Amendment 0005 Answers.pdf

PDF 1 MB Posted

Attached to
USS JOHN CANLEY Mid Term Availability. FY 27
Solicitation number
N6264926RL015
Issued by

About this file

This is a Questions and Answers (Q&A) document serving as Attachment J-5 to a federal contract solicitation, containing seven specification clarification inquiries and corresponding government responses related to various work items.

The document addresses clarifications for multiple work items across different vessel systems and maintenance scopes. For Work Item 0552 (Hose Replacement - 5 Year), the government clarifies that hoses will be provided as Contractor Furnished Material (CFM), not Government Furnished Material (GFM), with fabrication completed using installed hoses as templates; spray tape will be provided as CFM. For Work Item 0598 (Pipe Specifications), refrigeration system piping ranges from 1/2 inch to 2-1/8 inch in diameter, with specific lengths to be determined during an initial walkthrough. For Work Item 0601 (Tile Replacement), tile will be provided as GFM for approximately 12 square feet in a Toilet/Shower space. For Work Item 0104 (Flight Deck Preservation), the scope is limited to full preservation with full surface profile for Zone 3 only during the current availability period, approximately 15,000 square feet. Work Items 0694 and 0598 are confirmed as non-duplicative—one addresses A-Deck Galley piping while the other addresses Main Deck boxes, both in the AFT House. For Work Item 0451 (Annual Radar Service), installed radars are Raytheon equipment consisting of two 10CM S-Band radars (LPR-A1 and LPA-A3 models) and four 3CM X-Band radars (LPR-A25 and LPA-A25 models). A separate clarification for Work Item 0552 confirms hoses are CFM with template-based fabrication.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT J-5

REQUEST FOR SPECIFICATION CLARIFICATION

SPECIFICATION ITEM NO.: 0552______________ PARA. NO.:7.3.2 (m)

TITLE: Clarification for WI0552 TESB-CCSI-HOSE REPLACEMENT (5 YR)

QUESTION #01:

We kindly request some clarifications on following items

1) We would like Government to confirm the quantity of hoses. Based on Enclosures 2.2.1 and 2.2.2, our understanding is that there are total of 48 hoses for the four (4) MDGs (approximately 12 hoses per engine) and 52 hoses for the one (1) EDG. Please confirm that this understanding is correct.

2) Please confirm whether all hoses will be Government Furnished Material (GFM).

3) Paragraph 7.3.2(m) references spray shields/tape. Please confirm whether these materials will also be provided as GFM.

4) Please provide the approximate size (diameter) of each hose to assist us in preparing an accurate quotation.

ANSWER:

Hoses are to be provided as CFM

Fabrication shall be completed using each installed hose as a template.

Spray Tape will also be CFM.

The below table is from ESB-5 to be used a sample only.

ENCLOSURE 2.2.1 ESB MDG CRITICAL HOSE LIST

OEM Part No. Description Hose Type

Last Replaced (date)

Hose Length (in)

Hose I.D.

(in)

Hose O.D.

(in)

Max.

Operating Pressure (psi)

Fitting Type

Fitting Size (in)

DWG 261-8468331

MDGE 1 FO INLET INTERFACE

FLEX HOSE GF-F-403 – FO

PIPING BETWEEN FO PRESSURE

COMPENSATION TANK AND

ENGINE

XX XX XX XX XX XX XX XX

DWG 261-8468331

MDGE 1 FO OUTLET INTERFACE

FLEX HOSE GF-F-404 – FO

PIPING BETWEEN VALVE GF-V-

401 AND ENGINE

XX XX XX XX XX XX XX XX

TECH MANUAL

S9233-ES-MMC-

030, PART #,

D11.43429-0335

MDGE 1 FO RETURN, OEM HOSE

– LOCATED AT INJECTION

PUMPS RETURN LINE

XX XX XX XX XX XX XX XX

TECH MANUAL

S9233-ES-MMC-

030, PART #,

D11.43429-0335

MDGE 1 FO RETURN, OEM HOSE

– LOCATED AT INJECTION

PUMPS RETURN LINE

XX XX XX XX XX XX XX XX

TECH MANUAL

S9233-ES-MMC-

030, PART #

D11.43429-0335

MDGE 1 FO RETURN, OEM HOSE

– LOCATED AT INJECTION

PUMPS RETURN LINE

XX XX XX XX XX XX XX XX

TECH MANUAL

S9233-ES-MMC-

030, PART #

D11.43429-0335

MDGE 1 FO RETURN, OEM HOSE

– LOCATED AT INJECTION

PUMPS RETURN LINE

XX XX XX XX XX XX XX XX

SPECIFICATION ITEM NO.: 0598 PARA. NO.:

TITLE: Request for Clarification – Pipe Specifications

QUESTION #02:

We understand that the pipe lagging replacement is required in the Dairy Refrigerator (1-43-2) and Galley (A-47-0), and that all existing pipe lagging is to be replaced. However, the specification does not provide the pipe sizes or total lengths requiring replacement. Please provide the pipe sizes and lengths, or the applicable drawings so that we can accurately determine the required quantities.

