About this file

This document is an Attachment A - Specialized Experience Supplemental Information template for a Naval Facilities Engineering Command (NAVFAC) Indefinite Delivery/Indefinite Quantity (IDIQ) contract for Architect-Engineer services. The template provides a structured format for documenting up to 10 example projects, allowing firms to demonstrate their specialized experience across multiple technical disciplines and project types.

The template covers key project details including project role, construction type (new construction or repair), design/engineering services, and relevant project types. Discipline checkboxes include civil, electrical, telecom, architectural, structural, mechanical, fire protection, geotechnical, and fuels/POL. Relevant project type selections range from water treatment and wastewater systems to electrical distribution, power generation, alternative energy systems, utility substations, and telecommunications systems. The solicitation (N6247825R5049) is for utility projects primarily under NAVFAC Hawaii, with a response deadline of October 20, 2025 at 2:00 p.m. Hawaii Standard Time.

View the file

Other files

File Type Posted
N6247825R5049QA1_MOD2.pdf PDF
N6247825R5049SYNOPSISMOD1.pdf PDF
N6247825R5049_ATTACHMENT_B_KEY PERSONNEL.docx DOCX document
N6247825R5049_ATTACHMENT_C_PPQ.docx DOCX document
N6247825R5049SYNOPSIS_24SEP2025.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT (A)

SPECIALIZED EXPERIENCE SUPPLEMENTAL INFORMATION

(a) SPECIALIZED EXPERIENCE
EXAMPLE PROJECT KEY NUMBER:
1
PROJECT TITLE AND LOCATION (CITY & STATE)
DESIGN COMPLETED (YR)

(NOT INCLUDING PCAS)

EST. CONSTRUCTION COMPLETED (YR)

PROJECT ROLE: PRIME A/E, DB DESIGNER OF RECORD, OR SUB CONSULTANT
CONSTRUCTION COST (NOT AE DESIGN FEE):

AE FIRM NAME OR JV:

NEW CONSTRUCTION (NC) OR REPAIR (R):

SPECIFIED DESIGN/ENGINEERING SERVICE (CHECK ALL THAT APPLIES)

DESIGN-BID BUILD

NAVFAC D-B RFP

ENGINEERING STUDIES

DESIGN-BUILD DOR

DISCIPLINES INVOLVED IN PROJECT (CHECK ALL THAT APPLIES):

CIVIL

ELECTRICAL

TELECOM

ARCHITECT

STRUCTURAL

MECHANICAL

FIRE PROTECTION

GEOTECH

FUELS/POL

RELEVANT PROJECTS TYPES (CHECK ALL THAT APPLIES):

WATER TREATMENT

WATEWATER COLLECTION SYSTEMS

STORM DRAINAGE SYSTEMS

UTILITY SWITCHING STATIONS

WATERFRONT ELECTICAL SYSTEM

WATER DISTRIBUTION SYSTEMS

WASTEWATER TREATMENT SYSTEMS

ELECTRICAL PRIMARY DISTRIBUTION SYSTEMS

POWER GENERATION

ALTERNATIVE ENERGY SYSTEMS

WATER PUMP STATIONS

WASTEWATER PUMP STATIONS

UTILITY SUBSTATIONS

SECONDARY DISTRIBUTION SYSTEMS

TELECOMMUNICATIONS SYSTEM FOR FACILITIES

(a) SPECIALIZED EXPERIENCE
EXAMPLE PROJECT KEY NUMBER:
2
PROJECT TITLE AND LOCATION (CITY & STATE)
DESIGN COMPLETED (YR)

EST. CONSTRUCTION COMPLETED (YR)

PROJECT ROLE: PRIME A/E, DB DESIGNER OF RECORD, OR SUB CONSULTANT
CONSTRUCTION COST (NOT AE DESIGN FEE):

AE FIRM NAME OR JV:

NEW CONSTRUCTION (NC) OR REPAIR (R):

SPECIFIED DESIGN/ENGINEERING SERVICE (CHECK ALL THAT APPLIES)

