Text version

25 April 2019

N62478-19-R-5034 INDEFINITE DELIVERY/INDEFINITE QUANTITY CONTRACT

FOR ARCHITECT-ENGINEER SERVICES FOR VARIOUS MECHANICAL

ENGINEERING PROJECTS AND RELATED PROJECTS, VARIOUS LOCATIONS

UNDER THE COGNIZANCE OF NAVFAC HAWAII

ALL INFORMATION NEEDED FOR INTERESTED PARTIES TO SUBMIT A STANDARD

FORM SF 330, ARCHITECT ENGINEER QUALIFICATIONS IS CONTAINED HEREIN.

THERE IS NO SEPARATE REQUEST FOR PROPOSALS (RFP) PACKAGE TO

DOWNLOAD.

N62478-19-R-5032 was cancelled and is replaced with N62478-19-R-5034.

This procurement will result in one Indefinite Delivery/Indefinite Quantity (IDIQ) contract for multi-discipline Architect-Engineer (A-E) services for mechanical engineering projects within the State of Hawaii, but may also include work worldwide. These services will be procured in accordance with 40 USC Chapter 11, Selection of Architects and Engineers, as implemented by FAR Subpart 36.6. The IDIQ contract will be for a base period of one year and four one-year option periods (if exercised). The total fee for the contract term shall not exceed $15,000,000.

The guaranteed minimum for the contract term (including option years) is $10,000. Firm-fixed price task orders will be negotiated for this contract. There will be no dollar limit per task order and no dollar limit per year. Estimated construction cost of project is between $300,000 and $30,000,000. Estimated start date is October 2019.

This proposed contract is being solicited on a 100% set-aside for small business concerns basis. The Small Business size standard classification is North American Industrial Classification System (NAICS) Code 541330, Engineering Services. The Government seeks the most highly qualified firm to perform the required services, based on the demonstrated competence and qualifications, in accordance with the selection criteria.

The market research study Sources Sought Announcements OPHA1FY190001 and OPHA1FY190002 conducted by NAVFAC Hawaii included an assessment of relevant qualifications and capabilities of potentially qualified Women-Owned Small Business (WOSB) and Service-Disabled Veteran-Owned Small Business (SDVOSB) firms. As a result of the market research analysis, a determination was made to set aside this procurement under the Small Business Program as a 100% small business set-aside. The NAVFAC Hawaii small business office concurs with this decision.

The type of design and engineering services expected to be performed under this contract are primarily for Request for Proposal (RFP) documentation for Design-Bid-Build (DBB) mechanical engineering projects with associated multi-discipline architect-engineering support services for new construction, alteration, repair, and installation of mechanical systems and associated facilities. Other design and engineering services may include, but not limited to, Design-Build (DB) RFP documentation, engineering investigations/concept studies, Functional Analysis Concept Development (FACD)/charrettes, and Post Construction Award Services

(PCAS).

All contractors are advised that registration in System for Award Management (SAM) Database is required prior to award of a contract. Failure to register in the SAM Database may render your firm ineligible for award. For more information, check the SAM Web site:

https://www.sam.gov.

The awarded contract will be subject to specific provisions addressing the avoidance of organizational conflicts of interest, including NFAS 5252.209-9300, Organizational Conflicts of Interest. The prime firm for this contract will be required to perform throughout the contract term.

The selected firm and its subsidiaries or affiliates may be tasked to assist in the preparation of a statement of work, a plan, or a specification for a construction project. This includes concept design, which includes preparation of project programming documents (DD 1391), facility studies, environment assessments, or other activities that result in identification of project scope and cost. The selected firm, its subsidiaries or affiliates that design or prepare specifications for a construction contract cannot provide the construction services for the same contract.

Interviews may be scheduled with firms slated as the most highly qualified. Firms slated for interviews may be asked to clarify information contained in the SF330 submittal. Elaborate presentations are not desired.

SELECTION CRITERIA:

Firms responding to this synopsis will be evaluated to determine the most highly qualified firms to perform the required services in accordance with the published selection criteria. Failure to comply with instructions, or provide complete information may affect the firm’s evaluation or disqualify the firm from further consideration. The selection criteria are in descending order of importance, with the last criterion for volume of work to serve as a tiebreaker. Specific selection criteria include:

1. Specialized Experience

2. Professional Qualifications

3. Past Performance

4. Program Management and Capacity

5. Quality Control Program

6. Sustainable Design

7. Firm Location

8. Volume of Work

Criterion 1 – Specialized Experience (SF330, Part I, Section F):

Firms/Offerors will be evaluated on specialized experience in performance of services similar to those anticipated under this contract through evaluation of experience in each of the following (paragraphs 1-3 below):

1. Firm’s/Offeror’s specialized recent and relevant experience in the design of mechanical system design projects, approximately $30 million or less in construction cost per project/contract, design completed within the past ten (10) years. Experience includes design and engineering services for both New Construction and Maintenance/Repair/Renovation/ Alteration projects.

