About this file

This document is an amendment to solicitation N6274219R1304 for the FY19 MCON PROJECT P-735 MACHINE GUN RANGE AT US NAVAL SUPPORT ACTIVITY ANDERSEN GUAM, JOINT REGION MARIANAS, GUAM. The amendment extends the deadline for price proposals to September 10, 2019, the deadline for non-price factors to September 10, 2019, and the deadline for subcontracting plans to September 11, 2019. It provides revised drawings and specifications, including adding one drawing and revising several others dated between August 2 and August 20, 2019. Revisions to specifications include deleting and replacing sections on cybersecurity and electricity metering. It also revises sections on temporary environmental controls, water utility distribution piping, and monitoring wells. The solicitation is issued by the Naval Facilities Engineering Command Pacific Construction Contracts Branch for the Department of the Navy.

191304-AMD4.pdf

View the file

Other files

File Type Posted
P-735_AMD6.pdf PDF
P-735_AMD5.pdf PDF
P735_AMD3.pdf PDF
19R1304-AMD2.pdf PDF
19R1304-AMD1.pdf PDF
N6274219R1304_Foreign_National_Access_Req.pdf PDF
N6274219R1304_Contractor_Memo_IIILog.pdf PDF
N6274219R1304_P735_Disc_Rel_Form.pdf PDF
N6274219R1304_Affidavit_BAL.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

19RXXX2

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

RFP N62742-19-R-1304, NAVFAC WORK ORDER NUMBER 1570384, FY19 MCON PROJECT P-735 MACHINE GUN RANGE AT US NAVAL

SUPPORT ACTIVITY ANDERSEN GUAM, JOINT REGION MARIANAS, GUAM

Continued on page 2

1. CONTRACT ID CODE PAGE OF PAGES

J 1 4

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 21-Aug-2019

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N6274219R1304

X 9B. DATED (SEE ITEM 11)

11-Jun-2019

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

21-Aug-2019

CODE

NAVFAC PACIFIC

CONSTRUCTION CONTRACTS BR (CODE ACQ33)

258 MAKALAPA DR STE 100

PEARL HARBOR HI 96860-3134

N62742 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

RFP No. N6274219R1304 Amendment No. 0004

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

DOCUMENT 00100 INSTRUCTIONS TO PROPOSERS

Paragraph 1.1 NUMBER OF COPIES/TIME OF RECEIPT

Subparagraph a. PRICE PROPOSAL (PAPER). Line 2. Delete “29 August 2019” and insert “10 September 2019”.

Subparagraph b. NON-PRICE (FACTORS 1, 2, 3, 4 AND 5) (PAPER). Line 2. Delete “29 August 2019” and insert “10 September 2019”.

Subparagraph c. SUBCONTRACTING PLAN (PAPER). Line 2. Delete “30 August 2019” and insert “11 September 2019”.

DOCUMENT 00 01 15 LIST OF DRAWINGS

1.2. CONTRACT DRAWINGS.

Add the following to the list of drawings:

NAVFAC DWG NO. TITLE

17228801 Telecom Maintenance Hole Details This drawing accompany this Amendment.

The following drawings are revised as of August 2, 2019:

NAVFAC DWG NO. TITLE

17228574 Enlarged Plan & Karst Area 17228591 Sections @ Karst Area 17228592 Sections @ Karst Area 17228593 Sections @ Karst Area 17228594 Sections @ Karst Area 17228599 Miscellaneous Details 17228676 Range Electrical Site Plan 17228677 Range Electrical Site Plan 17228678 Range Electrical Site Plan 17228679 Range Electrical Site Plan 17228680 Range Electrical Site Plan 17228681 Range Electrical Site Plan 17228682 Range Electrical Site Plan 17228683 Range Electrical Site Plan 17228684 Range Electrical Site Plan 17228685 Range Electrical Site Plan 17228686 Range Electrical Site Plan 17228687 Range Electrical Site Plan 17228688 Range Electrical Site Plan 17228689 Range Electrical Site Plan 17228690 Range Electrical Site Plan 17228698 SIT Emplacement Details 17228699 DSIT Emplacement Details 17228700 Double DSIT Emplacement Details 17228701 SAT Emplacement Details 17228702 MIT Emplacement Details 17228703 Miscellaneous Details 17228704 Miscellaneous Details 17228705 Miscellaneous Details 17228706 Miscellaneous Details 17228708 Miscellaneous Details