DESIGN-BID BUILD

NAVFAC D-B RFP

ENGINEERING STUDIES

DESIGN-BUILD DOR

DISCIPLINES INVOLVED IN PROJECT (CHECK ALL THAT APPLIES):

CIVIL

ELECTRICAL

TELECOM

ARCHITECT

STRUCTURAL

MECHANICAL

FIRE PROTECTION

GEOTECH

FUELS/POL

RELEVANT PROJECTS TYPES (CHECK ALL THAT APPLIES):

WATER TREATMENT

WATEWATER COLLECTION SYSTEMS

STORM DRAINAGE SYSTEMS

UTILITY SWITCHING STATIONS

WATERFRONT ELECTICAL SYSTEM

WATER DISTRIBUTION SYSTEMS

WASTEWATER TREATMENT SYSTEMS

ELECTRICAL PRIMARY DISTRIBUTION SYSTEMS

POWER GENERATION

ALTERNATIVE ENERGY SYSTEMS

WATER PUMP STATIONS

WASTEWATER PUMP STATIONS

UTILITY SUBSTATIONS

SECONDARY DISTRIBUTION SYSTEMS

TELECOMMUNICATIONS SYSTEM FOR FACILITIES

(a) SPECIALIZED EXPERIENCE
EXAMPLE PROJECT KEY NUMBER:
3
PROJECT TITLE AND LOCATION (CITY & STATE)
DESIGN COMPLETED (YR)

EST. CONSTRUCTION COMPLETED (YR)

PROJECT ROLE: PRIME A/E, DB DESIGNER OF RECORD, OR SUB CONSULTANT
CONSTRUCTION COST (NOT AE DESIGN FEE):

AE FIRM NAME OR JV:

NEW CONSTRUCTION (NC) OR REPAIR (R):

SPECIFIED DESIGN/ENGINEERING SERVICE (CHECK ALL THAT APPLIES)

DESIGN-BID BUILD

NAVFAC D-B RFP

ENGINEERING STUDIES

DESIGN-BUILD DOR

DISCIPLINES INVOLVED IN PROJECT (CHECK ALL THAT APPLIES):

CIVIL

ELECTRICAL

TELECOM

ARCHITECT

STRUCTURAL

MECHANICAL

FIRE PROTECTION

GEOTECH

FUELS/POL

RELEVANT PROJECTS TYPES (CHECK ALL THAT APPLIES):

WATER TREATMENT

WATEWATER COLLECTION SYSTEMS

STORM DRAINAGE SYSTEMS

UTILITY SWITCHING STATIONS

WATERFRONT ELECTICAL SYSTEM

WATER DISTRIBUTION SYSTEMS

WASTEWATER TREATMENT SYSTEMS

ELECTRICAL PRIMARY DISTRIBUTION SYSTEMS

POWER GENERATION

ALTERNATIVE ENERGY SYSTEMS

WATER PUMP STATIONS

WASTEWATER PUMP STATIONS

UTILITY SUBSTATIONS

SECONDARY DISTRIBUTION SYSTEMS

TELECOMMUNICATIONS SYSTEM FOR FACILITIES

(a) SPECIALIZED EXPERIENCE
EXAMPLE PROJECT KEY NUMBER:
4
PROJECT TITLE AND LOCATION (CITY & STATE)
DESIGN COMPLETED (YR)

EST. CONSTRUCTION COMPLETED (YR)

PROJECT ROLE: PRIME A/E, DB DESIGNER OF RECORD, OR SUB CONSULTANT
CONSTRUCTION COST (NOT AE DESIGN FEE):

AE FIRM NAME OR JV:

NEW CONSTRUCTION (NC) OR REPAIR (R):

SPECIFIED DESIGN/ENGINEERING SERVICE (CHECK ALL THAT APPLIES)

DESIGN-BID BUILD

NAVFAC D-B RFP

ENGINEERING STUDIES

DESIGN-BUILD DOR

DISCIPLINES INVOLVED IN PROJECT (CHECK ALL THAT APPLIES):

CIVIL

ELECTRICAL

TELECOM

ARCHITECT

STRUCTURAL

MECHANICAL

FIRE PROTECTION

GEOTECH

FUELS/POL

RELEVANT PROJECTS TYPES (CHECK ALL THAT APPLIES):

