This amendment modifies a solicitation for construction services related to a machine gun range project on Guam. The solicitation is being amended to revise drawings, specifications, and other contract documents related to site grading, drainage, sedimentation basins, range berms, signage, monitoring wells, and environmental controls. Protected tree and plant species are also addressed. The solicitation response due date is not extended by this amendment.
19R1304-AMD1.pdf
View the file
Other files
| File | Type | Posted |
|---|---|---|
| P-735_AMD6.pdf | ||
| P-735_AMD5.pdf | ||
| 191304-AMD4.pdf | ||
| P735_AMD3.pdf | ||
| 19R1304-AMD2.pdf | ||
| N6274219R1304_Foreign_National_Access_Req.pdf | ||
| N6274219R1304_Contractor_Memo_IIILog.pdf | ||
| N6274219R1304_P735_Disc_Rel_Form.pdf | ||
| N6274219R1304_Affidavit_BAL.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
19RXXX2
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
RFP N62742-19-R-1304, NAVFAC WORK ORDER NUMBER 1570384, FY19 MCON PROJECT P-735 MACHINE GUN RANGE AT US NAVAL
SUPPORT ACTIVITY ANDERSEN GUAM, JOINT REGION MARIANAS, GUAM
Continued on page 2.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 2
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 17-Jul-2019
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N6274219R1304
X 9B. DATED (SEE ITEM 11)
11-Jun-2019
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
17-Jul-2019
CODE
NAVFAC PACIFIC
CONSTRUCTION CONTRACTS BR (CODE ACQ33)
258 MAKALAPA DR STE 100
PEARL HARBOR HI 96860-3134
N62742 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
RFP No. N6274219R1304 Amendment No. 0001
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
DOCUMENT 00800 SPECIAL CONTRACT REQUIREMNTS
1.5 NOTICE CONCERNING LABOR RATES
Line 2. Delete “State of Hawaii General Wage Decision No.” and replace with “Guam General Wage Decision No.”.
DOCUMENT 00 01 15 LIST OF DRAWINGS
1.2. CONTRACT DRAWINGS. The following drawings are revised as of July 11, 2019:
NAVFAC DWG NO. TITLE
17228533 Title Sheet 17228595 Miscellaneous Details 17228598 Miscellaneous Details 17228600 Miscellaneous Details 17228608 Site Grading and Drainage Plan 17228609 Site Grading and Drainage Plan 17228613 Site Grading and Drainage Plan 17228615 Sedimentation/Infiltration Basin 1 17228616 Sedimentation/Infiltration Basin 2 17228617 Sedimentation/Infiltration Basin 3 17228630 Range Earth Berm Layout Plan 17228633 Range Firing Mound Typical Sections and Details - Sheet 2 of 2 17228634 Range Earth Berm Typical Sections and Details 17228637 Range Signage Layout Plan - Sheet 3 of 3 17228786 Equipment Schedule, Legends, Range Control Tower Air Conditioning Plan, Bleachers Ventilation Plan 17228787 FCU/ACCU Isometric, Details
These revised drawings accompany this Amendment.
SPECIFICATION REVISIONS
SECTION 01 57 19.04 SUPPLEMENTAL TEMPORARY ENVIRONMENTAL CONTROLS (DPRI)
GENERAL HANDLING REQUIREMENTS OF HIGH VALUE TREES
Delete the second page and replace with the attached revised page dated July 11, 2019.
SECTION 32 92 19 SEEDING
Delete page 5 and replace with the attached revised page dated July 11, 2019.
SECTION 33 51 39 MONITORING WELLS
1.1 UNIT PRICES
Delete this paragraph and all associated subparagraphs 1.1.1 through 1.1.12 in their entirety.
