N6247319R6005_RFP.pdf
PDF 1 MB Posted
- Attached to
- 099 All Other Professional, Scientific, and Technical Service Federal contract opportunity
- Solicitation number
- N6247319R6005
About this file
This is a synopsis for a request for proposals for natural resource services. The Naval Facilities Engineering Command, Southwest intends to issue an RFP to award up to four firm-fixed-price, indefinite delivery/indefinite quantity contracts with a minimum $5,000 guarantee for each. The contracts will have a two-year base period and three-year option period, with an aggregate value not to exceed $30 million. The services required include biomonitoring, surveying, mapping, and technical reports for natural resources at locations in Arizona, California, Colorado, Nevada, New Mexico, Utah, Oregon, and Washington. The solicitation will be set aside 100% for small businesses. The closing date for proposals is April 18, 2019, with evaluations based on price and non-price factors including corporate experience, program management, safety, and past performance.
View the file
Other files for this federal contract opportunity
Show all 17
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CODE
(Hour)
PAGE(S)
until 02:00 PM local time 18 Apr 2019
X
A X B X C
D
EX
X G F 187 - 195
196 - 203 X H 204 - 206 penny.brown@navy.mil
RATING PAGE OF PAGES
7. ISSUED BY
(Date)
IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.
Previous Edition is Unusable 33-134 STANDARD FORM 33 (REV. 9-97)
Prescribed by GSA FAR (48 CFR) 53.214(c)
1 206
(If other than Item 7)
15A. NAME 16. NAME AND TITLE OF PERSON AUTHORIZED TO
AND
ADDRESS
SIGN OFFER (Type or print)
OF
OFFEROR
AMENDMENT NO. DATE
15B. TELEPHONE NO (Include area code) 17. SIGNATURE15C. CHECK IF REMITTANCE ADDRESS
IS DIFFERENT FROM ABOVE - ENTER
SUCH ADDRESS IN SCHEDULE.
18. OFFER DATE
1. THIS CONTRACT IS A RATED ORDER
UNDER DPAS (15 CFR 700)
2. CONTRACT NO.
N62473 8. ADDRESS OFFER TO
See Item 7
9. Sealed offers in original and 4 copies for furnishing the supplies or services in the Schedule will be received at the place specified in Item 8, or if handcarried, in the depository located in
CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and
See Section L Instructions conditions contained in this solicitation.
10. FOR INFORMATION
CALL:
A. NAME (NO COLLECT CALLS)
PENNY A BROWN 619-532-3859
11. TABLE OF CONTENTS
SOLICITATION/ CONTRACT FORM
SUPPLIES OR SERVICES AND PRICES/ COSTS
X I CONTRACT CLAUSES
DESCRIPTION/ SPECS./ WORK STATEMENT X
PACKAGING AND MARKING
3 - 170 J LIST OF ATTACHMENTS
INSPECTION AND ACCEPTANCE
DELIVERIES OR PERFORMANCE
X K
REPRESENTATIONS, CERTIFICATIONS AND
OTHER STATEMENTS OF OFFERORS
CONTRACT ADMINISTRATION DATA 173 - 175 X
SPECIAL CONTRACT REQUIREMENTS
OFFER (Must be fully completed by offeror) 176 - 177 X M
L INSTRS., CONDS., AND NOTICES TO OFFERORS
EVALUATION FACTORS FOR AWARD
NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.
is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.
13. DISCOUNT FOR PROMPT PAYMENT
(See Section I, Clause No. 52.232-8)
14. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments
AMENDMENT NO. DATE
to the SOLICITATION for offerors and related documents numbered and dated):
FACILITY
12. In compliance with the above, the undersigned agrees, if this offer is accepted within calendar days (60 calendar days unless a different period
SOLICITATION, OFFER AND AWARD
X
(X) SEC. DESCRIPTION (X) SEC. DESCRIPTION PAGE(S)
PART I - THE SCHEDULE
26. NAME OF CONTRACTING OFFICER (Type or print) 27. UNITED STATES OF AMERICA 28. AWARD DATE
EMAIL:TEL: (Signature of Contracting Officer)
CODE CODE
B. TELEPHONE (Include area code) C. E-MAIL ADDRESS
AWARD (To be completed by Government)
19. ACCEPTED AS TO ITEMS NUMBERED 20. AMOUNT 21. ACCOUNTING AND APPROPRIATION
22. AUTHORITY FOR USING OTHER THAN FULL AND OPEN COMPETITION:
10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)
23. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
24. ADMINISTERED BY (If other than Item 7) CODE 25. PAYMENT WILL BE MADE BY CODE
PART IV - REPRESENTATIONS AND INSTRUCTIONS
PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS
178 - 185
PART II - CONTRACT CLAUSES
NAVFAC SOUTHWEST
ENVIRONMENTAL CONTRACTS CORE
CODE RAQE0
1220 PACIFIC HWY
SAN DIEGO CA 92132-5190
FAX:
TEL:
FAX:
TEL:
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
SOLICITATION
6. REQUISITION/PURCHASE NO.
ACQR4918222
5. DATE ISSUED
19 Mar 2019
4. TYPE OF SOLICITATION
SEALED BID (IFB)
NEGOTIATED (RFP)
[ X ]
3. SOLICITATION NO.
N6247319R6005
Section B - Supplies or Services and Prices
ITEM NO SUPPLIES/SERVICES MAX
QUANTITY
UNIT UNIT PRICE MAX AMOUNT
0001 1 Each Natural Resource Related Services
FFP
as provided in the performanced based statement of work herein.
