Solicitation - N6264926RA057.pdf

PDF 2 MB Posted

Attached to
USS SHOUP (DDG 86) SRA 7C1, Bundle 1 Federal contract opportunity
Solicitation number
N6264926RA057
Issued by
Department of the Navy Naval Supply Systems Command

About this file

This is a federal Request for Proposal (RFP) for ship repair and maintenance services for the USS SHOUP (DDG 86) Fiscal Year 2027 Selected Restricted Availability (SRA) Bundle 1 at Yokosuka Naval Base, Japan.

The solicitation number is N6264926RA057, issued by NAVSUP Fleet Logistics Center Yokosuka. Proposals are due by September 10, 2026 at 10:00 AM Japan Standard Time via email submission. The contract is firm fixed price with performance from March 22, 2027 through November 1, 2027. The work will be performed at Yokosuka Naval Base, and the award will be made in Japanese Yen (JPY) with USD amounts provided for funding purposes only. Offerors must hold an active U.S. Navy Master Ship Repair Agreement (MSRA) or Agreement for Boat Repair (ABR) as a Prime Contractor to be eligible; non-holders may apply for certification but should note the process may require up to one year. The solicitation includes two contract line items: CLIN 0001 for the primary USS SHOUP (DDG 86) FY27 7C1 SRA Bundle 1 repair work and CLIN 0002 for growth work representing 9.42% of the total proposed cost for CLIN 0001. The repair and maintenance package includes 105 task group instructions (TGIs) encompassing fuel tank cleaning and preservation, structural repairs, system testing, deck covering replacement, and various technical work requiring detailed labor hour breakdowns, management/staffing plans, integrated master schedules with critical path analysis, past performance documentation, and itemized pricing. Evaluation will be on a pass/fail technical acceptability basis followed by a price/past performance tradeoff, with past performance considered significantly more important than price. The Government intends to award without discussions but reserves the right to conduct discussions if deemed in its best interest.

View the file

Other files for this federal contract opportunity

Other files attached to USS SHOUP (DDG 86) SRA 7C1, Bundle 1, newest first.
File Type Posted
Solicitation Amendment N6264926RA0570003 SF 30.pdf PDF
Solicitation Amendment N6264926RA0570002 SF 30.pdf PDF
Solicitation Amendment N6264926RA0570001 SF 30.pdf PDF
Att V Source of Repair Instruction.pdf PDF
Att III Request for Information Sheet.docx DOCX document
Att IX 4200.9J, CONTRACTING OFFICER'S CRANE OVERSIGHT PLAN, dtd 8 Feb 2023.pdf PDF
Att VIII Contract Data Sheet.pdf PDF
Att VII QASP.docx DOCX document
Att VI Warranty Tracking Information.pdf PDF
Att II Price Proposal Form N6264926RA057.xlsx XLSX spreadsheet
Att IV GFP List.xlsx XLSX spreadsheet
Att I Contract POP List (2).pdf PDF
Show all 12

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION

15A. NAME AND

ADDRESS

OF OFFEROR

SOLICITATION, OFFER, AND AWARD 1. This Contract is a Rated Order under the Defense Priorities and Allocations System (DPAS) - Code of Federal Regulations - at 15 CFR 700.

RATING PAGE OF PAGES

2. CONTRACT NUMBER 3. SOLICITATION NUMBER 4. TYPE OF SOLICITATION 5. DATE ISSUED 6. REQUISITION/PURCHASE NUMBER

CODE7. ISSUED BY 8. ADDRESS OFFER TO (If other than item 7)

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

SOLICITATION

9. Sealed offers in original and copies for furnishings the supplies or services in the Schedule will be received at the place specified in item 8, or if hand carried, in the depository located in until local time

CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision Number 52.214-7 or 52.215-1. All offers are subject to all terms and conditions contained in this solicitation.

10. FOR

INFORMATION

CALL:

A. NAME B. TELEPHONE (NO COLLECT CALLS)

AREA CODE NUMBER EXTENSION

C. EMAIL ADDRESS

11. TABLE OF CONTENTS

(X) DESCRIPTION PAGE(S) (X) SECTION PAGE(S)DESCRIPTION

A B C D E F G H

I

J

K

L

M EVALUATION FACTORS FOR AWARD

INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS

REPRESENTATIONS, CERTIFICATIONS AND OTHER

STATEMENTS OF OFFERORS

PART IV - REPRESENTATIONS AND INSTRUCTIONS

LIST OF ATTACHMENTS

PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS

CONTRACT CLAUSESSOLICITATION/CONTRACT FORM

SUPPLIES OR SERVICES AND PRICES/COSTS

DESCRIPTION/SPECIFICATIONS/WORK STATEMENT

PACKAGING AND MARKING

INSPECTION AND ACCEPTANCE

DELIVERIES OR PERFORMANCE

CONTRACT ADMINISTRATION DATA

SPECIAL CONTRACT REQUIREMENTS

NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.

OFFER (Must be fully completed by offeror)

12. In compliance with the above, the undersigned agrees, if this offer is accepted within calendar days (60 calendar days unless a different period is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the set opposite each item, delivered at the designated point(s), within the time specified in the schedule.

13. DISCOUNT FOR PROMPT PAYMENT

(See Section I, Clause Number 52.232-8)

14. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the SOLICITATION for offerors and related documents numbered and dated):

10 CALENDAR DAYS (%) 20 CALENDAR DAYS (%) 30 CALENDAR DAYS (%) CALENDAR DAYS (%)

DATEAMENDMENT NUMBERAMENDMENT NUMBER DATE

CODE FACILITY 16. NAME AND THE TITLE OF PERSON AUTHORIZED TO SIGN OFFER

(Type or print)

15B. TELEPHONE NUMBER

AREA CODE NUMBER EXTENSION

15C. CHECK IF REMITTANCE ADDRESS IS

DIFFERENT FROM ABOVE - ENTER

SUCH ADDRESS IN SCHEDULE.