2. “Relevant Mechanical System Design Projects” include the following fourteen (14) types of design: Heating/Ventilating/Air Conditioning (HVAC) chilled water and direct expansion (DX) systems; BACnet Direct Digital Controls (DDC); low pressure compressed air systems;

industrial ventilation systems; general supply/exhaust systems; service water heating systems/solar hot water heating systems; general purpose plumbing systems; hydronic pumping systems; waterfront utilities; elevators/vertical transportation equipment (VTE);

anti-Terrorism Force Protection (ATFP) measures for facilities and waterways; above ground/below ground Mogas fuel storage/distribution systems; Petroleum/Oils/Lubricant (POL) receiving, storing, distribution and dispensing systems for aviation and diesel fuels on military land-based facilities; and fire sprinkler, fire alarm and mass notification systems.

NOTE: Experience in Relevant Mechanical System Design Projects ONLY from the

Firm/Offeror performed as either a Prime A-E or sub-consultant will be considered, except for experience from a sub-consultant for POL and fire sprinkler/fire alarm/mass notification systems. Firm/Offeror does not have to demonstrate all fourteen (14) Relevant Mechanical System Design Project types within the ten (10) Section F projects; however, more variety in the types described above may be considered more favorable.

3. “Specified Design/Engineering Services” must include experience in preparation of drawings/specifications for the purpose of a Design-Bid-Build (DBB) contract in Relevant Mechanical System Design Projects.

NOTE 1: Experience in Specified Design/Engineering Services ONLY from the Firm/Offeror performed as either a Prime A-E or sub-consultant will be considered.

Experience as A-E Designer of Record (DOR) for a Design-Build Contractor may be submitted but will be given less consideration then experience as the A-E DOR for a Design- Bid-Build (DBB) contract.

NOTE 2: Experience in Specified Design/Engineering Services from the Firm’s/ Offeror’s sub-consultant(s) will not be considered, except for experience by a sub-consultant for POL and fire sprinkler/fire alarm/mass notification systems.

Favorable Items: Firms/Offerors may be considered more favorably by demonstrating the following, whether the Firm/Offeror performed such work as either a Prime A-E or sub-consultant:

1. Experience in more variety in the types of Relevant Mechanical System Design Projects described above.

2. Experience in preparation of Design-Build (DB) Request for Proposal (RFP) documents utilizing the NAVFAC Design-Build RFP Six-Part Master Format.

3. Experience of the Firm/Offeror as a Prime A-E may be considered more favorable than experience performed by the Firm/Offeror as a sub-consultant.

4. Experience with a variety of Heating/Ventilating/Air Conditioning (HVAC) chilled water or direct expansion (DX) plants with a facility total tonnage of 250 tons or larger, and were designed to optimize energy performance at the highest level that were Life Cycle Cost Effective (LCCE).

5. Experience with large dewatering pumping systems in drydocking facilities.

6. Experience with laboratory ventilation systems.

7. Experience in preparation of fire protection studies and surveys, fire hazard analysis, life safety code analysis, hydrant flow test, and fire alarm system test.

8. Experience in Relevant Mechanical System Design Projects that were designed and constructed in Hawaii and tropical environments similar to Hawaii.

9. Experience in Department of Defense projects (e.g. NAVFAC, USACE, Air Force, NGB, etc.)

10. Experience with Functional Analysis and Concept Development (FACD)/design charrettes.

11. Experience in preparation of MILCON Region/FEC Team 1391 project documentation.

12. Proposed team with a demonstrated history of firms working successfully together on prior projects as a team may be considered more favorably than those without such history.

13. Experience in mechanical engineering investigations/concept studies used to develop or validate project scope requirements through Business Case Analysis (BCA), identifying and comparing alternatives by examining the mission impacts (both financial and non-financial), risks, and sensitivities. Develop project scope alternatives for mechanical system utilizing Economic Analysis, HVAC Life Cycle Cost Analysis (LCCA), Energy Analysis, engineering calculations, and related criteria.

Submission Requirements:

Projects shall be submitted on the SF330, Part I, Section F. Provide a maximum of 10 recent and relevant projects, approximately $30 million or less in total estimated construction cost, with the design completed to final design, within the past 10 years immediately preceding the date of issuance of this notice that best demonstrate specialized experience of the proposed team in the areas outlined above. A completed design may be exclusive of Post Construction Award Services (PCAS). Projects with design services that are on-going, exclusive of PCAS, will not be considered. If more than the maximum number of projects is submitted, the Government will only evaluate projects up to the maximum number authorized in the order submitted.

