Solicitation Amendment N6247324R00360002 SF 30.pdf
PDF 586 KB Posted
- Solicitation number
- N6247324R0036
About this file
This document is a Standard Form 30 (SF 30) amendment to solicitation N6247324R0036, issued by NAVFACSYSCOM Southwest on February 11, 2026, with an effective date of February 11, 2026. The amendment extends the proposal response due date from February 13, 2026, at 2:00 PM Pacific Standard Time to February 17, 2026, at 2:00 PM Pacific Standard Time. The amendment also addresses 22 Request for Information (RFI) questions and revises documents in Section J, including Section L (Instructions, Conditions, and Notices to Offerors) and Exhibits A through E with additions indicated in blue text and deletions shown in red strikethrough. The contracting officer is Christopher Jennen, and all other terms and conditions of the original solicitation remain unchanged and in full force and effect.
The revised solicitation materials include updated sections covering Performance Work Statement requirements for General Information, Management and Administration, Facility Management (Relocatable Facility), Facility Investment, Pest Control, and Building Systems Vulnerability Evaluation (BSVE), all designated as MCBCP BOS I Follow-on work. Updated attachments include revised special contract requirements (Attachments 1-4 with various revision dates between December 2024 and January 2026) and multiple Excel documents detailing facility systems inventory and specifications. Evaluation factors address corporate experience (Exhibit B), past performance (Exhibits C1 and C2), key personnel (Exhibit D), safety data and narrative (Exhibit E), and financial questionnaire (Exhibit A), with submission requirements documented in the J-L-01 RFI Form.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
R
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
16C. DATE SIGNED
Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBE
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
Block 14 (Description of Amendment/Modification): The purpose of this amendment 0013 (0002) is to accomplish the following:
1. The due date for revised proposals is extended from February 13, 2026, at 2:00PM Pacific Standard Time (PST) to February 17, 2026, at 2:00 PM Pacific Standard Time (PST).
2. Respond to Request for Information (RFI) questions #1-22.
3. Make revisions to documents in Section J:
- N62473-24-R-0036, Section L - Instructions, Conditions, and Notices to Offerors
- Exhibit A through Exhibit E (Changes are provided as an attachment with blue text indicating additions and red strikethrough indicating deletions)
4. All other terms and conditions remain unchanged.
Section A - Solicitation/Contract Form
The following changes have been made:
INFORMATION FROM TO
Response Due Date 13 Feb 2026 17 Feb 2026
N6247324R00360002
Section J - List of Attachments
The following attachments were added:
24R0036_Exhibits A-E_2102026 N62473-24-R-0036, Section L - Instructions, Conditions, and Notices to Offerors_02102026
The following attachments were deleted:
24R0036_Exhibits A-E_Updated N62473-24-R-0036_Section L_ Instructions, Conditions and Notice to Bidders
Miscellaneous text in this section has been modified to:
SECTION J
SECTION J TECHNICAL ANNEXES AND ATTACHMENTS WILL BE PROVIDED AS A SEPARATE ATTACHMENT TO THIS
SOLICITATION.
SECTION C - PERFORMANCE WORK STATEMENT
0100000 C General Information v2.6 MCBCP BOS I Follow-on 0200000 C Management and Administration v2.11 MCBCP BOS I Follow-on 1501001 C Facility Mgmt (Relocatable Facility) v2.1 MCBCP BOS I Follow-on 1502000 C Facility Investment - v3.0 MCBCP BOS I Follow-on 1503020 C Pest Control MCBCP BOS I Follow-on 1700000 C BSVE MCBCP BOS I Follow-on
SECTION F - DELIVERIES OR PERFORMANCE
0200000 F Management and Administration MCBCP BOS I Follow-on 1501001 F Facility Mgmt (Relocatable Facility) v2.1 MCBCP BOS I Follow-on 1502000 F Facility Investment - v3.0 MCBCP BOS I Follow-on 1503020 F Pest Control v2.4 MCBCP BOS I Follow-on 1700000 F BSVE v2.3 MCBCP BOS I Follow-on
SECTION H - SPECIAL CONTRACT REQUIREMENTS
** Attachment 1: CA20240001 rev. 16 12202024 ** Attachment 2: 2015 5635 rev. 26 12232024
** Attachment 3: CA20260001 rev. 2 01232026 ** Attachment 4: 2015 5635 rev. 29 12032025
SECTION J - LIST OF ATTACHMENTS
0200000 J Management and Administration v2.7 MCBCP BOS I Follow-on 1501001 J Facility Mgmt (Relocatable Facility) v2.1 MCBCP BOS I Follow-on 1502000 J Facility Investment - v3.0 MCBCP BOS I Follow-on 1503020 J Pest Control MCBCP BOS I Follow-on 1700000 J BSVE MCBCP BOS I Follow-on N62473-24-R-0036_Section L Instructions, Conditions and Notice to Bidders_02102026
EXCEL Documents:
J-0200000-05 - Forms MCBCP BOS I Follow-on J-0200000-07 - SERVICE PROVIDER INFORMATION v1 MCBCP BOS I Follow-on J-0200000-08 - ASSET INFORMATION v2 MCBCP BOS I Follow-on J-0200000-09 - ASSET SPECIFICATION v1 MCBCP BOS I Follow-on J-0200000-10 - CHARACTERISTIC METER READING INFORMATION v2 MCBCP BOS I Follow-on J-0200000-14 ELINS - 1502000 Facility Investment MCBCP BOS I Follow-on (unpopulated) J-1502000-05 HVAC and Refrigeration Systems MCBCP BOS I Follow-on J-1502000-07 Interior and Exterior Lighting Systems MCBCP BOS I Follow-on J-1502000-08 Boilers and Unfired Pressure Vessels (UPVs) Systems MCBCP BOS I Follow-on J-1502000-09 Fire Protection Systems MCBCP BOS I Follow-on J-1502000-10 Vertical Transportation Equipment (VTE) and Systems MCBCP BOS I Follow-on J-1502000-11 Compressed Air Systems MCBCP BOS I Follow-on J-1502000-12 Auxiliary Generator Systems MCBCP BOS I Follow-on J-1502000-13 Petroleum Fuels Rolling Stock - MCBCP BOS I Follow-on
J-1502000-14 Recycled Materials - Processing and Handling Equipment MCBCP BOS I Follow-on J-1502000-15 Intrusion Detection (Building Security) Systems MCBCP BOS I Follow-on J-1502000-16 Hangar Door Systems MCBCP BOS I Follow-on J-1502000-17 Industrial Door, Bay Door and Automatic Entry Door Systems MCBCP BOS I Follow-on J-1502000-18 Anti-Terror Force Protection (ATFP) Equipment MCBCP BOS I Follow-on J-1502000-19 Dock Leveling Systems MCBCP BOS I Follow-on J-1502000-20 Exhaust Capture Vent Systems MCBCP BOS I Follow-on J-1502000-21 Vehicle Scale Systems MCBCP BOS I Follow-on J-1502000-22 Traffic Control Signal Systems MCBCP BOS I Follow-on J-1502000-23 Portable Light Towers MCBCP BOS I Follow-on J-1502000-24 Pressure Washing - Wash Rack System MCBCP BOS I Follow-on J-1502000-25 Oil Water Separators- MCBCP BOS I Follow-on J-1502000-26 Aerated Vault Latrines and Wastewater Holding Systems MCBCP BOS I Follow-on J-1502000-27 Instrumentation (Flowmeters and Associated Components) MCBCP BOS I Follow-on J-1502000-28 Landfill Gas Systems MCBCP BOS I Follow-on J-1502000-29 Propane Delivery Service MCBCP BOS I Follow-on J-1502000-30 Electrical PM Program Inventory - Transformers MCBCP BOS I Follow-on J-1502000-31 Electrical Power Metering Stations MCBCP BOS I Follow-on J-1502000-32 Solar Photovoltaic (PV) Systems MCBCP BOS I Follow-on J-1502000-33 Transformer Stations MCBCP BOS I Follow-on J-1502000-34 400HZ Frequency Converters and Operator Stations MCBCP BOS I Follow-on J-1502000-35 Grease and Grit Trap Systems MCBCP BOS I Follow-on J-1502000-36 Exhaust Hood and Duct Systems MCBCP BOS I Follow-on J-1502000-37 Soft Water Systems MCBCP BOS I Follow-on J-1502000-38 Non-Potable Water Delivery, Replenishment, and Pumping Systems MCBCP BOS I Follow-on J-1700000-02 Transportation Inventory MCBCP BOS I Follow-on
SOLICITATION SUBMITTAL DOCUMENTS AND OTHER ATTACHMENTS
J-0200000-14 ELINS - 1502000 Facility Investment MCBCP BOS I Follow-on (unpopulated) Exhibit A - Financial Questionnaire Exhibit B - Factor 1, Corporate Experience Exhibit C1 - Factor 2, Past Performance Questionnaire Exhibit C2 - Factor 2, Past Performance History Exhibit D - Factor 3, Key Personnel Exhibit E - Factor 4, Safety Data and Narrative J-L-01 RFI Form
| IDCode: J |
| Page: 1 |
| Pages: 4 |
| AmendNo: 0002 |
| EffDate: 11 Feb 2026 |
| ReqNo: See Continuation Sheet |
| ProjNo: |
| IssCode: N62473 |
| AdmCode: |
| IssuedBy: NAVFACSYSCOM SOUTHWEST |
750 PACIFIC HIGHWAY, SAN DIEGO CA 92132-0001
SAN DIEGO, CA 92132-0001
UNITED STATES
Demi Flores, Email: demi.m.flores.civ@us.navy.mil Telephone: 619-708-6751 AdminBy:
SCD: PAS:
| ContractorNameAdd: |
| Code: |
| FacCode: |
| SolChg: 1 |
| SolNo: N6247324R0036 |
| SolDate: 05 Jun 2025 |
| AwardChg: Off |
| AwardNo: |
| AwardDate: |
| Amended: 1 |
| OffrExt: 1 |
| OffrNoEx: Off |
| NoCopies: 1 |
| ApprData: See Section G - Contract Administration Data |
| ChgeOrd: Off |
| ChgeOrder: |
| Modify: Off |
| SuppAgre: Off |
| SuppAuth: |
| ModOthr: Off |
| OthrSpec: |
| NoReq: Off |
| Require: Off |
| Copies: |
| Descript: See Schedule |
| ContNameTitle: |
| CoNameTitle: Christopher Jennen |
| ContDate: |
| CODate: 11 Feb 2026 |
File details come from the government source that posted it. Updated .