17. SIGNATURE 18. OFFER DATE

AWARD (To be completed by Government)

19. ACCEPTED AS TO ITEMS NUMBERED 20. AMOUNT 21. ACCOUNTING AND APPROPRIATION

22. AUTHORITY FOR USING OTHER THAN FULL OPEN COMPETITION UNDER THE

UNITED STATES CODE AT:

10 U.S.C. 3204(a) ( )41 U.S.C. 3304(a)

24. ADMINISTERED BY (If other than Item 7)

26. NAME OF CONTRACTING OFFICER (Type or print)

IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.

AUTHORIZED FOR LOCAL REPRODUCTION

Previous edition is unusable

23. SUBMIT INVOICES TO ADDRESS SHOWN IN

(4 copies unless otherwise specified)

25. PAYMENT WILL BE MADE BY

27. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

28. AWARD DATE

CODE

ITEM

STANDARD FORM 33 (REV. 12/2022)

Prescribed by GSA - FAR (48 CFR) 53.214 (c)

SEALED BID (IFB) INVITATION FOR BID

NEGOTIATED (RFP) REQUEST FOR

PROPOSAL

(Hour) (Date)

PART I - THE SCHEDULE PART II - CONTRACT CLAUSES

Section A - Solicitation/Contract Form

USS SHOUP (DDG 86) FY27 7C1 SRA Bundle 1

MASTER AGREEMENT FOR THE REPAIR AND ALTERATION OF VESSELS (MARAV): In the event the successful offeror possesses a Master Agreement for Repair and Alteration of Vessels (MARAV) with the U.S. Navy in the form of either a Master Ship Repair Agreement (MSRA) or an Agreement for Boat Repair (ABR), award for this requirement will be made in the form of a firm fixed price job order under the applicable agreement and all of the terms and conditions of the offer's existing MARAV will apply.

MSRA/ABR Number: ___________________

Firms who do not possess an active U.S MSRA/ABR as a Prime Contractor are ineligible for award.

Non MSRA /ABR holders may request an application for an MSRA or an ABR certification by requesting an application package from:

flcy_msra_abr_group@us.navy.mil. This solicitation is intended only for sources duly authorized to operate and do business in Japan as prescribed by

DFARS 252.225-7042.

1. REQUIREMENT: NAVSUP Fleet Logistics Center Yokosuka (NAVSUP FLCY) has a new requirement in support of the USS SHOUP (DDG-86).

The repair and maintenance package of work items are included as Attachment (I) Work Specification(s) for TGIs.

2. PERIOD OF PERFORMANCE: From 22-MAR-2027 through 1-NOV-2027

3. PLACE OF PERFORMANCE: Yokosuka Naval Base

4. OFFER: Offerors must provide all information required by this solicitation no later than 10-Sep-2026 at 10:00 AM Japan Standard Time (JST).

5. WORK ITEM INFORMATION: Access to the work specification package listed in Section J as Attachment (I) may only be accessed through DoD SAFE. DoD SAFE is a secure U.S. Government repository which enables the sharing of large files and requires outside users to receive a drop-off request from the U.S. Government. Therefore, any offeror intending to provide a proposal to this solicitation shall request access by sending an email to: shouko.sekido.ln@us.navy.mil, gil.lopez3.civ@us.navy.mil by 14-AUG-2026 10:00 am JST. Once the U.S. Government receives the offeror's access request, the U.S. Government will provide the offeror with a link and instructions to retrieve Attachment (I). Offerors shall note that access is only available for 14 days once sent.

N6264926RA057

Section B - Supplies or Services & Prices or Costs

Additional Information/Notes

The contractor is required to submit an itemized breakdown of the total price proposal using Attachment II Price Proposal Breakdown Sheet provided in Section J. Failure to properly complete and submit Attachment II by the specified closing date may cause rejection of the proposal.

Item Supplies/Service Quantity Unit Unit Price Amount

USS SHOUP (DDG 86) FY27 7C1 SRA Bundle 1

The Contractor shall accomplish the work specification package requirements listed in Attachment (I) of Section J.

The contractor will be responsible for ship repair work to include providing the necessary management, scheduling, testing, quality assurance, technical documentations to support the USS SHOUP (DDG 86) FY27 7C1 SRA Bundle 1.

Note - The award will be made in Japanese Yen (JPY). The USD amounts shown are for funding purposes only.

NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.

Pricing Arrangement: Firm Fixed Price

1 Job

Growth Work for CLIN 0001 This growth CLIN amount represents 9.42% of the total proposed cost for CLIN 0001.

The contractor shall accomplish GROWTH WORKS necessary to accommodate anticipated Growths USS SHOUP (DDG 86) 7C1 SRA Bundle 1 requirements.

Note - The award will be made in Japanese Yen (JPY). The USD amounts shown are for funding purposes only.

NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.

Pricing Arrangement: Firm Fixed Price

1 Job

Section C - Description/Specifications/Statement of Work

C-1.0 : General Requirements The Contractor, under the direction of the U.S. Naval Ship Repair Facility and Japan Regional Maintenance Center (SRF-JRMC) as an independent Contractor and not as an agent of the Government, shall furnish the material, support (electrical, crane, rigging, etc.) and facilities (except those furnished by the Government under express provisions of this contract) and provide the management, technical, procurement, production, testing and quality assurance necessary to prepare and accomplish the repairs and maintenance required to complete the USS SHOUP (DDG 86) FY27 7C1 Selected Restricted Availability in accordance with the requirements stated in this Section, the Work Item Specifications / Task Group Instructions (TGIs) and Work Item Plans, Drawings, and Other References, the Delivery Schedule, and all other terms and conditions set forth in this contract

C-1.1 Technical Description and Specifications: The work to be performed hereunder shall conform to the description of work /work specification described in Section B. The Contractor shall accomplish the contract requirements listed in Attachment (I) of Section J. Actual physical shipboard work shall begin and end in accordance with the dates listed in Section F of this solicitation.

