Section_J.pdf
PDF 24 MB Posted
- Attached to
- FY18-26 BASE OPERATING SUPPORT (BOS) SERVICES AT NAVAL AIR FACILITY (NAF) EL CENTRO, CALIFORNIA
- Solicitation number
- N6247317R3807
About this file
Section_J.pdf
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment_08.pdf | ||
| Unpopulated_ELIN_Spreadsheet.xlsx | XLSX spreadsheet | |
| Amandment_0007.pdf | ||
| Unpopulated_ELIN_Spreadsheet.xlsx | XLSX spreadsheet | |
| Section_C_Revised.pdf | ||
| Section_F.pdf | ||
| Amendment_0006.pdf | ||
| Amendment_04.pdf | ||
| El_Centro_Range_Complex_-_R2510_West_Mesa.pdf | ||
| Amendment_03.pdf | ||
| El_Centro_Range_Complex_-_R2512_East_Mesa.pdf | ||
| Amendment_02.pdf | ||
| Section_J.pdf | ||
| Section_C.pdf | ||
| Amendment_01.pdf | ||
| N6247317R3807_N62473-17-R-3807_-_Pre-solicitation_Notice.pdf |
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SECTION J
DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS
TABLE OF CONTENTS
ATTACHMENT
NUMBER
ATTACHMENT TITLE
J-0200000-01 DEFINITIONS AND ACRONYMS
J-0200000-02 WAGE DETERMINATIONS
J-0200000-03 DIRECTIVES, INSTRUCTIONS, AND REFERENCES
J-0200000-04 INVOICE FORM
J-0200000-05 FORMS
J-0200000-06 GOVERNMENT-FURNISHED PROPERTY, MATERIALS, AND SERVICES
J-0200000-07 NAVFAC MAXIMO DATA REPORTING
J-0200000-08 NAVFAC MAXIMO SYSTEM ACCESS PROCEDURES
J-0200000-09 INSTALLATION SPILL CONTROL PLAN
J-0200000-10 CONTRACTOR HAZARDOUS MATERIAL INVENTORY LOG
J-0200000-11 EXHIBIT LINE ITEM NUMBERS
ATTACHMENT J-0200000-01
DEFINITIONS AND ACRONYMS
Definition Description
Assessment A general term referring to either a survey or inspection of a facility to determine condition.
Asset A general term used to refer to an item, such as a component, system, building or facility, which is managed by an automated data management program.
Business Management
System (BMS)
A web-based tool that provides a systematic method for the management of business processes, common practices, and process quality improvements that produce and support the most efficient and effective delivery of NAVFAC’s products and services.
Competent Person A person who has the professional experience and training necessary to identify existing and predictable hazards at a work or service environment, and who has the authority to take prompt and corrective action to eliminate or remove dangers from the environment.
One who can identify existing and predictable hazards in the working environment or working conditions that are dangerous to personnel and who has authorization to take prompt corrective measures to eliminate them.
Component Inventory
Management Unit
(CIMU)
An organization of like-kind real property into manageable maintenance units. CIMU is a building component, group of components or component assemblies, serving a specific purpose in a facility that can be expected to follow a common and predictable lifecycle behavior. This class of non-equipment will include items such as exterior walls, exterior windows, interior finish, and roofs. This class of equipment will include items such as fan coil units, air handling units, lighting, and water closets. CIMUs can include one or more items of installed equipment typically subject to routine scheduled maintenance.
Confined Work Space A space that is large enough and so configured that a person may bodily enter a space
(such as in tanks, vessels, silos, storage bins, hoppers, vaults, pits, and like spaces where there is limited means of entry) and is hindered or restricted from escaping during an emergency.
Contracting Officer
(KO)
That individual with the authority to enter into, administer, and/or terminate contracts and make related determinations and findings. The term includes certain authorized representatives of the Contracting Officer acting within the limits of their authority as delegated by the Contracting Officer.
Contracting Officer’s
Representative (COR)
The individual appointed by the KO responsible for monitoring the Contractor’s technical compliance and progress, relative to assigned contract(s)/orders(s), based on the contract requirements specified in the PWS and in accordance with the PAP. The COR performs a variety of contract administration duties that includes oversight of PA, documenting and rating Contractor performance, reviewing invoices, and acceptance of work. Assignment as a COR is a collateral duty typically performed by the FSCM or SPAR.
Contractor That entity or its representative responsible for the delivery of the services or materials specified in this contract, as designated by contract award. The term Contractor as used herein refers to both the prime Contractor and any subcontractors. The prime Contractor shall insure that subcontractors comply with the provision of this contract.
Contractor
Representative
That individual appointed by the Contractor, either orally or in writing, who has been assigned responsibility for executing the requirements of this contract.
Direct Material Costs The actual vendor invoice charges for materials used for performance of work under this contract. Direct material costs shall include transportation charges when such charges are included on the invoice by the vendor, as well as any discounts allowed for prompt payment and discounts or rebates for core value or salvage value that accrue to the
Contractor. When questions arise concerning the cost of materials, material costs will be based on the lowest of quotes provided by the Contractor from at least three different commercial vendors for the direct material cost. The Government retains the right to obtain additional quotes in questionable situations. The lowest price will be used.
Electronic Operation
And Maintenance And
Support Information
(eOMSI)
A set of consultant-prepared data and document files that contain detailed, as-built technical information that describes the efficient, economical and safe operation, maintenance and repair of a facility, plant, equipment or system throughout its life cycle.
Generally it is prepared during construction and submitted upon completion of a new facility or major facility upgrade. eOMSI’s typically include asset information, staffing and budgeting information, supply support including critical spare parts, operating procedures, troubleshooting and diagnostic guides, extended warranty data, maintenance task frequencies and documentation, technical data, repair procedures and manufacturer’s product data. eOMSI data and document files are provided in electronic formats.
DEFINITIONS AND ACRONYMS
Definition Description
Equipment Tangible asset that is functionally complete for its intended purpose, durable, and non-expendable.
Facility A building or structure designed and created to serve a particular function.
Fixed Burden Rate
(FBR)
The additional costs (expressed in percent of direct material cost) for ordering, handling, and stockpiling materials and repair parts. For example, if the offeror's Fixed Burden Rate for materials in the Base Period is 10% then:
$100,000.00 + ($100,000.00 x 10%) = $110,000.00
The Government will compensate the Contractor for the required parts and materials and not the total amount shown in Schedule of Indefinite Delivery Indefinite Quantity Work.
Frequency Of Service <<Note to Spec Writer: Edit as appropriate>>
Annual (A). Services performed once during each 12-month period of the contract at intervals of 335 to 395 days.
Biennial (B). Services performed once during each 24-month period of the contract at internals of 670 to 790 days.
Daily (D5). Services performed once each calendar day, Monday through Friday, including holidays unless otherwise noted.
Daily (D7). Services performed once each calendar day, seven days per week, including weekends and holidays.
Monthly (M). Services performed 12 times during each 12-month period of the contract at intervals of 28 to 31 calendar days.
