This document is a Solicitation Amendment (SF 30) for a YT-807 Harbor Tug Boat overhaul at Yokosuka Naval Base. The amendment (No. 0006) extends the solicitation closing date from July 9, 2025 to July 23, 2025, and addresses multiple contractor questions regarding the project scope, work location, and performance requirements. Key modifications include clarifying that work will be conducted in Dry Dock 2, confirming base utilities will be available, and potentially extending the period of performance to August 31, 2026.

The amendment details specific work scope considerations, including hull-related tasks such as cleaning, blasting, preservation, ultrasonic inspection, and painting. The government is seeking contractor input on crane capabilities, material procurement, potential additional tasks, and coordination requirements. Contractors are asked to confirm their ability to perform specific work items, purchase certain materials like rubber fenders and battery components, and provide a response timeline and proposed coordination approach for the YT-807 harbor tug boat overhaul project.

View the file

Other files

File Type Posted
N6105425RCPR107-0-SOW rev4 YT 807.docx DOCX document
N6264925RA045-0009.pdf PDF
N6264925RA045-0008.pdf PDF
N6105425RCPR107-0-SOW rev3 YT 807.docx DOCX document
N6264925RA045-0007.pdf PDF
N6105425RCPR107-0-SOW rev2 YT 807.docx DOCX document
ATT 3 Request for Information Form -5.rtf RTF text file
N6264925RA045-0005.pdf PDF
N6264925RA045-0003.pdf PDF
N6264925RA045-0004.pdf PDF
ATT 4 Contract Data Sheet 25RA045.pdf PDF
ATT 5 Government Furnished Property (GFP-GFM listings).xlsx XLSX spreadsheet
ATT 3 Request for Information Form.rtf RTF text file
ATT1 N6105425RCPR107-0-SOW rev1 YT 807.docx DOCX document
N6264925RA045.pdf PDF
N6264925RA045-0001.pdf PDF
ATT 6 YT-807 QASP (Rev).docx DOCX document
ATT 2 Price Proposal Form N6264925RA045.xlsx XLSX spreadsheet
N6264925RA045-0002.pdf PDF
Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

N6105425RCPR107

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The solicitation amendment 0006 is issued to respond to the questions.

All other information remains unchanged.

See continuation page for details.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 4

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X N6264925RA045

X 9B. DATED (SEE ITEM 11)

07-May-2025

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO.

5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

18-Jul-2025

CODE

NAVSUP FLC YOKOSUKA

(CODE 200)

CONTRACTING DEPARTMENT

PSC 473 BOX 11

FPO AP 96349-0011

N62649 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL: ai.gillard.ln@us.navy.milTEL: 243-8385

Ai Gillard

N6264925RA045

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been modified:

QUESTION & ANSWER

Q1 Please specify the location of work to be conducted (which Drydock?)

Government Answer 1 Dry Dock 2

Q2 IS it possible to extend solicitation closing date?

Government Answer 2 The solicitation closing date is changed from 9 July 2025 to 23 July 2025

Q3 We have some urgent requests.

Considering the fluidity of the SOW, we have distinguished what we can do and what we cannot.

In the attached, we have humbly deleted some Work Scope for the following concerns.

With Red line, some got deleted due to the restriction of the Place of Work.

With Blue line, we would like to let know some help like, emptying fuel tank, is necessary, which needs to be done not by us.

With Green Triangle, some got highlighted due to the uncertainty of the workforce available for the designated POP in which seasons we are usually busy. We, therefore recommend deleting them.

Lastly, we would like to clarify the accessibility of the Utility including electricity, water , Air and waste disposal.

Taking everything into consideration, we demand solicitation due date be extended.

Government Answer 3 Dear KTR Team, Thank you for your interest in supporting the overhaul of YT-807. To ensure a comprehensive and efficient execution, please note that hull cleaning should be integrated with the following associated tasks, it would be extremely helpful:

• Hull blasting and preservation

• Hull and freeboard ultrasonic thickness (UT) inspection

• Hull cleaning, painting, and repairs

Base utilities (water, power, compressed air, and wastewater disposal) will be available.

Regarding the fuel-tank requirements and the tank level indicating systems, please advise if any additional assistance or resources are needed, besides just emptying the tanks.

To facilitate planning, please provide responses to the following questions:

1. Which scopes of work can you complete pier-side with the tug alongside the pier?

2. If the period of performance (POP) is adjusted to extend the proposed end date, what additional tasks could you incorporate?

3. Would you be able to specify and procure the following materials, with our team arranging installation and associated services?

o Rubber fenders o Battery chargers and battery straps o Seawater valves and related components o Any additional requirements you can assist us with procuring

In addition, to ensure clear expectations and smooth execution, please provide:

• Response Timeline: Date by which you will submit your detailed assistance requirements and any key milestones

• Coordination & Scheduling: Proposed date for a kickoff meeting or site survey, and lead party responsible for arranging scaffolding, laydown areas, and site inductions

Your collaboration in identifying these requirements and designating installation partners will greatly expedite the overhaul process and strengthen our working relationship.

Thank you once again for your engagement with YT-807. We look forward to your prompt feedback and to a successful partnership.

Q4 Since there is capability of crane usage at DD2, we cannot conduct the red crossed items.

(what we can conduct is Hull cleaning, blasting and preservation other than the fender area; since we cannot replace fender) With, Government previous response, we are able to conduct blue crossed items.

Q5 Also, is it possible to extend POP to 2026/8/31, at this moment, we cannot complete the SOW even with red line /triangle marked items removed.

Q6 With POP extension, we are able to complete items excluding red lined /triangle marked items

Q7 Is it possible to issue revised SOW?

Government Answer for Q4 through Q7 Crane Capacity

Dry Dock 2 can use two portable cranes, each lifting up to 130 tons. Please confirm if these cranes would work for you or if you will need to bring your own.

Hull-Related Work Please confirm if you will be able to do all the hull related work:

• Hull blasting and preservation

• Ultrasonic (UT) inspection of hull and freeboard

• Hull cleaning, painting, and repairs Purchase and Delivery of Items Can you purchase and deliver the following items? We do not require installation by KTR. If KTR changes their mind and decides to do the work, please inform us.

• Rubber fenders

• Battery chargers and battery straps

• Seawater valves and related parts

• Any other items you require Rubber Fenders If you agree to purchase the Rubber Fenders for us, can you remove the old fenders for us? This would give KTR the ability to do the hull work on the covered-up fender spots as well.

Dry Dock Availability We can extend use of Dry Dock 2 until August 31, 2026. Please confirm if this date works for your schedule.

(End of Summary of Changes)