WATER TREATMENT

WATEWATER COLLECTION SYSTEMS

STORM DRAINAGE SYSTEMS

UTILITY SWITCHING STATIONS

WATERFRONT ELECTICAL SYSTEM

WATER DISTRIBUTION SYSTEMS

WASTEWATER TREATMENT SYSTEMS

ELECTRICAL PRIMARY DISTRIBUTION SYSTEMS

POWER GENERATION

ALTERNATIVE ENERGY SYSTEMS

WATER PUMP STATIONS

WASTEWATER PUMP STATIONS

UTILITY SUBSTATIONS

SECONDARY DISTRIBUTION SYSTEMS

TELECOMMUNICATIONS SYSTEM FOR FACILITIES

(a) SPECIALIZED EXPERIENCE
EXAMPLE PROJECT KEY NUMBER:
5
PROJECT TITLE AND LOCATION (CITY & STATE)
DESIGN COMPLETED (YR)

EST. CONSTRUCTION COMPLETED (YR)

PROJECT ROLE: PRIME A/E, DB DESIGNER OF RECORD, OR SUB CONSULTANT
CONSTRUCTION COST (NOT AE DESIGN FEE):

AE FIRM NAME OR JV:

NEW CONSTRUCTION (NC) OR REPAIR (R):

SPECIFIED DESIGN/ENGINEERING SERVICE (CHECK ALL THAT APPLIES)

DESIGN-BID BUILD

NAVFAC D-B RFP

ENGINEERING STUDIES

DESIGN-BUILD DOR

DISCIPLINES INVOLVED IN PROJECT (CHECK ALL THAT APPLIES):

CIVIL

ELECTRICAL

TELECOM

ARCHITECT

STRUCTURAL

MECHANICAL

FIRE PROTECTION

GEOTECH

FUELS/POL

RELEVANT PROJECTS TYPES (CHECK ALL THAT APPLIES):

WATER TREATMENT

WATEWATER COLLECTION SYSTEMS

STORM DRAINAGE SYSTEMS

UTILITY SWITCHING STATIONS

WATERFRONT ELECTICAL SYSTEM

WATER DISTRIBUTION SYSTEMS

WASTEWATER TREATMENT SYSTEMS

ELECTRICAL PRIMARY DISTRIBUTION SYSTEMS

POWER GENERATION

ALTERNATIVE ENERGY SYSTEMS

WATER PUMP STATIONS

WASTEWATER PUMP STATIONS

UTILITY SUBSTATIONS

SECONDARY DISTRIBUTION SYSTEMS

TELECOMMUNICATIONS SYSTEM FOR FACILITIES

(a) SPECIALIZED EXPERIENCE
EXAMPLE PROJECT KEY NUMBER:
6
PROJECT TITLE AND LOCATION (CITY & STATE)
DESIGN COMPLETED (YR)

EST. CONSTRUCTION COMPLETED (YR)

PROJECT ROLE: PRIME A/E, DB DESIGNER OF RECORD, OR SUB CONSULTANT
CONSTRUCTION COST (NOT AE DESIGN FEE):

AE FIRM NAME OR JV:

NEW CONSTRUCTION (NC) OR REPAIR (R):

SPECIFIED DESIGN/ENGINEERING SERVICE (CHECK ALL THAT APPLIES)

DESIGN-BID BUILD

NAVFAC D-B RFP

ENGINEERING STUDIES

DESIGN-BUILD DOR

DISCIPLINES INVOLVED IN PROJECT (CHECK ALL THAT APPLIES):

CIVIL

ELECTRICAL

TELECOM

ARCHITECT

STRUCTURAL

MECHANICAL

FIRE PROTECTION

GEOTECH

FUELS/POL

RELEVANT PROJECTS TYPES (CHECK ALL THAT APPLIES):

