |
| - Other if any | | | | | | | |
| Total A10 | |
| B10 | SUPERSTRUCTURE | |
| Concrete work | |
| - Lean and structural concrete | Cu.m |
| - Excavation and back fill | Cu.m |
| - Damp proof membrane | SM |
| Reinforcing Bar | |
| - Round Bar & Deformed Bar | Kg |
| - Binding wire | Kg |
| Form work | |
| - Falswork and Formwork | SM |
| Miscellaneous | |
| - Termite Treatment | SM |
| - Other if any | |
| Total B10 | |
| B20 | EXTERIOR CLOSURE | |
| - Concrete Gutter | m |
| - Steel Grating | m |
| - Manholes and piping to collect storm sewer from both rain leaders and storm water run-off from the walkway. | m |
| Exterior Walls | |
| - Exterior CMU Wall 150 mm. Thk. | SM |
| - Vertical Tie-column 100x200 mm. | m |
| - Horizontal Lintel 100x200 mm. | m |
| - Dia 6 mm Dowel | Kg |
| - Dia 6 mm Dowel ( Plug through R.C) | Ea |
| Plaster work | |
| - Exterior wall plaster | SM |
| Miscellaneous | |
| - Scaffolding | Ea |
| Window | |
| - Aluminum sliding window with integral insect screen, 6 mm black tinted glass, and office style curtain | Ea |
| Exterior Door | |
| - Double steel door | Ea |
| - Single steel door | Ea |
| - Roller shutter door | Ea |
| Total B20 | |
| B30 | ROOFING | |
| - Roof steel structure | SM |
| - Metal roof panel and thermal insulation | SM |
| - Roof gutter and down spout | M |
| - Miscellaneous | Lot |
| - Other if any | |
| Total B30 | |
| C10 | INTERIOR CONSTRUCTION | |
| Partitions | |
| Interior CMU Wall 100 mm. Thk. | SM |
| - Vertical Tie-column 100x150 mm. | m |
| - Horizontal Lintel 100x150 mm. | m |
| Plaster work | |
| - Interior wall plaster | SM |
| Toilet Partition w/Door and Accessories | Ea |
| Interior Doors | |
| - Single steel door | Ea |
| - Master keys | Ea |
| - Other if any | |
| Total C10 | |
| C30 | INTERIOR FINISHES | |
| Wall Finishes | |
| - Ceramic Tile Wall | SM |
| - Wall Skirting Work | m |
| - Miscellaneous | Lot |
| Floor Finishes | |
| - Concrete Floor with Epoxy Coating | SM |
| - Ceramic Floor Tile 600 x 600 MM. | SM |
| - Ceramic Floor Tile 300 x 300 MM. | SM |
| - Miscellaneous | Lot |
| Ceiling Finishes | |
| - Gypsum Ceiling and Steel Frame Work | SM |
| Painting | |
| - Exterior Painting Work | SM |
| - Interior Painting Work | SM |
| - Ceiling Painting Work | SM |
| - Other if any | |
| Total C30 | |
| D20 | PLUMBING | |
| Plumbing Fixtures | |
| - Water Closet | Ea |
| - Tissue Holder | Ea |
| - Rinsing Spray | Ea |
| - Urinal with partition | Ea |
| - Sink with faucet | Ea |
| -Countertop for sinks | Ea |
| - Hose bib | Ea |
| - Mirror with its Accessories | Ea |
| Domestic Water Equipment | |
| - Ground Water Storage Tank | Ea |
| - Control Valve and its related Work | Ea |
| - Water Pressure Pump | Ea |
| - Control Panel | Ea |
| - Pipe & Fitting | Lot |
| - Concrete Pad & Pump Housing Work | SM |
| - Miscellaneous | Lot |
| Sanitary Waste & Vent | |
| - Waste Pipe & Fitting | Lot |
| - Vent Pipe & Fitting | Lot |
| - Floor Drain | Ea |
| - Valve | Lot |
| - Miscellaneous | Lot |
| Rain Water Drainage | |
| - Roof Drain, rainleader | Lot |
| - Miscellaneous | Lot |
| - Other if any | |
| | Total D20 | |
| D30 | HVAC & VENTILATION | |