FOB: Destination
PURCHASE REQUEST NUMBER: ACQR4918222
MAX
NET AMT
MAXIMUM NOT TO EXCEED (NTE) AND MINIMUM GUARANTEE
The maximum NTE value of an ordering period is the total of all the CLINs in that ordering period. The maximum or NTE value of the contract is the total value of all CLINs in the Schedule. Orders shall not be made that exceed the maximum NTE value for any ordering period. The maximum NTE value of an ordering period and of the contract may be increased by written modification to the contract in conjunction with any modification that increases the value of an existing task order that is authorized by a contract clause. Orders in excess of the estimated quantity set forth for any particular CLIN shall not be exceeded without the Contractor’s agreement which shall be indicated by signing or beginning performance of the order.
Concurrently with the award of the basic contract, the Government intends to issue a task order to obligate the contract minimum guarantee for the following:
CLIN 0001, Base Period;
Minimum guarantees do not apply to the option periods.
Section C - Descriptions and Specifications
ANNEX 1
Annex 0100000 – General Information
Spec Item/Title
1 General Information
1.1 Outline of Services
Except where otherwise stated, the Contractor shall furnish all labor, supervision, management, tools, materials, equipment, facilities, transportation, incidental engineering, and other items necessary to provide the services outlined below and described in this Performance Work Statement (PWS) at various military installations located in the Naval Facilities Engineering Command, Southwest (NAVFAC SW) Area of Responsibility (AOR) to include, but not limited to: Arizona, California, Colorado, Nevada, New Mexico, Utah, and the States of Oregon and Washington.. Work will be awarded as both non pre-established fixed price woand/orrk and pre-established fixed price work. The PWS is organized into annexes. Annex 1 is "General Information". Annex 2 contains the on-site project management and administration requirements. Annexes 3 through 18 contain the technical requirements.
<<The “Note to Spec Writer” refers to insertions at the task order level, not to/in the basic contract.>> <<Note to Spec Writer: Insert any sub-annexes as appropriate.>>
Annex 1 General Information Annex 2 Management and Administration Annex 3 through 17 not relevant Annex 18 Environmental
1.2 Project Location
The work shall be performed at various locations and habitat types within NAVFAC SW’s AOR primarily throughout Arizona, California and Nevada, etc. However, the majority of the work is expected to be performed in California.
1.3 Background Information
<<Note to Spec Writer: Insert Background Information as considered appropriate. Consider Location, Surrounding Communities, Description of Installations and Commands, Natural and Cultural Resources, etc.>>
1.4 Verification of Workload and Conditions
Throughout the PWS, the workload data is generally referred to as being located in Section J. Section J provides data such as maps, figures and tables to represent the type, quantity and location of services to be provided.
However, Offerors are encouraged to visit the project site during the site visit for Offerors as part of its due diligence to assess the nature of work and conditions under which work is to be performed.
1.5 Related Information
There are four types of Related Information that can be found in the Description and Related Information columns of the specification as follows:
Informational Notes as used throughout this PWS provides additional information to Offerors to be used in developing a thorough understanding of the work to be performed in this contract. Any block of text marked “Informational Notes” throughout Annexes 1 through 18 is subject to this disclaimer. Offerors may not rely upon the "Informational Notes" as material representations of the Government. Information provided in "Informational Notes" does not create a contractual requirement on either party to this contract.
Clarifying Information describes client expectations in a more detailed manner than the Performance Objective and Performance standard alone.
Annex 0100000 – General Information
Spec Item/Title
1.5 Related Information -Continued
Constraining Information describes limitations to the work performed to meet the Performance Objective and Performance Standard.
Requirement Information further describes client requirements associated with each Performance Objective.
1.6 Navy Approach to Service Contracting
The Department of Navy (DoN) spends billions of dollars each year to provide base operations support services (OBOS). The Head of the Contracting Activity (HCA) of the Naval Facilities Engineering Command (NAVFAC) has focused increased attention on re-engineering service contracts in response to customer and industry feedback, budget constraints, and the impact of a variety of contracting, program management and financial management regulations. The Navy also supports the following principles:
1.6.1 Partnering Philosophy
The first principle is that the Navy views its contractors as partners and not just abstract service providers. The Navy wants its contractors to succeed because partners' success drives the Navy's successful mission completion.
Within the bounds of acquisition policy the Navy intends to work to find solutions that will be beneficial to both the Government and its partners.
1.6.2 Contractor's Knowledge
The second principle is that the Navy will receive insightful management from its contractors. This management will include the knowledge, skills, authority and willingness to use contractor resources to find better ways of serving Navy clients’ strategic and operational goals and objectives. The Navy's use of performance-based objectives evidences this principle. Although performance work statements will typically contain several levels of performance assessment, the Navy wants its contractors to exercise maximum discretion within bounds of prudent risk management to adjust processes and resources needed to reach specified objectives at the highest performance level.
1.6.3 Industry Best Practices
The third principle is that the Navy will adopt industry best commercial practices and maintain state-of-the-art service delivery. It is the Navy's and contractor's responsibility as partners to reach this goal. To that end, the Navy's emphasis will be in evaluating performance objectives (end results).
Annex 0100000 – General Information
1.7 Standard Template
Key to implementing a programmatic approach is using a standard template that ensures Navy-wide consistency yet affords appropriate tailoring to meet local needs. This contract conforms to the standard template and has been tailored for this solicitation. NAVFAC intends to use this template-based approach for future service contracts.
Offerors should develop an understanding of the template as part of performing due diligence in reaching an understanding of the Navy’s requirements and expectations.