The Firm/Offeror (actual office/branch/regional office) must have been involved in all projects submitted in the SF330, either as a Prime A-E or sub-consultant, with the exception of projects for POL and Fire Protection, which may have been completed by Firm’s/Offeror’s sub-consultant, where the Firm/Offeror was not involved. Projects not meeting this requirement will be excluded from consideration in the evaluation.

Special Instructions for SF330, Part I, Section F. Include the following additional information when completing Section F:

Block 21: Include Contract number or project identification number with project title/location.

Block 22: Year completed of professional services is required, and year completed of construction (if applicable). If construction is not completed, indicate status, e.g. “estimated Dec 2019”.

Block 23(c): E-mail address and/or phone number for the project’s point of contact is required.

Block 24, include the following items:

o Contract period of performance o Award contract value o Current contract value o Estimated construction cost o Type of professional service performed:

Design-Bid-Build drawings/specifications as the Prime Consultant or as a Sub-consultant;

Designer of Record for Design-Build Contract as a Prime Consultant or Sub-consultant; or Design-Build RFP preparation as the Prime Consultant or as a Sub-consultant.

o Brief description of project and relevance to specialized experience as outlined above Criteria 1 paragraphs #1 through 3.

o For projects where the Firm/Offeror performed as a sub-consultant, indicate the value of the work performed as a sub-consultant, and identify the specific role(s) and responsibilities performed as a sub-consultant rather than the work performed on the project as a whole.

NOTE: If the project description does not clearly demonstrate experience in the work performed by the Firm/Offeror, the project may be eliminated from consideration.

Block 25: List all firms (or branch offices) from Section C that were involved in the example project. Indicate each firm’s role on the project, whether as a Prime A-E or sub-consultant and the firm’s discipline(s). e.g. “Mechanical Prime” or “Electrical sub-consultant.”

The abovementioned information for each project must be included or the project may not be considered. When submitting an example project, a task order on an IDIQ contract is considered a project, as is a stand-alone contract award. Do not submit an IDIQ contract as an example project. Instead, list relevant task orders or stand-alone contract awards that fit within the definition above. The Government will not evaluate information provided for an IDIQ contract. Examples of project work submitted that do not conform to this requirement will not be evaluated.

All information for Criterion 1 should be submitted in the SF330, Part I, Section F. The Government WILL NOT consider information submitted in addition to Part I, Section F in evaluation of Criterion 1.

Criterion 2 – Professional Qualifications (SF330, Part I, Sections E & G):

Firms/Offerors will be evaluated on professional qualifications, competence, and experience of the proposed key personnel in providing services to accomplish the tasks required under this contract, including participation in example projects in the SF330, Part 1, Section G. Key personnel are individuals who will have major contract or project management responsibilities and/or will provide unusual or unique expertise. Specific disciplines that must be included in key personnel are Mechanical (including Principal-in-Charge and Project Manager/Project Engineer), Fire Protection, Fuels (POL), VTE, Civil, Architecture, Structural, Electrical, Cost Estimator, and Lead Commissioning Specialist (CxC).

All key personnel must be licensed in their specific discipline, with the exceptions of the following:

Fuels (POL), for which a Mechanical license would be acceptable;

VTE, where U.S. professional registration is not required but will be evaluated based upon his/her education (e.g. engineering degree) and years of relevant work experience;

Cost Estimator, where U.S. professional registration is not required but will be evaluated based upon his/her years of relevant work experience; and Lead Commissioning Specialist (CxC), who must have a minimum of five years of commissioning experience and provide documentation that he/she possesses certification in one of the following: a NEBB qualified Systems Commissioning Administrator (SCA); ACG Certified Commissioning Authority (CxA); ICB/TABB Certified Commissioning Supervisor;

BCA Certified Commissioning Professional (CCP); AEE Certified Building Commissioning Professional (CBCP); University of Wisconsin-Madison Qualified Commissioning Process Provider (QCxP); or ASHRAE Commissioning Process Management Professional (CPMP).

Key personnel will be evaluated on their competence and experience in performance of services similar to those anticipated under this contract through evaluation of experience in each of the following (paragraphs 1-3 below):

1. Key personnel’s specialized recent and relevant experience in the design of mechanical system design projects, approximately $30 million or less in construction cost per project/contract, design completed within the past ten (10) years. Experience includes design and engineering services for both New Construction and Maintenance/Repair/ Renovation/Alteration projects.

2. “Relevant Mechanical System Design Projects” include the following fourteen (14) types of design: Heating/Ventilating/Air Conditioning (HVAC) chilled water and direct expansion (DX) systems; BACnet Direct Digital Controls (DDC); low pressure compressed air systems;

industrial ventilation systems; general supply/exhaust systems; service water heating systems/solar hot water heating systems; general purpose plumbing systems; hydronic pumping systems; waterfront utilities; elevators/vertical transportation equipment (VTE);

anti-Terrorism Force Protection (ATFP) measures for facilities and waterways; above ground/below ground Mogas fuel storage/distribution systems; Petroleum/Oils/Lubricant (POL) receiving, storing, distribution and dispensing systems for aviation and diesel fuels on military land-based facilities; and fire sprinkler, fire alarm and mass notification systems.