| | Cooling Generating Systems | |
| | -Split-type air conditioning unit with all wiring, hang | |
| support and all accessories | | | Ea |
| Other HVAC System & Equipment | |
| - Exhaust fan with its related work | Ea |
| - Adjustable Speed Rotation/Oscillation Fan with its related Work | Ea |
| - Other if any | |
| Total D30 | |
| D40 | FIRE PROTECTION | |
| OTHER FIRE PROTECTION SYSTEM | |
| - Wall mounted fire extinguisher ABC-dry chemical type | Ea |
| Total D40 | |
| D50 | ELECTRICAL | |
| Electrical Service & Distribution | |
| - HV electrical cable, pole and other if required | Ea |
| - Transformer if required | Ea |
| - LV electrical cable | Ea |
| - kWH meter | Ea |
| Lighting & Branch Wiring | |
| - LED Lighting Fixture and Accessories | Ea |
| - Weather proof LED Lighting Fixture and Accessories | Ea |
| - Emergency light | Ea |
| - Exit sign | Ea |
| - 220 V Receptacle Outlet, Box, Plate and Accessories | Ea |
| - 380 V Receptacle Outlet, Box, Plate and Accessories | Ea |
| - Conduit and Wiring for Lighting and Power Outlets | Ea |
| Communication and Security | |
| - LAN Outlets RJ45 CAT6 | Ea |
| - LAN cable and Conduit | Ea |
| - Miscellaneous | Lot |
| - TEL Outles 6P4C | Ea |
| - MDF | Ea |
| - TIEV Cable 4C -0.65 mm | Ea |
| - Miscellaneous | Lot |
| Lightning protection | Ea |
| - Other if any | |
| Total D50 | |
| E20 | FURNISHINGS | |
| Fixed Furnishing | |
| - Project Rendering | Ea |
| - Venetian blind curtain | Ea |
| - Key cabinet | Ea |
| - Commercial-grade work station | Ea |
| - Commercial-grade chair | Ea |
| - Heavy duty steel shelve | Ea |
| - Commercial-grade portable air compressor 250 psi | Ea |
| - Other if any | |
| Total E20 | |
| - Remove all existing utilities from construction site and relocate septic tanks | Lot |
| - Other if any | |
| Total G10 | |
| G20 | SITE IMPROVEMENTS | |
| - Concrete pavement | SM |
| - Fencing | M |
| - Building name sign | Ea |
| - Dedication plaque | Ea |
| - Other if any | |
| Total G20 | |
| G30 | SITE CIVIL/MECHANICAL UTILITIES | |
| Water Supply | |
| - Water Metering Work | Ea |
| - Main Gate Valve & Accessories | Ea |
| - Main Pipe & Fitting | Lot |
| Sanitary Sewer | |
| - Septic Tank | Ea |
| - Concrete foundation | Ea |
| - Waste Pipe & Fitting | Ea |
| - Barricade for Septic Tank | Ea |
| - Miscellaneous | Lot |
| Strom Sewer | |
| - Excavation, Backfill and Compaction | Lot |
| - Manhole with Covers | Ea |
| - Concrete pipes | M |
| - Other if any | |
| Total G30 | |
| Total A to G | |
| X10 | FIELD REQUIREMENTS | |
| Mobilization | |
| - Temporary Fence | Ea |
| - Project Signboard | Ea |
| - Temporary Site Office | Ea |
| - Temporary Site Storage | Ea |
| - Temporary Toilets | Ea |
| - Worker Camp | Ea |
| Topographic Survey | Ea |
| Temporary Utilities | Ea |
| - Electrical supply | Ea |
| - Water supply | Ea |
| Safety Implementation | Ea |
| Transportation | Ea |
| Repair Damages | Ea |
| Technical Training for Enduser | Ea |
| Asbuilt Drawing, O&MN | Ea |
| Key personnel (Project manager, safety officer and QC manager) | Ea |
| Other if any | |
| Total X10 | |
| X20 | OFFICE EXPENSES | |
| - Design Fee | Lot |
| - Home Office Operation | Lot |
| -Other if any | |