The standard template contains 18 standard annexes. Annex 1 will always contain information that is relevant to the entire scope of the contract. Annex 2 contains on-site project management and administration requirements that are relevant to the entire scope of the contract. Annexes 3 through 18 contain the technical information and requirements peculiar to that technical annex. Within each technical annex, the organization of information and requirements are also standardized. Specification item 1 will always contain General Information. Specification item 2 will always contain the management and administrative requirements. Specification item 3 will usually contain the scheduled Firm Fixed-Price (FFP) requirements (i.e. work scheduled on a daily, weekly, or monthly basis). However for this contract, Specification Item 3 contains Indefinite Delivery-Indefinite Quantity (IDIQ) work requirements with No Pre-Priced Fixed Contract Price. Specification item 4 will always contain the IDIQ requirements. For this contract, Specification 4 contains IDIQ work requirements with Pre-Established Fixed Contract Prices (see Exhibit Line Item Numbers (ELIN) in Section J. All costs associated with Annexes 1 and 2 and Specification items 1 and 2 must be priced and distributed within Specification Item 4 of Annexes 3 through 18.
1.8 Navy PBSC Approach
The Navy’s approach to performance-based service contracting (PBSC) includes four component parts which are 1) performance outcomes, 2) measurable standards, 3) consideration of incentives, and 4) performance assessment plan.
1.9 General Contract Requirements
The contractor shall provide natural resources related services in accordance with the contract requirements. All the work will be ordered by issue of a task order and performed at various locations in Arizona, California, Nevada, New Mexico, Oregon, Utah and Washington. The types of natural resources services that may be ordered under this contract include but are not limited to: botanical, ornithological, mammal, amphibian, reptile and invertebrate surveys; wetlands delineations; biological monitoring; soil sampling and analysis; natural resources management plans; native plant community planning and restoration, wildland erosion control plans, fire management plans;
analysis of the effects of military training or similar extensive land uses (e.g. off-road vehicle use) on natural resources at species, community, and landscape scale, and use of this information to predict ecological trends;
natural resource and land use model development (including both conceptual and mathematical modeling); aerial photo interpretation of land use and natural resources in non-urban areas; geographic information systems (GIS);
research on natural resource related topics; and preparation of interpretive materials on natural resources topics (e.g.
informational pamphlets and signage).
1.10 Technical Proposal Certification
The contractor warrants that its proposal incorporated herein by reference including, but not limited to, proposed approaches, staffing, methodology, or work plans, will meet the performance objectives set forth in this contract during execution thereof. The contractor is not excused from meeting such performance objectives in the event such proposal proves inadequate as conceived or executed to meet such performance objectives. The contractor understands that it bears all of the cost and performance risk associated with adopting acceptable additional (and/or alternative) means or methods of meeting the performance objective.
ANNEX 2
Annex 0200000 - Management and Administration
Table of Contents Spec Item/ Title 2 Management and Administration
2.1 Definitions and Acronyms
2.2 General Information
2.2.1 Government Regular Working Hours
2.2.1.1 Observed Federal Holidays
2.2.1.2 Restriction to Contractor Working Hours
2.2.2 Wage Determinations
2.2.3 Requirements Hierarchy
2.3 General Administrative Requirements
2.3.1 Required Conferences and Meetings
2.3.2 Permits and Licenses
2.3.3 Insurance
2.3.3.1 Certificate of Insurance
2.3.3.2 Minimum Insurance Amounts
2.3.4 Protection of Government Property
2.4 Instructions, Directives, and References
2.4.1 Applicable Laws, Regulations and References
2.4.2 Executive Orders (EO)
2.4.3 Federal Regulations – Code of Federal Regulations (CFR)
2.4.4 Department of Defense Directives and Instructions
2.4.5 Department of the Navy Manuals and Instructions
2.4.6 Invoicing Procedures
2.5 Government-Furnished Property, Materials and Services
2.5.1 Government-Furnished Facilities (GFF)
2.5.2 Government-Furnished Utilities
2.5.3 Government-Furnished Materials (GFM)
2.5.4 Government-Furnished Equipment (GFE)
2.5.5 Availability of Utilities
2.6 Contractor-Furnished Items
2.7 Product Ownership
2.7.1 Publications
2.7.2 Data, Field Notes, Field Specimens and Products
2.8 Management
2.8.1 Work Control
2.8.2 Work Schedule
2.8.3 Frequency of Service
2.8.4 Deliverables
2.8.5 Corporate Quality Control (QC) Program Requirements
2.8.5.1 Corporate Quality Control (QC) Plan
2.8.5.2 Quality Inspection and Surveillance
2.9 Personnel Requirements
2.9.1 Key Personnel
2.9.1.1 Senior Scientist/Supervisor
2.9.1.2 Procurement/Contracts Manager
2.9.1.3 Project Manager (PM) / Supervisory Resource Specialist
2.9.1.4 Statistician
2.9.1.5 Quality Control Manager (QCM)
Spec Item Title
2.9.2 Non-Key Personnel
2.9.2.1 Wetland Delineator
2.9.2.2 Biologist
2.9.2.3 Environmental Education Media Coordinator
2.9.2.4 Field Technician
2.9.2.5 Geographic Information and Global Positioning System Professional and Analyst
2.9.2.6 Site Safety and Health Officer (SSHO)
2.9.3 Employee Requirements
2.9.3.1 Employee Appearance
2.9.3.2 Employee Conduct
2.9.3.3 Identification as Contractor Employee
2.9.3.4 Removal of Employees
2.9.3.5 Proof of Legal Residency
2.10 Security Requirements
2.10.1 Employee Listing
2.10.2 Vehicles
2.10.3 Passes and Badges
2.10.4 Access to Installation
2.10.4.1 NCACS Program
2.10.4.2 One-Day Passes
2.10.5 Access to Work Areas
2.10.6 Access to Buildings
2.10.7 Access Arrangements
2.10.8 Security Clearances
