This notice announces an indefinite-delivery/indefinite-quantity contract for professional architect-engineering services to support stormwater, incidental groundwater, wastewater, and potable water compliance at Navy and Marine Corps installations. The contract has a two-year base period and one three-year option period, is set aside for small businesses, and has a maximum value of $100 million.

Services required include field investigations, studies, surveys, analyses, monitoring plans, sampling and analysis plans, and interfacing with regulatory agencies to support compliance programs in California, Arizona, Colorado, Nevada, New Mexico, Utah, Washington and other DoD installations. Offerors must submit Standard Form 330 responses by April 23, 2019 to Naval Facilities Engineering Command Southwest demonstrating experience, qualifications, past performance, safety record, location and knowledge of project areas, capacity, and quality control processes. The notice provides detailed evaluation criteria and submission requirements for each technical factor. Task orders will have minimum values of $3,000 up to a maximum of $3 million.

N6247319R2802_Amendment_1_RFI_Form_-_Stormwater_Synopsis_.pdf

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REQUEST FOR INFORMATION (RFI)

AMENDMENT 1

STORMWATER SYNOPSIS N62473-19-R-2802

Please submit questions to Dawn Evans by e-mail at dawn.i.evans1@navy.mil

Question 1: In the Selection Criteria and Submittal Requirements Section on, under Submittal

Requirements, on page 2 the first paragraph states, "Submit one (1) original hard copy of the SF330 in a 3-ring binder (comb bound proposals will not be accepted) and four (4) electronic copies on separate

CDs." However, in the Additional Information section, the third paragraph on the last page of the solicitation discussing the submittal package states, "4 original SF 330's in separate 3 ring binders; each

3 ring binder must also include a copy on CD in MS Word or PDF format." Please clarify the number of hard copies and electronic copies the government would like. Is it the government's intent to receive

1 original and 4 hard copies, plus electronic copies on CD for each binder?

Answer: Please see REV 1. The synopsis has been revised. The submittal requirements were revised as follows: Submit four (4) original hard copies of the SF330 in a 3-ring binder (comb bound proposals will not be accepted) and four (4) electronic copies on separate CDs.

Question 2: Criterion 2 appears to have an omission, in Key Personnel, the Program Manager is not listed in the list of Key Personnel, but the paragraph below requires "The Program Manager or the

Senior Technical Manager shall be a registered professional engineer" and attachment A identifies the

Program Manager in Key Personnel Qualifications.

Answer: Please see REV 1. The synopsis has been revised. Project Manager was removed and replaced with Program Manager in Criterion 2.

Question 3: Criterion 3 and 7 requirements appear to overlap both requesting "Describe the offeror's corporate quality control program, process, and procedures, and authorities." However, the submittal requirements for Criterion 3 only address submittal of CPARS and PPQs and the submittal requirements for Criterion 7 address in detail the submittal requirements for the quality control program. Is it the governments intent to have Criterion 3 submittal address only CPARS and PPQs and

Criterion 7 address the submittal requirements listed and also the submittal requirements for the following: (1) cost control, quality of work, compliance with performance schedules, and reliability of the firm's quality assurance, quality control, and cost programs. Indicate effectiveness by briefly de scribing internal quality and cost control procedures. Document recent awards and commendations, and other performance evaluations (do not submit copies). (2) Describe the offeror's corporate quality control program, process, and procedures, and authorities assigned to the firm's Quality Control

Manager. The quality control program shall demonstrate knowledge of applicable regulatory requirements related to quality control.

Answer: Please see REV 1. The requirements section for Criterion 3 – Past Performance has been revised in its entirety. Criterion 7 remains unchanged.

FROM:

Criterion 3 - Past Performance

(a) Past performance on contracts with Government agencies and private industry, in terms of cost control, quality of work, compliance with performance schedules, and reliability of the firm’s quality mailto:dawn.i.evans1@navy.mil assurance, quality control, and cost programs. Indicate effectiveness by briefly describing internal quality and cost control procedures. Document recent awards and commendations, and other performance evaluations (do not submit copies).

(b) Describe the offeror’s corporate quality control program, process, and procedures, and authorities assigned to the firm’s Quality Control Manager. The quality control program shall demonstrate knowledge of applicable regulatory requirements related to quality control.

TO:

Criterion 3 - Past Performance

The evaluation will consider the Offeror’s past performance on relevant contracts with government and/or commercial projects in terms of cost control, quality of work, and compliance with performance schedules; with emphasis on example projects presented in Section F of the

SF330. Points of Contact in the proposal may be contacted. Firms will be evaluated based on past performance assessments and other available information regarding past performance.

Where there is no record of past performance, the Offeror will be evaluated neither favorably nor unfavorably. Superior performance ratings on relevant projects may be considered more favorably in the evaluation.

Question 4: In order to develop a competitive submission and further solidify necessary teaming arrangements to prepare for this very important 5-year contract for NAVFAC Southwest, please consider revising the SF-330 submission due date to 7 May 2019 by 2:00 p.m. PST. Thank you for your consideration.

Answer: The SF 330 due date will not be extended. The due date of 23 April 2019 remains unchanged.

Question 5: Based on the market research that was performed, please confirm if the Professional

Architect-Engineering (A-E) technical services for the Storm Water, Incidental Groundwater, Wastewater, and Potable Water Compliance (N6247319R2802) solicitation is intended to be a Small

Business Multiple Award Contract so that multiple small firms can benefit from the opportunity?

Answer: This is not a Multiple Award Contract (MAC).

Question 6: Please confirm the final day that questions can be submitted for timely responses by

NAVFAC prior to the submission date of the SF 330.

Answer: A final day to submit questions has not been set. All answers are provided via formal amendments.