Piping for the Refrigeration System ranges form

1 / 2 inch 7 /8 inch 1 – 1 / 8 inch 2 – 1 /8 inch

Lengths of each will be required during initial walk through.

f

SPECIFICATION ITEM NO.: 0601 PARA. NO.:

TITLE: Request for more detail information for WI0601

QUESTION #03:

Please provide the tile type, size, color, quantity, and extent of damage in Toilet/Shower (B-52- 6). Alternatively, please provide photographs or applicable drawings so that we can accurately determine the repair scope and material quantities.

Tile will be provided as GFM

The Toilet/Shower is approx. 12sqft.

SPECIFICATION ITEM NO.: 0104 PARA. NO.: 3.1.1 & 3.1.2

TITLE: Request to clarification for Area for the work

QUESTION #04:

We understand that this Work Item is for the preservation of the Flight Deck underside.

However, based on Paragraph 3.1.1, the work scope appears to be limited to Zone 3 only. In contrast, Paragraph 3.1.2 specifies a total quantity of 62,484 SQFT (approximately 15,000 SQFT per zone).

Please clarify the required work scope. Based on the referenced drawing, the area of Zone 3 appears to be closer to 15,000 SQFT rather than 62,484 SQFT

Full Preservation to include full surface profile for Zone 3 only during this Availability

SPECIFICATION ITEM NO.: 0694 & 0598 PARA. NO.:

TITLE: Request to confirm duplication of Work Item 0694 & 0598

QUESTION #05:

It appears that Work Item 0694 and 0598 are duplicated.

Government is kindly requested to check duplication.

These work items are not duplicated.

Both are for the AFT House.

One is for the piping in the A-Deck Galley and the other is for the boxes on the Main Deck.

SPECIFICATION ITEM NO.: ______0451____________ PARA. NO._3.2, 7.10.3, 7.10.4____

TITLE: ANNUAL RADAR SERVICE_____________________________________________

QUESTION:

Kindly confirm the total no. of Radars & Maker details.

1. As per Para 3.2, it is shown as total 2 x S Band radar & 4 x X band radars onboard.

2. Also at section 7.10.3 and 7.10.4 mentioned Sperry Vision Master. Please clarify if it is Anschuetz or Sperry Radar.

We assume should be 1 x S band radar and 2x X band radars of Anschuetz make, please confirm.

Installed RDARs are Raytheon

10CM “S” Band Radar, 12 FT Raytheon LPR-A1 1 3CM “X” Band Radar, 8 FT Raytheon LPR-A25 1 3CM “X” Band Radar, 8 FT Raytheon LPR-A25 1 10CM “S” Band Radar, 12 FT Raytheon LPA-A3 1 3CM “X” Band Radar, 8 FT Raytheon LPA-A25 1 3CM “X” Band Radar, 8 FT Raytheon LPR-A25 1

SPECIFICATION ITEM NO.: 0552__________________ PARA. NO.: 4.2_________________

TITLE: Hose Replacement (5 Yr)

QUESTION:

We would be grateful if you could advise whether the Government will furnish the hoses. Thank you for your kind assistance.

4.2 Government Furnished Material (GFM)

Item

Part Number

NSN/TNICN

Description

Qty1

UOM2

1. XXXXX XXXX XXXXXX XXXX XXXX

1 Qty = Quantity 2 UOM = Unit of measure

Hoses are to be provided as CFM

Fabrication shall be completed using each installed hose as a template.

The below table is from ESB-5 to be used a sample only.

ENCLOSURE 2.2.1 ESB MDG CRITICAL HOSE LIST

OEM Part No. Description Hose Type

Last Replaced (date)

Hose Length (in)

Hose I.D.

(in)

Hose O.D.

(in)

Max.

Operating Pressure (psi)

Fitting Type

Fitting Size (in)

DWG 261-8468331

MDGE 1 FO INLET INTERFACE

FLEX HOSE GF-F-403 – FO

PIPING BETWEEN FO PRESSURE

COMPENSATION TANK AND

ENGINE

XX XX XX XX XX XX XX XX

DWG 261-8468331

MDGE 1 FO OUTLET INTERFACE

FLEX HOSE GF-F-404 – FO

PIPING BETWEEN VALVE GF-V-

401 AND ENGINE

XX XX XX XX XX XX XX XX

TECH MANUAL

S9233-ES-MMC-

030, PART #,

D11.43429-0335

MDGE 1 FO RETURN, OEM HOSE

– LOCATED AT INJECTION

PUMPS RETURN LINE

XX XX XX XX XX XX XX XX

TECH MANUAL

S9233-ES-MMC-

030, PART #,

D11.43429-0335

MDGE 1 FO RETURN, OEM HOSE

– LOCATED AT INJECTION

PUMPS RETURN LINE

XX XX XX XX XX XX XX XX

TECH MANUAL

S9233-ES-MMC-

030, PART #

D11.43429-0335

MDGE 1 FO RETURN, OEM HOSE

– LOCATED AT INJECTION

PUMPS RETURN LINE

XX XX XX XX XX XX XX XX

TECH MANUAL

S9233-ES-MMC-

030, PART #

D11.43429-0335

MDGE 1 FO RETURN, OEM HOSE

– LOCATED AT INJECTION

PUMPS RETURN LINE

XX XX XX XX XX XX XX XX

Amendment 0005 Answers
Amendment 0005 Answers 2
Amendment 0005 Answers 3