2.10.9 Installation Stipulations and Regulations
2.11 Contractor Safety Program
2.11.1 Accident Prevention Plan (APP)
2.11.2 Activity Hazard Analysis (AHA)
2.11.3 Emergency Response Plans
2.11.4 Hazards
2.11.5 Emergency Medical Care
2.11.6 Accident Reporting
2.11.7 Damage Reporting
2.11.8 Fire Protection
2.11.9 Monthly Exposure Report (MERs)
2.11.10 OSHA Citations and Violations
2.11.11 Safety Inspections and Monitoring
2.11.12 Safety Certification
Spec Item Title
2.12 Environmental Management and Sustainability
2.12.1 Energy Efficient Products
2.12.2 Environmental Protection
2.12.2.1 Non-Hazardous Waste Disposal
2.12.2.2 Hazardous Waste Disposal
2.12.2.3 Spill Prevention, Containment, and Clean-up
2.12.2.4 Hazardous Material Use
2.12.2.5 Protection of Endangered and Threatened Species (Flora and Fauna)
2.12.2.6 Noise Control
2.12.2.7 Salvage
2.13 Disaster Preparedness
2.14 Energy Management
2.14.1 Warranty Management
2.15 Indefinite Delivery/Indefinite Quantity (IDIQ) Work
2.15.1 Firm Fixed Price (FFP) Work
2.15.2 FFP Exhibit Line Item Numbers (ELINs)
2.15.3 Non Pre-Established Fixed Price Work
2.15.3.1 IDIQ Preparation of Proposals
2.15.4 Issuance of Task Order
2.16 Invoicing and Receiving Payment
2.17 Partnering
2.17.1 Informal Partnering
2.17.2 Contract Partnering Administration
2.17.3 Contract Partnering Session Attendees
2.18 Geographical Zone Area of Services
2 Management and Administration
2.1 Definitions and Acronyms
Administrative Contracting Officer (ACO) The individual designated by the Contracting Officer to administer the contract.
Authorized and/or Permitted Biologist The Authorized and/or Permitted Biologist is the individual with permission from the regulatory agency (if applicable, usually USFWS) and experience to handle species or specimens. Where this individual is potentially other than the Biological Monitor or Biologist, the Spec Item refers to this individual as the Authorized and/or Permitted Biologist. In all other cases, this person is assumed to be the Biologist or Biological Monitor.
Contract Discrepancy Report (CDR) A report, sent by the Government to the Contractor which the contractor is required to complete when performance is unsatisfactory. The CDR requires the Contractor to explain to the Contracting Officer, in writing within 10 calendar days, why performance is unsatisfactory, how performance shall be returned to satisfactory levels, and how recurrence of the problem shall be prevented in the future.
Contracting Officer (KO) That individual with the authority to enter into, administer, and/or terminate contracts and make related determinations and findings. The term includes certain authorized representatives of the Contracting Officer acting within the limits of their authority as delegated by the Contracting Officer.
Contracting Officer Representative (COR) The individual designated by the KO to be responsible for the monitoring of Contractor performance on the Task Order. The COR also serves as the Technical Representative for the Task Order responsible for ensuring that all work is performed per the requirements and specifications outlined in the Task Order, and that the work performed, including all written reports and professional services are of an acceptable technical quality. The COR shall be the first and primary point of contact for the Contractor and base Point of Contact regarding any injuries, questions, concerns, and issues related to the implementation of the requirements and specifications of the Task Order. The COR has no authority to make any changes to the Task Order, and only the KO may affect any change to the Task Order.
Contractor That entity or its representative responsible for the delivery of the services or materials specified in this contract, as designated by contract award. The term Contractor as used herein refers to both the prime Contractor and any subcontractors. The prime Contractor shall ensure that subcontractors comply with the provision of this contract.
Contractor Representative That individual appointed by the Contractor, either orally or in writing, who has been assigned responsibility for executing the requirements of this contract.
Construction Equipment All mechanical equipment used in the construction, alteration or repair of buildings, bridges, roads or other kinds of real property and includes, but is not limited to, road rollers, wheel mounted backhoes and loaders, hydraulic excavators, trenchers, plows, street sweepers and brooms, dump trucks, equipment hauling trailers, line striping equipment, brush chippers, portable pumps, air compressors and welders, and mobile weight handling equipment (cranes).
2.1 Definitions and Acronyms – Continued
Degree in Natural Sciences Natural science degrees include biology, wildlife biology, wildlife management, botany, ecology, range science, hydrology, soil science, and/or zoology. If major is not from subject list above, resume must include transcript with additional educational requirements including dates, courses, and institution highlighting 24 semester hours in the subject. Degrees in hydrology and soil science, etc. may be considered acceptable if field experience with natural resources projects is indicated in the resume. For this procurement, majors in planning or engineering are not considered “natural sciences.”
DoD Department of Defense
Electronic Copies Submittal of products on a Compact Disk read-only memory (CD-ROM) or Digital Versatile Disc read-only memory (DVD-ROM), unless otherwise stipulated in the ELIN.
ELIN
Exhibit Line Item Number.
ESA
Endangered Species Act
Facility A building or structure designed and created to serve a particular function.
Field Experience Number of hours experience in the field, not including pre-field preparation time, travel or data download
Field Season A field season in reference to experience is considered an individual having the minimum of three (3) months of general field work in a year, appropriately timed to the relevant specialized field experience to the organism’s life cycle and biology of the biota per the Spec Item and/or permit.
