24R1321_Doc 002200-Attachment A_AMD02.docx
DOCX document 34 KB Posted
- Attached to
- PACIFIC DETERRENCE INITIATIVE MULTIPLE AWARD CONSTRUCTION CONTRACT, VARIOUS LOCATIONS, INDO-PACIFIC Federal contract opportunity
- Solicitation number
- N6274224R1321
About this file
This document is a Construction and Design Experience Project Data Sheet that is an attachment to a solicitation for a Pacific Deterrence Initiative Multiple Award Construction Contract (PDI MACC). The PDI MACC will award task orders for a variety of design-build and design-bid-build construction projects in the Indo-Pacific region, including new facilities, repair/renovation, and upgrades to infrastructure such as wharves/piers, runways, hangars, and other base facilities. The contract term is anticipated to be 96 months with a minimum guarantee of $25,000 per awardee. Task orders will typically range from $20 million to $2 billion. The solicitation seeks to award a minimum of 3 Indefinite Delivery Indefinite Quantity (IDIQ) contracts to the offerors whose proposals represent the best value to the Government. The Construction and Design Experience Project Data Sheet collects details about the offeror's relevant construction and design experience for evaluation.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 24R1321 Note 8.pdf | ||
| 24R1321 Note 7.pdf | ||
| N6274224R1321_AMD02.pdf | ||
| 24R1321 Note 6.pdf | ||
| 24R1321 Note 5.pdf | ||
| 24R1321 Note 4.pdf | ||
| 24R1321 Note 3.pdf | ||
| N6274224R1321_AMD01.pdf | ||
| 24R1321 Note 2.pdf | ||
| 24R1321 Note 1.pdf | ||
| RFPN6274224R1321_PH1.pdf |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
| JFY18 J-031 BACHELORS ENLISTED QUARTERS D & | WON 861137 | |
| J-033 BACHELORS ENLISTED QUARTERS F, | WON 1126103 |
MARINE CORPS BASE, GUAM, MI
PACIFIC DETERRENCE INITIATIVE MULTIPLE AWARD CONSTRUCTION CONTRACT FOR U.S. MILITARY CONSTRUCTION PROJECTS IN VARIOUS LOCATIONS, INDO-PACIFIC
ATTACHMENT A
CONSTRUCTION AND DESIGN EXPERIENCE PROJECT DATA SHEET
Project No. (check one) : |_| CON #1 |_| CON #2 |_| CON #3 CON #4
|_| DES #1 |_| DES #2
1. Name of Entity that Performed Project*: _________________________________________________ Address: ________________________________________
| Phone Number: __________________________________ | Entity Identifier (DUNS #): __________________________ |
| Point of Contact: _________________________________ | Contact Phone Number: _____________________________ |
a. If the firm that performed the project has been acquired by the Offeror and is no longer a separate legal entity, the Offeror shall provide an explanation of the acquisition sufficient to demonstrate that the predecessor firm is now part of the Offeror.
b. Name of Entity that Performed Work that Experience is Claimed for* (i.e.; if the project was performed by a J/V and Offeror is claiming experience of one of the J/V members that performed work on the project, state the exact legal name of the JV member the Offeror claims experience for): __________________________________________________________ Address: ________________________________________
| Phone Number: ___________________________________ | Entity Identifier (DUNS #): __________________________ |
| Point of Contact: __________________________________ | Contact Phone Number: _____________________________ |
2. Work Performed as: |_| Prime Contractor |_| Sub Contractor |_| Joint Venture |_| Other (Explain)
Percent of project work performed:
If subcontractor, who was prime (Name/Phone #):
3. Contract Number: Delivery/Task Order Number:
Title:
Location (City/ Province and Country):
4. Award Date (mm/dd/yy): Completion Date (mm/dd/yy):
If not complete, % physically complete:
5. Type of work:
|_| New Construction |_| Renovation |_| Repair |_| Alteration |_| Other (explain):
6. Type of Contract/Task Order: (Check ALL that apply)
|_| Firm-Fixed Price |_| Cost/Time and Material |_| Other (explain):
Complete Blocks 7 and 8 for Construction Projects.
7. Construction Project:
Total Construction Award Amount: $___________________ Final Construction Price: $______________________
Type of Contract/Task Order: (Check ALL that apply)
|_| Design-Build |_| Design-Bid-Build |_| Delivery/Task Order (IDIQ) |_| Other (explain):
8. Construction Project Details: (For each item checked, provide a detailed description of the work in Block 10).
Area of airfield Portland Cement Concrete (PCC) pavement constructed or repaired (Mark N/A for projects that are not airfield related):
square meters with a minimum concrete thickness of mm Was PCC Pavement for an aircraft runway, taxiway or apron? |_| Yes |_| No |_| N/A
Did the project need to provide workforce housing and subsistence provisions? |_| Yes |_| No Did the project require coordination of construction activities near an operation airfield/ airport or operational port/harbor?
|_| Yes |_| No
Complete Block 9 for Design Projects.
9. Design Project:
Total Construction Value: $_______________________
Type of Contract/Task Order: (Check ALL that apply)
|_| Design-Build |_| Designer of Record |_| Full Plans & Specs |_| Other (explain):
Design Project Details: (for each item checked below, provide a detailed description of the work in Block 10)
Does this project demonstrate that the Offeror has previous work experience with the proposed design firm?
|_| Yes |_| No Did the project include an aircraft hangar? |_| Yes |_| No Did the project include industrial buildings/structures? |_| Yes |_| No Did the project include structure containing long spans and column-free areas, approximately 90 meters or more in width?
|_| Yes |_| No Did the project include structures utilizing heavy structural steel roof truss framing (structure consisting of multiple structural steel member connected at nodes or joints)?
|_| Yes |_| No
10. Provide a detailed description of the project and the relevancy to the project requirements of this RFP (i.e.: unique features, square footage, construction methods, any problems encountered and how it was resolved). If design-build, include a description of the design-effort.
RFP N62742-19-R-1300
DOCUMENT 00202 – ATTACHMENT C
RFP N62742-24-R-1321
DOCUMENT 00 22 00 – ATTACHMENT A
Amendment No. 0002
File details come from the government source that posted it. Updated .