J-11 Answers to Request for Clarifications No. 29-55.pdf

PDF 411 KB Posted

Attached to
USNS YUKON (T-AO 202) FY26 Regular Overhaul/Dry-dock Availability
Solicitation number
N6264926RL001
Issued by

About this file

This document is an Attachment J-11 containing Answers to Request for Clarifications (No. 29-55) for a naval vessel maintenance and repair contract. The document addresses multiple technical specifications and work items, including vessel docking conditions, electrical shore power requirements, equipment maintenance, and various inspections. Key technical details include: vessel arrival draft specifications (20ft Fwd / 27ft Aft), electrical shore power capacity of 2,400A with 6 cables of 400A each, and requirements for servicing various shipboard systems such as fire detection, personnel elevator, freshwater generators, and constant tension winches. The responses provide specific technical guidance, reference drawings, technical manuals, and clarify work scope for each queried specification item, with naval architects and technical experts providing detailed explanations for complex maintenance and operational requirements.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment J-11: Answers to Request for Clarifications No. 29 - 55

QUESTION NO.29:

SPECIFICATION ITEM NO.: N/A

TITLE: 3. Vessel’s Arrival Draft.

We are reviewing the docking conditions for vessel. We note that the vessel arrival draft is 20ft (6.096 meter) Fwd /

27ft (8.2296 meter) Aft, with a trim of 7ft (2.1336 meter). Is it possible to reduce the vessel's arrival trim to around

4ft (1.2meter)? Additionally, what would be her lightest possible arrival Fwd/Aft draft?

ANSWER NO.29:

From our Naval architects: See attached recent USNS YUKON docking condition. We can reduce the trim but this will require minimizing arrival FO to less than 33%. We often require a forward CO tank to be ballasted with FW for addition trim correction. We can reduce the trim but may be limited by actual FO tank levels at arrival.

Sample condition:

Disp: 23,893 MT

Draft AP: 6.81m (22.3ft)

Draft MS: 6.67m (21.9ft)

Draft FP: 6.54m (21.5ft)

QUESTION NO.30:

SPECIFICATION ITEM NO.: 0003

TITLE: Approach Berthing And Mooring Requirements

I would appreciate it if you could provide the following information:

. Mooring Bitts Capacity (SWL)

. Mooring Chocks Capacity (SWL)

. Latest Mooring Arrangement Drawing with the mooring equipment capacities

ANSWER NO.30:

Please see attached:

Mooring 2C005C401_-

Mooring 4C081C402_B

Mooring 6580043_-

Mooring L-T8892-COT-010_0_0

QUESTION NO.31:

SPECIFICATION ITEM NO.: 0011 PARA. NO. 7.1.1

TITLE: Electrical Shore Power

1. Minimum capacity mentioned is 2,400A, what is the maximum capacity required.

2. For the 6, 400Amp power cable, how much Amps is required per side.

ANSWER NO.31:

All 6 cables are connected on one side (port or stbd), contractor may connect either side depending on scope of work. The 2400A total load will be carried by these 6 cables. Each cable is still rated for 400 amps of continuous use. Thus:

• Total load per side = 2400A (since all cables are on selected side).

• Each cable will still carry 400A (since each cable is rated for that value).

So, each of the 6 cables will carry 400A, and the total load is 2400A for all cables combined.

QUESTION NO.32:

SPECIFICATION ITEM NO.: 0958 PARA. NO. N/A

TITLE: TAO187-CCSI-PROPELLER CLEAN AND POLISH AND HULL INSPECTION - IN WATER (0.5 YR)

Question for necessity of conducting on waterborne. This ROH has dry dock term and we consider all required work scope for this WI can be accomplished during dry dock term. Is it be required to conduct this WI while waterborne?

ANSWER NO.32:

This can be accomplish during Dry Dock. This is normally done while in the water but can be accomplished in the dock. The only difference is switching Divers to the use of scaffolding.