GIS
Geographic Information System
GPS
Global Positioning System
Installation Point of Contact (IPOC) A representative from a specified Department of Defense installation designated as the point of contact for access and site issues for the Contractor while working on a given Task Order.
MAPS
Monitoring Avian Productivity and Survivorship
MBTA
Migratory Bird Treaty Act
2.1 Definitions and Acronyms – Continued
NCCP
Natural Community Conservation Planning
NGO
Non-Governmental Organization
NEPA
National Environmental Policy Act
Performance Assessment A method used by the Government to provide some measure of control over the quality of purchased goods and services received.
Performance Assessment Representative (PAR) That individual designated by the KO to be responsible for the monitoring of the Contractor performance of the task order. The PAR also serves as the Technical Representative for the task order.
Pre-performance Meeting A meeting among all parties to initiate work. Also known as a Kickoff-meeting.
SDSFIE
Spatial Data Standards for Facilities, Infrastructure, and Environment
Task Order A task order is a document (DD Form 1155) issued by a Contracting Officer unilaterally or bilaterally for work to be performed in accordance with Annex 18. Any changes to a task order shall only be made by the Contracting Officer.
USACE
United States Army Corps of Engineers
USFWS
United States Fish and Wildlife Service
USGS
United States Geological Survey
USMC
United States Marine Corps
UTM
Universal Transverse Mercator
Years of Experience Experience equivalent to full time work during the relevant season(s) for the work covered in the Spec Item.
2.2 General Information
2.2.1 Government Regular Working Hours
The Government's regular working hours are from 0730-1630, five days per week, Monday through Friday, except observed Federal holidays. Exceptions, if any, to the regular hours of operation are detailed in subsequent sections of this PWS. The performance of work requirements shall be accomplished within the Government’s regular working hours unless specific work requirement specified otherwise. Any other work outside Government regular working hours requires prior KO approval.
2.2.1.1 Observed Federal Holidays
The Government observes the following holidays: New Year’s Day, Martin Luther King Jr.’s Birthday, President’s Day, Memorial Day, Independence Day, Labor Day, Columbus Day, Veterans’ Day, Thanksgiving Day, and Christmas Day.
2.2.1.2 Restriction to Contractor Working Hours
None unless identified in the task order.
2.2.2 Wage Determinations
Refer to Section H for Wage Determination incorporated by reference.
2.2.3 Requirements Hierarchy
Requirements or definitions specified in each spec item of this contract apply to subordinate paragraphs. For example, requirements shown in spec item 3.1 would apply to spec items 3.1.1, 3.1.2, 3.1.2.1, and so on.
2.3 General Administrative Requirements
2.3.1 Required Conferences and Meetings
The Contractor may be required to attend administrative and coordination meetings. Specifically, the Contractor’s representative shall meet with the Government’s representatives monthly during the first three months of the contract. Thereafter, meetings will be as often as necessary at the direction of the KO. A mutual effort will be made to resolve all problems identified. The Contractor’s representative and the Government’s representative shall approve the written minutes of these meetings, prepared by the Contractor and reviewed by the Government.
Should the Government not concur with the minutes, the Contractor shall state in writing to the KO (via the COR) any areas of disagreement within 15 calendar days.
2.3.2 Permits and Licenses
The Contractor shall, without additional expense to the Government, obtain all required permits, licenses and authorizations to perform work under this contract and comply with all the applicable Federal, State and local laws and regulations. The Contractor shall provide evidence of such permits and licenses to the KO before work commences on each task order and at other times as requested by the KO. No survey shall violate any conditions stipulated in federal or state permits issued in support of the survey effort. The Contractor shall be responsible for all permit violations or other illegal acts conducted by Contractor or Sub-Contractor personnel and the consequences thereof, including any consequences that arise from these actions.
2.3.3 Insurance
Within 15 days after award of this contract, the Contractor shall furnish the KO a certificate of insurance as evidence of the existence of the following insurance coverage in amounts not less than the amounts specified below in accordance with the FAR Clause 52.228-05, INSURANCE – WORK ON A GOVERNMENT INSTALLATION.
This insurance must be maintained during the performance period.
2.3.3.1 Certificate of Insurance
The Certificate of Insurance shall provide for at least 30 days written notice to the KO by the insurance company prior to cancellation or material change in policy coverage. Other requirements and information are contained in the aforementioned insurance clause.
2.3.3.2 Minimum Insurance Amounts
The Contractor shall procure and maintain, during the entire period of performance under this contract, the following minimum insurance coverage:
Comprehensive General Liability: $500,000 per occurrence;
Automobile Liability: $200,000 per person, $500,000 per occurrence, $20,000 per occurrence for property damage;
Workmen's Compensation: As required by Federal and State worker's compensation and occupational disease statutes;
Employer's Liability coverage: $100,000, except in states where worker's compensation may not be written by private carriers;
Other as required by State Law.
2.3.4 Protection of Government Property
During execution of the work, the Contractor shall protect Government property. The Contractor shall return areas damaged as a result of negligence under this contract to their original condition at no cost to the Government, including revegetation or replacement of damaged habitat if necessary. Unauthorized collection of cultural material is not allowed. The Government will consider unauthorized collection a violation of the Archaeological Resource Protection Act and subject to criminal and civil penalties. The Contractor is expressly prohibited from plant or animal collection on Government property other than as specified in the task order. The Contractor is specifically prohibited from carrying out any activities not specified under a task order unless written approval is obtained from the Contracting Officer. No animals will be brought on to Government property and released without the consent of the Contracting Officer. Personal pets are not to be brought on to Government property. The Contractor will not remove dead, injured or sick wildlife from Government property. All such wildlife shall be reported immediately to the Contracting Officer.