Quarterly (Q). Services performed four times during each 12-month period of the contract at intervals of 80 to 100 calendar days.
Semiannual (SA). Services performed twice during each 12-month period of the contract at intervals of 160 to 200 calendar days.
Semimonthly (SM). Services performed 24 times during each 12-month period of the contract at intervals of 14 to 16 calendar days.
Three times weekly (3W). Services performed three times a week, such as Monday, Wednesday, and Friday.
Twice weekly (2W). Services performed twice a week, such as Monday and Thursday or
Tuesday and Friday.
Weekly (W). Services performed 52 times during each 12-month period of the contract at intervals of six to eight calendar days.
Government Furnished
Property (GFP)
Property in the possession of, or directly acquired by, the Government and subsequently furnished to the contractor for performance of a contract. Government furnished property includes, but is not limited to, spares and property furnished for repairs, maintenance, overhaul, or modification. Government furnished property also includes contractor acquired property if the contractor acquired property is a deliverable under a cost contract when accepted by the Government for continued use under the contract.
Infrastructure Condition
Assessment Program
(ICAP)
A Navy automated data management program that utilizes historical asset lifecycle data and a structured assessment process to evaluate the condition facilities and their components.
Inspection A rigorous, detailed assessment of the condition of a facility performed to generate a fundable scope and cost estimate for prioritization and funding of maintenance and repair.
Job or Work Order An authorization for work that requires planning and estimating and has an individual line of accounting for financial and performance evaluation.
Load Handling
Equipment
A term used to describe cranes, hoists and all other hoisting equipment (hoisting equipment means equipment, including crane, derricks, hoists and power operated equipment used WITH RIGGING to raise, lower and/or horizontally move a load.
Maintenance And
Repair
The preservation or restoration of a piece of equipment, system, or facility to such condition that it may be effectively used for its designated purposes. Maintenance/repair may be adjustment, overhaul, reprocessing, or replacement of constituent parts or materials that are missing or have deteriorated by action of the elements or usage, or replacement of the entire unit or system if beyond economical repair.
DEFINITIONS AND ACRONYMS
Definition Description
NAVFAC MAXIMO A specially configured software version of MAXIMO®, a commercially available computerized maintenance management system (CMMS), adopted by NAVFAC for enterprise facility asset data management. The terms “MAXIMO”, “NAVFAC
MAXIMO” or “Government’s MAXIMO” shall be used interchangeably in the document.
Performance
Assessment
A method used by the Government to provide some measure of control over the quality of purchased goods and services received.
Performance
Assessment
Representative (PAR)
The individual(s) assigned as a Technical Point of Contact (TPOC) / Subject Matter Expert
(SME) to the COR to perform duties as the on-site representative who assesses Contractor performance. The PAR periodically observes Contractor performance, reviews delivered services, reviews quality management corrective actions, periodically assesses and documents Contractor performance on PAWs and the MPAS, and communicates findings as necessary with the Contractor, SPAR, and COR.
Pre-Expended Bin
Materials And Supplies
The minor materials and supplies that are incidental to the job, for which the total direct cost of any one material line item shown on the material estimate is $10.00 or less.
Examples of pre-expended bin materials and supplies include, but are not limited to, solder, lead, flux, electrical connectors, electrical tape, fuses, nails, screws, bolts, nuts, washers, spacers, masking tape, sand paper, solvent, cleaners, lubricants, grease, oil, rags, mops, glue, epoxy, spackling compound, joint tape, plumbers tape and compound, clips, welding rods, and touch up paint.
Property Administrator An authorized representative of the Contracting Officer who is responsible for administering contract property requirements, terms and conditions of the contract
Property Management
Program
A Government program established for the purpose of reviewing and approving the
Contractor’s Property Management Plan and System through performance of a system analysis whenever government property is in the possession of the Contractor.
Quality Assurance
(QA)
The planned and systematic activities implemented in a quality system so that quality requirements for a product or service will be fulfilled.
Quality Control (QC) The observation techniques and activities used to fulfill requirements for quality.
R. S. Means A data collection and organization system developed by R. S. Means Company which can be used to prepare accurate, dependable construction estimates and budgets in a variety of ways. The Contractor shall use the latest edition. Material prices are based on a national average and computed labor costs are based on a 30-city national average. An estimate prepared using this data is called a "Means estimate"; data may simply be referred to as
"Means".
Real Property Inventory
Equipment (RPIE)
A Government owned or leased individual pieces of equipment, apparatus, or fixture that are essential to the function of the real property (i.e. plumbing, electrical, heating, cooling and elevators). It is physically attached to, integrated into, and built in or on the property.
Individual RPIE’s can be combined to make a CIMU to facilitate facilities management.
An individual RPIE can also be a CIMU if the equipment is complex enough to require its own management planning.
Response Time The time allowed the Contractor after initial notification of a work requirement to be physically on the premises at the work site with appropriate personnel, tools, equipment, and materials, ready to perform the work required.
Unit Priced Labor
(UPL) Hour
The unit price bid by the Contractor to perform one hour of work-in-place. With the exception of direct material and construction equipment costs, the unit price includes all indirect and direct costs associated with performing work. The price includes the
Contractor’s hourly composite trade wage, adjusted to allow for workforce productivity;
costs for pre-expended bin materials, union agreements, crew sizes, hand tools, payroll burdens and fringes, overtime, job (field) overhead (including clerical support, supervision, inspection, fees, taxes, licenses, permits, and insurance), general and administrative (home office) overhead, and profit. Additionally, time for job preparation, safety standby personnel, and similar indirect labor elements are included.
DEFINITIONS AND ACRONYMS
Acronym Title
ACO Administrative Contracting Officer
BW Biweekly
CDR Contract Discrepancy Report
CIA Controlled Industrial Area
CIMU Component Inventory Management Unit
CMMS Computerized Maintenance Management System
COR Contracting Officer Representative
COR Condition of Readiness
DBH Diameter at Breast Height
DCR Direct Condition Rating
DoD Department of Defense
DoN Department of Navy
DRMO Defense Reutilization Management Office
EPA Environmental Protection Agency
EPCRA Emergency Planning and Community Right-to-Know Act
FAR Federal Acquisition Regulation
FFP Firm Fixed Price
FIFRA Federal Insecticide, Fungicide, and Rodenticide Act
FSC Facility Support Contract
FSCM Facility Support Contract Manager
GIS Geospatial Information System
GFE Government-furnished Equipment
GFF Government-furnished Facilities
GFM Government-furnished Materials
HCA Head Contracting Agency
ICAP Infrastructure Condition Assessment Program
ICP Integrated Contingency Plan
IDIQ Indefinite Delivery Indefinite Quantity iNFADS Internet Navy Facilities Asst Data Store
IPM Integrated Pest Management
IPMIS Integrated Pest Management Information System
IPMP Integrated Pest Management Plan
KO Contracting Officer
LAN Local Area Network
M Monthly
MAP Maintenance Action Plan
MDI Mission Dependency Index
MEP Mechanical, Electrical and Plumbing
MPAS Monthly Performance Assessment Summary
MRI Mission Readiness Index
MSDS Material Safety Data Sheets
NAVFAC Naval Facilities Engineering Command
NMCI Navy Marine Corps Intranet
NOSC Navy-On-Scene Coordinator
PAP Performance Assessment Plan
PAR Performance Assessment Representative
PAW Performance Assessment Worksheet
PEO Program Executive Officer
PM Project Manager
PM Planned Maintenance or Preventative Maintenance
PRCSP Permit Required Confined Space Program
PWS Performance Work Statement
PWO Public Works Officer
Q Quarterly
QC Quality Control
RPIE Real Property Inventory Equipment
DEFINITIONS AND ACRONYMS
Acronym Title
RSL Remaining Service Life
SC Security Clearances
SM Semimonthly
SPAR Senior Performance Assessment Representative
TE Technical Exhibit
VIQ Variation in Quantity
WBS Work Breakdown Structure
ATTACHMENT J-0200000-02
WAGE DETERMINATIONS
See Wage Determinations in Section J if this solicitation.
