This document is an Attachment J-12 containing Answers to Request for Clarifications for three specific work items (No. 56-58). Key details include:
The clarifications address multiple work items for what appears to be a naval vessel maintenance contract. Question 56 concerns a propeller hub replacement, where the shipyard is requested to provide pricing for a Category "B" emergency work item, noting both hubs were previously replaced in 2025. Question 57 clarifies execution conditions for a propeller clean, polish, and hull inspection, confirming the work can be accomplished during dry dock. Question 58 involves replacing work item 0024 "OCONUS Force Protection" with work item 0040 "SWI Force Protection" and revising associated documentation. The document provides contact information for Rolls Royce Marine (manufacturer's representative) and indicates that revised work item specifications and a J-3 Contractor Pricing Sheet Rev.2 have been attached.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment J-12: Answers to Request for Clarifications No. 56 - 58
QUESTION NO.56:
SPECIFICATION ITEM NO.: 0914 PARA. NO. 7.0
TITLE: Propellor Hub Replacement
1. According to the manufacturer, this work was recently completed during the last ROH. Please confirm if the same work will be carried out this time as well.
2. We would appreciate if you could provide the contact point for the manufacturer’s Technical Representative.
ANSWER NO.56:
1. Shipyard is requested to provide proposed pricing and to conduct work item specification as written. This is a
CAT “B” work item for an emergency; the Government reserves the right to exercise (or not) Option CLINs.
Both HUBS were replaced earlier in 2025.
2. Please see work item specification paragraph 7.5 Manufacturer’s Rep.
7.5.1 Manufacturers Representative:
Source: Rolls Royce Marine
110 Norfolk Street Walpole, Massachusetts 02081 (USA)
Tel - (508) 734-6326) Fax [Int. + (508) 734-2497)
POC: Mr. Thomas Quinn/ Mr. Joe Beauvais
QUESTION NO.57:
SPECIFICATION ITEM NO.: 0958 PARA. NO. 7.0
TITLE: TAO187-CCSI-PROPELLER CLEAN AND POLISH AND HULL INSPECTION - IN WATER (0.5 YR)
Confirmation on work item 0958 Execution Condition. Although this project is based on DRYDOCKING, according to the work item 0958 specification, the work related to the propeller, rudder and transducer are described as being performed in a waterborne condition. Please confirm if our understanding is correct, or if these works should be carried out during DRYDOCKING instead.
ANSWER NO.57:
Please refer to Q&A No.32 issued via Amendment 0003; this can be accomplish during Dry Dock. This is normally done while in the water but can be accomplished in the dock. The only difference is switching Divers to the use of scaffolding.
QUESTION NO.58:
SPECIFICATION ITEM NO.: 0030 PARA. NO. 7.9
TITLE: TAO187_CONTINUATION OF SERVICES
Work item 0024 ‘Force Protection’ is clearly stated at the bottom of the J-3 form, but we never received the specifications for WI 0024. Furthermore, WI 0024 is missing from the Section 'General Services and Requirement' which is at the top of the J-3. If WI 0024 is an item that must be performed, please send us the specifications for WI
0024 and a J-3 Form containing WI 0024.
ANSWER NO.58:
Work item 0024 “OCONUS Force Protection” to be replaced by work item 0040 “SWI Force Protection,” and work item 0030 “Continuation of Services” paragraph 7.9 was revised accordingly. Please see attached revised work item