C-1.2 Applicable Reference Documents: The Contractor shall accomplish all work in accordance with applicable NAVSEA Standard Items (NSIs) and SRF-JRMC Local Standard Items (LSIs). SRF-JRMC will determine which NSIs and LSI versions are applicable for all Chief of Naval Operations (CNO) availabilities to include Selected Repair Availability (SRA), Docking SRA (DSRA), and Extended DSRA (EDSRA); Continuous Maintenance Availability (CMAV); Emergent Maintenance (EM); and Surface Incremental Availability (SIA) scheduled for each ship. The same version continues to apply until the completion of each availability and maintenance regardless of whether the work crosses fiscal years.

CATEGORY-I items are invoked for all work resulting from this solicitation under the Master Agreement for Agreement for Repair and Alteration of Vessels; Master Ship Repair Agreement (MSRA) or Agreement for Boat Repair (ABR). CATEGORY-II items are invoked only to the extent specifically indicated within Attachment (I). Ship repair contractors are also subject to the applicable laws and regulations of the Host Nation.

Category I NAVSEA Fiscal Year 2 Standard Items are applicable to all items without further reference. Category II 2027 (FY27) CH NAVSEA 2 Standard Items are applicable when invoked and/or referenced in individual Task Group Instruction (TGI) FY27 CH specified in Attachment (I). NSIs may be found at:

https://www.navsea.navy.mil/Home/RMC/CNRMC/Our-Programs/SSRAC/

Category I U.S. Naval Ship Repair Facility and Japan Regional Maintenance Center (SRF-JRMC) 7 Local Standard Items (LSI), FY2 7 SRF- JRMC LSI is applicable to all items without further reference. Category II SRF-JRMC 7 LSI is applicable when FY2 FY2 invoked and/or referenced in individual TGIs specified in Attachment (I). 7 LSIs and subsequent Changes have been distributed to FY2 all MSRA/ABR holders. Please refer to Section A of this Solicitation when requesting copy of these references.

C-1.3 The contractor is to coordinate the delivery and/or pick-up of all Government Furnished Government Furnished Material:

Material (GFM) with SRF-JRMC Code 500 as cited in work specification(s), supporting drawings, references and/or Statement of Work (SOW). The Contractor is required to manage all GFM upon receipt which includes monitoring, inspecting, segregating, determining nonconformance, and returning unused or nonconforming material o the Government for final disposition.

C-1.4 : The Contractor shall accomplish planning and scheduling to ensure a rational, integrated Contractor Furnished Material and timely plan for procurement, receipt, storage and installation of Contractor Furnished Material (CFM). All materials must meet the specified standard military performance specifications, Federal performance standards, and may require to be listed on a Qualified Products List (QPL) for shipboard installations.

C-1.5 : The Contractor is required to submit a production schedule in accordance with Exhibit (B) Integrated Production Schedule CDRL (Contract Data Requirement List) - NSI (NAVSEA Standard Item) 009-60 encompassing, to the maximum extent possible, all contractor work requirements to the Government at the following milestones:

(1) Work Package Execution Review;

(2) Start of the Availability;

(3) 25% complete conference;

(4) 50% complete conference;

(5) 75% complete conference;

(6) Production Completion Date (PCD);

(7) Work Completion;

N6264926RA057

https://www.navsea.navy.mil/Home/RMC/CNRMC/Our-Programs/SSRAC/

(8) Pre-Sea Trials requirements.

C-2.0 : Availability Preparation and Meeting Participation The Contractor, under the direction of SRF-JRMC shall complete the following efforts after contract award in preparation to execute the ship's availability. The Contractor shall include meetings attendance as part of their fully-burdened ship repair labor rates.

(a) The contractor shall attend and support the Integrated Project Team Development (IPTD) Work Package Integration Conference (WPIC) as needed prior to the scheduled availability. The contractor shall support the conference by evaluating the Availability Work Package and pinpointing work requirements or issues that conflict, prevent or impact other work items from being accomplished.

(b) The contractor shall conduct final ship-checks and coordination with assigned Zone Managers (ZMs) and Work Integration Managers (WIMs) who will liaison with the project team.

(c) The contractor shall attend and support the IPTD Work Package Execution Review (WPER) and Schedule Model Review (SMR) events as needed prior to availability. The contractor shall support the mandated conference executed during planning period leading up to execution of an availability to review work, schedule, and ensure material and resource availability.

(d) The contractor shall support the early start period of availability at the time of award. Contractor is required to begin work and therefore needs time to coordinate and stage materials and equipment prior to starting the physical work.

(e) The contractor is required to order all long lead time structural materials some of which has long duration for fabrication and shipping from United States manufacturers.

(f) The contractor is required to ensure the schedule is submitted to the project team in order to integrate with existing project schedule and mitigate risks due to space/location constraints to avoid work stoppages.

C-3.0 : Identification of Condition Found In accordance with the requirements of NSI 009-01, the Contractor shall identify needed repairs and recommend corrective action during contract performance for work/deficiencies discovered which are not covered by the existing work package. For conditions that impact the critical path(s) /controlling item(s), the Contractor shall notify the Government via electronic media within 24-hours of discovery to SRF-JRMC Business Office. This initial notification need not include all content required for a Condition Found Report (CFR), but must include a description of the condition/deficiency and an estimated timeframe for the offeror's professional recommendation for resolution, which shall not exceed five (5) working days as specified below. Recommended repairs and corrective actions shall be submitted to the Government in the form of a CFR (intended to represent the "Work Request" described in DFARS 252.217-7028 "Over and Above Work").