QUESTION NO.33:

SPECIFICATION ITEM NO.: 0215 PARA. NO. N/A

TITLE: TAO187_CSI_MAIN ENGINE LOCAL CONTROL PANEL SERVICE (3 YR)(SCSI)

Arrangement for OEM field service representative. We have contacted L3 harris to arrange OEM tech. Rep to conduct required service for MDE local control panel. However, L3 harris declined submit us their offer because

This item has been contracted with MSC via IDIQ. So we cannot get a quote from the OEM.

Then, we would like to confirm follows;

1. To accomplish this WI, is it possible for USG to arrange them as GFS with IDIQ they advised?

2. Or, could USG provide us another suggested source?

ANSWER NO.33:

This work item will be accomplished as a Service Order under the IDIQ, work item 0215 TAO187_CSI_MAIN

ENGINE LOCAL CONTROL PANEL SERVICE (3 YR)(SCSI) is deleted. Please see revised Attachment J-3

Contractor Pricing Sheet.

QUESTION NO.34:

SPECIFICATION ITEM NO.: 0520 PARA. NO. 2.0

TITLE: TAO187_CSI_SHIPS SERVICE AIR COMPRESSOR SERVICE (1 YR)

Please provide the following references: Last Service Report, Serial Number, and Running Hours.

ANSWER NO.34:

MSC is requesting Shipyard to conduct work item specification as written, report attached.

QUESTION NO.35:

SPECIFICATION ITEM NO.: 0570 PARA. NO. 2.1

TITLE: TAO187_CCSI_PORTABLE FIRE EXTINGUISHER SERVICE (1 YR)

Please provide the following references: Last Service Report.

ANSWER NO.35:

Service report attached.

QUESTION NO.36:

SPECIFICATION ITEM NO.: 0571 PARA. NO. 2.1

TITLE: TAO187-CCSI-FIRE AND SMOKE DAMPER SERVICE (1 YR)

ANSWER NO.36:

QUESTION NO37:

SPECIFICATION ITEM NO.: 0572 PARA. NO. 2.1

TITLE: TAO187_CCSI_DEEP FAT FRYER AND RANGE HOOD FIRE EXTINGUISHING SYSTEM (1 YR)

ANSWER NO.37:

QUESTION NO.38:

SPECIFICATION ITEM NO.: 0574 PARA. NO. 2.1

TITLE: TAO187-CCSI-FIRE DOORS AND SHUTTERS (1 YR)

ANSWER NO.38:

QUESTION NO.39:

SPECIFICATION ITEM NO.: 0646 PARA. NO. 2.1

TITLE: LIFEBOAT AND RHIB BOAT EXTERIOR OVERHAULS

Please provide the following references: Last Service Report and Serial Number.

ANSWER NO.39:

QUESTION NO.40

SPECIFICATION ITEM NO.: 0647 PARA. NO. 2.1

TITLE: LIFEBOAT & RHIB BOAT ENGINE SERVICING

ANSWER NO.40:

QUESTION NO.41:

SPECIFICATION ITEM NO.: 0651A PARA. NO. 2.1

TITLE: TAO187-CCSI-ANNUAL LIFEBOAT INSPECTION

ANSWER NO.41:

QUESTION NO.42:

SPECIFICATION ITEM NO.: 0653A PARA. NO. 2.1

TITLE: TAO187-CCSI-ANNUAL RESCUE BOAT INSPECTION

ANSWER NO.42:

QUESTION NO.43:

SPECIFICATION ITEM NO.: 0657 PARA. NO. 2.1

TITLE: TAO187-CCSI-ACCOMMODATION LADDER INSPECTION (1 YR)

ANSWER NO.43:

QUESTION NO.44:

SPECIFICATION ITEM NO.: 0603 PARA. NO. N/A

TITLE: Port & Stbd Bridge Sliding Doors

Please provide the specific work/repairs that yard need to do and quote. Please also provide any photo or drawings for said doors.

ANSWER NO.44:

Drawing attached.

1. Inspection and Assessment:

Conduct a detailed inspection of the sliding watertight door assembly, including:

Door panel condition (corrosion, deformation, or cracks).

Door frame and coaming alignment.

Sliding track, rollers, and guide rails.

Manual operation mechanism (door lock and handle).

Door gasket integrity and sealing surfaces.

Record findings and provide photographic documentation.

