This is a Price Proposal Form for federal contract solicitation N6264926RA057 for USS SHOUP (DDG 86) SRA 7C1, Bundle 1. The form is an Excel-based template requiring offerors to submit pricing for 105 total work items organized across two Contract Line Items (CLINs): CLIN 0001 containing 105 Task Group Items (TGIs) and CLIN 0002 as a growth CLIN with 9.42% growth capacity. The template requires cost breakdowns by labor category (in-house labor measured in man-hours, sub-contractor labor), material costs, and Other Direct Costs (ODCs), with all pricing to be submitted in Japanese Yen (¥).
The 105 work items cover comprehensive ship maintenance and repair services for the USS SHOUP destroyer at Yokosuka Naval Base during the period of performance from March 22, 2027 through November 1, 2027. Services include tank cleaning and preservation (fuel, waste oil, sewage tanks), structural repairs, gas turbine module intake and exhaust system maintenance, deck covering replacement, nonskid system installation, piping system chemical cleaning, and various tightness and operational tests for ship systems including potable water, sewage, drainage, and countermeasure washdown systems. The proposal submission deadline is September 10, 2026 at 10:00 AM Japan Standard Time. The form includes linked summary tables that automatically calculate total labor costs, material costs, ODC costs, and proposed prices from detailed line-item entries, with a note indicating that manual input of summary values is unnecessary. Award will be made as a firm fixed price job order under an existing Master Agreement for Repair and Alteration of Vessels (MARAV), with eligibility limited to firms holding an active Master Ship Repair Agreement (MSRA) or Agreement for Boat Repair (ABR) certification from the U.S. Navy.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Solicitation Amendment N6264926RA0570003 SF 30.pdf | ||
| Solicitation Amendment N6264926RA0570002 SF 30.pdf | ||
| Solicitation Amendment N6264926RA0570001 SF 30.pdf | ||
| Att IX 4200.9J, CONTRACTING OFFICER'S CRANE OVERSIGHT PLAN, dtd 8 Feb 2023.pdf | ||
| Att VIII Contract Data Sheet.pdf | ||
| Att VII QASP.docx | DOCX document | |
| Att V Source of Repair Instruction.pdf | ||
| Att III Request for Information Sheet.docx | DOCX document | |
| Att VI Warranty Tracking Information.pdf | ||
| Solicitation - N6264926RA057.pdf | ||
| Att IV GFP List.xlsx | XLSX spreadsheet | |
| Att I Contract POP List (2).pdf |
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SUMMARY
OFFEROR/COMPANY NAME:
| TAB | SUMMARY | SUMMARY | CLIN | Total Labor (MH) | Labor Cost | Material Cost | ODC Cost | Proposed Price |
| SOLICITATION NO: | N6264926RA057 | CLIN 0001(105 TGIs) | 0 | ¥0 | ¥0 | ¥0 | ¥0 | |
| SHIP/VESSEL NAME: | USS SHOUP (DDG 86) | CLIN 0002 (Growth CLIN) | 0 | ¥0 | ¥0 | ¥0 | ¥0 | |
| DESCRIPTION: | FY27 7C1 SRA BUNDLE 1 | Total for All CLIN | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| Total WI/TGI (Specify) | 105 | Total Evaluated Price | ¥0 |
| Growth CLIN % | 9.42% |
| Note to Offerors: The values in this Summary table is linked to the corresponding data from Tabs for each TGI listed, manual input is not necessary. | ||||||||||
| No. | Work Item/TGI No. | DESCRIPTION | Proposed Labor | Material/ODCs | Proposed Price (JPY) | |||||
| In-House Labor (MH) | Sub-Contractor Labor (MH) | Total Labor (MH) | Overall Total Labor Cost (JPY) | Material Cost (JPY) | ODC (JPY) | |||||
| 1 | 38KC312305A01 | Open and Clean Fuel Receiving Tank Gp-3 (4-174-1-F) | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | |
| 2 | 38KC312306A01 | Clean, Assess, Inspect, Weld Repair, and Preserve Fuel Service Tank (4-220-1-F) | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | |
| 3 | 38KC312307A01 | Clean, Assess, Inspect, Weld Repair, and Preserve Fuel Service Tank (4-220-4-F) | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | |
| 4 | 38KC312308A01 | Clean, Assess, and Repair Controllable Pitch Propeller Hydraulic Oil Sump Tank (4-254-2-F) | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | |
| 5 | 38KC312309A01 | Clean, Assess, Inspect, Weld Repair, and Preserve Fuel Service Tank (4-300-1-F) | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | |
| 6 | 38KC312310A01 | Inspect, Repair, and Preserve 4-370-1-J | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | |
| 7 | 38KC312311A01 | Clean, Assess, Repair, and Preserve Gas Turbine Waste Drain Collecting Tank 4-370-2-F | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | |
| 8 | 38KC312312A01 | Inspect, Repair, and Preserve 4-386-0-J | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | |
| 9 | 38KC312313A01 | Inspect, Repair, and Preserve 4-390-0-J | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | |
| 10 | 38KC312314A01 | Clean, Assess, Repair, and Preserve Waste Water Drain Collecting Tank 5-212-2-W | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | |
| 11 | 38KC312315A01 | Clean, Assess, Repair, and Preserve Waste Oil Tank 5-220-1-F | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | |
| 12 | 38KC312316A01 | Clean, Assess, Repair, and Preserve Oily Waste Handling Tank 5-220-2-F | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | |
| 13 | 38KC312319A01 | AER 64153D Installation of Zinc Anode, and Cleaning, Assessment, Repair, and Preservation for Gas | ||||||||
| Turbine Waste Drain Collecting Tank 5-292-1-F | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | |||
| 14 | 38KC312320A01 | AER 64153D Installation of Zinc Anode, and Cleaning, Assessment, Repair, and Preservation for Gas | ||||||||
| Turbine Waste Drain Collecting Tank for 5-296-1-F | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | |||
| 15 | 38KC312321A01 | Clean, Assess, Inspect, Weld Repair, and Preserve Fuel Service Tank (5-300-4-F) | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | |
| 16 | 38KC312322A01 | Inspect, Repair, and Preserve Sewage Correcting Tank No. 2 | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | |
| 17 | 38KC312322T01 | Tightness and Operational Test for Sewage (VCHT) System | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | |
| 18 | 38KC312323A01 | Inspect, Repair, and Preserve Plumbing Waste Drain Tank No. 2 | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | |
| 19 | 38KC312324A01 | Inspect, Repair, and Preserve Sewage Correcting Tank No. One | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | |
| 20 | 38KC312324T01 | Tightness and Operational Test for Sewage (VCHT) System | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | |
| 21 | 38KC312325A01 | Inspect, Repair, and Preserve Plumbing Waste Drain Tank No. One | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | |
| 22 | 38KC312326A01 | Open and Clean Fuel Tank Gp-4 (4-272-2-F) and (5-264-2-F) | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | |
| 23 | 38KC312327A01 | Open and Clean Fuel Expansion Seawater Overflow Tank Group-5 (4-370-3-F) | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | |
| 24 | 38KC312328A01 | Open and Clean Fuel Expansion Seawater Overflow Tank Group-6 (4-370-4f) | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | |
| 25 | 38KC312329A01 | Open and Clean Jp-5 Tank (4-394-0-J) | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | |
| 26 | 38KC312330A01 | Open and Clean Fuel Tank Group-3 (5-220-3-F) | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | |
| 27 | 38KC312331A01 | Open and Clean Fuel Receiving Tank Group-4 (5-220-4-F) | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | |
| 28 | 38KC312332A01 | Open and Clean Fuel Expansion Seawater Overflow Tank Group-3 (5-254-1-F) | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | |
| 29 | 38KC312333A01 | Open and Clean Fuel Expansion Seawater Overflow Tank Group-4 (5-254-2-F) | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | |
| 30 | 38KC312334A01 | Open and Clean Fuel Tank Gp-3 (5-254-3-F) | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | |
| 31 | 38KC312336A01 | Aer 64153, Install Zinc and Clean Waste Water Drain Collecting Tank (5-292-2-W) | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | |
| 32 | 38KC312337A01 | Open and Clean Fuel Tank Gp-3 (5-300-1-F) | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | |
| 33 | 38KC312338A01 | Open and Clean Fuel Tank Gp-4 (5-300-2-F) | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | |
| 34 | 38KC312339A01 | Open and Clean Fuel Receiving Tank Group-5 (5-338-1-F) | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | |
| 35 | 38KC312340A01 | Open and Clean Fuel Receiving Tank Group-6 (5-338-2-F) | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | |
| 36 | 38KC312341A01 | Open and Clean Fuel Tank Group-5 (5-354-0-F) | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | |
| 37 | 38KC312342A01 | Open and Clean Fuel Tank Group-6 (5-370-0-F) | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | |
| 38 | 38KC312343A01 | Repair 1a and 1b GTM Exhaust Collector | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | |
| 39 | 38KC312343T01 | Tightness and Operational Test for Uptake System 1a | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | |
| 40 | 38KC312343T02 | Tightness and Operational Test for Uptake System 1b | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | |
| 41 | 38KC312344A03 | Repair Structural Member in 4-370-5-A | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | |
| 42 | 38KC312345A01 | Repair Structural Member in 4-370-6-A | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | |
| 43 | 38KC312346A01 | Inspect, Repair, and Preserve in No. 1b GTM Intake Dirty Side | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | |
| 44 | 38KC312346T01 | Tightness and Operational Test for Firemain System | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | |
| 45 | 38KC312347A01 | Inspect, Repair, and Preserve in No. 1a GTM Intake Dirty Side | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | |
| 46 | 38KC312348A01 | Inspect, Repair, and Preserve in No. One Ship Service Gas Turbine Generator (SSGTG) Intake Dirty Side | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | |
| 47 | 38KC312349A01 | Repair 2a and 2b GTM Exhaust Collector and Exhaust Duct Inner Insulation | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | |
| 48 | 38KC312349T01 | Tightness and Operational Test for Uptake 2a GTM Exhaust System | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | |
| 49 | 38KC312349T02 | Tightness and Operational Test for Uptake 2b GTM Exhaust System | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | |
| 50 | 38KC312350A01 | Inspect, Repair, and Preserve Intake No. 2 Gas Turbine Module Intake Dirty Side | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | |
| 51 | 38KC312351A01 | Inspect, Repair, and Preserve in No. 2b GTM Intake Dirty Side | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | |
| 52 | 38KC312352A01 | Inspect, Repair, and Preserve in No. 2 Ship Service Gas Turbine Generator (SSGTG) Intake Dirty Side | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | |
| 53 | 38KC312352T01 | Tightness and Operational Test for Low Pressure Air System | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | |
| 54 | 38KC312352T02 | Tightness and Operational Test for Fire Main System | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | |
| 55 | 38KC312354A01 | Preserve Air Vent Hose Connection in 3-158-3-T | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | |
| 56 | 38KC312355A01 | Repair Incompleted Weld on Vertical Stiffener in 3-164-4-T | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | |
| 57 | 38KC312356A01 | Repair Mechanical Hole in Longitudinal No. 8s in 3-220-01-A | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | |
| 58 | 38KC312357A01 | Open and Clean Lubricating Oil Settling Tank (3-254-2-F) | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | |
| 59 | 38KC312358A01 | Inspect, Repair, and Preserve in No. 3 Ship Service Gas Turbine Generator (SSGTG) Intake Dirty Side | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | |
| 60 | 38KC312360A01 | Inspect and Preserve Bottom Surface of Escape Trunk 4-250-2-T | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | |
| 61 | 38KC312361A01 | Inspect and Preserve Aft Louver | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | |
| 62 | 38KC312362A01 | Inspect and Preserve Forward Louver | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | |
| 63 | 38KC312363A01 | Inspect, Repair, and Preserve Bilge and Bilge Drain Well in 4-220-0-E | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | |
| 64 | 38KC312363T01 | Tightness and Operational Test for Oily Waste Water System | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | |
| 65 | 38KC312363T02 | Tightness and Operational Test for Main and Secondary Drainage System | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | |
| 66 | 38KC312363T03 | Static Load Test for Padeye | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | |
| 67 | 38KC312364A01 | Inspect, Repair, and Preserve Fwd Uptake Space | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | |
| 68 | 38KC312365A01 | Inspect, Repair, and Preserve Bilge and Bilge Drain Well in 4-254-0-E | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | |
| 69 | 38KC312365T01 | Tightness and Operational Test for Oily Waste Water System | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | |
| 70 | 38KC312365T02 | Tightness and Operational Test for Main and Secondary Drainage System | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | |
| 71 | 38KC3123AAA01 | Clean, Inspect, Repair, and Preserve Void (0 1-2-Mm-0-V) | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | |
| 72 | 38KC3123ABA01 | Clean, Inspect, Repair and Preserve 4-P-0-W | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | |
| 73 | 38KC3123AEA01 | Clean, Assess, Repair, and Preserve Gas Turbine Waste Drain Collecting Tank (5-177-1-F) | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | |
| 74 | 38KC3123AFA01 | Clean, Inspect, Repair and Preserve Cofferdam 5-204-1-V | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | |
| 75 | 38KC3123AKA01 | Preserve Deck Plating in 1-304-2-M | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | |
| 76 | 38KC3123AQA01 | Repair Deck Covering in 3-220-0-T | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | |
| 77 | 38KC313601A01 | Replace Nonskid System on Forecastle | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | |
| 78 | 38KC313701A01 | Remove Unknown Unused Foundation in 02 Level Weather | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | |
| 79 | 38KC313801A01 | Repair Structural Member in 03 Level Weather | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | |
| 80 | 38KC315501A01 | Replace Peel and Stick Nonskid System on 04 Lvl and 05 Lvl Deck Weather | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | |
| 81 | 38KC315502A01 | Repair Structural Member in 04 Level Weather | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | |
| 82 | 38KC315502T02 | Tightness and Operational Test for Countermeasure Washdown System | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | |
| 83 | 38KC316801A01 | Repair Bolted Equipment Removal Plate (BERP) 02-296-2, 02-296-4, 02-281-2 | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | |
| 84 | 38KC316802A01 | Repair Bolted Equipment Removal Plate (BERP) 03-182-1, 03-182-3, 02-225-1 | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | |
| 85 | 38KC325901A01 | Modify GTM and Gtg Bolted Bliss Cap | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | |
| 86 | 38KC358302A01 | Tightness and Operational Test for Potable Water System | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | |
| 87 | 38KC358302T01 | Potable Water Sys (T and Op), Sa 99171d | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | |
| 88 | 38KC358804A01 | Replace Nonskid System in 2-442-0-E | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | |
| 89 | 38KC359305A01 | Chemical Clean Fwd VCHT Piping System Throughout The Ship | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | |
| 90 | 38KC359305A02 | Chemical Clean Aft VCHT Piping System Throughout The Ship | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | |
| 91 | 38KC359305T01 | Static Load Test for Aircraft Securing Fittings | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | |
| 92 | 38KC359305T02 | Tightness and Operational Test for Sewage (VCHT) System | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | |
| 93 | 38KC363401A01 | Load Test for Rast Track | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | |
| 94 | 38KC363401T01 | Tightness and Operational Test for Potable Water System | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | |
| 95 | 38KC363401T02 | Rast System Track (Load Test) | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | |
| 96 | 38KC363401T03 | Tightness and Operational Test for Potable Water System | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | |
| 97 | 38KC364303A01 | Replace Deck Covering System in Berthing No. 7 (3-350-2-L) | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | |
| 98 | 38KC364303T01 | Tightness and Operational Test for Potable Water System | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | |
| 99 | 38KC364501A02 | Replace Deck Covering in 2-370-3-L | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | |
| 100 | 38KC364502A01 | Replace Deck Covering in 02-154-2-L | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | |
| 101 | 38KC366101A01 | Replace Deck Covering in 1-78-4-Q | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | |
| 102 | 38KC386401A01 | Remove and Reinstall Bow Anchor and Chain Assy for Ship’s Force Maint Work | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | |
| 103 | 38KC386402A01 | Accomplish Pressurized Waveguide and Transmission Line Dry Air Lay-Up | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | |
| 104 | 38KC386402T01 | Tightness and Operational Test for Waveguide and Transmission Line Dry Air Layup | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | |
| 105 | 38KC386501A01 | Provide FY27 SRA Crane, Crane Rigging, and Rigging Service for Ship’s Force Work | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | |
| 106 | ||||||||||
| 107 | ||||||||||
| 108 | ||||||||||
| 109 | ||||||||||
| 110 | ||||||||||
| 111 | ||||||||||
| 112 | ||||||||||
| 113 | ||||||||||
| 114 | ||||||||||
| 115 | ||||||||||
| 116 | ||||||||||
| 117 | ||||||||||
| 118 | ||||||||||
| 119 | ||||||||||
| 120 | ||||||||||
| 121 | ||||||||||
| 122 | ||||||||||
| 123 | ||||||||||
| 124 | ||||||||||
| 125 | ||||||||||
| 126 | ||||||||||
| 127 | ||||||||||
| 128 | ||||||||||
| 129 | ||||||||||
| 130 | ||||||||||
| 131 | ||||||||||
| 132 | ||||||||||
| 133 | ||||||||||
| 134 | ||||||||||
| 135 | ||||||||||
| 136 | ||||||||||
| 137 | ||||||||||
| 138 | ||||||||||
| 139 | ||||||||||
| 140 | ||||||||||
| 141 | ||||||||||
| 142 | ||||||||||
| 143 | ||||||||||
| 144 | ||||||||||
| 145 | ||||||||||
| 146 | ||||||||||
| 147 | ||||||||||
| 148 | ||||||||||
| 149 | ||||||||||
| 150 | ||||||||||
| 151 | ||||||||||
| 152 | ||||||||||
| 153 | ||||||||||
| 154 | ||||||||||
| 155 | ||||||||||
| 156 | ||||||||||
| 157 | ||||||||||
| 158 | ||||||||||
| 159 | ||||||||||
| 160 | ||||||||||
| 161 | ||||||||||
| 162 | ||||||||||
| 163 | ||||||||||
| 164 | ||||||||||
| 165 | ||||||||||
| 166 | ||||||||||
| 167 | ||||||||||
| 168 | ||||||||||
| 169 | ||||||||||
| 170 | ||||||||||
| 171 | ||||||||||
| 172 | ||||||||||
| 173 | ||||||||||
| 174 | ||||||||||
| 175 | ||||||||||
| 176 | ||||||||||
| 177 | ||||||||||
| 178 | ||||||||||
| 179 | ||||||||||
| 180 | ||||||||||
| 181 | ||||||||||
| 182 | ||||||||||
| 183 | ||||||||||
| 184 | ||||||||||
| 185 | ||||||||||
| 186 | ||||||||||
| 187 | ||||||||||
| 188 | ||||||||||
| 189 | ||||||||||
| 190 | ||||||||||
| 191 | ||||||||||
| 192 | ||||||||||
| 193 | ||||||||||
| 194 | ||||||||||
| 195 | ||||||||||
| 196 | ||||||||||
| 197 | ||||||||||
| 198 | ||||||||||
| 199 | ||||||||||
| 200 |
1_38KC312305A01
| SHIP NAME/AVAILABILITY: | USS SHOUP (DDG 86) - FY27 7C1 SRA BUNDLE 1 | 1_38KC312305A01 SUMMARY | |||||||||
| SOLICITATION #: | N6264926RA057 | ||||||||||
| Work Item/TGI #: | 1_38KC312305A01 | In-House MH | Sub-KTR MH | Labor Cost (JPY) | Material (JPY) | ODC (JPY) | TOTAL (JPY) | ||||
| DESCRIPTION: | Open and Clean Fuel Receiving Tank Gp-3 (4-174-1-F) | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||||
| Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed. | |||||||||||
| IN-HOUSE LABOR HOUR BREAKDOWN | |||||||||||
| KEY WORK ITEM | SFTR | INSL | WELD | SMTL | RGRS | PNTR | ELEC | PFTR | QA | OTHERS | TOTAL |
TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
| KEY WORK ITEM | IN-HOUSE LABOR BREAKDOWN | SUB-CONTRACTOR LABOR BREAKDOWN | TOTAL | |||||
| TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | ||||
| HOURS | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL |
HOURS
| TOTAL M/Hs | 0 | TOTAL M/Hs | 0 | ||||
| COST PER M/H (¥) | <--- Please input in-house labor rate | COST PER M/H (¥) | <--- Please input sub-contractor labor rate | ||||
| LABOR COST (¥) | ¥0 | LABOR COST (¥) | ¥0 | ||||