ATTACHMENT J-0200000-03
DIRECTIVES, INSTRUCTIONS, AND REFERENCES
Reference Title
EM 385-1-1 U.S. Army Corps of Engineers Safety and Health Requirements
P.L. 91-596 Occupational Safety and Health Act
OPNAV 5090.1
ENVIRONMENTAL PROTECTION AND NATURAL RESOURCES
OPNAV 5530.14
PHYSICAL SECURITY AND LOSS PREVENTION
OPNAVINST 5100.23
NAVY OCCUPATIONAL AND SAFETY HEALTH PROGRAM MANUAL
NAVFACINST 6250.3
APPLIED PROGRAM SERVICES TRAINING AND REPORTING
REQUIREMENTS
CALIFORNIA; BUILDING
CODE (PART 2 TITLE 24,
C.C.R)
UNIFORM FEDERAL ACCESSIBILITY STANDARDS
29 CRR 1910 OCCUPATION SAFETY AND HEALTH STANDARDS
DoDI 6055.1 DoD Safety and Occupational Health (SOH) Program
DoDI 6055.4 DoD Traffic Safety Program
DoDI 6055.5 Industrial Hygiene and Occupational Health
DoDI 6055.7 Accident Investigation, Reporting, and Record Keeping
DoDI 6055.12 DoD Hearing Conservation Program
OPNAVINST 5090.1 Environmental and Natural Resources Program Manual with Change 3 (14 Mb zip file)
OPNAVINST 5100.8 Navy Safety and Occupational Health Program
OPNAVINST 5100.12 Navy Traffic Safety Program
OPNAVINST 5100.19 (w/chg 1) – NAVOSH Program Manual for Forces Afloat
OPNAVINST 5100.23 Navy Occupational Safety and Health Program Manual
OPNAVINST 5100.24 Navy System Safety Program
OPNAVINST 5100.28 Hazardous Material User’s Guide (1 Mb pdf file) or download as Word
Document (4.3 Mb zip file)
OPNAVINST 5100.23,
Appendix 14-E
Report of Traumatic Injury
OPNAVINST 5102.1 Navy & Marine Corps Mishap and Safety Investigation, Reporting, And Record
Keeping Manual
SECNAVINST 5305.4 DoN Safety Excellence Awards Program
OPNAVINST 5530.13 DoN Physical Security Instruction for Conventional Arms, Ammunition and
Explosives (AA&E)
OPNAVINST 11320.23 Shore Activities Fire Protection and Emergency Services Program
Unified Facilities Criteria (UFC)
OPNAVINST 11320.25 Reporting of Fire and Related Emergencies at Naval Shore Activities and Marine
Corps Facilities
NAVAIR P5100-NAVOSH NAVOSH Requirement of Shore
ATTACHMENT J-0200000-04
INVOICE FORM
See DFARS 252.232-7006 in Section I of this solicitation.
ATTACHMENT J-0200000-05
FORMS
NAVFAC Contractor Incident Report, WHE Accident Report.
ATTACHMENT "A"
CONTRACTOR CRANE OPERATING CHECKLIST FOR CRITICAL LIFTS YES NO
1 Does the operator know the weight of the load to be lifted?
Is the load to be lifted within the crane manufacturer's rated capacity in its present configuration?
3 Is the crane level and on firm ground?
4 Are outriggers required?
5 If so, are outriggers fully extended and down, and the load off the wheels?
6 If blocking is required, is the entire surface of the outrigger pad supported, and is the blocking material of sufficient strength to safely support the loaded outrigger pad?
If outriggers are not used, is the crane rated for on-rubber lifts by the manufacturer's load chart?
Is the swing radius of the crane counterweight clear of people and obstructions and accessible areas within the swing area barricaded to prevent injury, damage and unplanned encroachment?
Has the hook been centered over the load in such a manner to prevent swing (deflection, side loading, load-moment)?
Is the load well secured and balanced in the sling or lifting device before it is lifted (free and clear) more than a few inches?
11 Is the lift swing path clear of obstructions?
12 If rotation of the load being lifted is hazardous, is tag line or restraint line being used?
13 Are personnel prevented from standing or passing under a suspended load?
14 Are personnel prevented from entering the load fall zone?
15 Is the crane operator's attention diverted?
16 Are proper signals being used at all times?
17 If radio communications are used is the frequency isolated to the crane team?
18 Do the operations ensure that side and tip loading is prohibited?
Are start and stop motions in a smooth fluid motion (no sudden acceleration or deceleration)?
If operating near electric power lines, are the rules and guidelines understood and adhered to as specified in NAVFAC P-307?
21 Is the lift a critical lift?
If so, are critical lift regulations understood, check-off sheets initialed and signed off, and was there an interactive brief conducted with associated personnel?