Artocarpus artilis, Hernandia Sonora, and Pisonia grandis vegetation clearing
3. The contractor shall cut the trees at the base and haul the trees to a laydown area within the project site and separately from green waste
4. The logs of the same type of tree will be placed together
5. Appropriate handling considerations shall be provided to prevent the mishandling of timber in such a way that would adversely affect its value as a commodity for artful purposes such as carving and woodworking
6. The contractor shall store the trees in the laydown area until the master carvers are ready to pick-up and the contractor will transport the trees to a designated off-base meeting location, easily accessible by roads
7. The master carvers may request that the trees be cut by the contractor into smaller segments, exact lengths will be determined by the master carvers
Serianthes nelsonii This tree is protected by the Endangered Species Act and shall not to be disturbed. A minimum buffer of 100 foot is to be maintained around the tree
Cycad micronesica This tree is protected by the Endangered Species Act and shall not be disturbed. A third party contactor will be used for cycad salvage and transplantation.
Tabernaemontana rotensis and Heritiera longipetiolata, These trees are protected by the Endangered Species Act.
1. Leave in place to the greatest extent practicable
2. Do not disturb until a third party contractor has completed seed collection Eugenia bryanii, Psychotria malaspinae
These shrubs are protected by the Endangered Species Act.
1. Leave in place to the greatest extent practicable
2. Do not disturb until approved by the Government
Bulbophyllum guamense, Dendrobium guamense, and Tuberolabium guamense, These epiphytic orchids are protected by the Endangered Species Act.
1. Leave in place to the greatest extent practicable
2. Do not disturb until approved by the Government
Ficus prolixa and Ficus tinctoria
Leave in place to the greatest extent practicable
Elatostema calcareum, Procris pedunculata, and Maytenus thompsonii
1. Leave in place to the greatest extent practicable
2. Do not disturb until approved by the Government keith.hayashi Cross-Out keith.hayashi Text Box Amendment 0001 - July 11, 2019
FY19 MCON PROJECT P-735 MACHINE GUN RANGE WON 1570384
US NAVSUPACT Andersen Guam, Joint Region Marianas, Guam RTA Final Submittal minimum 90 percent must pass a 2.36 mm sieve; a minimum 99 percent must be retained on a 0.250 mm sieve; and material passing a 0.150 mm sieve must not exceed 2 percent. Bulk density: A maximum 640 kilogram per cubic meter.
2.4 FERTILIZER
2.4.1 Granular Fertilizer
synthetic, granular controlled release fertilizer.
2.4.2 Hydroseeding Fertilizer
Controlled release fertilizer, to use with hydroseeding and composed of pills coated with plastic resin to provide a continuous release of nutrients for at least 6 months.
2.5 MULCH
Mulch must be free from noxious weeds, mold, insects, and other deleterious materials.
2.5.1 Wood Cellulose Fiber Mulch
Use recovered materials of either paper-based (100 percent post-consumer content) or wood-based (100 percent total recovered content) hydraulic mulch. Processed to contain no growth or germination-inhibiting factors and dyed an appropriate color to facilitate visual metering of materials application. Composition on air-dry weight basis: 9 to 15 percent moisture, pH range from 5.5 to 8.2 . Use with hydraulic application of grass seed and fertilizer.
2.6 WATER
Source of water must be approved by Contracting Officer and of suitable quality for irrigation, containing no elements toxic to plant life.
PART 3 EXECUTION
3.1 PREPARATION
3.1.1 EXTENT OF WORK
Provide soil preparation prior to planting (including soil conditioners as required), fertilizing, seeding, and surface topdressing of all newly graded finished earth surfaces, unless indicated otherwise, and at all areas inside or outside the limits of construction that are disturbed by the Contractor's operations.
3.1.1.1 Topsoil
Provide 100 mm of on-site topsoil to meet indicated finish grade. After areas have been brought to indicated finish grade, incorporate fertilizer into soil a minimum depth of 100 mm by disking, harrowing, tilling or other method approved by the Contracting Officer. Remove debris and stones larger than 19 mm in any dimension remaining on the surface after finish grading. Correct irregularities in finish surfaces to eliminate depressions. Protect finished topsoil areas from damage by vehicular or pedestrian traffic.