C-3.1 : Condition Found Notification to Government Submit CFRs within five (5) working days via approved electronic media to SRF-JRMC Business Office after discovery of the condition. At a minimum, the CFR must include the following:

(1) Identify contract, ship, and hull number

(2) Identification of the applicable Work Item number

(3) Date requirement was discovered

(4) Description of the work requirement

(5) Specific location of the work

(6) Recommendation for corrective action

(7) Recommendation for the appropriate/best time to accomplish the work (i.e. during current availability with or without schedule change, future CNO or Continuous Maintenance Availability). Provide supporting rationale for the recommendation, such as cost efficiencies, availability of work force, availability of material, premium expenditures, etc.

(8) Identification of related changes, if any, to the internal milestones and production and contract completion dates.

C-3.2 : Government Review and Response to CFR The Maintenance Team will review the CFR. If the CFR is inadequate or incomplete, it will be rejected with time continuing to accrue (relative to five (5) working day requirement). As appropriate, the Government and contractor shall meet and discuss the recommendation for corrective action further, conducting ship checks as necessary, to determine the full scope of work required prior to final approval of the CFR. Accuracy of CFR submissions may be evaluated in CPARS and utilized for past performance ratings on future requirements.

C-4.0 Descoping of Requirements: The Government reserves the right to descope any requirement under this contract at any time and for any reason. Descopes are incorporated into the contract via Deficiency Log (DL) and can either be a partial deletion of paragraph(s) from the work specification or deletion of a work item in its entirety. The Government will rely on the fully burdened labor rates for negotiating and settling descope DLs. At no time may the Contractor amend entered in Section H-6.0 GROWTH CLIN its pricing for full or partial work deletion.

C-4.1 : Descope DLs The Contractor agrees to price descope DLs at the same labor rate proposed in the original award. Partial or full work item deletion from the original work item or TGI will be processed via the usual contract modification process. Partial or full work item deletion from the settled Growth Management Request (GMR) will be processed as a descope GMR.

C-4.2 : Minimum Technically Required (MTR) repairs deletion MTR refers to the anticipated repairs that could not be clearly defined at the start of availability but were included in the TGI (based upon historical analysis published by Commander Navy Regional Maintenance Center and NAVSEA Contracting) to enable the Contractor to proceed with the work efficiently, if necessary.

In certain instances where the ship's condition were found satisfactory after a thorough inspection, these MTR repair are cancelled and descoped before the end of the availability. As a result of the deletion of work, the Contractor is expected to return the awarded costs in full. The Contractor must be able to demonstrate production cost and provide justification of work incurred to the Administrative Contracting Officer if the proposing cost is different from the awarded amounts. Program management, idle time not worked and other indirect costs will not be considered.

C-5.0 : DELAYS / DISRUPTIONS The Contractor shall coordinate the work effort with SRF-JRMC Project Manager on a daily basis to prevent changing situations from causing delays and disruptions. Disruption due to minor delays in obtaining access to spaces and operation of equipment are to be expected. A minor delay is defined as eight clock (8) hours or less in duration (and is not the cumulative effect of labor hour impact). Minor delays and/or disruptions are considered normal rather than unusual occurrences during the performance of tasks ordered under the resulting contract. The Government will not provide any schedule relief for minor delays /disruptions.

C-6.0 REQUIREMENTS FOR CONTRACTOR OPERATED CRANES AND WEIGHT HANDLING EQUIPMENT

In accordance with NAVSUP FLC Yokosuka Instruction 4200.9J (NAVSUPFLCYINST 4200.9J), "CONTRACTING OFFICER'S CRANE OVERSIGHT PLAN" (dated 8 Feb 2023) and its primary references, the Contractor shall comply with all safety, oversight, and operational regulations for the explicit or incidental use of non-Navy owned cranes, Weight Handling Equipment (WHE), and materials handling equipment used to lift suspended loads.

Because this requirement is in support of SRF-JRMC Yokosuka, the Contractor shall strictly comply with the specific crane oversight and operational provisions set forth in SRF-JRMC LSI 099-903YO, "Requirements for Contractor Cranes, Multi-purpose Machines and Material Handling Equipment at Naval Facilities; accomplish".

As mandated by NAVSUPFLCYINST 4200.9J, translated copies of Enclosure (3) - Contractor Crane Operation Checklist and Enclosure (4) - Certificate of Compliance are incorporated into this contract. The Contractor is required to review, complete, and submit these documents as part of their crane operational procedures. The complete, unclassified NAVSUP FLC Yokosuka instruction, including Enclosure (3) and Enclosure (4), are incorporated into this solicitation under Section J as an Attachment.

C-7.0 SECURITY REQUIREMENTS

INSTALLATION

The Contractor and all associated personnel shall comply with the application requirements delineated in COMFLEACT YOKOSUKA INSTRUCTION 5700.1 (CFAYINST 5700.1) to conduct business within the Commander, Fleet Activities (FLEACT) Yokosuka jurisdiction. The Contractor shall submit all installation access applications to the FLEACT Yokosuka Visitor Control Center (VCC).

The Contractor shall ensure all personnel are registered in the Defense Biometrics Identification System (DBIDS) via the VCC. When authorized by the Government, access will be designated as unescorted, escorted, or trusted traveler. Contractor personnel access times to the installation shall be restricted to 0500 through 2359. Except as otherwise noted, all passes are issued through DBIDS. Personnel requiring access for 31 days or more shall be issued DBIDS cards. Personnel requesting access for 60 days or fewer shall be issued paper passes. The Contractor shall direct any questions, administrative issues, or security concerns regarding the installation access and badging process to the FLEACT Yokosuka VCC office.

REGISTRATION AND DE-REGISTRATION PROCEDURE

1. Upon acceptance of any contract renewal or subsequent purchase orders, the Contractor shall immediately confirm its active registration status with the FLEACT Yokosuka VCC.

2. The Contractor shall immediately notify the FLEACT Yokosuka VCC in writing of any changes to company details, to include change of company name, address, corporate officials, or personnel who no longer require installation access.

3. Upon expiration or termination of a valid contract or purchase order, the Contractor's registration status shall be automatically terminated. All associated access passes shall expire immediately.