NOTE: Experience in Relevant Mechanical System Design Projects ONLY from the

Firm’s/Offeror’s Key Personnel performed as either a Prime A-E or sub-consultant will be considered, except for experience of POL, Fire Protection, and CxC consultants. Key Personnel do not have to demonstrate all fourteen (14) Relevant Mechanical System Design Project types within the five (5) Section E projects; however, more variety in the types described above may be considered more favorable.

3. “Specified Design/Engineering Services” must demonstrate experience in the preparation of drawings/specifications for the purpose of a Design-Bid-Build (DBB) contract in Relevant Mechanical System Design Projects.

NOTE 1: Experience in Specified Design/Engineering Services ONLY from the

Firm/Offeror performed as either a Prime A-E or sub-consultant will be considered.

Experience as A-E Designer of Record (DOR) for a Design-Build Contractor may be submitted but will be given less consideration then experience as the A-E DOR for a Design- Bid-Build (DBB) contract.

NOTE 2: Experience in Specified Design/Engineering Services from the Firm’s/Offeror’s sub-consultant’s key personnel will not be considered, except for experience from POL, Fire Protection, and Lead Commissioning Specialist sub-consultants.

4. Experience in Commissioning of mechanical, plumbing, and building automation systems.

Projects may be submitted featuring Commissioning of mechanical, plumbing, and building automation systems that have been completed by Key Personnel of the Firm/Offeror or the Firm’s/Offeror’s Commissioning sub-consultant.

Favorable Items: Key personnel may be considered more favorably by demonstrating the following:

1. Experience in more variety in the types of Relevant Mechanical System Design Projects described above.

2. Experience in preparation of Design-Build (DB) Request for Proposal (RFP) documents utilizing the NAVFAC Design-Build RFP Six-Part Master Format.

3. Experience in Relevant Mechanical System Design Projects that were designed and constructed in Hawaii and tropical environments similar to Hawaii.

4. Experience in Department of Defense projects (e.g. NAVFAC, USACE, Air Force, NGB, etc.)

5. Experience with Functional Analysis and Concept Development (FACD)/design charrettes.

6. Experience in preparation of MILCON Region/FEC Team 1391 project documentation as a

Prime consultant or sub-consultant.

7. Demonstrated history of key personnel working together on projects indicated in Criterion 1.

8. Experience in mechanical engineering investigations/concept studies used to develop or validate project scope requirements through Business Case Analysis (BCA), identifying and comparing alternatives by examining the mission impacts (both financial and non-financial), risks, and sensitivities. Develop project scope alternatives for mechanical system utilizing Economic Analysis, HVAC Life Cycle Cost Analysis (LCCA), Energy Analysis, engineering calculations, and related criteria.

9. Experience in preparing cost estimates utilizing the MII cost estimating system.

SF330, Part I, Section E. Provide resumes for all proposed key personnel that illustrate experience in the work proposed under this contract. Resumes should indicate: professional registration, certification, licensure and/or accreditation in appropriate disciplines; cite recent (completed within the past 10 years) project-specific experience in work relevant to the services required under this contract; and indicate proposed role in this contract (not current position in the firm). Projects must be approximately $30 million or less in construction value. Indicate the construction cost for each project (not the A-E design fee).

The maximum number of resumes for the key disciplines are: Mechanical (4) (consisting of Principal-in-Charge, Project Manager, Project Engineer), Fire Protection (2), Fuels-POL (1), VTE (1), Civil (1), Architect (1), Structural (1), Electrical (1), Cost Estimator (1), and Lead Commissioning Specialist (1). Do not use other company titles such as “Type I Engineer” where the discipline and role are unidentifiable. If more than the maximum number of resumes is submitted for each key discipline, the Government will only evaluate resumes up to the maximum number authorized in the order submitted per discipline. Resumes of disciplines that are not required, if submitted, will not be considered in the evaluation.

Specialized experience and technical competence shall be limited to only the Mechanical, Fire Protection, Fuels-POL, and Commissioning disciplines. Complete one Section E for each of the Mechanical, Fire Protection, Fuels-POL, and Commissioning disciplines, providing all requested information.

For other key personnel, only complete Blocks 12 through 18; and leave Block 19, Relevant Projects, blank. Relevant project information for other key personnel is not required and if submitted, will not be considered in the evaluation.

If a project does not provide the requested data, that project may be evaluated less favorably or not considered.

Special Instructions for SF330, Part I, Section E for Mechanical, Fire Protection, Fuels (POL), and Commissioning Key Personnel. Include the following additional information when completing Section E:

Block 19: Submit a maximum of five (5) projects. A project is defined either as a stand-alone contract or a single task order in an IDIQ contract having the features described above.