23 Is Attachment "A" current, filled out completely, and posted in the crane?
Contractor Name (Print Legibly):
Contractor Name (Signature):
Location: Date:
FORMS
CRANE AND RIGGING GEAR ACCIDENT REPORT
Accident Category: Crane Accident Rigging Gear Accident
From:
UIC:
To: Navy Crane Center
Bldg. 491 NNSY
Portsmouth, VA 23709
Fax: 757-967-3808
Activity:
Report No:
Crane No:
Category:
Accident Date:
Time: hrs:
Category of Service: SPS GPS Crane Type:
Crane Manufacturer:
Was Crane/Rigging Gear Being Used in SPS: Yes
No
Was Crane/Rigging Gear Being Used in a Complex
Lift/Critical Non-Crane Rigging Operation:
Yes No
Location:
Weather:
Crane Capacity:
Hook Capacity:
Weight of Load on hook:
Fatality or Permanent Disability? Yes
Material/Property Cost Estimate:
Reported to NAVSAFECEN? Yes
Accident Type:
Personal Injury Overload Derail Damaged Rigging Gear
Load Collision Two Blocked Dropped Load Damaged Crane
Crane Collision Damaged Load Other:
Specify
Cause of Accident:
Improper Operation Equipment Failure Inadequate Visibility
Improper Rigging Switch Alignment inadequate Communication
Track Condition Procedural Failure Other:
Chargeable to:
Crane Walker Rigger Operator
Maintenance Management/Supervision Other:
Crane Function:
Travel Hoist Rotate Luffing Telescoping Other N/A Is this accident indicative of a recurring problem? Yes No
If yes, list Accident Report
Nos.:
ATTACH COMPLETE AND CONCISE SITUATION DESCRIPTION AND CORRECTIVE/PREVENTIVE
ACTIONS TAKEN AS ENCLOSURE (1). Include probable cause and contributing factors. Assess damages and define responsibility. For equipment malfunction or failure, include specific description of the component and the resulting effect or problem caused by the malfunction or failure. List immediate and long term corrective/preventive actions assigned and respective codes. Preparer:
Phone:
E-mail:
Code:
Date:
Concurrences: (Include Code, Signature and Date)
Certifying Official (Crane Accident Only):
CRANE AND RIGGING GEAR ACCIDENT REPORT INSTRUCTIONS
This form is designed for fax transmission without a cover page or by e-mail and, with enclosures and signatures, shall be the official document. Electronic submission will be accepted without signatures but the names of the preparer, concurring personnel, and certifying official (for crane accidents only) shall be filled in. The e-mail address is m_nfsh_ncc_accident@navy.mil. The fax number is (757) 967-3808.
1. Accident Category: Indicate either crane accident or rigging gear accident.
2. From: The naval activity that is responsible for reporting the accident and UIC number.
3. Activity: The naval activity where the accident took place.
4. Report No.: The activity assigned accident number (e.g., 95-001).
5. Crane No.: The activity assigned crane number (e.g., PC-5), if applicable.
6. Category: Identify category of crane (i.e., 1, 2, 3, or 4), if applicable.
7. Accident Date: The date the accident occurred.
8. Time: The time (24 hour clock) the accident occurred (e.g., 1300).
9. Category of Service: Check the applicable service (SPS as defined by NAVSEA 0989-030-7000).
10. Crane Type: The type of crane involved in the accident (e.g., mobile, bridge), if applicable.
11. Crane Manufacturer: The manufacturer of the crane (e.g., Dravo, Grove, P&H), if applicable.
12. SPS: Was the crane or rigging gear being used in an SPS lift?
13. Complex lift: Was the crane or rigging gear being used in a complex lift?
14. Location: The detailed location where the accident took place (e.g., building 213, dry dock 5).
15. Weather: The weather conditions at time of accident (e.g., wind, rain, cold).
16. Crane Capacity: The certified capacity of the crane (e.g., 120,000 pounds), if applicable.
17. Hook Capacity: The capacity of the hook involved in the accident at the max radius of the operation, if applicable.
18. Weight of Load on Hook: If applicable, the weight of the load on the hook.
19. Fatality or Permanent Disability?: Check yes or no.
20. Material/Property Cost Estimate: Estimate total cost of damage resulting from the accident.
21. Reported to NAVSAFECEN?: Self-explanatory.
22. Accident Type: Check all that apply.
23. Cause of Accident: Check all that apply.
24. Chargeable to: Check all that apply.
25. Crane Function: Check all functions in operation at time of accident. Check N/A if a rigging gear accident.
26. Is this a recurring problem?: Check yes or no. Identify any other similar accidents.
27. Situation Description/Corrective Actions: Self-explanatory.
28. Preparer: Self-explanatory.
29. Concurrences: Self-explanatory.
30. Certifying Official (Crane Accidents Only): Self-explanatory.
31. Brief Description: No more than one paragraph summarizing the resultant incident.
32. Background and Detailed Description: Provide the relevant background in a descriptive timeline of preconditions leading up to the event, as well as a detailed description of the event.
33. Corrective Actions: List all short term and long term corrective actions that are taken to prevent recurrence of the incident. Short Term Corrective Actions are those actions taken that will allow return to work in short time frame. Long Term actions are more ‘programmatic’ in nature and typically include: process revision, changes in training, ‘mistake proofing’, etc.
CRANE AND RIGGING GEAR NEAR MISS REPORT
Near Miss Category: Crane Near Miss Rigging Gear Near Miss
From:
UIC:
To: Navy Crane Center
Bldg 491 NNSY
Portsmouth, VA 23709
Fax (757) 967-3808 nfsh_ncc_accident@navy.mil
Activity: Report No:
Crane/Equipment No: Category: Near Miss Date: Time:
hrs
Category of
Service:
SPS GPS Crane /Equipment
Type:
Crane/Equipment
Manufacturer:
Location: Weather:
Crane/Equipment Capacity: Hook Capacity: Weight of Load on Hook:
Is this near miss indicative of a recurring problem?
Yes No
If yes, list report numbers:
In the space below, include a brief description of the event and corrective actions taken to prevent recurrence:
Preparer:
Phone and email
Code Date
CRANE AND RIGGING GEAR NEAR MISS INSTRUCTIONS
This form is designed for fax transmission without a cover page or by e-mail and, with enclosures and signatures, shall be the official document. Electronic submission will be accepted without signatures but the names of the preparer, concurring personnel, and certifying official (for crane accidents only) shall be filled in. The e-mail address is nfsh_ncc_accident@navy.mil. The fax number is (757) 967-3808.
1. Near Miss Category: Indicate either crane or rigging gear near miss.
2. From: The naval activity that is responsible for reporting the near miss and UIC number.
3. Activity: The naval activity where the near miss took place.
4. Report No.: The activity assigned near miss number (e.g., 95-001).
5. Crane No.: The activity assigned crane number (e.g., PC-5), if applicable.
6. Category: Identify category of crane (i.e., 1, 2, 3, or 4), if applicable.
7. Near Miss Date: The date the near miss occurred.
8. Time: The time (24 hour clock) the near miss occurred (e.g., 1300).
9. Category of Service: Check the applicable service (SPS as defined by NAVSEA 0989-030-7000).
10. Crane Type: The type of crane involved in the near miss (e.g., mobile, bridge), if applicable.
11. Crane Manufacturer: The manufacturer of the crane (e.g., Dravo, Grove, P&H), if applicable.
12. Location: The detailed location where the near miss took place (e.g., building 213, dry dock 5).
13. Weather: The weather conditions at time of the near miss (e.g., wind, rain, cold).
14. Crane Capacity: The certified capacity of the crane (e.g., 120,000 pounds), if applicable.
15. Hook Capacity: The capacity of the hook involved in the near miss at the maximum radius of the operation, if applicable.
16. Weight of Load on Hook: If applicable, the weight of the load on the hook.
17. Is this a recurring problem?: Check yes or no. Identify any other similar near misses or accidents.
18. Situation Description/Corrective Actions: Self-explanatory.
19. Preparer: Self-explanatory.
ATTACHMENT J-0200000-06
GOVERNMENT-FURNISHED PROPERTY, MATERIALS, AND SERVICES
BUILDINGS AND STRUCTURES: Government Furnished Facilities
BUILDING/
LOCATION
DESCRIPTION (PRIMARY
USE)
*AREA SQ.
FT
YEAR
BUILT
145/C-5 BOS Contractor Office 5277 42
Office Space 3,160
Lounge Area 323
Rest Rooms 177
Hallways, stairs, etc. 551
Conference Room 228
157/C-5 Maintenance Shops 15602 44
158/C-5 Warehouse 320 44
159/C-5 Maintenance Shop 640 44
160/C-5 Shop 1920 44
163/C-5 Office & Shop 3456 44
164/C-5 Shop 3368 44
165/C-5 Shop 5328 44
175 Storage 75 SF na
184 Storage 80 SF 44
185 Storage 80 SF 44
193 Storage 350 SF 54
194 Storage 50 SF na
195 Storage 700 SF 54
219 Ground Electronics 6,240 SF 42
222 Support Equipment 6,240 SF 42
316 Supply 6,240 SF 42
361 Warehouse 6,400 SF 44
162/C-5 Contractors Wash Facility: 818 SF
426 Warehouse 6,240 SF 42
GROUND ELECTRONICS EQUIPMENT
Description Model Serial Manuf. USN # Bar Code
Megohmmeter 1M-
100MOHM
MJ159 6410-
863/080508/761
Megger 6625-01-223-
N/A
COMPUTER P11400MT 1360548-0002 MICRON N/A N/A
MONITOR, COMPUTER 700VX YA0098320150
MICRON N/A N/A
COMPUTER P11400MT 1360548-0006 MICRON S-03820 N/A
MONITOR, COMPUTER 700FGX FB7561793 MICRON N/A N/A
PRINTER 870 CXI SG6AF161R4 HP DESKJET N/A S-01300
DISTORTION
ANALYZER
3501-01 88171826 380457 N/A N/A
UNIVERSAL COUNTER 5334B 2937A10397 28480 N/A N/A
WATTMETER, W/4410-
5,4410-6,4410-7
4410 1269 70998 N/A N/A
WATTMETER, W/O
ELEMENTS
6154 14165 70998 N/A N/A
WIND MEASURING T/S AN-UMQ-5 116 80058 N/A N/A
DIGITAL MULTIMETER 27 5050026 89536 N/A N/A
DIGITAL MULTIMETER 27 5060039 89536 N/A N/A
DISTORTION
ANALYZER
334A 1140A07275 28480 N/A N/A
ELECTRONIC
COUNTER
1992 970387 21793 N/A N/A
WATTMETER, W/ 4410-
4,4410-5,4410-6,4410-7
4410 1161 70998 N/A N/A
OSCOPE 22460PT1Y B700784 80009 N/A N/A
DISTORTION
ANALYZER
3501-01 88171854 380457 N/A N/A
POWER SUPPLY DC SRL 40-25 0923 N/A N/A N/A
POWER SUPPLY DC SRL 40-25 0894 N/A N/A N/A
WATTMETER, W/O
ELEMENTS
6154 14161 70998 N/A N/A
WATTMETER, W/ 4410-
4,4410-5,4410-6,4410-7
4410 4089 70998 N/A N/A
MEGGER 212159P 1163M91254 07289 N/A N/A
UNIVERSAL XMISSION
ANALYZER
5200-17 1531 42161 N/A N/A
STACO VAR XFORMER 033-2558 74 N/A N/A N/A
SYNCHRO TESTER
60HZ
MK33 MOD
3699 N/A N/A N/A
ATTN TEE 120DB
150WATT
CN-608A/U 021 55314 N/A N/A
WATTMETER, W/ 4410-
5,4410-6,4410-7
4410 1247 70998 N/A N/A
DIGITAL MULTIMETER 27/AN 81930004 N/A N/A N/A
SCOPE, METER FLK-199/AN DM7780330 N/A N/A N/A
SCOPE, METER FLK-199/AN DM8080306 N/A N/A N/A
MULTIMETER,
DIGITAL 4245
77-3/BN 87350015 FLUKE N/A N/A
MULTIMETER,
DIGITAL 4245
77-./BN 87350016 FLUKE N/A N/A
MULTIMETER,
DIGITAL 4245
77-3/BN 87350017 FLUKE N/A N/A
TEST SET, RADIO 2947 29450/203 IFR(CAGE
09553)
N/A N/A
TEST, BOX TEE-300
RS232
TS153A 9605422 N/A N/A N/A
COMPASS, MAGNETIC
TE-303
07624 N/A STOCKER&
YALE
N/A N/A
GAUGE,TORQUE TE-
SO-3 N/A SEEKONK N/A N/A
PRESSURE, STANDARD
TE-400
760-16B 66995 PAROSCIEN
TIFIC
N/A N/A
TESTER, TE-308 TST-220 173 N/A N/A N/A
CALIBRATION,
REFLECTOR K220-1TE2
CTX-16 N/A N/A N/A N/A
KIT,SOLAR NOON TE-
N/A N/A N/A N/A N/A
KIT,CALIBRATION
VISIBILITY TE-305
6220 383 N/A N/A N/A
COMPUTER, LAB TAB
M030-1
CF-41 6BKSMO1888 PANASONIC N/A N/A
PSYCHROMETER,
ASPIRATED TE-315
N/A 01 N/A N/A N/A
SIGNAL,
GENERATOR(FREQ
SYNTH
SPNH 1-282 82199 N/A N/A
TERMINATION 160-100D 1161 LEAR
SIEGLER
N/A N/A
TERMINATION 160-100D 1448 LEAR
SIEGLER
N/A N/A
RADIO, TEST SET 2947 294502/693 N/A N/A N/A
RADIO, TEST SET 2947 294502/674 N/A N/A N/A
OSCILLOSCOPE TDS3012B-
NV
B031881 N/A N/A N/A
ATTN TEE 120DB
150WATT
CN-608A/U N/A N/A N/A N/A
HI FREQUENCY PROBE 82RF GEMD2 FLUKE N/A N/A
WATTMETER, W/ 4410-
4,4410-5,4410-6,4410-
7,4275-020
4410A 21064 BIRD N/A N/A
WATTMETER, 4410-
4,4410-5,4410-6,4410-
7,4275-020
4410-A 21131 BIRD N/A N/A
Analyzer, Spectrum
9KHx-40GHZ
1164.4391.3
100862 Rohde &
Schwarz
6625-01-522-
Multi-meter Digital 7-1/2 2001M 1157158 Keithley
Instruments
Inc.
6625-01-425-
Multi-meter Digital 7-1/2 2001M 1193822 Keithley
Instruments
Inc.