4. Following contract expiration or de-registration, the Contractor shall immediately return all issued access passes to the FLEACT Yokosuka VCC. Failure to return passes shall result in the responsible individuals, the Contractor, or both being placed on the installation access denial list.

5. The Contractor may voluntarily request company de-registration at any time by submitting a written request and returning all issued access passes to the FLEACT Yokosuka VCC.

SECURITY REQUIREMENTS FOR PERSONNEL HAVING ACCESS TO U.S. NAVAL FORCES/NAVY REGION JAPAN

INSTALLATIONS

In accordance with COMNAVFORJAPAN/COMNAVREGJAPAN INSTRUCTION 5500.7, all non-exempt Contractor personnel requiring installation access shall be subject to comprehensive security and background screening. Appropriate security and background checks will be conducted utilizing any available resources, on all Contractor employees requiring access within FLEACT Yokosuka or its jurisdiction. The Contractor shall submit all prescribed documents (listed below) to the Government to facilitate the required security checks for all personnel requesting access.

a. Required documents pertaining to Japanese Nationals who are not specifically exempted:

(1) One copy of the Personal History Statement.

(2) Valid and accepted proof of residency (i.e., passport, resident alien card or GoJ Alien Registration) in accordance with local policy.

(3) Valid and accepted proof of ID in accordance with local policy (i.e., driver's license).

(4) One copy of SECNAV Form 5512/1.

b. Required documents pertaining to U.S. citizens who are not specifically exempted:

(1) One copy of the SECNAV Form 5512/1.

(2) Proof of current and valid visa/residency status.

(3) Valid and accepted proof of identification per USFJ Instruction 31-206.

c. Third Country Nationals who are not specifically exempted or addressed as designated Third Country Nationals in USFJ Instruction 31-204:

(1) One copy of the Statement of Personal History.

(2) Proof of current and valid visa/residency status.

(3) Valid and accepted proof of ID in accordance with reference (c).

(4) One copy of SECNAV Form 5512/1.

Investigative and security agencies may occasionally require additional documentation or information to complete background checks.

Upon notification by the appropriate security agency, the Contractor, or individual Contractor employee shall promptly provide all requested documentation and information to facilitate the security review process.

SRF-JRMC SECURITY

Per NAVSHIPREPFAC M-5500.1, all visitors entering SRF-JRMC spaces must check-in with the C1110 security office to receive visitor badges as applicable. Foreign nationals who fall outside of the Master Labor Agreement are not authorized to access, generate, or destroy CUI information or materials. Access to classified information or systems is not authorized for foreign nationals at SRF-

JRMC.

Per NAVSHIPREPFAC Yokosuka M- 5239.3, access to the SRF network or other command IT systems requires the member to possess a valid clearance, verified need-to-know, and a CAC. As such, foreign national contractors who do not meet the above criteria are not authorized to access SRF systems.

SHIPBOARD ACCESS REQUIREMENTS

The Contractor shall comply with all current Senior Officer Present Afloat (SOPA) directives and OPNAVINST 5530.14 requirements for all personnel requiring access to U.S. Navy vessels moored or stationed within the installation.

Requirements USS SHOUP (DDG 86) FY27 7C1 SRA Bundle 1

Section D - Packaging and Marking

Section E - Inspection and Acceptance

E-1.0 Inspection of the work accomplished hereunder shall be performed periodically by an authorized representative during the performance of the work and at the final inspection upon completion of the work. The representative will be identified in writing at t ime of contract award.

E-2.0 :Quality Assurance The Contractor shall provide and maintain a quality management system acceptable to the Government, and shall perform or have performed the inspections and tests pursuant to that system to substantiate that the material and workmanship provided pursuant to the job order conform to the drawings, specifications, job orders, and contract requirements listed herein. For U.S. Naval Ship Repair Facility and Japan Regional Maintenance Center (SRF-JRMC) Yokosuka/Detachment Sasebo, Japan requirements and Commander, Logistics Group Western Pacific (COMLOGWESTPAC) SRU Singapore requirements, the Contractor's quality management system shall be in accordance with that set forth in NAVSEA Standard Item 009-04 . In addition to its rights under DFARS clause 252.217-7005 Inspection and Manner of Doing Work of the Master Agreement for Repair and Alteration of Vessels, the Government shall have the right to deem work or material furnished by the Contractor to be incomplete and not in accordance with the requirements of the job order by reason of the Contractor's failure to comply with the requirements of its quality management system and, as such, the Contractor shall not be entitled to progress payments for said work and material.

E-3.0 Government Quality Assurance Surveillance Plan (QASP): The Government will monitor the Contractor's performance to ensure that services meet the requirements outlined in the Work Item/ Task Group Instruction in Section C. The Government will utilize a Quality Assurance Surveillance Plan (QASP) to systematically assess the Contractor's performance against established performance standards. The QASP is available as Attachment VII to this solicitation.

FAR Clauses Incorporated by Reference

Number Title Effective Date

Alternate/ Deviation

Variation Effective Date

52.246-2 Inspection of Supplies-Fixed-Price. Aug 1996 52.246-4 Inspection of Services-Fixed-Price. Aug 1996 52.246-16 Responsibility for Supplies. Apr 1984

Overall Contract Inspection/Acceptance Locations

Inspection and Acceptance Location

Both Destination Instructions: See Section E for details

DoDAAC: N62758 CountryCode: USA

SRF AND JRMC YOKOSUKA

PSC 473 BOX 8, FPO AP 96349

FPO, AP 96349

UNITED STATES

Takashi Konuta, Business Agent Telephone: 243-3635

Inspection and Acceptance Location

Both Destination Instructions: See Section E for detaisl

DoDAAC: N62758 CountryCode: USA

SRF AND JRMC YOKOSUKA

PSC 473 BOX 8, FPO AP 96349

FPO, AP 96349

UNITED STATES

Takashi Konuta, Business Agent Telephone: 243-3635

Section F - Deliveries or Performance

F-1.0 Time of Performance: The Government has established execution dates for the following milestones and key events as outlined below:

Contractor Work Start Date: 22-Mar-2027

Contractor Work Completion Date: 1-Nov-2027

The Contractor shall accomplish the work for each TGI in accordance with the Period of Performance (POP) - Bundle 1 Contract POP list" in Section J Attachment (I). A POP extension will only be issued if the POP for any individual TGI exceeds the Contractor Work Completion Date listed above.