The following drawings are revised as of August 12, 2019:

NAVFAC DWG NO. TITLE

17228712 New Primary Distribution One Line Diagram (2 of 2)

The following drawings are revised as of August 14, 2019:

NAVFAC DWG NO. TITLE

17228597 Miscellaneous Details 17228745 Exterior Telecommunications Details - Sheet 6

The following drawings are revised as of August 20, 2019:

NAVFAC DWG NO. TITLE

17228626 Range SIT and DSIT Target Details 17228627 Range SAT Target Details 17228628 Range MIT Target Details

These revised drawings accompany this Amendment.

SPECIFICATION REVISIONS

PROJECT TABLE OF CONTENTS

Section 25 05 11, CYBERSECURITY FOR FACILITY-RELATED CONTROL SYSTEMS, is deleted and Section 25 05 11, CYBERSECURITY FOR FACILITY-RELATED CONTROL SYSTEMS, dated August 21, 2019, as shown in the footer, is added to the Project Table of Contents and accompanies this Amendment.

SECTION 01 57 19 TEMPORARY ENVIRONMENTAL CONTROLS

3.7.2.2 Control and Management of Solid Waste

In the second paragraph, delete “the Navy Base Guam Landfill” and replace with “a permitted C&D landfill on Guam.”

SECTION 26 27 14.00 20 ELECTRICITY METERING

2.1 ELECTRICITY METERS AND ACCESSORIES

Delete this paragraph in its entirety, and replace with the following:

“Provide meter(s) and connect the meter(s) to the existing AMI DAS. The government will configure the meter(s), which must be compatible with the existing system, using existing software. The Contractor must ensure that the meter(s) are capable of transmitting the specified data to the DAS. The current meters being used by NAVFACMAR are: Square D, ION 8650A, Form 9S, socket mounted.”

SECTION 33 11 00 WATER UTILITY DISTRIBUTION PIPING

1.1 REFERENCES

To the list, add the following:

“NAVAL FACILITIES ENGINEERING COMMAND NAVFAC MARIANAS (NFM)

PWUC (2018) Public Works Utilities Criteria (PWUC) for Design and Construction:

Electrical, Sewer and Water”

2.1.5.1 Turbine Type Meters

In the first sentence, delete “and Direct Digital Communication (DDC) compatible meter” and replace with “in conformance with the NFM PWUC.”

2.1.5.2 Propeller Type Meters

In the first sentence, delete “and Direct Digital Communication (DDC) compatible meter” and replace with “in conformance with the NFM PWUC.”

2.1.5.3 Displacement Type Meters

In the first sentence, delete “and Direct Digital Communication (DDC) compatible meter” and replace with “in conformance with the NFM PWUC.”

2.1.5.4 Compound Type Meters

In the first sentence, delete “and Direct Digital Communication (DDC) compatible meter” and replace with “in conformance with the NFM PWUC.”

2.1.5.5 Advanced Metering Infrastructure

Delete this paragraph in its entirety, and replace with the following:

“Provide an Advanced Metering Infrastructure (AMI) compatible water meter(s) and connect to the existing AMI Data Acquisition System (DAS). The Contractor must ensure that the meter(s) transmit the metered data to the DAS. The Government will configure the meter(s), which must be compatible with the existing system, using existing software.”

SECTION 33 51 39 MONITORING WELLS

1.4 SUBMITTALS, SD-06 Test Reports

Delete “Sieve Analyses of Sampled Material; G” and “Water Source Analytical Test Results; G.”

1.5.4 Sampling and Analysis Plan (SAP)

In the last paragraph, delete “a certified” and replace with “an ELAP certified.”

3.1.1 Water Source

Delete “Sample and test the water source for the constituents specified in the Sampling and Analysis Plan.

Submit the water source analytical test results” and replace with “Submit water source.”

3.2.6.1 Bentonite Pellets

Delete the first sentence, “Pouring of pellets is acceptable in shallow boreholes less than 12 meters.”

3.3.2 Sampling for Geotechnical Analysis

Delete this Paragraph in its entirety and replace with the following:

“3.3.2 NOT USED.”

3.3.3.1 Well Development Records

Delete “m. Name and/or description of the disposal facility/area, for the waters removed during development.”