| Total X20 | |
| X30 | Profit | Profit |
| Total X30 | |
| Total X | |
| VAT | |
| TOTAL CLIN 0003 | |
BOQ CLIN 0004 Wash Rack
BOQ DATE PREPARED :
ACTIVITY AND LOCATION :
Chiang Mai, TH
CONSTRUCTION CONTRACT NUMBER :
N6274224R6708
| PROJECT TITLE : | |
| D/B AT-6 Facility, Wing 41, Chiang Mai, Thailand | | ESTIMATED BY : |
| ITEM | DESCRIPTION | QUANTITY | | MATERIAL COST | | LABOR COST | | TOTAL |
| | NUMBER | UNIT | UNIT COST | TOTAL (USD) | UNIT COST | TOTAL (USD) | USD |
| CLIN 0004 OPTION 0001: CONSTRUCTION OF AN AIRCRAFT WASH RACK WITHIN AN EXISTING REVETMENT | | | | | | | | |
| D20 | PLUMBING | | | | | | | |
| Domestic Water Equipment | | | | | | | |
| - Ground Water Storage Tank | | Ea | | | | | |
| - Water Pressure Pump with Control Panel | | Ea | | | | | |
| - Pipe & Fitting | | Ea | | | | | |
| - Concrete Pad & Pump Housing Work | | Ea | | | | | |
| - Miscellaneous | | Lot | | | | | |
| Sanitary Waste & Vent | | | | | | | |
| - Oil Water Seperator | | Ea | | | | | |
| - Pipe & Fitting | | Ea | | | | | |
| - Miscellaneous | | Lot | | | | | |
| - Other if any | | | | | | | |
| Total D20 | |
| D50 | ELECTRICAL | |
| Electrical Service & Distribution | |
| - Power Supply for Water Pump | Ea |
| - Other if any | |
| Total D50 | |
| F10 | SPECIAL CONSTRUCTION | |
| - Aircraft Wash System | Ea |
| - Shipping Cost for Aircraft Wash System | Ea |
| Total F10 | |
| G30 | SITE CIVIL/MECHANICAL UTILITIES | |
| Water Supply | |
| - Water Metering Work | Ea |
| - Main Gate Valve & Accessories | Ea |
| - Main Pipe & Fitting | Ea |
| - Other if any | |
| Total G30 | |
| TOTAL D to G | |
| X10 | FIELD REQUIREMENTS | |
| Mobilization | |
| - Temporary Fence | Ea |
| - Project Signboard | Ea |
| - Temporary Site Office | Ea |
| - Temporary Site Storage | Ea |
| - Temporary Toilets | Ea |
| - Worker Camp | Ea |
| Topographic Survey | Ea |
| Temporary Utilities | Ea |
| - Electrical supply | Ea |
| - Water supply | Ea |
| Safety Implementation | Ea |
| Transportation | Ea |
| Repair Damages | Ea |
| Technical Training for Enduser | Ea |
| Asbuilt Drawing, O&MN | Ea |
| Key personnel (Project manager, safety officer and QC manager) | Ea |
| Other if any | |
| Total X10 | |
| X20 | OFFICE EXPENSES | |
| - Design Fee | Lot |
| - Home Office Operation | Lot |
| -Other if any | |
| Total X20 | | |
| X30 | Profit | Profit | |
| Total X30 | | |
| Total X | | |
| VAT | | Included |
| TOTAL CLIN 0004 | | |
BOQ CLIN 0005 Tie Down
BOQ DATE PREPARED :
ACTIVITY AND LOCATION :
Chiang Mai, TH
CONSTRUCTION CONTRACT NUMBER :
N6274224R6708
| PROJECT TITLE : | |
| D/B AT-6 Facility, Wing 41, Chiang Mai, Thailand | | ESTIMATED BY : |
| ITEM | DESCRIPTION | QUANTITY | | MATERIAL COST | | LABOR COST | | TOTAL |
| | NUMBER | UNIT | UNIT COST | TOTAL (USD) | UNIT COST | TOTAL (USD) | USD |
| CLIN 0005 OPTION 0002: RENOVATE SIX EXISTING TIE DOWNS AT THE EXISTING APRON | | | | | | | | |
| F10 | SPECIAL COPNSTRUCTION | | | | | | | |
| 1 | Concrete | | SQM | | | | | |
| 2 | Steel | | Kg | | | | | |
| 3 | Paint | | SM | | | | | |
| 4 | Other (If any) | | | | | | | |
| X10 | FIELD REQUIREMENT |
| X20 | OFFICE EXPENSE |
| X30 | PROFIT |
VAT
TOTAL CLIN 0005