Document_00110_attach_C3_COEFFICIENT_WORKSHEET.xlsx
XLSX spreadsheet 14 KB Posted
- Solicitation number
- N6247819R4040
About this file
This solicitation requests proposals for an Indefinite Delivery Indefinite Quantity contract to provide plumbing, heating, ventilation, and air conditioning services at various locations in Hawaii. The contract would have a one year base period and four option years, not exceeding 60 months total. The contract has a maximum value of $48 million. The minimum task order amount is $5,000 while the maximum is $1,000,000. Proposals are due approximately on the receipt date listed. Award will be made to the responsible offeror with the lowest price technically acceptable proposal based on evaluation of corporate experience, safety, and past performance. The North American Industry Classification System code is 238220 and the small business size standard is $15 million. The solicitation can be viewed or downloaded from the listed website.
Attachment C3 - Coefficient Worksheet
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amd2.pdf | ||
| Amendment_No._0001.pdf | ||
| Document_00110_attach_C1_(Amend_0001).docx | DOCX document | |
| Document_00110_attach_C1.docx | DOCX document | |
| N62478-19-R-4040_RFP.pdf | ||
| Document_00110_attach_C4_-_Project_Worksheet.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Exhibit K
| ATTACHMENT C3 - COEFFICIENT WORKSHEET | ||||
| OFFEROR'S NAME: | ||||
| PRE-PRICED COSTS | MATERIALS | LABOR | EQUIPMENT | AMOUNT |
| R.S. MEANS BARE COST (PRESUMED ANNUAL AMOUNT) | $ - 0 |
| WORKER'S COMP INSURANCE | $ - 0 | |
| AVERAGE FIXED LABOR OVERHEAD | $ - 0 | |
| PROJECT OVERHEAD PRE-PRICED | $ - 0 | |
| MATERIAL MARKUP | $ - 0 | |
| EQUIPMENT MARKUP | $ - 0 | |
| SUBTOTAL | $ - 0 | |
| GENERAL AND ADMINISTRATIVE | $ - 0 | |
| PROFIT | $ - 0 | |
| TOTAL | $ - 0 | |
| COEFFICIENT FACTOR (TOTAL DIVIDED BY PRESUMED ANNUAL AMOUNT) | ERROR:#DIV/0! | |
| R.S. MEANS BARE COST ADJUSTMENT (PRODUCTION/DISCOUNT - FACTOR) | ||
| PRE-PRICED COEFFICIENT | ERROR:#DIV/0! |
| NON PRE-PRICED COSTS | MATERIALS | LABOR | EQUIPMENT | AMOUNT |
| NON PRE-PRICED BARE COSTS (PRESUMED ANNUAL AMOUNT) | $ - 0 |
| WORKER'S COMP INSURANCE | $ - 0 | |
| AVERAGE FIXED LABOR OVERHEAD | $ - 0 | |
| PROJECT OVERHEAD NON PRE-PRICED | $ - 0 | |
| MATERIAL MARKUP | $ - 0 | |
| EQUIPMENT MARKUP | $ - 0 | |
| SUBTOTAL | $ - 0 | |
| GENERAL AND ADMINISTRATIVE | $ - 0 | |
| PROFIT | $ - 0 | |
| TOTAL | $ - 0 | |
| BARE COST | $ - 0 | |
| COEFFICIENT FACTOR (TOTAL DIVIDED BY BARE COST) | ERROR:#DIV/0! | |
| NON PRE-PRICED BARE COSTS ADJUSTMENT (PRODUCTION/DISCOUNT - FACTOR) | ERROR:#DIV/0! | |
| NON PRE-PRICED COEFFICIENT | ERROR:#DIV/0! | |
| Offerors should fully understand "at a minimum" what is to be included in the coefficient. Document 00800 of the RFP, and more specifically paragraphs 4.1 OFFEROR'S COEFFICIENT AND PRE-PRICED WORK (and its subparagraphs) and 4.2 NON PRE-PRICED WORK (and its subparagraphs) define the requirements for the pre-priced and non-pre-priced coefficients. |
Cost items should be added, removed, or separated as the Offeror deems necessary to demonstrate a detailed breakdown of coefficient cost. Any Offeror edits to the form must be explained in detail in the Offeror’s proposal.
NOTE: The profit percentage proposed by the contractor on this form to be included in its pre-priced and non-pre-priced coefficients shall be binding and shall be the maximum profit rate the Contractor will be allowed to propose for all task orders and/or subsequent modifications issued under this contract.
The Contractor may propose a lower profit rate when responding to an individual task order request (or subsequent modifications) based on the tasks identified in the request. Profit will be negotiated on an individual Task Order and modification basis, but shall never exceed the maximum profit rate proposed by the Contractor on this form. The maximum profit rate shall be binding even if the DFARS 215.404-73 ALTERNATE STRUCTURED APPROACH PROFIT WORKSHEET would result in a higher profit. The maximum profit rate shall not be construed as a “fixed” profit percentage for all Task Orders or Modification actions issued under this contract. If DFARS 215.404-73 ALTERNATE STRUCTURED APPROACH PROFIT WORKSHEET calculations indicate a lower profit rate is merited, the lower profit percentage shall be applied.
Page &P of 2
File details come from the government source that posted it. Updated .