6625-01-425-
Computer Laptop M2400 FK2FLJ1 Precision N/A N/A
GROUND ELECTRONIC FURNISHINGS
BOOKCASES, METAL
COVERED
TBU-4 N/A KIMBALL LS-00449 N/A
BOOKCASES, METAL
COVERED
TBU-4 N/A KIMBALL LS-00450 N/A
BOOKCASES, METAL TBU-4 N/A KIMBALL LS-00451 N/A
COVERED
BOOKCASES, METAL
COVERED
TBU-4 N/A KIMBALL LS-00452 N/A
BOOKCASES, METAL
COVERED
TBU-4 N/A KIMBALL LS-00453 N/A
BOOKCASES, METAL
COVERED
TBU-4 N/A KIMBALL LS-00454 N/A
CHAIR, TASK
CHADWICK
33AA1BKT
SXSC
N/A KNOLL INC. LS-00372 N/A
CHAIR, TASK
CHADWICK
33AA1BKT
SXSC
N/A KNOLL INC. LS-00382 N/A
CHAIR, TASK
CHADWICK
33AA1BKT
SXSC
N/A KNOLL INC. LS-00389 N/A
CHAIR, TASK
CHADWICK
33AA1BKT
SXSC
N/A KNOLL INC. LS-00440 N/A
CHAIR, DESK ROLLING
BLK
33AA1BKT
SXSC
N/A KNOLL INC. LS-00436 N/A
CHAIR, DESK ROLLING
BLK
33AA1BKT
SXSC
N/A KNOLL INC. LS-00414 N/A
CHAIR, DESK ROLLING
BLK
33AA1BKT
SXSC
N/A KNOLL INC. LS-00458 N/A
TABLE, ROUND
W/ROLLS
SS42TTRNL N/A KIMBALL LS-00441 N/A
DESK, CREDENZA L-
SHAPE
S524367224 N/A KIMBALL LS-00438 N/A
FILE CABINET, TOP OF
DESK
S7215FMLP N/A KIMBALL LS-00439 N/A
DESK, CREDENZA L-
SHAPE
S524367224 N/A KIMBALL LS-00455 N/A
FILE CABINET, TOP OF
DESK
S7215FMLP N/A KIMBALL LS-00456 N/A
CHAIR, STOLL
ADJUSTABLE
531DH N/A KIMBALL NO-TAG N/A
CHAIR, STOLL
ADJUSTABLE
531DH N/A KIMBALL NO-TAG N/A
CHAIR, STOLL
ADJUSTABLE
531DH N/A KIMBALL NO-TAG N/A
FILE CABINET, TOP OF
DESK
S7215FMLP N/A KIMBALL LS-00442 N/A
DESK, CREDENZA L-
SHAPE
S524367224 N/A KIMBALL LS-00443 N/A
CHAIR, STOLL
ADJUSTABLE
531DH N/A KIMBALL LS-00446 N/A
SERVICE SHOP EQUIPMENT
1989-Tractor Case 485 N/A International
Case
N/A 48-17918
Generator Diesel 100.0DGB-
L1293
K570940527 Cummins N/A 51-22353
SUPPLY FURNISHINGS
UNIT, WOODEN DESK N/A 1154678RB N/A N/A S-13379
UNIT, WOODED DESK 1154678RB 09990-00-FT UNICOR N/A S-13380
BOOK CASE N/A N/A N/A N/A S-11552
Cabinet Metal 5-Drawer N/A N/A HON N/A N/A
CBH FURNISHINGS
FILE CABINET, METAL
4-DRAWER LOCKING
N/A N/A N/A N60042-
20499
B-08220
WWTP EQUIPMENT
Vacuum Pump S55NXMLD
-671
N/A Emerson N/A N/A
Meter, Flow Magnitrol 345-0442-
006952-01-001 Magnitrol N/A N/A
Analytical Balance AB204-5 1125220938 Mettler
Toledo
N/A N/A
WWTP FURNISHINGS
Oven, Utility 13U N/A Hach N/A N/A
Fridge, 18.1CF N/A 13766 GE N/A N/A
HAZMAT FURNISHINGS
Cabinet, Filing N/A N/A HON S-13365 N/A
Panasonic T.V. With VCR PV-N2037 F7AA24638 Panasonic S-11504 N/A
Rolling T.V. Stand N/A N/A N/A S-11596 N/A
Bookcase N/A N/A N/A S-11510 N/A
Green Chair N/A N/A UNICOR S-11822 N/A
Chair, Gray N/A N/A N/A S-11557 N/A
Locker, Gray N/A N/A N/A S-13369 N/A
Bookcase N/A N/A N/A S-11471 N/A
FILE CABINET 5-
DRAWER TAN
N/A N/A HON S-11668 N/A
FILE CABINET 5-
DRAWER TAN
N/A N/A HON S-17006 N/A
Desk, Wood L-Shape N/A N/A N/A S-16001 N/A
Desk, Wood W/ shelf
Cabinet
N/A N/A N/A S-16002 N/A
Chair, High Back w/ Arms N/A N/A N/A S-17030 N/A
TRANSIENT LINE EQUIPMENT
SCALE, CARGO
WEIGHT 50TON CAP.
N/A 1201281 HOWE N60042-
013739
N/A
SKID, YELLOW 624002 N/A IRVINGLIDE N/A N/A
SKID, YELLOW N/A N/A N/A N/A N/A
SKID, YELLOW N/A N/A N/A N/A N/A
SKID, YELLOW N/A N/A N/A N/A N/A
SKID, YELLOW 624002 N/A IRVINGLIDE N/A N/A
SKID, YELLOW 624002 N/A IRVINGLIDE N/A N/A
SKID, YELLOW N/A N/A N/A N/A N/A
STAKEWAGON,
TOWING CARTS
STAKEWA
GON
97-31809 PARKHURST 014289 STAKEWA
GON,
TOWING
CARTS
STAKEWAGON,
TOWING CARTS
STAKEWA
GON
97-31805 PARKHURST 014291 STAKEWA
GON,
TOWING
CARTS
STAKEWAGON,
TOWING CARTS
STAKEWA
GON
97-31804 PARKHURST 014290 STAKEWA
GON,
TOWING
CARTS
STAKEWAGON,
TOWING CARTS
STAKEWA
GON
97-31807 PARKHURST 025254 STAKEWA
GON,
TOWING
CARTS
SHOCKS, AIRCRAFT N/A N/A N/A N/A N/A
COVER, SIDEWINDER
MISSLE
N/A N/A N/A N/A N/A
PALLET, METAL
CARGO
N/A N/A N/A N/A N/A
FOD FINDER TRUCK F-350 N/A Chevrolet N/A
ATTACHMENT J-0200000-10 07
NAVFAC MAXIMO DATA REPORTING
PURPOSE AND OVERVIEW
The purpose of this attachment is to provide guidance on how data is to be recorded and provided by the Contractor in reporting Service Provider, Asset, Specification, and Characteristic Meter Reading Information for NAVFAC
MAXIMO. This document outlines the methods that must be utilized by the Contractor and associated NAVFAC business process and procedures for how data is to be submitted.
GENERAL TYPES OF DATA
Work Order Data
Work order data includes all necessary information for the documentation of all completed work orders, including, but not limited to, service orders, preventive maintenance (as performed under the PM program or as part of IMP), and work issued as IDIQ.