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed. | |||||||
| MATERIAL COST BREAKDOWN | |||||||
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
| TOTAL (¥) | ¥0 | ||||
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed. | |||||
| OTHER DIRECT COST (ODC) (IF ANY) | |||||
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
TOTAL (¥) ¥0
2_38KC312306A01
| SHIP NAME/AVAILABILITY: | USS SHOUP (DDG 86) - FY27 7C1 SRA BUNDLE 1 | 2_38KC312306A01 SUMMARY | |||||||||
| SOLICITATION #: | N6264926RA057 | ||||||||||
| Work Item/TGI #: | 2_38KC312306A01 | In-House MH | Sub-KTR MH | Labor Cost (JPY) | Material (JPY) | ODC (JPY) | TOTAL (JPY) | ||||
| DESCRIPTION: | Clean, Assess, Inspect, Weld Repair, and Preserve Fuel Service Tank (4-220-1-F) | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||||
| Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed. | |||||||||||
| IN-HOUSE LABOR HOUR BREAKDOWN | |||||||||||
| KEY WORK ITEM | SFTR | INSL | WELD | SMTL | RGRS | PNTR | ELEC | PFTR | QA | OTHERS | TOTAL |
TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
| KEY WORK ITEM | IN-HOUSE LABOR BREAKDOWN | SUB-CONTRACTOR LABOR BREAKDOWN | TOTAL | |||||
| TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | ||||
| HOURS | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL |
| TOTAL M/Hs | 0 | TOTAL M/Hs | 0 | ||||
| COST PER M/H (¥) | <--- Please input in-house labor rate | COST PER M/H (¥) | <--- Please input sub-contractor labor rate | ||||
| LABOR COST (¥) | ¥0 | LABOR COST (¥) | ¥0 | ||||
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed. | |||||||
| MATERIAL COST BREAKDOWN | |||||||
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
| TOTAL (¥) | ¥0 | ||||
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed. | |||||
| OTHER DIRECT COST (ODC) (IF ANY) | |||||
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
TOTAL (¥) ¥0
3_38KC312307A01
| SHIP NAME/AVAILABILITY: | USS SHOUP (DDG 86) - FY27 7C1 SRA BUNDLE 1 | 3_38KC312307A01 SUMMARY | |||||||||
| SOLICITATION #: | N6264926RA057 | ||||||||||
| Work Item/TGI #: | 3_38KC312307A01 | In-House MH | Sub-KTR MH | Labor Cost (JPY) | Material (JPY) | ODC (JPY) | TOTAL (JPY) | ||||
| DESCRIPTION: | Clean, Assess, Inspect, Weld Repair, and Preserve Fuel Service Tank (4-220-4-F) | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||||
| Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed. | |||||||||||
| IN-HOUSE LABOR HOUR BREAKDOWN | |||||||||||
| KEY WORK ITEM | SFTR | INSL | WELD | SMTL | RGRS | PNTR | ELEC | PFTR | QA | OTHERS | TOTAL |
TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
| KEY WORK ITEM | IN-HOUSE LABOR BREAKDOWN | SUB-CONTRACTOR LABOR BREAKDOWN | TOTAL | |||||
| TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | ||||
| HOURS | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL |
| TOTAL M/Hs | 0 | TOTAL M/Hs | 0 | ||||
| COST PER M/H (¥) | <--- Please input in-house labor rate | COST PER M/H (¥) | <--- Please input sub-contractor labor rate | ||||
| LABOR COST (¥) | ¥0 | LABOR COST (¥) | ¥0 | ||||
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed. | |||||||
| MATERIAL COST BREAKDOWN | |||||||
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
| TOTAL (¥) | ¥0 | ||||
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed. | |||||
| OTHER DIRECT COST (ODC) (IF ANY) | |||||
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
TOTAL (¥) ¥0
4_38KC312308A01
| SHIP NAME/AVAILABILITY: | USS SHOUP (DDG 86) - FY27 7C1 SRA BUNDLE 1 | 4_38KC312308A01 SUMMARY | |||||||||
| SOLICITATION #: | N6264926RA057 | ||||||||||
| Work Item/TGI #: | 4_38KC312308A01 | In-House MH | Sub-KTR MH | Labor Cost (JPY) | Material (JPY) | ODC (JPY) | TOTAL (JPY) | ||||
| DESCRIPTION: | Clean, Assess, and Repair Controllable Pitch Propeller Hydraulic Oil Sump Tank (4-254-2-F) | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||||
| Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed. | |||||||||||
| IN-HOUSE LABOR HOUR BREAKDOWN | |||||||||||
| KEY WORK ITEM | SFTR | INSL | WELD | SMTL | RGRS | PNTR | ELEC | PFTR | QA | OTHERS | TOTAL |
TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
| KEY WORK ITEM | IN-HOUSE LABOR BREAKDOWN | SUB-CONTRACTOR LABOR BREAKDOWN | TOTAL | |||||
| TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | ||||
| HOURS | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL |
| TOTAL M/Hs | 0 | TOTAL M/Hs | 0 | ||||
| COST PER M/H (¥) | <--- Please input in-house labor rate | COST PER M/H (¥) | <--- Please input sub-contractor labor rate | ||||
| LABOR COST (¥) | ¥0 | LABOR COST (¥) | ¥0 | ||||
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed. | |||||||
| MATERIAL COST BREAKDOWN | |||||||
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
| TOTAL (¥) | ¥0 | ||||
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed. | |||||
| OTHER DIRECT COST (ODC) (IF ANY) | |||||
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
TOTAL (¥) ¥0
5_38KC312309A01
| SHIP NAME/AVAILABILITY: | USS SHOUP (DDG 86) - FY27 7C1 SRA BUNDLE 1 | 5_38KC312309A01 SUMMARY | |||||||||
| SOLICITATION #: | N6264926RA057 | ||||||||||
| Work Item/TGI #: | 5_38KC312309A01 | In-House MH | Sub-KTR MH | Labor Cost (JPY) | Material (JPY) | ODC (JPY) | TOTAL (JPY) | ||||
| DESCRIPTION: | Clean, Assess, Inspect, Weld Repair, and Preserve Fuel Service Tank (4-300-1-F) | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||||
| Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed. | |||||||||||
| IN-HOUSE LABOR HOUR BREAKDOWN | |||||||||||
| KEY WORK ITEM | SFTR | INSL | WELD | SMTL | RGRS | PNTR | ELEC | PFTR | QA | OTHERS | TOTAL |
TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
| KEY WORK ITEM | IN-HOUSE LABOR BREAKDOWN | SUB-CONTRACTOR LABOR BREAKDOWN | TOTAL | |||||
| TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | ||||
| HOURS | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL |
| TOTAL M/Hs | 0 | TOTAL M/Hs | 0 | ||||
| COST PER M/H (¥) | <--- Please input in-house labor rate | COST PER M/H (¥) | <--- Please input sub-contractor labor rate | ||||
| LABOR COST (¥) | ¥0 | LABOR COST (¥) | ¥0 | ||||
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed. | |||||||
| MATERIAL COST BREAKDOWN | |||||||
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
| TOTAL (¥) | ¥0 | ||||
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed. | |||||
| OTHER DIRECT COST (ODC) (IF ANY) | |||||
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
TOTAL (¥) ¥0
6_38KC312310A01
| SHIP NAME/AVAILABILITY: | USS SHOUP (DDG 86) - FY27 7C1 SRA BUNDLE 1 | 6_38KC312310A01 SUMMARY | |||||||||
| SOLICITATION #: | N6264926RA057 | ||||||||||
| Work Item/TGI #: | 6_38KC312310A01 | In-House MH | Sub-KTR MH | Labor Cost (JPY) | Material (JPY) | ODC (JPY) | TOTAL (JPY) | ||||
| DESCRIPTION: | Inspect, Repair, and Preserve 4-370-1-J | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||||
| Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed. | |||||||||||
| IN-HOUSE LABOR HOUR BREAKDOWN | |||||||||||
| KEY WORK ITEM | SFTR | INSL | WELD | SMTL | RGRS | PNTR | ELEC | PFTR | QA | OTHERS | TOTAL |
TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
| KEY WORK ITEM | IN-HOUSE LABOR BREAKDOWN | SUB-CONTRACTOR LABOR BREAKDOWN | TOTAL | |||||
| TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | ||||
| HOURS | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL |
| TOTAL M/Hs | 0 | TOTAL M/Hs | 0 | ||||
| COST PER M/H (¥) | <--- Please input in-house labor rate | COST PER M/H (¥) | <--- Please input sub-contractor labor rate | ||||
| LABOR COST (¥) | ¥0 | LABOR COST (¥) | ¥0 | ||||
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed. | |||||||
| MATERIAL COST BREAKDOWN | |||||||
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
| TOTAL (¥) | ¥0 | ||||
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed. | |||||
| OTHER DIRECT COST (ODC) (IF ANY) | |||||
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
TOTAL (¥) ¥0
7_38KC312311A01
| SHIP NAME/AVAILABILITY: | USS SHOUP (DDG 86) - FY27 7C1 SRA BUNDLE 1 | 7_38KC312311A01 SUMMARY | |||||||||
| SOLICITATION #: | N6264926RA057 | ||||||||||
| Work Item/TGI #: | 7_38KC312311A01 | In-House MH | Sub-KTR MH | Labor Cost (JPY) | Material (JPY) | ODC (JPY) | TOTAL (JPY) | ||||
| DESCRIPTION: | Clean, Assess, Repair, and Preserve Gas Turbine Waste Drain Collecting Tank 4-370-2-F | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||||
| Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed. | |||||||||||
| IN-HOUSE LABOR HOUR BREAKDOWN | |||||||||||
| KEY WORK ITEM | SFTR | INSL | WELD | SMTL | RGRS | PNTR | ELEC | PFTR | QA | OTHERS | TOTAL |
TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
| KEY WORK ITEM | IN-HOUSE LABOR BREAKDOWN | SUB-CONTRACTOR LABOR BREAKDOWN | TOTAL | |||||
| TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | ||||
| HOURS | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL |
| TOTAL M/Hs | 0 | TOTAL M/Hs | 0 | ||||
| COST PER M/H (¥) | <--- Please input in-house labor rate | COST PER M/H (¥) | <--- Please input sub-contractor labor rate | ||||
| LABOR COST (¥) | ¥0 | LABOR COST (¥) | ¥0 | ||||
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed. | |||||||
| MATERIAL COST BREAKDOWN | |||||||
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
| TOTAL (¥) | ¥0 | ||||
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed. | |||||
| OTHER DIRECT COST (ODC) (IF ANY) | |||||
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
TOTAL (¥) ¥0
8_38KC312312A01
| SHIP NAME/AVAILABILITY: | USS SHOUP (DDG 86) - FY27 7C1 SRA BUNDLE 1 | 8_38KC312312A01 SUMMARY | |||||||||
| SOLICITATION #: | N6264926RA057 | ||||||||||
| Work Item/TGI #: | 8_38KC312312A01 | In-House MH | Sub-KTR MH | Labor Cost (JPY) | Material (JPY) | ODC (JPY) | TOTAL (JPY) | ||||
| DESCRIPTION: | Inspect, Repair, and Preserve 4-386-0-J | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||||
| Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed. | |||||||||||
| IN-HOUSE LABOR HOUR BREAKDOWN | |||||||||||
| KEY WORK ITEM | SFTR | INSL | WELD | SMTL | RGRS | PNTR | ELEC | PFTR | QA | OTHERS | TOTAL |
TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
| KEY WORK ITEM | IN-HOUSE LABOR BREAKDOWN | SUB-CONTRACTOR LABOR BREAKDOWN | TOTAL | |||||
| TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | ||||
| HOURS | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL |
| TOTAL M/Hs | 0 | TOTAL M/Hs | 0 | ||||
| COST PER M/H (¥) | <--- Please input in-house labor rate | COST PER M/H (¥) | <--- Please input sub-contractor labor rate | ||||
| LABOR COST (¥) | ¥0 | LABOR COST (¥) | ¥0 | ||||
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed. | |||||||
| MATERIAL COST BREAKDOWN | |||||||
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
| TOTAL (¥) | ¥0 | ||||
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed. | |||||
| OTHER DIRECT COST (ODC) (IF ANY) | |||||
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
TOTAL (¥) ¥0
9_38KC312313A01
| SHIP NAME/AVAILABILITY: | USS SHOUP (DDG 86) - FY27 7C1 SRA BUNDLE 1 | 9_38KC312313A01 SUMMARY | |||||||||
| SOLICITATION #: | N6264926RA057 | ||||||||||
| Work Item/TGI #: | 9_38KC312313A01 | In-House MH | Sub-KTR MH | Labor Cost (JPY) | Material (JPY) | ODC (JPY) | TOTAL (JPY) | ||||
| DESCRIPTION: | Inspect, Repair, and Preserve 4-390-0-J | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||||
| Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed. | |||||||||||
| IN-HOUSE LABOR HOUR BREAKDOWN | |||||||||||
| KEY WORK ITEM | SFTR | INSL | WELD | SMTL | RGRS | PNTR | ELEC | PFTR | QA | OTHERS | TOTAL |
TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
| KEY WORK ITEM | IN-HOUSE LABOR BREAKDOWN | SUB-CONTRACTOR LABOR BREAKDOWN | TOTAL | |||||
| TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | ||||
| HOURS | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL |
| TOTAL M/Hs | 0 | TOTAL M/Hs | 0 | ||||
| COST PER M/H (¥) | <--- Please input in-house labor rate | COST PER M/H (¥) | <--- Please input sub-contractor labor rate | ||||
| LABOR COST (¥) | ¥0 | LABOR COST (¥) | ¥0 | ||||
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed. | |||||||
| MATERIAL COST BREAKDOWN | |||||||
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
| TOTAL (¥) | ¥0 | ||||
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed. | |||||
| OTHER DIRECT COST (ODC) (IF ANY) | |||||
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
TOTAL (¥) ¥0
10_38KC312314A01
| SHIP NAME/AVAILABILITY: | USS SHOUP (DDG 86) - FY27 7C1 SRA BUNDLE 1 | 10_38KC312314A01 SUMMARY | |||||||||
| SOLICITATION #: | N6264926RA057 | ||||||||||
| Work Item/TGI #: | 10_38KC312314A01 | In-House MH | Sub-KTR MH | Labor Cost (JPY) | Material (JPY) | ODC (JPY) | TOTAL (JPY) | ||||
| DESCRIPTION: | Clean, Assess, Repair, and Preserve Waste Water Drain Collecting Tank 5-212-2-W | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||||
| Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed. | |||||||||||
| IN-HOUSE LABOR HOUR BREAKDOWN | |||||||||||
| KEY WORK ITEM | SFTR | INSL | WELD | SMTL | RGRS | PNTR | ELEC | PFTR | QA | OTHERS | TOTAL |
TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
| KEY WORK ITEM | IN-HOUSE LABOR BREAKDOWN | SUB-CONTRACTOR LABOR BREAKDOWN | TOTAL | |||||
| TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | ||||
| HOURS | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL |
| TOTAL M/Hs | 0 | TOTAL M/Hs | 0 | ||||
| COST PER M/H (¥) | <--- Please input in-house labor rate | COST PER M/H (¥) | <--- Please input sub-contractor labor rate | ||||
| LABOR COST (¥) | ¥0 | LABOR COST (¥) | ¥0 | ||||
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed. | |||||||
| MATERIAL COST BREAKDOWN | |||||||
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
| TOTAL (¥) | ¥0 | ||||
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed. | |||||
| OTHER DIRECT COST (ODC) (IF ANY) | |||||
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
TOTAL (¥) ¥0
11_38KC312315A01
| SHIP NAME/AVAILABILITY: | USS SHOUP (DDG 86) - FY27 7C1 SRA BUNDLE 1 | 11_38KC312315A01 SUMMARY | |||||||||
| SOLICITATION #: | N6264926RA057 | ||||||||||
