About this file

This document is an Attachment B Key Personnel Resume Supplemental Information template for a Naval Facilities Engineering Command (NAVFAC) Architect-Engineer (A-E) services contract. The template provides a structured format for documenting key personnel's professional experience, requiring detailed information for up to five relevant projects across multiple utility and infrastructure domains. The resume template covers project-specific details including project title, location, client, point of contact, specific role, construction type (new construction or repair), construction cost, and project types such as water treatment, wastewater systems, electrical distribution, power generation, telecommunication systems, and alternative energy systems.

The template is associated with Solicitation Number N6247825R5049, an Indefinite Delivery/Indefinite Quantity (IDIQ) contract for utility and facility projects primarily under NAVFAC Hawaii's cognizance. The response deadline is Monday, October 20, 2025 at 2:00 p.m. Hawaii Standard Time (HST). The solicitation is currently in the pre-solicitation phase and seeks comprehensive documentation of key personnel's specialized experience and qualifications across a broad range of engineering and infrastructure project types, with a particular focus on utility, electrical, and facility systems.

View the file

Other files

File Type Posted
N6247825R5049QA1_MOD2.pdf PDF
N6247825R5049SYNOPSISMOD1.pdf PDF
N6247825R5049SYNOPSIS_24SEP2025.pdf PDF
N6247825R5049_ATTACHMENT_C_PPQ.docx DOCX document
N6247825R5049_ATTACHMENT_A_EXPERIENCE.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT (B)

KEY PERSONNEL RESUME SUPPLEMENTAL INFORMATION

NAME
ROLE IN THIS CONTRACT (NOT TITLE IN COMPANY)
RELEVANT PROJECT
1
PROJECT TITLE AND LOCATION (CITY & STATE)
CLIENT AND PROJECT OWNER
POINT OF CONTACT / CONTACT INFORMATION

SPECIFIC ROLE IN PROJECT

NEW CONSTRUCTION (NC) OR REPAIR (R)

CONSTRUCTION COST (NOT AE DESIGN FEE):

SPECIFIED DESIGN/ENGINEERING SERVICE (CHECK ALL THAT APPLIES)

DESIGN BID BUILD

NAVFAC D-B RFP

ENGINEERING STUDIES

RELEVANT PROJECTS TYPES (CHECK ALL THAT APPLIES):

WATER TREATMENT

WASTEWATER TREATMENT SYSTEMS

ELECTRICAL PRIIMARY DISTRIBUTION SYSTEMS

SECONDARY DISTRIBUTION SYSTEMS

POL SYSTEMS FOR AVIATION/DIESEL FUELS

WATER DISTRIBUTION SYSTEMS

WASTEWATER PUMP STATIONS

UTILITY SUBSTATIONS

WATERFRONT ELECTRICAL SYSTEM

WATER PUMP STATIONS

STORM DRAINAGE SYSTEMS

UTILITY SWITCHING STATIONS

ALTERNATIVE ENERGY SYSTEMS

WATEWATER COLLECTION SYSTEMS

POWER GENERATION

TELECOMMUNICATION SYSTEMS FOR FACILITIES

RELEVANT PROJECT
2
PROJECT TITLE AND LOCATION (CITY & STATE)
CLIENT AND PROJECT OWNER
POINT OF CONTACT / CONTACT INFORMATION

SPECIFIC ROLE IN PROJECT

NEW CONSTRUCTION (NC) OR REPAIR (R)

CONSTRUCTION COST (NOT AE DESIGN FEE):

SPECIFIED DESIGN/ENGINEERING SERVICE (CHECK ALL THAT APPLIES)

DESIGN BID BUILD

NAVFAC D-B RFP

ENGINEERING STUDIES

RELEVANT PROJECTS TYPES (CHECK ALL THAT APPLIES):

WATER TREATMENT

WASTEWATER TREATMENT SYSTEMS

ELECTRICAL PRIIMARY DISTRIBUTION SYSTEMS

SECONDARY DISTRIBUTION SYSTEMS

POL SYSTEMS FOR AVIATION/DIESEL FUELS

WATER DISTRIBUTION SYSTEMS

WASTEWATER PUMP STATIONS

UTILITY SUBSTATIONS

WATERFRONT ELECTRICAL SYSTEM

WATER PUMP STATIONS

STORM DRAINAGE SYSTEMS

UTILITY SWITCHING STATIONS

ALTERNATIVE ENERGY SYSTEMS

WATEWATER COLLECTION SYSTEMS

POWER GENERATION

TELECOMMUNICATION SYSTEMS FOR FACILITIES

RELEVANT PROJECT
3
PROJECT TITLE AND LOCATION (CITY & STATE)
CLIENT AND PROJECT OWNER
POINT OF CONTACT / CONTACT INFORMATION

SPECIFIC ROLE IN PROJECT

NEW CONSTRUCTION (NC) OR REPAIR (R)

CONSTRUCTION COST (NOT AE DESIGN FEE):

SPECIFIED DESIGN/ENGINEERING SERVICE (CHECK ALL THAT APPLIES)

DESIGN BID BUILD

NAVFAC D-B RFP

ENGINEERING STUDIES

RELEVANT PROJECTS TYPES (CHECK ALL THAT APPLIES):

WATER TREATMENT

WASTEWATER TREATMENT SYSTEMS

ELECTRICAL PRIIMARY DISTRIBUTION SYSTEMS

SECONDARY DISTRIBUTION SYSTEMS

POL SYSTEMS FOR AVIATION/DIESEL FUELS

WATER DISTRIBUTION SYSTEMS

WASTEWATER PUMP STATIONS

UTILITY SUBSTATIONS

WATERFRONT ELECTRICAL SYSTEM

WATER PUMP STATIONS

STORM DRAINAGE SYSTEMS

UTILITY SWITCHING STATIONS

ALTERNATIVE ENERGY SYSTEMS

WATEWATER COLLECTION SYSTEMS

POWER GENERATION

TELECOMMUNICATION SYSTEMS FOR FACILITIES

RELEVANT PROJECT
4
PROJECT TITLE AND LOCATION (CITY & STATE)
CLIENT AND PROJECT OWNER
POINT OF CONTACT / CONTACT INFORMATION

SPECIFIC ROLE IN PROJECT

NEW CONSTRUCTION (NC) OR REPAIR (R)

CONSTRUCTION COST (NOT AE DESIGN FEE):

SPECIFIED DESIGN/ENGINEERING SERVICE (CHECK ALL THAT APPLIES)

DESIGN BID BUILD

NAVFAC D-B RFP

ENGINEERING STUDIES

RELEVANT PROJECTS TYPES (CHECK ALL THAT APPLIES):

WATER TREATMENT

WASTEWATER TREATMENT SYSTEMS

ELECTRICAL PRIIMARY DISTRIBUTION SYSTEMS

SECONDARY DISTRIBUTION SYSTEMS

POL SYSTEMS FOR AVIATION/DIESEL FUELS

WATER DISTRIBUTION SYSTEMS

WASTEWATER PUMP STATIONS

UTILITY SUBSTATIONS

WATERFRONT ELECTRICAL SYSTEM

WATER PUMP STATIONS

STORM DRAINAGE SYSTEMS

UTILITY SWITCHING STATIONS

ALTERNATIVE ENERGY SYSTEMS

WATEWATER COLLECTION SYSTEMS

POWER GENERATION

TELECOMMUNICATION SYSTEMS FOR FACILITIES

RELEVANT PROJECT
5
PROJECT TITLE AND LOCATION (CITY & STATE)
CLIENT AND PROJECT OWNER
POINT OF CONTACT / CONTACT INFORMATION

SPECIFIC ROLE IN PROJECT

NEW CONSTRUCTION (NC) OR REPAIR (R)

CONSTRUCTION COST (NOT AE DESIGN FEE):

SPECIFIED DESIGN/ENGINEERING SERVICE (CHECK ALL THAT APPLIES)

DESIGN BID BUILD

NAVFAC D-B RFP

ENGINEERING STUDIES

RELEVANT PROJECTS TYPES (CHECK ALL THAT APPLIES):

WATER TREATMENT

WASTEWATER TREATMENT SYSTEMS

ELECTRICAL PRIIMARY DISTRIBUTION SYSTEMS

SECONDARY DISTRIBUTION SYSTEMS

POL SYSTEMS FOR AVIATION/DIESEL FUELS

WATER DISTRIBUTION SYSTEMS

WASTEWATER PUMP STATIONS

UTILITY SUBSTATIONS

WATERFRONT ELECTRICAL SYSTEM

WATER PUMP STATIONS

STORM DRAINAGE SYSTEMS

UTILITY SWITCHING STATIONS

ALTERNATIVE ENERGY SYSTEMS

WATEWATER COLLECTION SYSTEMS

POWER GENERATION

TELECOMMUNICATION SYSTEMS FOR FACILITIES

File details come from the government source that posted it. Updated .