About this file

Amendment_0005.pdf

View the file

Other files

File Type Posted
Att.11_-_Sheet_C-114_rev1.pdf PDF
Amendment_0006.pdf PDF
Att.10_-_Sheet_V-106_rev1.pdf PDF
Amendment_0004.pdf PDF
Att.9-SF_24-98.pdf PDF
Att.8-DBA_Wages_1-4-19.pdf PDF
Att.7-Revised_P238_Civil_Plans_1-22-2019.pdf PDF
Amendment_0003.pdf PDF
Amendment_0002.pdf PDF
Att._7_–_Revised_P238_Civil_Plans.pdf PDF
Amendment_0001.pdf PDF
Att._1_-_P238_Construction_Plans_and_Specifications.pdf PDF
Solicitation.pdf PDF
Att._3_-_Final_Environmental_Assessment.pdf PDF
Att._2_-_P238_Civil_Plans.pdf PDF
Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

SUBJECT: SOLICITATION N6247319B2425, DESIGN-BID-BUILD PROJECT P238, AIRFIELD SECURITY IMPROVEMENTS AT MARINE CORPS AIR

STATION MIRAMAR, SAN DIEGO, CALIFORNIA

The purpose of this amendment is to provide response to Request for Information. See page 2 for revisions.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 25-Jan-2019

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N6247319B2425

X 9B. DATED (SEE ITEM 11)

03-Jan-2019

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

25-Jan-2019

CODE

NAVFAC SOUTHWEST

CAPITAL IMPROVEMENTS CONTRACT CORE

CODE: CIMAR

1220 PACIFIC HIGHWAY

SAN DIEGO CA 92132-5190

N62473 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

N6247319B2425

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

AMENDMENT 0005

The following changes are hereby incorporated into the subject solicitation. Changes are shown in red italics fonts.

Section 1: Scope Revisions to Solicitation

None in this amendment.

Section 2: Response to Requests for Information (RFI’s)

RFI #14

Question is regarding: Current round gate posts Section of the Request for Proposal:

Paragraph:

Page number:

QUESTION: There are a number of existing gate posts that are 4” and 6 5/8” diameter. Can we extend those posts by welding extensions?

Response #14 Welded extensions would be allowed on the larger fencing poles.

RFI #23

Question is regarding: Recycling of Fencing Section of the Request for Proposal: 1.74.19 Paragraph: 1.6 Page number: 2

QUESTION: For our waste management plan would it be possible to utilize Environmental Management S-7 for the recycling of metals resulting from demolition?

Response #23 All of the chain-link fencing and metal poles that are demoed can be recycled at the MCAS Miramar Base Recycling Center Building 6310.

RFI #32

Question is regarding: Barbed Tape Section of the Request for Proposal: 32 31 13.53 Paragraph: 2.5 Page number: 5

QUESTION: Is Barbed Tape required on this Project?

Response #32 Refer to Response #17 in Amendment 0004.

N6247319B2425

RFI #33

Question is regarding: Single extension arm with three strands of barbed wire.

Section of the Request for Proposal:

Paragraph: Details A1 and B1 Page number: Sheet C-503

QUESTION: Please confirm existing arms and barbed wire arrangement is to be replaced with a single extension arm and three strands of barbed wire.

Response #33 Refer to Response #17 in Amendment 0004.

RFI #34

Top tension wire or top rail.

Section of the Request for Proposal:

Paragraph: Detail C1 Page number: Sheet C-501

QUESTION: Please provide which is required, top tension wire or top rail?

If top rail, please provide specifications.

If top tension wire, please provide specifications.

Response #34 Top rail is required; these are the minimum requirements: 1.66 inches O.D. (SP1) Steel pipe, grade A weighing 2.27 pound per linear foot. Provide expansion couplings 6 inches long at each joint in top rails.

RFI #35

Question is regarding: Barbed Tape (Razor Wire) Section of the Request for Proposal: 32 31 13.53 Paragraph: 2.5 Page number: 5

QUESTION: Please provide coil diameter size and spacing.

Response #35 Refer to Response #17 in Amendment 0004

NOTE: All other paragraphs, provisions, and conditions to this solicitation remain unchanged. All prospective Offerors must acknowledge receipt of all amendments in Block 19 of the SF1442. Failure to acknowledge receipt of all amendments may result in the proposal being rejected as non-responsive.

(End of Summary of Changes)

File details come from the government source that posted it.