2.4 Instructions, Directives, and References
Applicable Department of Defense (DoD), Secretary of the Navy (SECNAV), Chief of Naval Operations (OPNAV), and other directives, instructions, and references are listed below. The Contractor shall comply with the most current version of directives, instructions, and references including versions published during the term of the contract.
2.4.1 Applicable Laws, Regulations and References
The following lists the laws, regulations, and references that are applicable to this contract.
American Indian Religious Freedom Act of 1978 The American Indian Religious Freedom Act of 1978 (PL 95-341; 42 USC § 1996) directs consultations with traditional leaders, where appropriate, to insure continuity in religious practices on Federal lands. The Act requires the Federal government to protect the right of American Indian, Eskimo, Aleut, and Native Hawaiian to exercise traditional religious practices.
2.4.1 Applicable Laws, Regulations and References-Continued
Antiquities Act of 1906 The Antiquities Act of 1906 (PL 59-209; 16 USC §§ 431 et seq., 1982) authorizes the President to designate as National Monuments historic and natural resources of national significance located on Federally owned or controlled lands. The act further provides for the protection of all historic and prehistoric ruins and objects of antiquity located on Federal lands by providing criminal sanctions against excavation, injury, or destruction of such antiquities without the permission of the Department having jurisdiction over such resources. The Secretaries of the Interior, Agriculture, and Defense are further authorized to issue permits for archaeological investigations on lands under their control to recognize educational and scientific institutions for the purposes of systematically and professionally gathering data of scientific value.
Archaeological and Historic Preservation Act of 1974 The Archaeological and Historic Preservation Act of 1974 (Moss-Bennett Act; 16 USC §§ 469 et seq.) provides for the protection of historic and archaeological sites threatened by Federal or Federally funded or assisted construction projects.
Archaeological Resources Protection Act of 1979 The Archaeological Resources Protection Act of 1979 (16 USC §§ 470 et seq., 1982) sets up penalties for destruction or removal of archaeological materials from Federal land without the proper permits. Requirements for obtaining these permits are also established by this regulation.
Bald and Golden Eagle Protection Act The Bald and Golden Eagle Protection Act (PL 95-616; 16 USC §§ 668 et seq.) provides for protection of the bald and golden eagles by prohibiting taking, possession, and commerce in the birds.
California Water Code The California Water Code Section 1243 declares the reservation of water for the enhancement and protection of fish and wildlife to be a beneficial use.
Carson-Foley Act of 1968 The Carson-Foley Act (aka Noxious Plant Control Act) (PL 90-583; 43 USC § 1241) provides for the control of noxious plants on lands under control or jurisdiction of the Federal Government.
Clean Air Act The Clean Air Act (42 USC § 7401 et seq.) is the major federal legislation addressing air pollution control on a national level. It establishes national ambient air quality standards (NAAQS) for common air pollutants (“criteria pollutants”) and requires States to institute controls with established air quality control regions to achieve the NAAQS. The Act requires the US EPA to establish necessary air quality control where States fail to do so. Severity of controls increases as degree of nonattainment with NAAQS increases. Mandates EPA regulation of 138 identified “hazardous air pollutants.” Implements the Montreal Protocol on Ozone Depleting Substances (ODS), mandating phase out of ODS production, prohibiting intentional venting of ODS refrigerants during appliance servicing, and requires technician certification.
Clean Water Act Clean Water Act regulates the discharge of pollutants to waters of the United States in order to protect water quality and the beneficial uses of these waters. Through a permit application process, CWA Section 401 regulates dredge and fill discharges to waters of the United States.
2.4.1 Applicable Laws, Regulations and References-Continued
Coastal Zone Management Act The Coastal Zone Management Act (CZMA) of 1972 (16 USC § 1451, et seq.) requires federal permit applicants to obtain a certification that verified activities proposed within the “coastal zone” are consistent with state coastal zone management programs; e.g. federal Clean Water Act and §404 applicants. The CZMA creates a broad program based on land development controls within coastal zones, incorporating State involvement through the development of programs for comprehensive state management. The CZMA also requires Federal agencies or licensees to carry out their activities in such a way that they conform to the maximum extent practicable with a state’s coastal zone management program.
Community Environmental Response Facilitation Act The Community Environmental Response Facilitation Act (CERFA) (42 USC § 9601 note, 9620) amends CERCLA Section 120 (h) to allow expedition of reuse and redevelopment of Federal facilities being closed.
Comprehensive Environmental Response, Compensation, and Liability Act of 1980 The Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA; 42 USC §§ 9601 et seq.), also known as Superfund, establishes programs for the cleanup of hazardous waste disposal and spill sites to ensure protection of human health and the environment. Designates the President as trustee for Federally protected or managed natural resources.
Conservation Programs on Military Reservations The Conservation Programs on Military Reservations (PL 90-465; 16 USC §§ 670 et seq.) amend PL 86-797 to include outdoor recreation programs on military lands. It requires each military department to manage natural resources and to ensure that services are provided which are necessary for management of fish and wildlife resources on each installation; to provide their personnel with professional training in fish and wildlife management;
and, to give priority to contracting work with Federal and State Agencies that have responsibility for conservation or management of fish and wildlife. Authorizes cooperative agreements (with States, local governments, non-governmental organizations, and individuals) which call for each party to provide matching funds or services to carry out natural resources projects/initiatives.
Defense Appropriations Act of 1991 The Defense Appropriations Act of 1991 (10 USC § 2701) establishes the Legacy Resource Management Program for the stewardship of biological, geophysical, cultural and historic resources on Department of Defense (DoD) lands.