| Work Item/TGI #: | 11_38KC312315A01 | In-House MH | Sub-KTR MH | Labor Cost (JPY) | Material (JPY) | ODC (JPY) | TOTAL (JPY) | ||||
| DESCRIPTION: | Clean, Assess, Repair, and Preserve Waste Oil Tank 5-220-1-F | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||||
| Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed. | |||||||||||
| IN-HOUSE LABOR HOUR BREAKDOWN | |||||||||||
| KEY WORK ITEM | SFTR | INSL | WELD | SMTL | RGRS | PNTR | ELEC | PFTR | QA | OTHERS | TOTAL |
TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
| KEY WORK ITEM | IN-HOUSE LABOR BREAKDOWN | SUB-CONTRACTOR LABOR BREAKDOWN | TOTAL | |||||
| TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | ||||
| HOURS | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL |
| TOTAL M/Hs | 0 | TOTAL M/Hs | 0 | ||||
| COST PER M/H (¥) | <--- Please input in-house labor rate | COST PER M/H (¥) | <--- Please input sub-contractor labor rate | ||||
| LABOR COST (¥) | ¥0 | LABOR COST (¥) | ¥0 | ||||
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed. | |||||||
| MATERIAL COST BREAKDOWN | |||||||
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
| TOTAL (¥) | ¥0 | ||||
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed. | |||||
| OTHER DIRECT COST (ODC) (IF ANY) | |||||
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
TOTAL (¥) ¥0
12_38KC312316A01
| SHIP NAME/AVAILABILITY: | USS SHOUP (DDG 86) - FY27 7C1 SRA BUNDLE 1 | 12_38KC312316A01 SUMMARY | |||||||||
| SOLICITATION #: | N6264926RA057 | ||||||||||
| Work Item/TGI #: | 12_38KC312316A01 | In-House MH | Sub-KTR MH | Labor Cost (JPY) | Material (JPY) | ODC (JPY) | TOTAL (JPY) | ||||
| DESCRIPTION: | Clean, Assess, Repair, and Preserve Oily Waste Handling Tank 5-220-2-F | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||||
| Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed. | |||||||||||
| IN-HOUSE LABOR HOUR BREAKDOWN | |||||||||||
| KEY WORK ITEM | SFTR | INSL | WELD | SMTL | RGRS | PNTR | ELEC | PFTR | QA | OTHERS | TOTAL |
TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
| KEY WORK ITEM | IN-HOUSE LABOR BREAKDOWN | SUB-CONTRACTOR LABOR BREAKDOWN | TOTAL | |||||
| TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | ||||
| HOURS | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL |
| TOTAL M/Hs | 0 | TOTAL M/Hs | 0 | ||||
| COST PER M/H (¥) | <--- Please input in-house labor rate | COST PER M/H (¥) | <--- Please input sub-contractor labor rate | ||||
| LABOR COST (¥) | ¥0 | LABOR COST (¥) | ¥0 | ||||
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed. | |||||||
| MATERIAL COST BREAKDOWN | |||||||
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
| TOTAL (¥) | ¥0 | ||||
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed. | |||||
| OTHER DIRECT COST (ODC) (IF ANY) | |||||
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
TOTAL (¥) ¥0
13_38KC312319A01
| SHIP NAME/AVAILABILITY: | USS SHOUP (DDG 86) - FY27 7C1 SRA BUNDLE 1 | 13_38KC312319A01 SUMMARY | ||||||||||
| SOLICITATION #: | N6264926RA057 | |||||||||||
| Work Item/TGI #: | 13_38KC312319A01 | In-House MH | Sub-KTR MH | Labor Cost (JPY) | Material (JPY) | ODC (JPY) | TOTAL (JPY) | |||||
| DESCRIPTION: | AER 64153D Installation of Zinc Anode, and Cleaning, Assessment, Repair, and Preservation for Gas | |||||||||||
| Turbine Waste Drain Collecting Tank 5-292-1-F | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||||||
| Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed. | ||||||||||||
| IN-HOUSE LABOR HOUR BREAKDOWN | ||||||||||||
| KEY WORK ITEM | SFTR | INSL | WELD | SMTL | RGRS | PNTR | ELEC | PFTR | QA | OTHERS | TOTAL |
TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
| KEY WORK ITEM | IN-HOUSE LABOR BREAKDOWN | SUB-CONTRACTOR LABOR BREAKDOWN | TOTAL | |||||
| TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | ||||
| HOURS | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL |
| TOTAL M/Hs | 0 | TOTAL M/Hs | 0 | ||||
| COST PER M/H (¥) | <--- Please input in-house labor rate | COST PER M/H (¥) | <--- Please input sub-contractor labor rate | ||||
| LABOR COST (¥) | ¥0 | LABOR COST (¥) | ¥0 | ||||
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed. | |||||||
| MATERIAL COST BREAKDOWN | |||||||
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
| TOTAL (¥) | ¥0 | ||||
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed. | |||||
| OTHER DIRECT COST (ODC) (IF ANY) | |||||
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
TOTAL (¥) ¥0
14_38KC312320A01
| SHIP NAME/AVAILABILITY: | USS SHOUP (DDG 86) - FY27 7C1 SRA BUNDLE 1 | 14_38KC312320A01 SUMMARY | ||||||||||
| SOLICITATION #: | N6264926RA057 | |||||||||||
| Work Item/TGI #: | 14_38KC312320A01 | In-House MH | Sub-KTR MH | Labor Cost (JPY) | Material (JPY) | ODC (JPY) | TOTAL (JPY) | |||||
| DESCRIPTION: | AER 64153D Installation of Zinc Anode, and Cleaning, Assessment, Repair, and Preservation for Gas | |||||||||||
| Turbine Waste Drain Collecting Tank for 5-296-1-F | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||||||
| Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed. | ||||||||||||
| IN-HOUSE LABOR HOUR BREAKDOWN | ||||||||||||
| KEY WORK ITEM | SFTR | INSL | WELD | SMTL | RGRS | PNTR | ELEC | PFTR | QA | OTHERS | TOTAL |
TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
| KEY WORK ITEM | IN-HOUSE LABOR BREAKDOWN | SUB-CONTRACTOR LABOR BREAKDOWN | TOTAL | |||||
| TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | ||||
| HOURS | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL |
| TOTAL M/Hs | 0 | TOTAL M/Hs | 0 | ||||
| COST PER M/H (¥) | <--- Please input in-house labor rate | COST PER M/H (¥) | <--- Please input sub-contractor labor rate | ||||
| LABOR COST (¥) | ¥0 | LABOR COST (¥) | ¥0 | ||||
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed. | |||||||
| MATERIAL COST BREAKDOWN | |||||||
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
| TOTAL (¥) | ¥0 | ||||
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed. | |||||
| OTHER DIRECT COST (ODC) (IF ANY) | |||||
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
TOTAL (¥) ¥0
15_38KC312321A01
| SHIP NAME/AVAILABILITY: | USS SHOUP (DDG 86) - FY27 7C1 SRA BUNDLE 1 | 15_38KC312321A01 SUMMARY | |||||||||
| SOLICITATION #: | N6264926RA057 | ||||||||||
| Work Item/TGI #: | 15_38KC312321A01 | In-House MH | Sub-KTR MH | Labor Cost (JPY) | Material (JPY) | ODC (JPY) | TOTAL (JPY) | ||||
| DESCRIPTION: | Clean, Assess, Inspect, Weld Repair, and Preserve Fuel Service Tank (5-300-4-F) | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||||
| Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed. | |||||||||||
| IN-HOUSE LABOR HOUR BREAKDOWN | |||||||||||
| KEY WORK ITEM | SFTR | INSL | WELD | SMTL | RGRS | PNTR | ELEC | PFTR | QA | OTHERS | TOTAL |
TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
| KEY WORK ITEM | IN-HOUSE LABOR BREAKDOWN | SUB-CONTRACTOR LABOR BREAKDOWN | TOTAL | |||||
| TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | ||||
| HOURS | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL |
| TOTAL M/Hs | 0 | TOTAL M/Hs | 0 | ||||
| COST PER M/H (¥) | <--- Please input in-house labor rate | COST PER M/H (¥) | <--- Please input sub-contractor labor rate | ||||
| LABOR COST (¥) | ¥0 | LABOR COST (¥) | ¥0 | ||||
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed. | |||||||
| MATERIAL COST BREAKDOWN | |||||||
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
| TOTAL (¥) | ¥0 | ||||
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed. | |||||
| OTHER DIRECT COST (ODC) (IF ANY) | |||||
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
TOTAL (¥) ¥0
16_38KC312322A01
| SHIP NAME/AVAILABILITY: | USS SHOUP (DDG 86) - FY27 7C1 SRA BUNDLE 1 | 16_38KC312322A01 SUMMARY | |||||||||
| SOLICITATION #: | N6264926RA057 | ||||||||||
| Work Item/TGI #: | 16_38KC312322A01 | In-House MH | Sub-KTR MH | Labor Cost (JPY) | Material (JPY) | ODC (JPY) | TOTAL (JPY) | ||||
| DESCRIPTION: | Inspect, Repair, and Preserve Sewage Correcting Tank No. 2 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||||
| Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed. | |||||||||||
| IN-HOUSE LABOR HOUR BREAKDOWN | |||||||||||
| KEY WORK ITEM | SFTR | INSL | WELD | SMTL | RGRS | PNTR | ELEC | PFTR | QA | OTHERS | TOTAL |
TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
| KEY WORK ITEM | IN-HOUSE LABOR BREAKDOWN | SUB-CONTRACTOR LABOR BREAKDOWN | TOTAL | |||||
| TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | ||||
| HOURS | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL |
| TOTAL M/Hs | 0 | TOTAL M/Hs | 0 | ||||
| COST PER M/H (¥) | <--- Please input in-house labor rate | COST PER M/H (¥) | <--- Please input sub-contractor labor rate | ||||
| LABOR COST (¥) | ¥0 | LABOR COST (¥) | ¥0 | ||||
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed. | |||||||
| MATERIAL COST BREAKDOWN | |||||||
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
| TOTAL (¥) | ¥0 | ||||
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed. | |||||
| OTHER DIRECT COST (ODC) (IF ANY) | |||||
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
TOTAL (¥) ¥0
17_38KC312322T01
| SHIP NAME/AVAILABILITY: | USS SHOUP (DDG 86) - FY27 7C1 SRA BUNDLE 1 | 17_38KC312322T01 SUMMARY | |||||||||
| SOLICITATION #: | N6264926RA057 | ||||||||||
| Work Item/TGI #: | 17_38KC312322T01 | In-House MH | Sub-KTR MH | Labor Cost (JPY) | Material (JPY) | ODC (JPY) | TOTAL (JPY) | ||||
| DESCRIPTION: | Tightness and Operational Test for Sewage (VCHT) System | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||||
| Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed. | |||||||||||
| IN-HOUSE LABOR HOUR BREAKDOWN | |||||||||||
| KEY WORK ITEM | SFTR | INSL | WELD | SMTL | RGRS | PNTR | ELEC | PFTR | QA | OTHERS | TOTAL |
TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
| KEY WORK ITEM | IN-HOUSE LABOR BREAKDOWN | SUB-CONTRACTOR LABOR BREAKDOWN | TOTAL | |||||
| TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | ||||
| HOURS | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL |
| TOTAL M/Hs | 0 | TOTAL M/Hs | 0 | ||||
| COST PER M/H (¥) | <--- Please input in-house labor rate | COST PER M/H (¥) | <--- Please input sub-contractor labor rate | ||||
| LABOR COST (¥) | ¥0 | LABOR COST (¥) | ¥0 | ||||
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed. | |||||||
| MATERIAL COST BREAKDOWN | |||||||
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
| TOTAL (¥) | ¥0 | ||||
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed. | |||||
| OTHER DIRECT COST (ODC) (IF ANY) | |||||
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
TOTAL (¥) ¥0
18_38KC312323A01
| SHIP NAME/AVAILABILITY: | USS SHOUP (DDG 86) - FY27 7C1 SRA BUNDLE 1 | 18_38KC312323A01 SUMMARY | |||||||||
| SOLICITATION #: | N6264926RA057 | ||||||||||
| Work Item/TGI #: | 18_38KC312323A01 | In-House MH | Sub-KTR MH | Labor Cost (JPY) | Material (JPY) | ODC (JPY) | TOTAL (JPY) | ||||
| DESCRIPTION: | Inspect, Repair, and Preserve Plumbing Waste Drain Tank No. 2 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||||
| Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed. | |||||||||||
| IN-HOUSE LABOR HOUR BREAKDOWN | |||||||||||
| KEY WORK ITEM | SFTR | INSL | WELD | SMTL | RGRS | PNTR | ELEC | PFTR | QA | OTHERS | TOTAL |
TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
| KEY WORK ITEM | IN-HOUSE LABOR BREAKDOWN | SUB-CONTRACTOR LABOR BREAKDOWN | TOTAL | |||||
| TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | ||||
| HOURS | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL |
| TOTAL M/Hs | 0 | TOTAL M/Hs | 0 | ||||
| COST PER M/H (¥) | <--- Please input in-house labor rate | COST PER M/H (¥) | <--- Please input sub-contractor labor rate | ||||
| LABOR COST (¥) | ¥0 | LABOR COST (¥) | ¥0 | ||||
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed. | |||||||
| MATERIAL COST BREAKDOWN | |||||||
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
| TOTAL (¥) | ¥0 | ||||
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed. | |||||
| OTHER DIRECT COST (ODC) (IF ANY) | |||||
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
TOTAL (¥) ¥0
19_38KC312324A01
| SHIP NAME/AVAILABILITY: | USS SHOUP (DDG 86) - FY27 7C1 SRA BUNDLE 1 | 19_38KC312324A01 SUMMARY | |||||||||
| SOLICITATION #: | N6264926RA057 | ||||||||||
| Work Item/TGI #: | 19_38KC312324A01 | In-House MH | Sub-KTR MH | Labor Cost (JPY) | Material (JPY) | ODC (JPY) | TOTAL (JPY) | ||||
| DESCRIPTION: | Inspect, Repair, and Preserve Sewage Correcting Tank No. One | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||||
| Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed. | |||||||||||
| IN-HOUSE LABOR HOUR BREAKDOWN | |||||||||||
| KEY WORK ITEM | SFTR | INSL | WELD | SMTL | RGRS | PNTR | ELEC | PFTR | QA | OTHERS | TOTAL |
TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
| KEY WORK ITEM | IN-HOUSE LABOR BREAKDOWN | SUB-CONTRACTOR LABOR BREAKDOWN | TOTAL | |||||
| TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | ||||
| HOURS | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL |
| TOTAL M/Hs | 0 | TOTAL M/Hs | 0 | ||||
| COST PER M/H (¥) | <--- Please input in-house labor rate | COST PER M/H (¥) | <--- Please input sub-contractor labor rate | ||||
| LABOR COST (¥) | ¥0 | LABOR COST (¥) | ¥0 | ||||
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed. | |||||||
| MATERIAL COST BREAKDOWN | |||||||
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
| TOTAL (¥) | ¥0 | ||||
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed. | |||||
| OTHER DIRECT COST (ODC) (IF ANY) | |||||
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
TOTAL (¥) ¥0
20_38KC312324T01
| SHIP NAME/AVAILABILITY: | USS SHOUP (DDG 86) - FY27 7C1 SRA BUNDLE 1 | 20_38KC312324T01 SUMMARY | |||||||||
| SOLICITATION #: | N6264926RA057 | ||||||||||
| Work Item/TGI #: | 20_38KC312324T01 | In-House MH | Sub-KTR MH | Labor Cost (JPY) | Material (JPY) | ODC (JPY) | TOTAL (JPY) | ||||
| DESCRIPTION: | Tightness and Operational Test for Sewage (VCHT) System | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||||
| Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed. | |||||||||||
| IN-HOUSE LABOR HOUR BREAKDOWN | |||||||||||
| KEY WORK ITEM | SFTR | INSL | WELD | SMTL | RGRS | PNTR | ELEC | PFTR | QA | OTHERS | TOTAL |
TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
| KEY WORK ITEM | IN-HOUSE LABOR BREAKDOWN | SUB-CONTRACTOR LABOR BREAKDOWN | TOTAL | |||||
| TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | ||||
| HOURS | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL |
| TOTAL M/Hs | 0 | TOTAL M/Hs | 0 | ||||
| COST PER M/H (¥) | <--- Please input in-house labor rate | COST PER M/H (¥) | <--- Please input sub-contractor labor rate | ||||
| LABOR COST (¥) | ¥0 | LABOR COST (¥) | ¥0 | ||||
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed. | |||||||
| MATERIAL COST BREAKDOWN | |||||||
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
| TOTAL (¥) | ¥0 | ||||
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed. | |||||
| OTHER DIRECT COST (ODC) (IF ANY) | |||||
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
TOTAL (¥) ¥0
21_38KC312325A01
| SHIP NAME/AVAILABILITY: | USS SHOUP (DDG 86) - FY27 7C1 SRA BUNDLE 1 | 21_38KC312325A01 SUMMARY | |||||||||
| SOLICITATION #: | N6264926RA057 | ||||||||||
| Work Item/TGI #: | 21_38KC312325A01 | In-House MH | Sub-KTR MH | Labor Cost (JPY) | Material (JPY) | ODC (JPY) | TOTAL (JPY) | ||||
| DESCRIPTION: | Inspect, Repair, and Preserve Plumbing Waste Drain Tank No. One | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||||
| Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed. | |||||||||||
| IN-HOUSE LABOR HOUR BREAKDOWN | |||||||||||
| KEY WORK ITEM | SFTR | INSL | WELD | SMTL | RGRS | PNTR | ELEC | PFTR | QA | OTHERS | TOTAL |
TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
| KEY WORK ITEM | IN-HOUSE LABOR BREAKDOWN | SUB-CONTRACTOR LABOR BREAKDOWN | TOTAL | |||||
| TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | ||||
| HOURS | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL |
| TOTAL M/Hs | 0 | TOTAL M/Hs | 0 | ||||
| COST PER M/H (¥) | <--- Please input in-house labor rate | COST PER M/H (¥) | <--- Please input sub-contractor labor rate | ||||
| LABOR COST (¥) | ¥0 | LABOR COST (¥) | ¥0 | ||||
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed. | |||||||
| MATERIAL COST BREAKDOWN | |||||||
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
| TOTAL (¥) | ¥0 | ||||
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed. | |||||
| OTHER DIRECT COST (ODC) (IF ANY) | |||||
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
TOTAL (¥) ¥0
22_38KC312326A01
| SHIP NAME/AVAILABILITY: | USS SHOUP (DDG 86) - FY27 7C1 SRA BUNDLE 1 | 22_38KC312326A01 SUMMARY | |||||||||
| SOLICITATION #: | N6264926RA057 | ||||||||||
| Work Item/TGI #: | 22_38KC312326A01 | In-House MH | Sub-KTR MH | Labor Cost (JPY) | Material (JPY) | ODC (JPY) | TOTAL (JPY) | ||||
| DESCRIPTION: | Open and Clean Fuel Tank Gp-4 (4-272-2-F) and (5-264-2-F) | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||||
| Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed. | |||||||||||
| IN-HOUSE LABOR HOUR BREAKDOWN | |||||||||||
| KEY WORK ITEM | SFTR | INSL | WELD | SMTL | RGRS | PNTR | ELEC | PFTR | QA | OTHERS | TOTAL |
TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
| KEY WORK ITEM | IN-HOUSE LABOR BREAKDOWN | SUB-CONTRACTOR LABOR BREAKDOWN | TOTAL | |||||
| TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | ||||
| HOURS | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL |
| TOTAL M/Hs | 0 | TOTAL M/Hs | 0 | ||||
| COST PER M/H (¥) | <--- Please input in-house labor rate | COST PER M/H (¥) | <--- Please input sub-contractor labor rate | ||||
| LABOR COST (¥) | ¥0 | LABOR COST (¥) | ¥0 | ||||
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed. | |||||||
| MATERIAL COST BREAKDOWN | |||||||
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
| TOTAL (¥) | ¥0 | ||||
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed. | |||||
| OTHER DIRECT COST (ODC) (IF ANY) | |||||
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
TOTAL (¥) ¥0
23_38KC312327A01
| SHIP NAME/AVAILABILITY: | USS SHOUP (DDG 86) - FY27 7C1 SRA BUNDLE 1 | 23_38KC312327A01 SUMMARY | |||||||||
| SOLICITATION #: | N6264926RA057 | ||||||||||
| Work Item/TGI #: | 23_38KC312327A01 | In-House MH | Sub-KTR MH | Labor Cost (JPY) | Material (JPY) | ODC (JPY) | TOTAL (JPY) | ||||
| DESCRIPTION: | Open and Clean Fuel Expansion Seawater Overflow Tank Group-5 (4-370-3-F) | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||||
| Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed. | |||||||||||
| IN-HOUSE LABOR HOUR BREAKDOWN | |||||||||||
| KEY WORK ITEM | SFTR | INSL | WELD | SMTL | RGRS | PNTR | ELEC | PFTR | QA | OTHERS | TOTAL |
TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
| KEY WORK ITEM | IN-HOUSE LABOR BREAKDOWN | SUB-CONTRACTOR LABOR BREAKDOWN | TOTAL | |||||
| TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | ||||
| HOURS | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL |
| TOTAL M/Hs | 0 | TOTAL M/Hs | 0 | ||||
| COST PER M/H (¥) | <--- Please input in-house labor rate | COST PER M/H (¥) | <--- Please input sub-contractor labor rate | ||||
| LABOR COST (¥) | ¥0 | LABOR COST (¥) | ¥0 | ||||
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed. | |||||||
| MATERIAL COST BREAKDOWN | |||||||
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
| TOTAL (¥) | ¥0 | ||||
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed. | |||||
| OTHER DIRECT COST (ODC) (IF ANY) | |||||
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
TOTAL (¥) ¥0
24_38KC312328A01
| SHIP NAME/AVAILABILITY: | USS SHOUP (DDG 86) - FY27 7C1 SRA BUNDLE 1 | 24_38KC312328A01 SUMMARY | |||||||||
| SOLICITATION #: | N6264926RA057 | ||||||||||
| Work Item/TGI #: | 24_38KC312328A01 | In-House MH | Sub-KTR MH | Labor Cost (JPY) | Material (JPY) | ODC (JPY) | TOTAL (JPY) | ||||
| DESCRIPTION: | Open and Clean Fuel Expansion Seawater Overflow Tank Group-6 (4-370-4f) | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||||
| Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed. | |||||||||||
| IN-HOUSE LABOR HOUR BREAKDOWN | |||||||||||
| KEY WORK ITEM | SFTR | INSL | WELD | SMTL | RGRS | PNTR | ELEC | PFTR | QA | OTHERS | TOTAL |
TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
| KEY WORK ITEM | IN-HOUSE LABOR BREAKDOWN | SUB-CONTRACTOR LABOR BREAKDOWN | TOTAL | |||||
| TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | ||||
| HOURS | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL |
| TOTAL M/Hs | 0 | TOTAL M/Hs | 0 | ||||
| COST PER M/H (¥) | <--- Please input in-house labor rate | COST PER M/H (¥) | <--- Please input sub-contractor labor rate | ||||
| LABOR COST (¥) | ¥0 | LABOR COST (¥) | ¥0 | ||||
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed. | |||||||
| MATERIAL COST BREAKDOWN | |||||||
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
| TOTAL (¥) | ¥0 | ||||
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed. |
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .