About this file

Amendment_0006.pdf

View the file

Other files

File Type Posted
Att.11_-_Sheet_C-114_rev1.pdf PDF
Att.10_-_Sheet_V-106_rev1.pdf PDF
Amendment_0005.pdf PDF
Amendment_0004.pdf PDF
Att.9-SF_24-98.pdf PDF
Att.8-DBA_Wages_1-4-19.pdf PDF
Att.7-Revised_P238_Civil_Plans_1-22-2019.pdf PDF
Amendment_0003.pdf PDF
Amendment_0002.pdf PDF
Att._7_–_Revised_P238_Civil_Plans.pdf PDF
Amendment_0001.pdf PDF
Att._1_-_P238_Construction_Plans_and_Specifications.pdf PDF
Solicitation.pdf PDF
Att._3_-_Final_Environmental_Assessment.pdf PDF
Att._2_-_P238_Civil_Plans.pdf PDF
Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

SUBJECT: SOLICITATION N6247319B2425, DESIGN-BID-BUILD PROJECT P238, AIRFIELD SECURITY IMPROVEMENTS AT MARINE CORPS AIR

STATION MIRAMAR, SAN DIEGO, CALIFORNIA

The purpose of this amendment is to provide scope revisions and response to Request for Information. See page 2 for revisions.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 4

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 29-Jan-2019

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N6247319B2425

X 9B. DATED (SEE ITEM 11)

03-Jan-2019

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

29-Jan-2019

CODE

NAVFAC SOUTHWEST

CAPITAL IMPROVEMENTS CONTRACT CORE

CODE: CIMAR

1220 PACIFIC HIGHWAY

SAN DIEGO CA 92132-5190

N62473 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

N6247319B2425

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

AMENDMENT 0006

The following changes are hereby incorporated into the subject solicitation. Changes are shown in red italics fonts.

Section 1: Scope Revisions to Solicitation

A. In Design Plans, Att. 2 – P238 Civil Plans has been replaced by Att.7 – Revised P238 Civil Plans (attached in this amendment) in its entirety.

The following Sheets in the Civil Plans were modified:

Replace in its entirety Sheet V-106 with Att.10 - Sheet V-106 rev1.

Replace in its entirety Sheet C-114 with Att.11 - Sheet C-114 rev1.

Section 2: Response to Requests for Information (RFI’s)

RFI #36

Question is regarding: Submittal Reviewers Duties and Qualifications Section of the Request for Proposal: Spec Section 01 45 00.00 20 Paragraph: 1.5.7 Submittal Reviewers Duties and Qualifications Page number: Page 7

QUESTION: Is a Registered Civil Engineer required by the Contractor to do submittal review?

Response #36 Yes, as registered civil engineer or architect is required.

RFI #37

Question is regarding: QC Administrative Assistant Section of the Request for Proposal: Spec Section 01 45 00.00 20 Paragraph: 1.5.8 QC Administrative Assistant Page number: 8

QUESTION: Can the QC Administrative Assistant be a part of the Contractors home office support staff and not have to be "at the work site until the work has been accepted".

Response #37 Provide QC Administrative Assistant as indicated in specification 01 45 00.00 20 Section 1.5.8.

RFI #38

Question is regarding: Install New Fence Section of the Request for Proposal: Plan Sheet C-114 - Note 6

QUESTION: Plans shown to remove and install new fence (Note 6) from approximate Sta. 236+00 to the End of Construction, Sta. 245+38. That section of fence is also marked as Note 1, Sleeve Fence Posts and Replace Fence. Please confirm if this section of fence is Note 1 or Note 6.

Response #38 Delete Sheet C-114 and Replace with new sheet C-114 rev 1, Note 6 removed, last call out mainly denotes end of construction.

RFI #39

Question is regarding: Site Access Section of the Request for Proposal:

QUESTION: Please confirm if site access to the project can be allowed through the gate located on Austin Avenue at "End Construction" (Sta. 245+38).

Response #39 Coordinate with MCAS base for access to project as conditions may vary depending on base security and other active construction projects.

RFI #40

Question is regarding: Flightline Training & Access Section of the Request for Proposal:

QUESTION: Please provide what type of training MCAS Miramar will provide the Contractor for access to the flightline. Will the Contractor have to be escorted by MCAS Miramar every day or will the Contractor will trained to escort personnel and deliveries? Will radios be supplied by MCAS to the Contractor to communicate with air traffic control?

Response #40 Coordinate with Base Security for at minimum daily operations, a flight line certificate/training is required for accessing the flightline. Radios are not permitted, coordinate with base security for alternative methods.

RFI #41

Question is regarding: Recycling Section of the Request for Proposal:

QUESTION: Will any bins and or containers be provided by MCAS Miramar for recycling of materials? by MCAS to the Contractor to communicate with air traffic control?

Response #41 No bins will be provided by base, refer to Response #23, recycling materials to be taken to Base Recycling Center Building 6310.

NOTE: All other paragraphs, provisions, and conditions to this solicitation remain unchanged. All prospective Offerors must acknowledge receipt of all amendments in Block 19 of the SF1442. Failure to acknowledge receipt of all amendments may result in the proposal being rejected as non-responsive.

(End of Summary of Changes)