Asset Data
Asset data includes the specific details necessary for proper identification and tracking of assets. Asset data must be updated for all completed work orders where an asset is repaired, replaced, installed, or otherwise affected. Utilities assets require the additional data listed on the Specification Information spreadsheet provided in J-0200000-. When replacing existing assets, the Contractor shall change the status of the current asset which will remove it from the maintenance plan and add the new asset.
Condition Assessment Data
Condition assessment data includes all necessary information for the accurate condition rating of all assets in support of the Infrastructure Condition Assessment Program (ICAP
METHODS FOR DATA SUBMISSION
The Contractor shall provide work order, asset, specification, and condition assessment data using the methods as specified in Section C. Additional details are provided below for submission of data via Direct Entry.
In this method a Contractor obtains authorized access as specified in Section C and directly enters data into
NAVFAC MAXIMO. Detailed guidance on NAVFAC MAXIMO System Access Procedures is provided in J-
0200000. All reference value verification is provided by NAVFAC MAXIMO.
All Contractors who obtain authorized access will be granted entry only within the applicable NAVFAC MAXIMO screens necessary to enter work order, asset, specification, and condition assessment data. Contractors are only authorized to view, edit, report or otherwise access data related to their work. Any unauthorized attempt to do otherwise may be grounds for removal of access privileges. Contractors will be assigned a specific work center code for their work and shall utilize this code for all such data entry and retrieval.
The Contractor is required to validate their data prior to submission to minimize data rejects. To assist the contractor in data validation, the appropriate reference values will be provided by the Government and updated as changes occur.
ATTACHMENT J-0200000-11 08
NAVFAC MAXIMO SYSTEM ACCESS PROCEDURES
Instructions should be reviewed with CIO and local Information Assurance Manager (IAM) to confirm access request and approval procedures are still current and tailor to any local requirements.
Purpose and Overview
In order to obtain access to NAVFAC MAXIMO for direct entry, Contractor personnel must obtain a Common
Access Card (CAC) with DoD PKI certificates for the access to Government Information Systems (IS) and must have an account established within NAVFAC MAXIMO.
CAC Application Procedures
Once the Contractor has provided the list of personnel requiring MAXIMO accounts, the Government Trusted
Agent (TA) will sponsor the Contractor personnel initiating the process to obtain a CAC. Contractor personnel must submit an application for the CAC within the Trusted Associate Sponsorship System (TASS). Contractor personnel must log into TASS within seven days of the application's approval and must complete the application for a CAC within 30 days of the initial login. More information can be found at: http://www.cac.mil/common-access-card/getting-your-cac/for-contractors/.
After approval in TASS, the Contractor personnel must go to a Real-Time Automated Personnel Identification
System (RAPIDS) site for final verification and issuance of the CAC with associated DoD PKI certificates.
NCMI Access Procedures
NAVFAC MAXIMO Account Requests
The Contractor shall submit a request for establishing a NAVFAC MAXIMO account to the Contracting Officer using the System Access Authorization Request – Navy (SAAR-N) form (OPNAV 5239/14), and indicate the role the user will have and the specific account privileges desired. Account requests SHALL NOT be submitted prior to having received a CAC.
Specific steps for requesting account access include:
Complete Information Assurance (IA) training o Cyber Awareness Challenge version 3.0 (current requirement, subject to change based on policy) o Annual IA training is required to maintain access to Government IS
Submit a complete and digitally signed SAAR form detailing the following required access:
o Requesting a NITC portal SSO account o Requesting a STS account o Request a NAVFAC Maximo account
After the SSO/STS accounts are created, submit a STS ticket requesting a new Maximo account.
The local NAVFAC Business Office will determine level of access and restrictions for users by configuring
NAVFAC MAXIMO Work Center access. The Contractor will receive notification that the NAVFAC
MAXIMO account has been created and NAVFAC MAXIMO access URL details.
ATTACHMENT J-0200000-12 09
INSTALLATION SPILL CONTROL PLAN
This attachment will be provided as 22 separate .pdf documents.
http://www.cac.mil/common-access-card/getting-your-cac/for-contractors/ http://www.cac.mil/common-access-card/getting-your-cac/for-contractors/
ATTACHMENT J-0200000-13 10
CONTRACTOR HAZARDOUS MATERIAL INVENTORY LOG
ATTACHMENT J-0200000-14 11
EXHIBIT LINE ITEM NUMBERS
This is provided as an attachment to the solicitation in Excel format.
LIST OF DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS
TABLE OF CONTENTS
ATTACHMENT NUMBER ATTACHMENT TITLE
J-0501040-01 Definitions and Acronyms
J-0501040-02 References, Instructions, and Directives
J-0501040-03 Airfield Operating Hours
J-0501040-04 Historical Data for PM and CM Labor Hours
J-0501040-05 ATC Communications Equipment Inventory
J-0501040-06 Non-precision Approach Equipment Inventory
J-0501040-07 ATC Ancillary Equipment Inventory
J-0501040-08 NAVAIDS Equipment Inventory
J-0501040-09 METOC Equipment Inventory
J-0501040-10 Other Aviation Equipment Inventory
J-0501040-11 Non-Aviation Equipment Inventory
ATTACHMENT J-0501030-01
DEFINITIONS AND ACRONYMS
Title Description
Operational
Availability (Ao)
The probability that a system or equipment is capable of performing its specified function when called for at a random point in time. Ao requirements for all NAALS equipment is established by CNO letter dated 26 July 2004, Ser. 785F5/4U790359.
Casualty Report
(CASREP)
Notification sent to applicable Type Commander, info to SPAWAR, OPNAV and associated equipment managers notifying of casualty, action taken, estimated time of repair.
A CASREP must be initiated when a malfunction or deficiency, not correctable within 48 hours, reduces the unit's primary or secondary mission capability. There are four types of
CASREPs as follows:
CASREP Initial Identifies the status of the casualty and required parts and assistance.
CASREP Update Contains information similar to the "initial" report and submits changes to supplied previous information.
CASREP Correct
(CASCOR)
Submitted when the casualty is repaired and in operational condition.
CASREP Cancel Submitted when the casualty is scheduled to be repaired during overhaul or other scheduled availability.
Corrective
Maintenance (CM)
The act of repair by part or replacement of system, equipment, sub-assembly or component.
CM includes actions taken to fix equipment that has failed or is not working to design specifications. Included in the phrase “corrective maintenance” are authorized changes or modifications to installed equipment.
Engineering Change
Proposal (ECP)
Modification to NAALS equipment or systems that is generated by the ISEA or higher authority.
Flight Check Performed on specific NAALS equipment to certify equipment for use in the National
Airspace. Official flight inspections are of five basic types: site evaluation, commissioning, periodic, special and surveillance.
Ground Inspection An on-going process of verifying that the system’s operation is within the baseline standards and tolerances set by the ISEA and, if necessary, verified by FAA Flight Check.
ISEA In Service Engineering Activity
JQR Job Qualification Requirement
Logistic Delay Time a system is unavailable due to logistic system delays associated with the maintenance action including:
-Supply Response Time – The portion of down time awaiting receipt of a spare component.
-Administrative Delay Time – The portion of down time awaiting logistic resources other than spare parts, including time awaiting qualified maintenance personnel, support equipment, technical data, training, etc.
-Outside Assistance Delay Time – The portion of down time awaiting maintenance teams from other locations, such as depot repair teams and general support teams who travel to operating sites for additional technical assistance.
LSO Landing Safety Officer
Maintenance Data
Accounting System
(MDAS)
A comprehensive database maintained by SPAWAR Systems Center for NAALS manpower, equipment, physical plant, and airspace ashore to serve as the baseline for management decisions. Facilitated by a reporting requirement for tracking equipment inventory, preventive and corrective maintenance hours, system outage hours, parts costs, logistic delay, number of failures and other pertinent data applicable to equipment and systems installed.
Notice to Airman
(NOTAM)
Reporting system for notifying pilots of the loss of a major NAVAID capability. NOTAMs must be transmitted by the ODO for any unscheduled outages of major NAVAID that exceeds 30 minutes and for any scheduled outage longer than one hour.
Preventive
Maintenance (PM)
Actions intended to prevent or discover functional failures. Minimum recurring maintenance required to verify systems and equipment are performing to the design parameters of the manufacturer and meet user requirements.
Trouble Calls (TCs) Deficiencies reported to maintenance personnel to initiate troubleshooting and repair.
ATTACHMENT J-0501030-01
Title Description
3M Material Maintenance Management
ATC Air Traffic Control
ATCF Air Traffic Control Facility
AVOIC Airfield Vehicle Operators Instruction Course
CNO Chief of Naval Operations
CPR Cardio Pulmonary Resuscitation
DoN Department of the Navy
FAA Federal Aviation Administration
GEMD Ground Electronics Maintenance Department
GEMO Ground Electronics Maintenance Officer
ISEA In Service Engineering Activity
JQR Job Qualification Requirement
LSO Landing Safety Officer
METOC Meteorological Command
MRC Maintenance Requirement Card
NAALS Naval Air Traffic Control Air Navigational Aids and Landing Systems
NAS National Air Space; also Naval Air Station
NAVAIDS Navigation Aids
NAVAIR Naval Air Systems Command
NAVSEA Naval Sea Systems Command
ODO Operations Duty Officer
OPNAV Office of the Chief of Naval Operations
OPNAVINST Office of the Chief of Naval Operations Instruction
SPAWAR Space and Naval Warfare Systems Command
ATTACHMENT J-0501040-01
REFERENCES, INSTRUCTIONS, DIRECTIVES
CNO letter dated 11 Feb 05, Ser N785F5/5U937761
Establishes Operational Availability (Ao) for all NAALS equipment.
NAVAIR 00-80T-114
(NOTAL)
NATOPS Air Traffic Control Manual
OPNAVINST 2400.20 Navy Management of the Radio Frequency Spectrum
OPNAVINST 3721.5 Naval Air Traffic Control, Air Navigation Aids and Landing Systems (NAALS) Program
OPNAVINST 3721.20 Department of Defense Notice to Airmen (NOTAM) System
NWP 1-03.1 (NOTAL) Navy Warfare Publication (NWP) Library, Operational Reports
NAVAIRINST 4130.1C NAVAIR Configuration Management Manual
FAAO 6000.6A Interagency Ground Inspection Guidance
NAVSEAINST 4790.8 Ships’ Maintenance and Material Management (3-M) Manual
OPNAV Manual OP43P6B Metrology Automated System for Uniform Recall and Reporting Manual
OPNAVINST 3000.12 Operational Availability of Equipment and Weapons Systems
OPNAVINST 4790.4 Ships’ Maintenance and Material Management (3-M) System Policy
OPNAV P-45-110-96 Hazardous Material User’s Guide (HMUG)
OPNAV 5100.23 Navy Occupational Safety and Health (NAVOSH) Program Manual
NAVAIR 16-1-520 U.S. Standard Flight Inspection Manual
OP43P6 Metrology Automated System for Uniform Recall and Reporting (MEASURE) User’s
Manual
NTP6C CFR 47 Federal
Communications Commission
ANNEX D Regulations Spectrum Management Manual
CINCPACFLT 4790.2 3M Inspection Policies Series
COMNAVAIRFORINST
4790.2A
The Naval Aviation Maintenance Program (NAMP).
COMNAVAIRPAC 4790.1 P.M.S. Manual Series
OPNAVINST 4790.2J Maintenance policies, procedures, and responsibilities for the conduct of the NAMP
NAVAIR 17-35NCE-1 Calibration Equipment List, Electronic
NAVAIR 17-35MTL-1 METRL (Metrology Requirement List)
NAVAIR/ESO ASL's Allowance Parts Lists, Various GE Equipment
NAVCOMPT VOL III Navy
Comptroller Manual
Appropriation, Cost, and Property Accounting (Field)
NAVEDTRA 43241E PQS for Ships' Maintenance and Material Management (3M) Systems
NAVELEX 0101.101 Naval Shore Electronics Criteria, General
NAVELEX 0101.102 Naval Shore Electronics Criteria, Naval Comm. Station Design
NAVELEX 0101.103 Naval Shore Electronics Criteria, HF Radio Propagation
NAVELEX 0101.105 Naval Shore Electronics Criteria, Satellite Communication Systems
NAVELEX 0101,106 Naval Shore Electronics Criteria, Electromagnetic Capability and Electromagnet Radiation
Hazards
NAVELEX 0101.107 Naval Shore Electronics Criteria, Naval Aeronautical Facilities
NAVELEX 0101.108 Naval Shore Electronics Criteria, Naval Security Group Elements
NAVELEX 0101.109 Naval Shore Electronics Criteria, Naval Training Facilities
NAVELEX 0101.110A Naval Shore Electronics Criteria, Installation Standards and Practices
NAVELEX 0101.111 Naval Shore Electronics Criteria, Digital Computer Systems
NAVELEX 0101.112 Naval Shore Electronics Criteria, Line-of-Sight Microwave and Tropospheric Comm.
Systems
NAVELEX 0101.113 Naval Shore Electronics Criteria, VLF, LF & MF Comm. Systems
NAVELEX 0101,114 Naval Shore Electronics Criteria, NAVELEX Corp Program
NAVELEX 0101,115 Naval Shore Electronics Criteria, Digital Computer Systems
NAVELEX 0967-LP-641-5010 GEMO Operations & Maintenance Management Guide
NAVELEXINST 5215.1 Index of NAVELEX Instructions: AN/GRC-171, 175 AN/GRT-21/22/ANGRR-23,24
NAVOSH P-5100 Safety Precautions for Shore Activities
NAVMAT P-1047 Safety Equipment Manual
NAVORD OP 3565 *Radio Frequency Hazards to Ordnance, Personnel and Fuel
NAVSEA 0900-LP-005-8000 Technical Manual for Radio Frequency Radiation Hazards
NAVSEA 0936-LP-003-7010 Handbook of Cleaning Practices
NAVSEA 0967-LP-000-0010 Communications
NAVSEA 0967-LP-000-0110
EIMB
Installation Standards
N…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.