2. Disassembly and Cleaning:

Remove door panel (if necessary) to access internal components.

Clean all moving parts, tracks, and recesses of rust, old grease, paint buildup, and debris.

Degrease and prepare surfaces for inspection and reassembly.

3. Repair and Replacement Work:

Repair or renew corroded or damaged steel sections of the door or coaming (as required).

Renew or refurbish the following components as needed:

Sliding rollers/bearings.

Door tracks and guides.

Door handle and locking mechanism.

Rubber gasket or sealing material.

Align and adjust door to ensure smooth operation and proper watertight sealing.

4. Reinstallation and Testing:

Reinstall the door and reconnect all control systems.

Conduct functional and operational tests.

Perform watertightness test using hose or chalk test method.

Apply anti-corrosive primer and final coating to repaired areas.

5. Documentation:

Provide report detailing:

Work performed.

Components renewed.

Test results and certification of watertight integrity.

QUESTION NO.45:

SPECIFICATION ITEM NO.: 1050 PARA. NO.: 7.6

TITLE: Cargo Gear Renewal Survey (5 Yr)

Please advise whether the Government will furnish the spare parts/ materials, or if it will be subject to CFR or CCO.

7.6 Renew all bearings with new.

ANSWER NO.45:

Shipyard to open identify and procure. These will be CFM, as CFM roller or ball bearings are required to meet the following;

(1) The (ball and roller) bearings shall be manufactured in the United States or Canada.

(2) For each (ball and roller) bearing, the cost of the bearing components manufactured in the United States or

Canada exceeds 50 percent of the total cost of the bearing components of that ball or roller bearing.

QUESTION NO.46:

SPECIFICATION ITEM NO.: 0011 PARA. NO.: 7.1.1

TITLE: ELECTRICAL SHORE POWER

1. Minimum capacity mentioned is 2,400A, what is the maximum capacity required

2. For the 6,400Amp power cable, how much Amps is required per side

ANSWER NO.46:

All 6 cables are connected on one side (port or stbd), contractor may connect either side depending on scope of work.

The 2400A total load will be carried by these 6 cables. Each cable is still rated for 400 amps of continuous use.

Thus:

• Total load per side = 2400A (since all cables are on selected side).

• Each cable will still carry 400A (since each cable is rated for that value).

So, each of the 6 cables will carry 400A, and the total load is 2400A for all cables combined.

QUESTION NO.47:

SPECIFICATION ITEM NO.: 0113 PARA. NO.: 7.6.1

TITLE: 0113_A_ABS Punchlist Standard Repairs

Kindly provide more detail / photo for this item from 0113_A_ABS Punchlist Standard Repairs:

7.6.15 AFFF Down Pipe Nozzle Couplings and pipe Qty one hundred (100). Para 3.17

7.6.15.1 Crop and renew AFFF Nozzle Couplings and drop down pipes that are mild steel and renew with

CuNi. (Coupling is piece where nozzle screws into)

7.6.15.1.1 1 ½” Pipe down pipes CuNi

7.6.15.1.2 1 ½” Full Coupling CuNi

ANSWER NO.47:

QUESTION NO.48:

SPECIFICATION ITEM NO.: 0113 PARA. NO. 7.6.4

TITLE: 0113_A_ABS Punchlist Standard Repairs

From the same 0113_A, please clarify what is the pipe material for toilet piping:

7.6.41 2-94-3 Toilet Piping, Qty. (5) Feet

7.6.41.1 Crop and renew approximately five (5’) linear feet of 2” piping to repair broken drain pipe. Linear feet of piping to include elbows and other devices due to locations to not have stresses on piping after installed. Template from existing remaining non-fractured pipe currently installed.

ANSWER NO.48:

See the attached file “Sewage System 8386500_-”

QUESTION NO.49:

SPECIFICATION ITEM NO.: 0415 PARA. NO.2.5

TITLE: 0415_A_System 3 Fire Detection System Replacement (TALT 0945)

Please provide the enclosure, 2.5 Bill of Material for Consilium Salwico Cargo Fire Detection & Alarm System.

ANSWER NO.49:

“2.5 Bill of Material for Consilium Salwico Cargo Fire Detection & Alarm System” This item is produced at the end of the installation and not currently available. If more in-depth questions about the installation please contact

Consilium Marine US POC:

Dan Emsley, Contractor

Phone: +1 954 791 7550 EXT: 316

Mob: +1 954 648 3022 dan.emsley@consiliumsafety.com

Address: Consilium Marine US

4370 Oakes Road, Suite 721

Fort Lauderdale, FL, 33314

QUESTION NO.50:

SPECIFICATION ITEM NO.: 0514 PARA. NO. 2.0

TITLE: 0514_A_Freshwater Generators (distilling plants) Maintenance

Please provide enclosures,

2.1 TECHNICAL MANUAL, TM T9A00-F9-SSM-040 “Distilling Plant & Fresh water system

2.2 NAVSEA DWG. 185-8495617 Evaporators Replacement Arrangements & Structural

ANSWER NO.50:

The PPE attached the proper technical manual. Our data base file is not opening the drawing requested. The PPE will reach out to our tech library to correct the issue.

QUESTION NO.51:

SPECIFICATION ITEM NO.: 0546 PARA. NO. 2.0

TITLE: CT WINCHES NO 1, 2 & 3 OVERHAUL

Please provide the following:

2.1.1 Technical Manual TG813-AX-MMC-010; Constant Tension Mooring Winch

2.2 ENCLOSURES

2.2.1 Contractor Furnished Material List

ANSWER NO.51:

Technical Manual attached. The “2.2.1 Contractor Furnished Material List” is in the WI specification, see Enclosure 2.2.1.

QUESTION NO.52:

SPECIFICATION ITEM NO.: 0547 PARA. NO. 2.0

TITLE: CT WINCH NO 1_2 & 3 FOUNDATIONS RENEWAL

Please provide the clear copy of Enclosure 2.2 – CT Winch Foundation Drawing

ANSWER NO.52:

Researching, more information to follow.

QUESTION NO.53:

SPECIFICATION ITEM NO.: 0558 PARA. NO. 7.8

TITLE: TAO187_CCSI_PERSONNEL ELEVATOR ANNUAL INSPECTION

Unidynamics Defense Systems was acquired by PaR Systems in 2006 and subsequently became part of Jered LLC, a wholly owned subsidiary of PaR Systems. Please confirm if you will allow use Jered LLC or other ABS Class Approved as OEM.

ANSWER NO.53:

Follow the work item specification, paragraph 7.8.1 Provide the services of an OEM authorized company recognized as a shipboard elevator certifying authority to inspect, repair, test and recertify the elevator using Reference 2.1 through 2.4 for guidance. Qualifications and certificates for the company and field service rep are to be submitted to the OMT REP for review and approval prior to starting any work.

QUESTION NO.54:

SPECIFICATION ITEM NO.: 901 PARA. NO. 7.0

TITLE: TAO187-CCSI-DRYDOCKING AND UNDOCKING THE VESSEL (2.5 YR)

We note that the vessel arrival draft is 20ft (6.096 meter) Fwd / 27ft (8.2296 meter) Aft, with a trim of 7ft (2.1336 meter). Is it possible to reduce the vessel's arrival trim to around 4ft (1.2meter)? Additionally, what would be her lightest possible arrival Fwd/Aft draft?

ANSWER NO.54:

From our Naval architects: See attached recent USNS YUKON docking condition. We can reduce the trim but this will require minimizing arrival FO to less than 33%. We often require a forward CO tank to be ballasted with FW for addition trim correction. We can reduce the trim but may be limited by actual FO tank levels at arrival.

Sample condition:

Disp: 23,893 MT

Draft AP: 6.81m (22.3ft)

Draft MS: 6.67m (21.9ft)

Draft FP: 6.54m (21.5ft)

QUESTION NO.55:

SPECIFICATION ITEM NO.: 1072 PARA. NO.: 3.1.2

TITLE: Ram Tensioner Upper And Lower Sheave Refurbishment (5 Yr)

Please advise the quantity.

3.1.2 Quantity: Stations 2, 6 & 8 Stations, Quantities shown in Material lists are for one RAM.

ANSWER NO.55:

Total 3.