Do not submit an IDIQ contract as an example project. If more than five (5) projects are submitted, the Government will evaluate the first five (5) projects listed in Part I, Section E and disregard any other project information. Projects with design services that are on-going, exclusive of PCAS services, will not be considered.

Block 19 (2):

o Year Professional Services completed (must be within the past ten (10) years).

o Year Construction completed, if applicable.

Block 19 (3):

o Role and work performed by the key personnel (including the specialized design and engineering services performed).

o Brief description of project and relevant Mechanical systems designed.

o Type of professional service performed:

Design-Bid-Build drawings/specifications as the Prime Consultant or as a Sub-consultant;

Designer of Record for Design-Build Contract as a Prime Consultant or Sub-

Consultant; or Design-Build RFP preparation, as the Prime Consultant or as a Sub-consultant.

o Estimated construction cost (must be approximately $30 million or less in construction value per project/contract).

Indicate participation of key personnel in Criterion 1 example projects in the SF330, Part 1, Section G.

All information for Criterion 2 should be submitted in the SF330, Part I, Sections E and G.

The Government WILL NOT consider information submitted in addition to the information provided in Part I, Sections E and G in evaluation of Criterion 2.

Criterion 3 – Past Performance (SF330, Part I, Section F and Attachment (1)):

Firms/Offerors will be evaluated on past performance with Government agencies and private industry in terms of work quality, compliance with schedules, cost control, and stakeholder/ customer satisfaction. Evaluating past performance and experience will include information provided in Past Performance Questionnaires (PPQs) or CPARS/ACASS for Criterion 1 projects and may include customer inquiries, Government databases, and other information available to the Government including contacts with points of contact in other criteria.

NOTE: Past performance information for projects listed under Criterion 1 may be given greater weight than information obtained by the Government from customer inquiries, Government databases, and other information available to the Government. Past performance submitted by the A-E for other projects will not be considered.

Submission Requirements:

SUBMIT A COMPLETED CPARS/ACASS EVALUATION FOR EACH PROJECT UNDER

CRITERION 1. IF A COMPLETED CPARS/ACASS EVALUATION IS NOT AVAILABLE,

the Past Performance Questionnaire (PPQ) (Attachment (1)) included in this notice is provided for the Firm/Offeror or sub-consultants in POL, Fire Protection, and Lead Commissioning Specialist to submit to the client for each project included under Criterion 1, Specialized Experience. The PPQ must be signed by the client. Include the evaluation immediately after each project that it is associated in Section F. The CPAR, DD2631 or Performance Survey provided in Section F will not be counted towards the SF330 page limitation. DO NOT

SUBMIT A PPQ WHEN A COMPLETED CPARS/ACASS IS AVAILABLE. DO NOT

SUBMIT CPARS/ACASS FOR PROJECTS FOR WHICH THE PROPOSING

FIRM/OFFEROR WAS NOT THE PRIME; HOWEVER, IF THE PROPOSING

FIRM/OFFEROR WAS THE DB DOR FOR A PROJECT, SUBMIT A PPQ FOR THE

FIRM/OFFEROR AND DO NOT SUBMIT THE CPARS/CCASS FOR THE PRIME

CONSTRUCTION CONTRACTOR.

IF A CPARS/ACASS EVALUATION IS NOT AVAILABLE, ensure correct phone numbers and email addresses are provided for the client point of contact. Completed PPQs should be submitted with your SF330. If the Firm/Offeror is unable to obtain a completed PPQ from a client for a project(s) before the response date set forth in this notice, the Firm/Offeror should complete and submit with their responses the first page of the PPQ (Attachment (1)), which will provide contract and client information for the respective project(s). Firm/Offeror may submit a PPQ previously submitted under a different Notice/RFP, such as NAVFAC or USACE Past Performance Questionnaires (legible copies are acceptable) as long as it is on the same form as posted with this Synopsis. Firm/Offeror should follow up with clients/references to ensure timely submittal of questionnaires. If requested by the client, questionnaires may be submitted directly to the Government's point of contact, Naval Facilities Engineering Command, Hawaii, Code ACQ33, Attn: Ms. Alice Mende and Ms. Rika Delaunay via email at alice.mende@navy.mil and rika.delaunay@navy.mil respectively, prior to the response date.

Firms/Offerors shall not incorporate by reference into their response PPQs or CPARS previously submitted in response to other A/E services procurements. However, this does not preclude the Government from utilizing previously submitted PPQ information in the past performance evaluation.

Firms/Offerors may provide any information on problems encountered and the corrective actions taken on projects submitted under Criterion 1 Specialized Experience. Firms/Offerors may also address any adverse past performance issues. Information shall not exceed one single-sided pages in total and will not be counted towards the SF330 page limitation. Include the information immediately after each evaluation that it is associated in Section F.