WATER TREATMENT

WATEWATER COLLECTION SYSTEMS

STORM DRAINAGE SYSTEMS

UTILITY SWITCHING STATIONS

WATERFRONT ELECTICAL SYSTEM

WATER DISTRIBUTION SYSTEMS

WASTEWATER TREATMENT SYSTEMS

ELECTRICAL PRIMARY DISTRIBUTION SYSTEMS

POWER GENERATION

ALTERNATIVE ENERGY SYSTEMS

WATER PUMP STATIONS

WASTEWATER PUMP STATIONS

UTILITY SUBSTATIONS

SECONDARY DISTRIBUTION SYSTEMS

TELECOMMUNICATIONS SYSTEM FOR FACILITIES

(a) SPECIALIZED EXPERIENCE
EXAMPLE PROJECT KEY NUMBER:
7
PROJECT TITLE AND LOCATION (CITY & STATE)
DESIGN COMPLETED (YR)

EST. CONSTRUCTION COMPLETED (YR)

PROJECT ROLE: PRIME A/E, DB DESIGNER OF RECORD, OR SUB CONSULTANT
CONSTRUCTION COST (NOT AE DESIGN FEE):

AE FIRM NAME OR JV:

NEW CONSTRUCTION (NC) OR REPAIR (R):

SPECIFIED DESIGN/ENGINEERING SERVICE (CHECK ALL THAT APPLIES)

DESIGN-BID BUILD

NAVFAC D-B RFP

ENGINEERING STUDIES

DESIGN-BUILD DOR

DISCIPLINES INVOLVED IN PROJECT (CHECK ALL THAT APPLIES):

CIVIL

ELECTRICAL

TELECOM

ARCHITECT

STRUCTURAL

MECHANICAL

FIRE PROTECTION

GEOTECH

FUELS/POL

RELEVANT PROJECTS TYPES (CHECK ALL THAT APPLIES):

WATER TREATMENT

WATEWATER COLLECTION SYSTEMS

STORM DRAINAGE SYSTEMS

UTILITY SWITCHING STATIONS

WATERFRONT ELECTICAL SYSTEM

WATER DISTRIBUTION SYSTEMS

WASTEWATER TREATMENT SYSTEMS

ELECTRICAL PRIMARY DISTRIBUTION SYSTEMS

POWER GENERATION

ALTERNATIVE ENERGY SYSTEMS

WATER PUMP STATIONS

WASTEWATER PUMP STATIONS

UTILITY SUBSTATIONS

SECONDARY DISTRIBUTION SYSTEMS

TELECOMMUNICATIONS SYSTEM FOR FACILITIES

(a) SPECIALIZED EXPERIENCE
EXAMPLE PROJECT KEY NUMBER:
8
PROJECT TITLE AND LOCATION (CITY & STATE)
DESIGN COMPLETED (YR)

EST. CONSTRUCTION COMPLETED (YR)

PROJECT ROLE: PRIME A/E, DB DESIGNER OF RECORD, OR SUB CONSULTANT
CONSTRUCTION COST (NOT AE DESIGN FEE):

AE FIRM NAME OR JV:

NEW CONSTRUCTION (NC) OR REPAIR (R):

SPECIFIED DESIGN/ENGINEERING SERVICE (CHECK ALL THAT APPLIES)

DESIGN-BID BUILD

NAVFAC D-B RFP

ENGINEERING STUDIES

DESIGN-BUILD DOR

DISCIPLINES INVOLVED IN PROJECT (CHECK ALL THAT APPLIES):

CIVIL

ELECTRICAL

TELECOM

ARCHITECT

STRUCTURAL

MECHANICAL

FIRE PROTECTION

GEOTECH

FUELS/POL

RELEVANT PROJECTS TYPES (CHECK ALL THAT APPLIES):