Emergency Planning and Community Right-to-Know Act of 1986 The Emergency Planning and Community Right-to-Know Act of 1986 (EPCRA) (42 USC §11001 et seq.) is also known as Title III of the Superfund Amendments and Reauthorization Act (SARA). EPCRA focuses on the hazards associated with toxic chemical releases. Most notably, specific sections of EPCRA require immediate notification of releases of oil and hazardous substances and CERCLA-defined hazardous substances to State and local emergency response planners. The Act requires State and local coordination in planning response actions to chemical emergencies, and certain industries to submit information on chemical inventories and fugitive emissions.
Endangered Species Act The Endangered Species Act (ESA) (PL 93-205; 7 USC § 136, 16 USC §§1531 et seq.), of 1973 requires that all Federal Agencies undertake programs for the conservation of endangered and threatened species. These agencies are prohibited from authorizing, funding, or carrying out any action that would jeopardize a listed species or destroy or modify its “critical habitat” (Section 7). Critical habitat is usually designated concurrently with a listing. Section 9 prohibits the “taking” of endangered fish or wildlife, including direct killing, harming, harassing, or destruction of habitat.
2.4.1 Applicable Laws, Regulations and References-Continued
Federal Flood Disaster Prevention Act The Federal Flood Disaster Prevention Act (PL 93-234; 42 USC §§ 4001 et seq.) established the Federal Flood Insurance Program, which has provided some incentives for construction outside flood prone areas. To a limited degree, this has reduced destruction of riparian vegetation by developments. President Carter issued two executive orders in a related effort: EO 11988 (Floodplain Protection) directed Federal agencies to avoid construction in flood hazard areas and to seek restoration and preservation of the natural and beneficial values of floodplains; EO 11990 (Protection of Wetlands) directed Federal agencies to minimize the destruction, loss, or degradation of wetlands.
Federal Insecticide, Fungicide, and Rodenticide Act The Federal Insecticide, Fungicide, and Rodenticide Act (FIFRA) (7 USC §136 et seq.) provides the principal means for preventing environmental pollution from pesticides through product registration and applicator certification. The registration of all pesticide products by EPA results in label instructions on each container for use, storage, and disposal. Label instructions are legally applicable to all users. Under FIFRA, EPA is required to accept certain pesticides under recall for safe disposal. It is unlawful to purchase, distribute, or use any pesticide that does not have any EPA registration number or for which registration has been cancelled or suspended, or to apply, store, or dispose of any pesticide or container I any manner inconsistent with applicable regulations.
Federal Noxious Weed Act of 1974 The Federal Noxious Weed Act of 1974 (PL 93-629; 7 USC § 2801) provides for the control and eradication of noxious weeds and their regulation in interstate and foreign commerce.
Federal Water Pollution Control Act Amendments of 1972 The Federal Water Pollution Control Act Amendments of 1972 (see Clean Water Act; 33 USC §§ 1251 et seq.) sets up a Federal permit and license system to carry out certain pollution discharge activities in navigable waters.
Fish and Wildlife Conservation Act of 1980 The Fish and Wildlife Conservation Act of 1980 (PL 96-366; 16 USC §§2901 et seq.) provides for conservation, protection, restoration and propagation of certain species, including migratory birds threatened with extinction.
Fish and Wildlife Conservation and Military Reservations Act See Sikes Act.
Fish and Wildlife Coordination Act The Fish and Wildlife Coordination Act (PL 85-624; 16 USC §§ 661 et seq.) mandates that wildlife conservation receive equal consideration and be coordinated with other features of water resource development. The intent is to prevent loss or damage of wildlife and provide for development and improvement of wildlife in conjunction with water development projects. Federal agencies proposing to impound, divert, or control surface waters are required to consult with the USFWS and CDFG, to include and give full consideration to the recommendations of these agencies, and to provide justifiable means and measures for benefiting wildlife in project plans. ACOE must coordinate permit applications with USFWS and CDFG. Like NEPA, implementation of this Act is essentially procedural in that no particular outcome is mandated. The Act authorizes project modification, land acquisition, and other measures necessary to protect wildlife.
2.4.1 Applicable Laws, Regulations and References-Continued
Historic Sites Act of 1935 The Historic Sites Act of 1935 (PL 74-292; 16 USC §§ 461 et seq., 1982) establishes as national policy the preservation for public use of historic resources, by giving the Secretary of the Interior the power to make historic surveys and to document, evaluate, acquire, and preserve archaeological and historic sites across the country. The Act led to the eventual establishment within the National Park Service of the Historic Sites Survey, the Historic Buildings Survey, and the Historic Sites Engineering Record.
Magnuson-Stevens Fishery Conservation Management Act The statute includes a mandate that Federal agencies must consult with the Secretary of Commerce (through the National Marine Fisheries Service) on all activities, or proposed activities, authorized, funded, or undertaken by the agency, that my adversely affect Essential Fish Habitat.
Migratory Bird Treaty Act The Migratory Bird Treaty Act (PL 65-186, as amended; 16 USC §§ 703 et seq.) protects most birds, whether or not they migrate. Birds, their nests, eggs, parts, or products may not be killed or possessed. Game birds are listed and protected except where specific seasons, bag limits, and other features govern their hunting. Exceptions are made for some agricultural pests, which require a USFWS permit (yellow-headed, red-winged, bi-colored red-winged, tri-colored red-winged, Rusty and Brewer’s Blackbirds, Cowbirds, all grackles, crows, and magpies). Some other birds that injure crops in California may be taken under the authority of the County Agricultural Commissioner (meadowlarks, horned larks, golden-crowned sparrows, white-and other crowned sparrows, goldfinches, house finches, acorn woodpeckers, Lewis woodpeckers, and flickers). Permits may be granted for various non-commercial activities involving migratory birds and some commercial activities involving captive-bred migratory birds.
Military Construction Authorization Act – Military Reservation and Facilities-Hunting, Fishing and Trapping The Military Construction Authorization Act – Military Reservation and Facilities-Hunting, Fishing and Trapping (10 USC § 2671) requires that all hunting, fishing, and trapping on military installations follow Fish and Game laws of the state in which it is located, and be issued appropriate state licenses for these activities.
Military Construction Authorization Act of 1975 The Military Construction Authorization Act of 1975 (10 USC § 2665) allows the proceeds from the sale of recyclable material to be credited to the installation to cover specified costs.
National Environmental Policy Act of 1969 The National Environmental Policy Act of 1969 (NEPA) (42 USC §§ 4321 et seq.) evolved over 10 years from the desire of Congress to have a cohesive statement of the national environmental policy. Agencies must assess, in detail, the potential environmental impact of any proposal for legislation or other major Federal action that has the potential for significantly affecting the quality of the human environment. The Act is intended to help public officials and citizens make decisions that are based on understanding of environmental consequences and take action that protects, restores, and enhances the environment.
NEPA mandates that agencies use a “systematic, interdisciplinary approach” that integrates the natural and social sciences and environmental design. The courts have interpreted this mandate to be essentially “procedural,” that is, environmental impacts must be considered, but proposals with environmentally damaging consequences need not necessarily be rejected.
The law requires a detailed statement of “significant” environmental impact of “major” Federal actions. An action may be significant in terms of geographical extent, long-term impact, potential risk, or because of its effect on heritage resources or endangered species.
The process identifies reasonable alternatives to proposed actions that might have less or no environmental effect.
Individual and cumulative impacts must be considered. A three-tiered approach is used to evaluate impacts: 1) The Environmental Assessment (EA) is the analysis to be completed when the government is uncertain as to whether an action will significantly affect the environment or the action is controversial. The result of an EA is either a Finding of No Significant Impact (FONSI) or a requirement to complete an Environmental Impact Statement (EIS); 2) The EIS is a full disclosure document that presents a full and unbiased discussion of significant impacts, informing the public and decision makers of reasonable alternatives to the proposed action; and 3) A Categorical Exclusion (CATEX) is used for actions which do not individually or cumulatively have a significant effect on the human environment and which have been found to have no such effect in procedures adopted by the Department of the Navy in implementation of Federal regulations and for which, therefore, neither and EA nor an EIS is required.
Annex 0200000 - Management and Administration
Spec Item/Title
2.4.1. Applicable Laws, Regulations and References – Continued
National Historic Preservation Act of 1966 The National Historic Preservation Act of 1966 (PL 89-665; 16 USC §§ 470 et seq.) expanded the National Register of Historic Places, provided a list of significant historic and pre-historic sites and districts, and gave them formal protection. Section 106 requires that Federal agencies with direct or indirect jurisdiction over such properties identify them for the Federal Register. It further directs agencies to consider historic and archaeological resources during planning, and allows the Advisory Council on Historic Preservation, established by this Act, an opportunity to comment when a Federal undertaking could affect historic properties.
National Trails Systems Act of 1968 National Trails Systems Act of 1968 (16 USC § 1271) promotes development of recreational, scenic, and historic trails for persons of diverse interest and abilities.
Native American Graves Protection and Repatriation Act of 1990 The Native American Graves Protection and Repatriation Act of 1990 (NAGPRA) (PL 101-601; 25 USC §§ 3001 et seq.) provides requirements for treatment, determination of ownership, control of, and repatriation of human remains and cultural items on Federal or Tribal lands. The term “Indian Tribe” refers to any Tribe, band, nation, or other organized Indian group or community that is on the current list of recognized Indian Tribes published by the Bureau of Indian Affairs. “Human remains” refers to all Native American human remains.
Noise Control Act of 1972 The Noise Control Act of 1972 (42 USC § 4901 et seq.) (as amended by the Quiet Communities Act) authorizes establishment of Federal noise emission standards for products distributed in commerce, and coordinates Federal research efforts in noise control.
Noxious Plant Control Act See Carson-Foley Act.
Oil Pollution Act of 1990 The Oil Pollution Act of 1990 (OPA) (33 USC §§2701 et seq.) provides that the National Contingency Plan (NCP) include planning, rescue and minimization of damage to fish and wildlife in responding to oil pollution.
Outdoor Recreation-Federal/State Program Act The Outdoor Recreation-Federal/State Program Act (PL 88-29; 16 USC §§ 460(L) et seq.) provides for the management of lands used for outdoor recreation. Requires consultations with US National Park Service regarding management.
Pollution Prevention Act of1990 The Pollution Prevention Act of 1990 (PPA) (42 USC § 13101 et seq.) establishes the national policy that “pollution should be prevented or reduced at the source whenever feasible. Pollution that cannot be prevented should be recycled in an environmentally safe manner. Disposal or other release of pollutants into the environment should be employed only as a last resort and should be conducted in an environmentally sound manner.”
Porter-Cologne Water Quality Control Act The Porter-Cologne Water Quality Control Act (California Water Code §§13000 et seq.) is the State’s primary water law. It gives the State Water Resources Control Board (SWRCB) and the nine regional water quality control boards substantial authority to regulate water use.
Program for Conservation and Rehabilitation of Natural Resources on Military Installations The Program for Conservation and Rehabilitation of Natural Resources on Military…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .