This is Standard Form 30 (SF 30), Amendment 0001, to solicitation N6264926RA057, issued by the Naval Supply Fleet Logistics Center Yokosuka on September 2, 2026, with an effective date of September 2, 2026. The amendment provides clarifications and answers to contractor questions submitted via Request for Information (RFI - Attachment III).
The amendment addresses six key questions regarding a Ship Restricted Availability (SRA) project at Yokosuka Naval Base. Clarifications include: (1) either Black or Gray Peel & Stick materials are acceptable for paragraphs 1.3.1 and 1.3.2; (2) all preservation work for the bow anchor and anchor chain shall be performed aboard the barge moored pierside, with no requirement to offload materials to shore; (3) the estimated barge size is 50m x 16m x 2.75m, though variations are acceptable if sufficient for the work; (4) the barge will be available within the Period of Performance (March 22, 2027 to October 5, 2027) for approximately 5 weeks, with specific details to be determined post-award; (5) the barge will be moored pierside within SRF-JRMC Yokosuka, with specific mooring location determined later; and (6) shift operations will be determined and notified to the awarded contractor as needed. The amendment was signed by Contracting Officer Gil Lopez on September 1, 2026. Offerors must acknowledge receipt of this amendment prior to the offer submission deadline using one of three specified methods.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Solicitation Amendment N6264926RA0570003 SF 30.pdf | ||
| Solicitation Amendment N6264926RA0570002 SF 30.pdf | ||
| Att IX 4200.9J, CONTRACTING OFFICER'S CRANE OVERSIGHT PLAN, dtd 8 Feb 2023.pdf | ||
| Att VIII Contract Data Sheet.pdf | ||
| Att VII QASP.docx | DOCX document | |
| Att V Source of Repair Instruction.pdf | ||
| Att III Request for Information Sheet.docx | DOCX document | |
| Att VI Warranty Tracking Information.pdf | ||
| Att II Price Proposal Form N6264926RA057.xlsx | XLSX spreadsheet | |
| Solicitation - N6264926RA057.pdf | ||
| Att IV GFP List.xlsx | XLSX spreadsheet | |
| Att I Contract POP List (2).pdf |
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
R
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
16C. DATE SIGNED
Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBE
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
Block 14 (Description of Amendment/Modification): Amendment 0001 is hereby issued to provide the information from the requesting activity per RFI (Request for Information - Attachment III) submitted by a contractor.
TGI 38KC315501A01
Question:
As usual, will color of Peel & Stick of para 1.3.1 and 1.3.2 be Gray ok?
Answer:
Either Black or Gray Peel & Stick (P&S) is acceptable for paragraphs 1.3.1 and 1.3.2.
TGI 38KC386401A01
Question:
For clarification, Para 2.1 states, "Remove each existing equipment listed in 1.3.1 from the ship to the area listed in 1.2.2." However, the area identified in Para 1.2.2 is the barge. Based on this requirement, is our understanding correct that all work associated with the bow anchor and anchor chain will be performed on the barge while it is moored alongside the pier, and that KTR is not required to offload the anchor and anchor chain to the shore?
Answer:
Yes, the contractor is not required to offload the bow anchor and anchor chain to the shore. Offerors shall base their proposals on performing all preservation work aboard the barge in accordance with the provided TGI, as a shore-side work location is not designated for this requirement. This is consistent with previous execution under 4C1 SRA (ICN: 3886B86406).
Question:
Could you please specify the size of barge in request ?
Answer:
RF P&E estimates for size 50m x 16m x 2.75m. It is acceptable for the barge size to differ from the specified size, provided it is sufficient for the work. (with 2 fenders, tugboat deliver and removal) (same as original response)
Question:
The period that barge is expected is 2027/3/22~2027/10/5, is that correct?
Answer:
The expected period will be within the POP (22-Mar-2027 to 5-Oct-2027) for approximately 5 weeks. The details will be determined and notified to the awarded contractor as needed.
Question:
Will the barge be moored at the pier within the Yokosuka Naval Base?
Answer:
Yes, the barge will be moored pierside within SRF-JRMC Yokosuka. The specific mooring location will be determined at a later date post award.
Question:
Shifting the barge is not expected under this TGI, is it?
Answer:
Shifting requirement is typically not listed in TGI. It is a standard practice to operate two shifts during SRA in the past, but the actual shifting for this TGI will be determined and notified to awarded contractor as needed.
N6264926RA0570001
| IDCode: J |
| Page: 1 |
| Pages: 2 |
| AmendNo: 0001 |
| EffDate: 02 Sep 2026 |
| ReqNo: See Continuation Sheet |
| ProjNo: |
| IssCode: N62649 |
| AdmCode: |
| IssuedBy: NAVSUP FLT LOG CTR YOKOSUKA |
PSC 473 BOX 11, FPO AP 96349-1500
FPO, AP 96349-1500
UNITED STATES
Shouko Sekido, Email: shouko.sekido.ln@us.navy.mil Telephone: 315-243-5481 AdminBy:
SCD: PAS:
| ContractorNameAdd: |
| Code: |
| FacCode: |
| SolChg: 1 |
| SolNo: N6264926RA057 |
| SolDate: 09 Aug 2026 |
| AwardChg: Off |
| AwardNo: |
| AwardDate: |
| Amended: 1 |
| OffrExt: Off |
| OffrNoEx: 1 |
| NoCopies: 1 |
| ApprData: See Section G - Contract Administration Data |
| ChgeOrd: Off |
| ChgeOrder: |
| Modify: Off |
| SuppAgre: Off |
| SuppAuth: |
| ModOthr: Off |
| OthrSpec: |
| NoReq: Off |
| Require: Off |
| Copies: |
| Descript: See Schedule |
| ContNameTitle: |
| CoNameTitle: Gil Lopez |
| ContDate: |
| CODate: 01 Sep 2026 |