WATER TREATMENT

WATEWATER COLLECTION SYSTEMS

STORM DRAINAGE SYSTEMS

UTILITY SWITCHING STATIONS

WATERFRONT ELECTICAL SYSTEM

WATER DISTRIBUTION SYSTEMS

WASTEWATER TREATMENT SYSTEMS

ELECTRICAL PRIMARY DISTRIBUTION SYSTEMS

POWER GENERATION

ALTERNATIVE ENERGY SYSTEMS

WATER PUMP STATIONS

WASTEWATER PUMP STATIONS

UTILITY SUBSTATIONS

SECONDARY DISTRIBUTION SYSTEMS

TELECOMMUNICATIONS SYSTEM FOR FACILITIES

(a) SPECIALIZED EXPERIENCE
EXAMPLE PROJECT KEY NUMBER:
9
PROJECT TITLE AND LOCATION (CITY & STATE)
DESIGN COMPLETED (YR)

EST. CONSTRUCTION COMPLETED (YR)

PROJECT ROLE: PRIME A/E, DB DESIGNER OF RECORD, OR SUB CONSULTANT
CONSTRUCTION COST (NOT AE DESIGN FEE):

AE FIRM NAME OR JV:

NEW CONSTRUCTION (NC) OR REPAIR (R):

SPECIFIED DESIGN/ENGINEERING SERVICE (CHECK ALL THAT APPLIES)

DESIGN-BID BUILD

NAVFAC D-B RFP

ENGINEERING STUDIES

DESIGN-BUILD DOR

DISCIPLINES INVOLVED IN PROJECT (CHECK ALL THAT APPLIES):

CIVIL

ELECTRICAL

TELECOM

ARCHITECT

STRUCTURAL

MECHANICAL

FIRE PROTECTION

GEOTECH

FUELS/POL

RELEVANT PROJECTS TYPES (CHECK ALL THAT APPLIES):

WATER TREATMENT

WATEWATER COLLECTION SYSTEMS

STORM DRAINAGE SYSTEMS

UTILITY SWITCHING STATIONS

WATERFRONT ELECTICAL SYSTEM

WATER DISTRIBUTION SYSTEMS

WASTEWATER TREATMENT SYSTEMS

ELECTRICAL PRIMARY DISTRIBUTION SYSTEMS

POWER GENERATION

ALTERNATIVE ENERGY SYSTEMS

WATER PUMP STATIONS

WASTEWATER PUMP STATIONS

UTILITY SUBSTATIONS

SECONDARY DISTRIBUTION SYSTEMS

TELECOMMUNICATIONS SYSTEM FOR FACILITIES

(a) SPECIALIZED EXPERIENCE
EXAMPLE PROJECT KEY NUMBER:
10
PROJECT TITLE AND LOCATION (CITY & STATE)
DESIGN COMPLETED (YR)

EST. CONSTRUCTION COMPLETED (YR)

PROJECT ROLE: PRIME A/E, DB DESIGNER OF RECORD, OR SUB CONSULTANT
CONSTRUCTION COST (NOT AE DESIGN FEE):

AE FIRM NAME OR JV:

NEW CONSTRUCTION (NC) OR REPAIR (R):

SPECIFIED DESIGN/ENGINEERING SERVICE (CHECK ALL THAT APPLIES)

DESIGN-BID BUILD

NAVFAC D-B RFP

ENGINEERING STUDIES

DESIGN-BUILD DOR

DISCIPLINES INVOLVED IN PROJECT (CHECK ALL THAT APPLIES):

CIVIL

ELECTRICAL

TELECOM

ARCHITECT

STRUCTURAL

MECHANICAL

FIRE PROTECTION

GEOTECH

FUELS/POL

RELEVANT PROJECTS TYPES (CHECK ALL THAT APPLIES):

WATER TREATMENT

WATEWATER COLLECTION SYSTEMS

STORM DRAINAGE SYSTEMS

UTILITY SWITCHING STATIONS

WATERFRONT ELECTICAL SYSTEM

WATER DISTRIBUTION SYSTEMS

WASTEWATER TREATMENT SYSTEMS

ELECTRICAL PRIMARY DISTRIBUTION SYSTEMS

POWER GENERATION

ALTERNATIVE ENERGY SYSTEMS

WATER PUMP STATIONS

WASTEWATER PUMP STATIONS

UTILITY SUBSTATIONS

SECONDARY DISTRIBUTION SYSTEMS

TELECOMMUNICATIONS SYSTEM FOR FACILITIES

File details come from the government source that posted it. Updated .