F-2.0 Place of Performance: The performance of all work set forth in SECTION B shall be accomplished aboard the vessel at Yokosuka Naval Base.

Line Item Delivery Schedule Quantity Address and POC

Period of Performance From 22 Mar 2027 To 01 Nov 2027

1 Job Place of Performance DoDAAC: N62758 CountryCode: USA

SRF AND JRMC YOKOSUKA

PSC 473 BOX 8, FPO AP 96349

FPO, AP 96349

UNITED STATES

Takashi Konuta, Business Agent Telephone: 243-3635

Period of Performance From 22 Mar 2027 To 01 Nov 2027

1 Job Place of Performance DoDAAC: N62758 CountryCode: USA

SRF AND JRMC YOKOSUKA

PSC 473 BOX 8, FPO AP 96349

FPO, AP 96349

UNITED STATES

Takashi Konuta, Business Agent Telephone: 243-3635

FAR Clauses Incorporated by Reference

Number Title Effective Date

Alternate/ Deviation

Variation Effective Date

52.242-15 Stop-Work Order. Aug 1989

Section G - Contract Administration Data

DFARS Clauses Incorporated by Reference

Number Title Effective Date

Alternate/ Deviation

Variation Effective Date

252.201-7000 Contracting Officer's Representative. Dec 1991 252.217-7007 Payments. Dec 1991 252.217-7008 Bonds. Dec 1991 252.231-7000 Supplemental Cost Principles Dec 1991 252.232-7003 Electronic Submission of Payment Requests and Receiving Reports. Dec 2018 252.232-7008 Assignment of Claims (Overseas). Jun 1997

DFARS Clauses Incorporated by Full Text

252.232-7006 Wide Area WorkFlow Payment Instructions. (Jan 2023)

WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)

(a) As used in this clause- Definitions.

"Department of Defense Activity Address Code (DoDAAC)" is a six position code that uniquely identifies a unit, activity, or organization.

"Document type" means the type of payment request or receiving report available for creation in Wide Area WorkFlow (WAWF).

"Local processing office (LPO)" is the office responsible for payment certification when payment certification is done external to the entitlement system.

"Payment request" and "receiving report" are defined in the clause at 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.

(b) The WAWF system provides the method to electronically process vendor payment requests and receiving reports, as Electronic invoicing.

authorized by Defense Federal Acquisition Regulation Supplement (DFARS) 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.

(c) To access WAWF, the Contractor shall- WAWF access.

(1) Have a designated electronic business point of contact in the System for Award Management at https://www.sam.gov; and

(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this web site.

(d) The Contractor should follow the training instructions of the WAWF Web-Based Training Course and use the Practice WAWF training.

Training Site before submitting payment requests through WAWF. Both can be accessed by selecting the "Web Based Training" link on the WAWF home page at https://wawf.eb.mil/

(e) Document submissions may be via web entry, Electronic Data Interchange, or File Transfer WAWF methods of document submission.

Protocol.

(f) The Contractor shall use the following information when submitting payment requests and receiving reports WAWF payment instructions.

in WAWF for this contract or task or delivery order:

(1) The Contractor shall submit payment requests using the following document type(s): Document type.

(i) For cost-type line items, including labor-hour or time-and-materials, submit a cost voucher.

(ii) For fixed price line items-

(A) That require shipment of a deliverable, submit the invoice and receiving report specified by the Contracting Officer.

N/A

(Contracting Officer: Insert applicable invoice and receiving report document type(s) for fixed price line items that require shipment of a deliverable.)

(B) For services that do not require shipment of a deliverable, submit either the Invoice 2in1, which meets the requirements for the invoice and receiving report, or the applicable invoice and receiving report, as specified by the Contracting Officer.

Invoice 2 in 1

(Contracting Officer: Insert either "Invoice 2in1" or the applicable invoice and receiving report document type(s) for fixed price line items for services.)

(iii) For customary progress payments based on costs incurred, submit a progress payment request.

(iv) For performance based payments, submit a performance based payment request.

(v) For commercial financing, submit a commercial financing request.

(2) ) Fast Pay requests are only permitted when Federal Acquisition Regulation (FAR) 52.213-1 is included in the contract.

[Note: The Contractor may use a WAWF "combo" document type to create some combinations of invoice and receiving report in one step.]

(3) The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in Document routing.

WAWF when creating payment requests and receiving reports in the system.

Routing Data Table*

Field Name in WAWF Data to be entered in WAWF

Pay Official DoDAAC HQ0907

Issue By DoDAAC N62649

Admin DoDAAC N62649

Inspect By DoDAAC ____

Ship To Code N62758

Ship From Code ____

Mark For Code ____

Service Approver (DoDAAC) ____

Service Acceptor (DoDAAC) N62758

Accept at Other DoDAAC ____

LPO DoDAAC ____

DCAA Auditor DoDAAC ____

Other DoDAAC(s) ____

(*Contracting Officer: Insert applicable DoDAAC information. If multiple ship to/acceptance locations apply, insert "See Schedule" or "Not applicable.")

(**Contracting Officer: If the contract provides for progress payments or performance-based payments, insert the DoDAAC for the contract administration office assigned the functions under FAR 42.302(a)(13).)

(4) The Contractor shall ensure a payment request includes documentation appropriate to the type of payment request in Payment request.

accordance with the payment clause, contract financing clause, or Federal Acquisition Regulation 52.216-7, Allowable Cost and Payment, as applicable.

(5) The Contractor shall ensure a receiving report meets the requirements of DFARS Appendix F. Receiving report.

(g) WAWF point of contact.

(1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity's WAWF point of contact.

Miyuki Hiwatari (miyuki.hiwatari.ln@us.navy.mil), Kayo Oobayashi (kayo.oobayashi.ln@us.navy.mil

(Contracting Officer: Insert applicable information or "Not applicable.")

(2) Contact the WAWF helpdesk at 866-618-5988, if assistance is needed.

(End of clause)

Section H - Special Contract Requirements

H-1.0 OCCUPATIONAL AND HEALTH STANDARDS FOR SHIPYARD EMPLOYMENT (29 CFR 1915)

The Contractor shall fully comply with 29 Code of Federal Regulations Part 1915, Occupational and Health Standards for Shipyard Employment (29 CFR 1915), as it is effective at the date of contract award, while performing any contract that is awarded from this solicitation. The provisions of 29 CFR 1915 shall apply to the same extent as if the ship repairing, shipbuilding, and shipbreaking employments and related employments to be performed under the contract are wholly accomplished on the navigable waters of the United States. The Contractor shall comply with applicable provisions of the laws and regulations where the ship repairing, shipbuilding, and shipbreaking employment and related employments are performed in addition to complying with the corresponding provisions of 29 CFR 1915 in instances in which those laws and regulations require compliance with more stringent safety standards.

The Contractor shall promptly notify the contracting officer if it becomes aware of any law or regulation that is applicable where the ship repairing, shipbuilding, and shipbreaking employment and related employments are performed that precludes compliance with any provision of 29 CFR 1915.

H-2.0 EXTENSION OF COMMERCIAL WARRANTY (NAVSEA) (NOV 1996)

The Contractor shall extend to the Government the full coverage of any standard commercial warranty normally offered in a similar commercial sale, provided that such warranty is available at no additional cost to the Government. The Contractor shall provide a copy of the standard commercial warranty with the item. The standard commercial warranty period shall begin upon the final acceptance of the applicable material or software. Acceptance of the standard commercial warranty does not waive the Government's rights under the "Inspection" clause, nor does it limit the Government's rights with regard to other terms and conditions of the contract. In the event of a conflict, the terms and conditions of the contract shall take precedence over the standard commercial warranty.

H-3.0 CONTROL OF UNCLASSIFIED INFORMATION (SRF-JRMC Requirements Only)

The Contractor shall not provide Controlled Unclassified Information (CUI) U.S. Navy technical information (engineering drawings, technical manuals, system or equipment photographs or any other U.S. Navy engineering data in any form (orally, paper copy, film or digital file/image) to anyone except SRF-JRMC employees, other Department of Defense (DoD) employees or U.S. DoD Contractors requiring the data for accomplishment of an SRF-JRMC business processes unless the data is marked Distribution Statement "A" (Approved for public release: distribution is unlimited) or has been approved for unrestricted public release by the Commanding Officer of SRF-JRMC or Commander U.S. Naval Forces Japan (COMNAVFORJAPAN) Public Affairs Officer (PAO). The Contractor shall notify SRF-JRMC Code 700 (Code 950 in Sasebo) and request written permission to release CUI outside of SRF- JRMC, DoD Activities or U.S. DoD Contractors that are not involved in the SRF-JRMC business process if the Contractor believes that the release is required to support a SRF-JRMC business or Public Affairs requirement.

H-4.0 Lay Down Space

The Contractor may request the lay down space adjacent to the ship yard in Yokosuka Naval base. Upon the receipt of approval by the Government, the Contractor may obtain the applicable lay down space. The Contractor shall be responsible for all the cost, but not limited to, for maintaining the facility, utility, safety, and security.

H-5.0 Applicable to Contracts Performed in Japan:

HISTORIC AND CULTURAL RESOURCES

If ship repair work is being performed in and around potentially significant historic buildings and structures (cultural properties) such as Dry Docks 1 through 6 and Cave 682 in Yokosuka Base, the contractor shall avoid changing the original materials and finishes used in the properties.

If work is being performed to repair or change a historical building/structure, the contractor shall submit design drawings, floor plans, and other relevant operational details to the CFAY Cultural Resource Manager through the Contracting Officer for review and approval prior to the commencement of work.

If work is being performed on a cultural or historical asset, such as a historical building/structure or archeological site, special precautions may be necessary. The contractor shall submit design drawings, floor plans, and other relevant operational details to the CFAY Cultural Resource Manager through the Contracting Officer for review and approval prior to the commencement of work. The contractor shall contact the CFAY Cultural Resources Manager through the Contracting Officer to determine if the work involves any archaeological, historical or cultural assets.

The contractor must conduct an archaeological monitoring by a qualified archaeologist for the planned excavations. During the monitoring, use of flat bladed bucket is required for backhoe operations. If any cultural/historical artifacts/assets include brick structures, manufactures plates indicating years before 1945 on the machines and equipment are discovered during work, the contractor shall notify the Public Works Department (PWD) Environmental Cultural Resources Manager Environmental Branch

1.

2.

3.

4.

5.

6.

Cultural Resources Manager (DSN 243-5136/COMM 046-816-5136) through the Contracting Officer, secure the discovery area, and continue to work around the secured area until further direction from the PWD Environmental Cultural Resources Manager Environmental Branch Cultural Resources Manager through the Contracting Officer.

If the items need to be temporarily removed, carefully protect them from disturbance, including weather conditions, unforeseen traffic, and pilfering. The PWD Environmental Cultural Resources Manager Environmental Branch Cultural Resources Manager through the Contracting Officer will provide further direction/guidance on how to protect the items. The Government retains ownership and control over historical and archaeological resources.

The contractor shall carefully protect in-place and report immediately to the Contracting Officer historical and archaeological items or human skeletal remains discovered in the course of work. Upon discovery, the contractor shall notify Cultural, Historical, and/or Natural Resources (CHNR) Manager (DSN 243-5136/COMM 046-816- 5136) through the Contracting Officer, secure the discovery area, and continue to work around the secured area. The Government retains ownership and control over historical and archaeological resources."