The Performance Survey shall be from the contracting agent and/or their representative responsible for the construction contract administration, or from the facility owner/user. It shall not be from the prime construction contractor on a design-build project nor shall it be from a prime contractor to a subcontractor. Past performance information not related to the projects described to meet Criterion 1 will not be considered. Past performance information provided in Section F for subcontractor’s or sub-consultant’s past performance will not be given the same level of consideration as the prime contractor.

Awards, letters of commendation, certificates of appreciation, etc. shall not be submitted and will not be considered in the evaluation.

The Government, however, is not restricted to the evaluations provided in the SF330 and may use other sources to assess past performance information such as the Past Performance Information Retrieval System (PPIRS), Contractor Performance Assessment Reporting System (CPARS) and inquiries with previous customers/owners. PPIRS/CPARS will be evaluated for the prime A-E firm that will perform the work, and the Government’s search will be based upon the prime A-E firm’s DUNS number. PPIRS/CPARS of sub-contractors will not be evaluated.

Criterion 4 – Program Management and Capacity (SF330, Part I, Section H):

Firms/Offerors will be evaluated on the Firm’s/Offeror’s ability to plan for and manage work under the contract and the capacity to accomplish the work in the required time.

1. Program Management:

a. In reference to the Section D organizational chart, discuss the management plan for this contract and personnel roles in the organization.

b. Describe the ability of the Firm/Offeror to manage, coordinate and work effectively with team members, both internal staff and consultants and why it is the most efficient and effective organization structure in execution of the work.

c. Discuss the history of working relationships with team members.

2. Capacity:

a. Describe the Firm’s/Offeror’s present workload and the availability of the project team (including sub-consultants) for the specified contract performance period.

b. Describe the Firm’s/Offeror’s present work on other IDIQ contracts that may present conflicts with this contract.

c. Describe the workload/availability of key personnel during the anticipated contract performance period and the ability of the Firm/Offeror to provide qualified backup staffing for key personnel to ensure continuity of services. Indicate all existing DoD contracts that the proposing Firm/Offeror is currently on either as prime or subcontractor with a list of existing open task orders and the proposing Firm’s/Offeror’s total design fee for each task order. General statements of availability/capacity may be considered less favorably.

d. Describe how the proposed team will complete several task orders concurrently requiring quick turnaround with similar deliverable due dates.

Criterion 5 – Quality Control Program (SF330, Part I, Section H):

Firms/Offerors will be evaluated on the strength of the quality control program proposed by the Firm/Offeror to ensure quality products and services under this contract, and means of ensuring quality services from their consultants/subcontractors.

Submission Requirements:

Describe the quality control program that will be utilized for all deliverables of this contract and the management approach for quality control processes and procedures. The description shall:

1. Explain the quality control program including an example of how the plan has worked for one of the projects submitted as part of SF330, Section F (considered more favorable) or how the plan will work if it has not been used previously.

2. Describe specific quality control processes and procedures proposed for this contract including technical accuracy of and assurance of overall coordination of plans and specifications, and engineering and design services; incorporation of the latest criteria;

lessons learned and review comments, etc.

3. Identify the quality control manager (by name and firm) and any other key personnel responsible for the quality control program and a description of their roles and responsibilities.

4. Describe how the Firm’s/Offeror’s quality control program extends to management of subcontractors to ensure design quality consistently between all design disciplines or team.

Criterion 6 - Sustainable Design (SF330, Part I, Section H)

Firms/Offerors will be evaluated in terms of their knowledge and demonstrated experience in applying sustainability concepts through an integral design approach and designing in accordance with recognized sustainability rating systems or current third party certification (TPC) programs, such as U.S. Green Building Council (USGBC) LEED, Green Building Initiative (GBI) Green Globes, or GBI Guiding Principles Compliance (GPC) as required by Unified Facilities Criteria (UFC) 1-200-02 High Performance and Sustainable Building Requirements.

Submission Requirements:

Identify examples indicating design team (including sub-consultants) experience and concepts employed, certification awarded. For projects certified, submit a copy of the certificate (certificates are not included toward the overall page count). Provide a maximum of three (3) projects that have attained or been submitted for TPC. For projects not yet certified, identify the date the project was submitted. For all projects, identify the team’s major contribution(s) (design elements, features, equipment, etc.) in attainment of the certification. If more than three projects are submitted for evaluation, the Government will evaluate the first three projects and disregard any other project information after the first three projects. Certified projects will be considered more favorably than projects not yet certified.

Identify accredited professionals proposed for this contract. Discuss key sustainable design personnel experience and qualifications.

Criterion 7 – Firm Location (SF330, Part I, Section H)

Provided that the application of this criterion leaves an appropriate number of qualified firms, given the nature and size of the contract, firms will be evaluated on the locations of their office or offices that will be performing the work under this contract and demonstrated knowledge of the general geographic areas in which projects could be located. Evaluation of Firms/Offerors will include consideration of their location within the general geographic area of the anticipated projects, primarily NAVFAC Hawaii AOR, which is primarily the State of Hawaii.

Submission Requirements:

1. Indicate location of the office(s) that will be performing the work, including main offices, branch offices, and offices of team members.

2. Address ability of the Firm/Offeror and team to ensure timely response to requests for on-site support. If the work is to be performed from other than the local area, briefly describe the ability of the Prime to forward deploy personnel and how the team would respond to project requirements throughout the life of the contract.

3. Provide a narrative describing the team’s knowledge of the primary geographic areas, primarily the State of Hawaii, to be covered by this contract.

Criterion 8 – Volume of Work (SF330, Part 1, Section H)

Firms/Offerors will be evaluated in accordance with DoD Federal Acquisition Regulation Supplement (DFARS) Procedures, Guidance and Information (PGI) 236.602-1, from data extracted from the Federal Procurement Data System (FPDS). Firms/Offerors will be evaluated in terms of work previously awarded to the firm by DoD within the past twelve months with the objective of effecting an equitable distribution of contracts among qualified A-E firms including small, disadvantaged business firms, and firms that have not had prior DoD A-E contracts.

Submission Requirements:

Firms/Offerors do not need to submit data for this factor. Only provide the DUNS and CAGE numbers for the Prime A-E in SF330, Part I, Section H. DoD A-E award information will be retrieved by the Government for the Prime A-E. DoD A-E award information will also be retrieved for the Prime A-E with multiple offices listed.

(End of selection criteria)

SF330 SUBMISSION REQUIREMENTS:

Architect-Engineer firms desiring to be considered for this contract must submit a completed SF330 package:

- The SF330 shall be typed, one sided, at least 11 point Times New Roman or larger.

- The SF330 Parts I and II pages shall be numbered sequentially.

- The SF330 (Parts I and II) shall not exceed 75 pages single-sided 8.5 by 11 inch pages. The page limit does not include certificates, PPQs, licenses, cover sheets or dividers, or other requested documentation (e.g. joint venture agreement, proof of A-E firm registration) provided that these do not contain any substantive information submitted in response to the synopsis or intended to demonstrate the qualifications of the firm.

- The organizational chart (SF330, Part I, Section D) may be one page, single sided, 11 by 17 foldout, using 11point font or larger (font limitations do not apply to graphics, captions or tables).

- An SF330 Part II shall be submitted for each firm identified in Part I, Section C. Please include your DUNS and CAGE in Block 8(c) of Part II.

- Firms/Offerors must indicate non-key disciplines, including, but not limited to, Surveyor, Environmental, and Geotechnical, in the Organization Chart, Part I, Section D.

- Any other information submitted such as company brochures, leaflets, etc., will not be considered.

In accordance with the FAR 36.601-4(b) contracts for architect-engineer services may only be awarded to firms permitted by law to practice the professions of architecture or engineering.

Firms must submit proof that they are permitted by law as required by FAR 36.601-4(b). If a firm is in a jurisdiction that requires A-E firm registration, the firm must provide proof of registration (e.g., state registration number). If a firm is in a jurisdiction that does not require A- E firm registration, the firm must provide proof eligibility to practice (e.g., a summary explaining eligibility under the laws of that jurisdiction, registration to do business in a state, etc.) Failure to submit the required proof could result in a firm’s elimination from consideration.

Firms/Offerors who are offering as a joint venture should include with their submission a copy of the joint venture agreement and shall submit the following additional documentation regarding their business entity:

1. The Firm/Offeror shall ensure that the joint venture meets the requirements of 13 CFR

121.103 to 121.106 and 125.6.

2. A detailed statement outlining the following in terms of percentages where appropriate:

a. The relationship of the team/partners/parties in terms of business ownership, capital contribution, profit distribution or loss sharing.

b. The management approach in terms of who will conduct, direct, supervise, and control.

c. The structure and decision-making responsibilities of the partners/parties in terms of who will control the manner and method of performance of work.

d. Identify (by name and title) the personnel having the authority to legally bind the partners/parties (including authority to execute the contract documents).

3. A list of partners/parties, to include company name, DUNS and CAGE numbers, address, point of contact, email address, phone number and facsimile number.

Failure to include the joint venture agreement will result in the Firm’s/Offeror’s elimination from further evaluation.

Architect-engineer firms which meet the requirements described in this announcement are invited to submit a completed SF330 to Naval Facilities Engineering Command Hawaii, Code OPHA1. Firms responding to this announcement by Thursday, May 30, 2019 at 2:00 p.m.

Hawaii Standard Time (HST) will be considered.

Electronic proposal submissions will be required and shall be submitted utilizing the AMRDEC SAFE Application, https://safe.amrdec.army.mil/safe/Welcome.aspx. Electronic submission sent via email or facsimile are not authorized and will not be accepted. Hard copy proposal submissions that are mailed, couriered, or hand delivered, etc. are not authorized and will not be accepted. Electronic proposal of your SF330 must be submitted in Adobe PDF format, and the file size must not exceed 2GB. Submit all pages of the SF330 as one complete file (multiple files will not be accepted).

There are no user accounts for SAFE; authentication is handled via email. Everyone has access to SAFE, and the application is available for use by anyone for uploading submissions.

1. The AMRDEC SAFE application can be accessed at:

https://safe.amrdec.army.mil/safe/Welcome.aspx

2. There are two options to proceed from the SAFE homepage:

- Proceed as CAC User - Select this option if you have a valid Common Access Card

(CAC).

- Proceed as Guest - Select this option if you do not have a CAC.

3. After selecting one of the options above, the page will be redirected to the package upload form. Fill in all the required input fields:

Personal Information:

- Your Name – Enter your firm name and your name (e.g. NAVFAC Hawaii, Alice

Mende).

- Your Email address – Enter your email address.

- Confirm Your Email Address – Re-enter your email address.

File Information:

- Click the "Browse…" button to select your file. Only one complete PDF file shall be uploaded, so long as the total file size does not exceed 2GB. PDF file should be titled “N6247819R5034YourCompanyName” (e.g. N6247819R5034NAVFACHawaii).

- Click “OK” on the popup to confirm that the file does NOT contain classified information.

- Description of File(s) – Enter "N6247819R5034 IDIQ Mech NAVFAC HI".

Recipient Information:

- Provide an email address to give access to – Enter the following email addresses

Alice.Mende@navy.mil and Rika.Delaunay@navy.mil. You are only able to enter one email address at a time; click on the Add button after typing the first email address.

Repeat process to add the second email address.

- Recipients List – These are the persons you have granted access to your SF330 submission. To remove a recipient, highlight the person’s name and click the "Remove" button.

Email Settings:

- Encrypt email message when possible – Check this box to encrypt emails being sent to recipient.

- Notify me when file(s) downloads are STARTED – Check this box so that you (the sender) will receive an email notification when recipient starts to download the file.

- Notify me when file(s) downloads are COMPLETED – Check this box so that you (the sender) will receive an email notification when the file is completely downloaded by recipient.

- None or FOUO – Select FOUO (For Official Use Only) and for Other dropdown, choose “Limited Distribution Document”

4. Clicking the "Upload" button will upload the files and submit the package. You will be then prompted to “I Agree” or “Disagree” to the SAFE Usage Policy. Select “I Agree” to proceed with your submission or “Disagree” to cancel your submission. If agreeing to proceed, you will then be notified that your file was successfully uploaded and that your files cannot be downloaded by recipients until you verify your email address. Check your email for further instructions. You will receive an email from no-reply@amrdec.army.mil that will indicate the date and time of your submission and will serve as the official time stamp of when your submission was received by the Government. The time will display in Central Time Zone, USA, and will be converted to Hawaii Standard Time.

5. To verify your email address in order for recipient(s) to download the file, use the link provided in the email from no-reply@amrdec.army.mil to verify that you are the sender of the package. On the Package Status page, enter your password then click “Submit”. The password will be located further down in that same email. Select “Verify” to send your package or “Cancel Package” to void the package. After selecting “Verify”, the page will show “Email address verified. The package has been sent.” Select “Continue.” The next screen will show the Package Status.

NOTE: Forwarding recipient and sender notification emails to anyone except for the AMRDEC WEB Team is strictly forbidden.

THIS IS NOT A REQUEST FOR PROPOSAL.

Late responses will be handled in accordance with FAR 52.215-1. The points of contact are Ms.

Alice Mende, Contract Specialist, at Alice.Mende@navy.mil or Ms. Rika Delaunay (Alternate), Contract Specialist, at Rika.Delaunay@navy.mil.

If an SF 254/SF 255 is submitted for this solicitation, it will not be reviewed or considered. As required above, provide verifiable evidence that your firm is permitted by law to practice the professions of architecture or engineering (e.g., state registration number).

Inquiries concerning this procurement should include the solicitation number and title and be forwarded via email to Ms. Alice Mende at Alice.Mende@navy.mil and Ms. Rika Delaunay (Alternate). Inquiries via phone will not be entertained. Questions submitted within 10 calendar days of the closing date may not be answered by the Government.

A-E firms shall have e-mail and Internet on-line access for routine exchange of correspondence.

All potential Firms/Offerors are advised to check daily the Navy Electronic Commerce Online (NECO) website, https://www.neco.navy.mil or Federal Business Opportunities website, https://www.fbo.gov, for any additional modifications pertaining to this notice.

File details come from the government source that posted it.