JAPANESE CONCILIATION PROCEDURES

Except as otherwise provided in this contract any disagreement arising under this contract which is not resolved by the parties to this contract may be submitted to the US-Japan Joint Committee for conciliation in accordance with paragraph 10, Article XVIII, of the Status of Forces Agreement under Article VI of the Treaty of Mutual Cooperation and Security between Japan and the United States of America. Request by the Contractor for conciliation shall be made in accordance with the procedures provided herein.

In the event the Contractor desires conciliation after the decision of the Contracting Officer has been served upon him, he will first file his appeal from such findings of fact within the time limits described therein before filing request for conciliation with the Joint Committee and then request for appellate authority under the clause of this contract entitled Disputes to suspend its action on his appeal until such time as the Joint Committee has had an opportunity for effecting conciliation.

The request for conciliation will be submitted by the Contractor through the nearest local Japanese Defense Facilities Administration Bureau to the Contract Conciliation Panel of the Joint Committee. Upon the filing of the request with the Joint Committee, the Contractor will immediately notify the Contracting Officer in writing that the request for conciliation has been filed.

In the event the disagreement submitted to the Joint Committee under subparagraph (b) above has been resolved through conciliation, it will be the responsibility of the Contractor to notify the appellate authority designated in the clause of this contract, entitled Disputes, of the settlement of the dispute and to withdraw his appeal.

In the event the Contractor who has submitted a request for conciliation to the Joint Committee under subparagraph (b) above desires, notwithstanding the pending request for conciliation, that action by the appropriate authority under the clause of this contract entitled Disputes be resumed on his appeal, it is his responsibility to so request the said authority in writing. The Joint Committee shall be immediately informed by the Contractor of his action taken hereunder.

No request for conciliation can be submitted to the Joint Committee in the case of a dispute upon which the final decision of the appropriate authority under the clause of this contract entitled Disputes has been rendered . Pending the hearing of conciliation panel the Contractor shall proceed diligently with the performance of the contract and in accordance with the Contracting Officer's decision. The provisions of this clause shall not prejudice any right which the parties to the contract may have to file a civil suit.

CONSUMPTION TAX

1. The Governments of the United States and Japan have agreed that this contract is exempt from the Japanese Consumption Tax. In accordance with paragraph (c) of the clause FAR 52.229-6, "TAXES -- FOREIGN FIXED-PRICE CONTRACTS (FEB 2013)," the offerors or quoters shall not include the Consumption Tax (including underlying taxes) in their proposal or quotations. By submission of your proposal or quotation, you are certifying that your proposal or quotation does not contain any such tax. The following U.S. Government (USG) proof of purchase forms shall be used to claim the exemption at tax offices:

USG Standard Form 1034

USG Standard Form 1113

USG Standard Form 44

Department of Defense Form 1155

Navy Comptroller Form 2277

2. The Contractor shall retain the appropriate USG proof of purchase forms set forth above for a period of seven (7) years. In addition, the Contractor shall maintain adequate records containing all pertinent information with regard to the claiming of Consumption Tax exemptions related to this contract. These records shall be subject to review by the Contracting Officer, or his or her designated representative, at any time up to seven (7) years from the date of final payment under this contract.

3. Any questions concerning the applicability of the Consumption Tax should be directed to the appropriate local tax office.

CUSTOMS AND TAX EXEMPTION

1. The Contractor shall, notwithstanding any other clause in this contract to the contrary, be required to submit a request in writing to the Contracting Officer for issuance of a Tax Exemption Certificate for any import duties and all taxes paid or to be paid from which the U.S. Government is entitled to an exemption. These taxes and duties are enumerated in Article XII of the Status of Forces Agreement under Article VI of the Treaty of Mutual Cooperation and Security between the Governments of the United States of America and Japan, regarding facilities areas and the status of United States Armed Forces in Japan. The Contractor's request shall include the following information:

(1) Name of contractor;

(2) Contract number and job order number (if applicable);

(3) Nomenclature of taxable material to be delivered and intended use;

(4) Quantity of taxable material used or to be delivered; and

(5) Period of taxable material use.

2. In the case of gasoline and other petroleum products, the Contractor shall be responsible for making every reasonable effort to determine the accuracy of his figures on consumption. In this regard, the Contractor shall, upon request of the Contracting Officer, present all available data used by the Contractor as the basis for determining such figures . The Contractor shall be required to maintain adequate records containing all pertinent information with regard to the above requirements . Further, these records shall be subject to review by the Contracting Officer at any time up to three years from the date of final payment under this contract.

H-6.0 GROWTH CLIN

(a) This contract will utilize a Growth CLIN (CLIN 0002) which is pre-funded to accommodate the anticipated growth work that may arise during the performance of the specified Task Group Instructions (TGIs) under CLIN 0001. The contractor shall provide (To Be

)Filled in upon Contract Award man-hours and (To Be Filled in upon )Contract Award materials in th e performance of the Growth CLIN in support of historically based growth under this contract. Upon negotiation of each growth work task, the agreed labor and material amount shall become a completion requirement. The total authorized growth work may not exceed the total dollar value of the Growth CLIN, however, the mix of labor hours and material provided above may be adjusted so long as the total does not exceed the dollar value of the Growth CLIN.

(b) GROWTH WORK - Growth is defined as any additional work that is identified and authorized after contract award that is within the scope of work of the TGIs defined in CLIN 0001 and as attached under Section J. Any additional work determined by the Contracting Officer as not within the scope of any of the TGIs shall be considered NEW WORK and will not be covered by this Growth CLIN.

(1) After any inspection reports detailed in any of the Task Group Instructions (TGIs) are submitted to Ship Repair Facility - Japan Regional Maintenance Center (SRF-JRMC), the contractor will propose solutions, recommendations, material availability, and time impacts to the Period of Performance.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .