Section_F.pdf
PDF 481 KB Posted
- Attached to
- FY18-26 BASE OPERATING SUPPORT (BOS) SERVICES AT NAVAL AIR FACILITY (NAF) EL CENTRO, CALIFORNIA
- Solicitation number
- N6247317R3807
About this file
Section_F.pdf
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment_08.pdf | ||
| Unpopulated_ELIN_Spreadsheet.xlsx | XLSX spreadsheet | |
| Amandment_0007.pdf | ||
| Unpopulated_ELIN_Spreadsheet.xlsx | XLSX spreadsheet | |
| Section_J.pdf | ||
| Section_C_Revised.pdf | ||
| Amendment_0006.pdf | ||
| Amendment_04.pdf | ||
| El_Centro_Range_Complex_-_R2510_West_Mesa.pdf | ||
| Amendment_03.pdf | ||
| El_Centro_Range_Complex_-_R2512_East_Mesa.pdf | ||
| Amendment_02.pdf | ||
| Section_J.pdf | ||
| Section_C.pdf | ||
| Amendment_01.pdf | ||
| N6247317R3807_N62473-17-R-3807_-_Pre-solicitation_Notice.pdf |
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
0200000 – Management and Administration
SECTION F: DELIVERIES OR PERFORMANCE
DELIVERABLES
Annex/
Spec Item
Form
Attachment
Number Deliverable Title
Date (s) of
Submission
Distribution
Frequency Original
Copies
(including original)
0200000/
2.2.1.2
N/A Request to Work
Outside
Government’s
Regular Working
Hours
At least seven calendar days prior to requested day.
KO 1 As required
0200000/
2.3.4
N/A Permits and
Licenses
Before work commences and as requested by the KO.
KO 1 As specified
0200000/
2.3.5
N/A Certificate of
Insurance
Within 15 calendar days after award.
KO 1 As specified
0200000/
2.3.11
N/A Cost Account Code
(CAC) Report
First work day of each month.
KO 1 Monthly
0200000/
2.3.11
N/A Government
Contract Copies
Within 15 calendar days after award.
KO 6 As specified
0200000/
2.6.6.2
J-0200000-XX Sample Delimited
Flat-file
Within 15 calendar days after award.
KO 1 As specified
0200000/
2.6.6.3
J-0200000-09 List of Personnel
Requiring
MAXIMO
Accounts
Within 15 calendar days after award and within seven calendar days of changes.
KO 1 As specified
0200000/
2.6.7.1
N/A Quality
Management Plan
Within 15 calendar days after award and within seven calendar days of changes.
KO 1 As specified
0200000/
2.6.7.2
N/A QC Inspection File Within five calendar days of completion/ termination of the contract.
KO 1 As specified
0200000/
2.6.7.3
N/A Contractor Quality
Inspection and
Surveillance
Report
First work day of each month.
KO 1 Monthly
0200000/
2.6.8
N/A Property
Management Plan
Within 45 calendar days after award.
KO 1 As specified
Spec Item
Form
Attachment
Number Deliverable Title
Date (s) of
Submission
Distribution
Frequency Original
Copies
(including original)
0200000/
2.7.1
N/A List of Key
Personnel and
Qualifications
Within 15 calendar days after award.
KO 1 As specified
0200000/
2.7.1
N/A Organizational
Chart
Within 15 calendar days after award.
KO 1 As specified
0200000/
2.7.2.4
N/A Proof of Legal
Residency
Prior to be admitted to site of work.
KO 1 As specified
0200000/
2.7.3
N/A Contractor Labor
Hours (eCMRA)
Report
No later than 31
October
KO 1 Annually for labor executed during the period of performance during each
Government fiscal year
(FY)
0200000/
2.8.1
N/A Employee List Upon request. KO 1 As required
0200000/
2.8.7
N/A Personnel Security
Investigation (PSI), Fingerprint Card
(FD87), and OF-
306 Declaration for
Federal
Employment
Prior to employee access to sensitive unclassified information.
KO/
Security
Manager
1 As required
0200000/
2.9.1.1
N/A Contractor and
Subcontractor
Experience
Modification Rate
(EMR)
Upon request. KO/COR 1 As required
0200000/
2.9.1.2
N/A Contractor and
Subcontractor
OSHA Days Away
From Work, Restricted Duty, or
Job Transfer
(DART) rate
Upon request. KO/COR 1 As required
0200000/
2.9.2
N/A Safety Prep
Meeting Minutes
Upon request. KO/COR 1 As required
0200000/
2.9.13
N/A Accident
Prevention Plan
Within 15 calendar days after award and within seven calendar days of changes.
KO 1 As specified
Spec Item
Form
Attachment
Number Deliverable Title
Date (s) of
Submission
Distribution
Frequency Original
Copies
(including original)
0200000/
2.9.24
N/A Activity Hazard
Analysis
Together with the
Accident
Prevention Plan and for changes.
KO 1 As specified
0200000/
2.9.35
N/A Compliance Plans, Programs, and
Procedures
Together with the
Accident
Prevention Plan and for changes.
KO 1 As specified
0200000/
2.9.56
J-0200000-05 NAVFAC
Contractor Incident
Reporting System
(CIRS)
Within five calendar days of accident.
KO 1 As required
0200000/
2.9.56
J-0200000-05 Weight Handling
Equipment
Accident Report
Within 15 working days of accident.
KO 1 As required
0200000/
2.9.56
J-0200000-05 Crane and Rigging
Gear Near Miss
Report
Within 15 working days of accident.
KO 1 As required
0200000/
2.9.78
N/A Monthly On-Site
Labor Report
First work day of each month.
KO 1 Monthly
0200000/
2.9.89
N/A OSHA Citations and Violations
Corrective Action
Report
Within 48 hours after receiving a citation.
KO 1 As required
0200000/
2.9.1011
N/A Safety
Certifications
Within 15 calendar days after award and as old certifications expire.
KO 1 As specified
0200000/
2.10.1.1
N/A Water
Conservation Plan
Within 15 calendar days after award and for changes.
KO 1 As specified
0200000/
2.10.2.1
N/A Class I ODS
Report
Within 24 hours following delivery of refrigerant to
DLA
KO 1 As required
0200000/
2.10.2.5
J-0200000-05 Emergency
Planning and
Community Right-
To-Know Act
(EPCRA) Report
Within 15 calendar days after contract award and not less than 10 working days prior to planned use of hazardous material.
KO 2 As specified
Spec Item
Form
Attachment
Number Deliverable Title
Date (s) of
Submission
Distribution
Frequency Original
Copies
(including original)
0200000/
2.10.2.5
J-0200000-10 Contractor
Hazardous
Material Inventory
Log
Within 15 calendar days after the end of each calendar year and at termination of the contract.
KO 2 Annually
0200000/
2.10.3
N/A Sustainable
Procurement and
Practices Plan
Within 15 calendar days after award and within 15 calendar days after exercised option periods.
KO 1 Annually
0200000/
2.10.3
N/A Sustainable
Delivery of
Services Report
Within five calendar days after each contract period.
KO 1 Annually
0200000/
2.10.3.2
N/A Recovered
Material
Certification
.As specified KO 1 When a product containing recovered materials is equal to or better than the original and could be used.
0200000/
2.16.1
N/A Phase-in Plan Within ten calendar day after award.
KO 2 As specified
0200000/
2.16.2
N/A Phase-out
(Transition ) Plan
Plan no later than the follow-on contract pre-performance conference
KO 2 As specified
0501040 – Ground Electronics
Spec Item
Form
Attachment
Number Deliverable Title
Date (s) of
Submission
Distribution
Frequency
Original/
Copies
Number of Copies
(including original)
0501040/
2.2.1
N/A Training Program Within 30 days after contract award
GEMO/KO 2 Once & Updated as
Required/
Electronic
Document/
No
0501040/
2.2.1
N/A Certification, Training and
Licenses
Within 15 days after award or as requested by the KO
KO 1 Once for initial submittal, then as requested
0501040/
3.1
N/A PM Program and
Corrosion Control
Plan
30 days following award
GEMO/KO 2 Once & Updated annually/
Electronic
Document/
No
0501040/
3.1
N/A Preventive
Maintenance
Schedule
Wednesday preceding scheduled week
KO 1 Weekly/ Electronic
Document/
No
0501040/
3.2
N/A Engineering
Change Proposal
Required modification
KO 1 As Required/
Electronic
Document/
No
0501040/
3.2.1
N/A List of On-Call
Technicians
30 days following award
KO 1 Once & Updated as
Required/
Electronic
Document/
No
0501040/
3.2.2
N/A Non-emergent
Trouble Calls Not
Completed
First day of following month
KO 1 Monthly/
Electronic
Document/
No
0501040/
3.2.4
N/A Casualty Reports
(CASREPs)
Within six hours of reported failure
GEMO/KO 2 Dailey/ Electronic
Document/
No
0501040/
3.2.4
N/A Casualty
Correction Report
(CASCOR)
Within one day upon correction of a
CASREP
GEMO/KO 2 Dailey/ Electronic
Document/
No
Form
Attachment
Number Deliverable Title
Date (s) of
Submission
Distribution
Frequency
Original/
Copies
Number of Copies
(including original)
0501040/
3.2.4
N/A CASREP updates Within two days prior to the required update or within one day of any changes for each
CASREP not corrected
GEMO/KO 2 Dailey/ Electronic
Document/
No
0501040/
3.3
N/A Ground Inspection
Program
30 days following award
GEMO/KO 2 Once & Updated annually/
Electronic
Document/
Yes
0501050 – Airfield Facilities
Form
Attachment
Number
Deliverable Title
Date (s) of
Submission
Distribution
Frequency/
Media/
Approval? Original
Copies
(including original)
0501050/
2.2.1
N/A Certification, Training and
Licenses
Within 15 days after award or as requested by the KO
KO 1 Once for initial submittal, then as requested
0501050/
2/3/3
N/A Procedure for
Communications with Airfield
30 days following award/Annually
KO 1 Annually/
Electronic/
Air Ops
Approval
0501050
/3.1
N/A Completed
Customer Survey
Forms
Beginning of each month
KO 1 Monthly
0501050/
3.1.3
N/A Summary of
Aircraft
Supported &
Services
Performed th day of following month
KO 3 Monthly
0501050/
3.2.2
N/A FOD Prevention
Report Sheets
Prior to 8am 3 Daily
0501050/
3.3
N/A Maintenance Plan 30 days following award/Annually
KO 1 Annually
0501050/
3.3
N/A Monthly
Maintenance
Schedule
Beginning of each month
KO 1 Monthly
0501050/
3.3
N/A Unaccomplished
Maintenance
Report
5th day of following month
KO 1 Monthly
DELIVERABLES FORM PREPARATION INSTRUCTION
1. Prepare a Deliverable Report Preparation Instruction for each deliverable requirement. Specify information that should be included in the report. Instructions should be meaningful, complete, and clear. If another document provides instructions, reference the instruction paragraph and state where/how the Contractor may obtain the referenced document (e.g., Existing permit is on file in the Technical Library.”). If no specific format is required, state that Contractor’s format is acceptable. If specific Government forms are to be used by the Contractor, prepare and insert the blank forms into Section J. Only insert forms that are required for Contractor use. If a Contractor-provided form is acceptable, no Government form is required.
2. Instruction form preparation (see sample form below):
Government Approval Required:
Check “yes” if you want the Contractor to submit a “draft” document for Government approval, before a
“final” document is submitted.
Check “no” if you do not need the Contractor to submit a “draft” document for Government approval before a “final” document is submitted, or if Government approval is not required even for a “draft”.
For check mark use capitalized “X”, bold, italic, and underlined. Delete extraneous underline markings.
Media:
Check the type(s) of document you want the Contractor to submit (hard copy, electronic and/or direct input into a system). For check mark use capitalized “X”, bold, italic, and underlined. Delete extraneous underline markings.
For “Electronic” specify in the preparation instructions if you want the report by e-mail, diskette or CD.
Direct system input means inputting the information into an established Government system such as
DCPDS or MODERN (for HRO) and SPM. It does not mean inputting into an Access or Excel database, etc.
Instructions:
Do not include contract performance requirements here that belongs in the PWS
Include any other special instructions or information the Contractor needs to prepare the deliverable (e.g., data must be input into a specific system).
If report is required electronically, note if the report should be e-mailed or submitted on CD or diskette (3.5 diskette, 100MB or 250MB zip disk). If applicable, specify the required file format (i.e. Excel, Word, Access, etc.).
Include description of approval chain (if required).
An example of unclear instructions: “As determined by the Contractor to include all applicable regulatory information.”
Deliverables Form Preparation Instructions
Deliverable Title: 0501050/3.1 – Customer Survey Forms
Form Attachment No.: J-0501050-XX
Government Approval Required: ___ Yes _X__ No
Media: _____ Hard Copy _X__ Electronic ___ Direct System Input
Instructions:
1. List shall be prepared using Microsoft Office software.
2. Submit original to KO.
0501070 – Passenger Terminal & Cargo Handling
Spec
Item
Form
Attachment
Number
Deliverable Title
Date (s) of
Submission
Distribution
Frequency/
Media/
Approval? Original
Copies
(including original)
0501050/
2.2.1
N/A Certification, Training and
Licenses
Within 15 days after award or as requested by the KO
KO 1 Once for initial submittal, then as requested
0501070/
3.1
J-0501070-04 Completed
Customer Survey
Forms and
Summary of
Results th working day of each month
Airfield
Manager
1 Monthly
0501070/
3.2.1.1
N/A Inspection and
Quality Control
Procedures
Checklist
Within two working days of Aircraft departure
ATO 2 As Needed
1001000 – Material Management
Form
Attachment
Number Deliverable Title
Date (s) of
Submission
Distribution
Frequency
Original/
Copies
Number of Copies
(including original)
1001000/
2.2.1
N/A Certification, Training and
Licenses
Within 15 days after award or as requested by the KO
KO 1 Once for initial submittal, then as requested
1001000
2.3.1
N/A System Access
List
Within 30 calendar days following contract award
KO 1 As changes occur
1001000
3.1
3.2
3.3
N/A
Standard operating
Procedures
(SOPs)
Within 30 calendar days following contract
1001000/
3.2.1
Inventory
Discrepancy
Report
Within five working days
KO 1 After receipt of inventory report.
3.2.2
Supply
Report (SDR)
Within eight hours
Inventory
Management
Office
1 When notified of a discrepancy
SOPs Within 30 calendar days following contract
3.3.2
Inventory Report Within five working days after completion of inventory
KO 1 Semi-Annually
1001000/
3.4.2
Transportation
Report (TDR)
Within five working days
TO 1 After identification or report of loss or damage
1200000 - MWR
Spec
Item
Form
Attachment
Number Deliverable Title
Date (s) of
Submission
Distribution
Frequency Original
Copies
(including original)
1200000/
2.2.1
N/A Certification and
Licenses
Within 15 days after award or as requested by the KO
KO 1 Once for initial submittal, then as requested
1200000/
3.2, 3.3
N/A Annual Schedule of Events
Within 60 calendar days following award, by 30
September thereafter
KO 1 Annually
1501000 – Facility Management
Form
Attachment
Number Deliverable Title
Date (s) of
Submission
Distribution
Frequency
Original/
Copies
Number of Copies
(including original)
1501000/
2.3.1
N/A System Access
Personnel Listing
Within 30 calendar days after contract award
COR/KO 2 Upon award and any change in personnel
1501000/
3.1.3
N/A Weekly MAXIMO
Work Order Report
By 0900 the first workday of each week
COR/KO,
PWO,
DPWO, &
FMD
5 Weekly
1501000/
3.2.1
N/A MAXIMO Asset
Changes Report
By COB the third workday of each month
COR/KO
& FMD
3 Monthly
1501000/
3.3
N/A Plan of Action and
Milestones (POAM)
As specified COR/KO
& FEAD
3 As required
1501000/
3.3
N/A Monthly Project
Updates
By COB the third workday of each month
COR/KO
& FEAD
3 Monthly
1502000 – Facility Investment
Form
Attachment
Number Deliverable Title
Date (s) of
Submission
Distribution
Frequency
Original/
Copies
Number of
Copies
(including original)
1502000/
2.2.1
Certification and
Licenses
Within 15 days after award or as requested by the
KO
KO 1 Once for initial submittal, then as requested
1502000/
3.1
N/A Service Order
Summary Report
First work day of each month
KO 2 Monthly
1502000/
3.2
Preventive
Maintenance
Program Plan
30 calendar days after contract award
KO 2 Annually
1502000/
3.2
N/A Monthly PM Work
Schedule
Five work days prior to the beginning of each month
KO 1 Monthly
1502000/
Integrated
Program Plan
30 calendar days after contract award
KO 2 Annually
1502000/
3.3
N/A Monthly IMP
Schedule and IMP
Maintenance and
Repair Status
Five work days prior to the beginning of each month
KO 1 Monthly
1502000/
3.4
Inspection, Testing, and Certification
Program Summary
Report
First work day of each month
KO 2 Monthly
1502000/
3.4
Inspection, Testing and Certification
Schedule and
Equipment
Certifications
First work day of each month
KO 2 Monthly
1502000/
3.5
Other Recurring
Services Program
Summary Report
First work day of each month
KO 2 Monthly
1503010 – Custodial Services
Form
Attachment
Number Deliverable Title
Date (s) of
Submission
Distribution
Frequency
Original/
Copies
Number of Copies
(including original)
1503010/
3.1
N/A Annual Work
Schedule
1 each year KO 1 Within 15 days after award and annually thereafter
1503010/
3.1
N/A Monthly Work
Plan
First work day of each month
KO 2 Monthly
1503010/
3.2
N/A Unscheduled
Services Report
First work day of each
1503020 – Pest Control
Annex/Spec
Item
Form
Attachment
Number
Deliverable Title
Date(s) of
Submission
Distribution
Frequency
Original/
Copies
Number of Copies
(including original)
1503020/2.2.1 N/A Copy of State
Certification for
Contractor Personnel
15 calendar days prior to start of work.
Copies of renewed certifications shall also be submitted.
KO 2 As required
1503020/2.3.1 N/A Copy of Local/State
Business License
Prior to contract award.
Copies of renewed licenses shall also be submitted within 15 days after award.
KO 2 1 per state
1503020/2.3.2 N/A Permits 5 days prior to the start of work requiring permits.
KO 2 As required
1503020/2.3.4 N/A Ultra-Low Volume
(ULV) Equipment
Calibration and
Droplet Analysis
Report
15 days prior to the start of work and thereafter every 50 hours of ULV equipment use.
KO 2 As required
Item
Form
Submission
Distribution
Frequency
Original/
Copies
Number of Copies
(including original)
1503020/2.3.5 J-1503020-02 Planned Pesticide Use
Sheets including
Pesticide Labels and
Material Safety Data
Sheets (MSDS)
With the proposal.
Within 15 days after award or as requested by the KO
Note: Any proposed changes in pesticide usage shall be submitted for
KO approval at least 5 business days in advance of pesticide use.
KO 2 1 for each pesticide per pest as required
1503020/3 J-1503020-05 Contractor's Work
Plan
With the proposal.
Within 15 days after award or as requested by the KO
Note: Any proposed changes in pesticide usage shall be submitted for
KO approval at least 5 business days in advance of pesticide use.
KO 2 1 per proposal
1503020/3, 4 J-1503020-12 Five-year Termite
Treatment Warranties
10 days following the treatment.
KO 2 As required
1503020/3, 4 J-1503020-12 Termite and Wood
Decay Inspection (DD
Form 1070) (per the appropriate Pest
Group Sheet)
10 working days after inspection completed.
KO 2 As required
Item
Form
Submission
Distribution
Frequency
Original/
Copies
Number of Copies
(including original)
1503020/3, 4 J-1503020-08 Adult Mosquito Catch
(per the appropriate
Pest Group Sheet)
The same day as collected in a labeled, re-sealable plastic bag.
Installati on
Preventiv e
Medicine
Departm ent
2 As required
1503020/3, 4 J-1503020-08 Larval Mosquito
Survey Report (per the appropriate Pest
Group Sheet)
Within 1 day of the survey.
KO 2 As required
1503020/3, 4 N/A Stored Product Pest
Survey (per the appropriate Pest
Group Sheet)
Within 1 day of the survey.
KO 2 As required
1503020/3, 4 N/A Pharaoh Ant
Treatment: Floor Plan
Diagram (per the appropriate Pest
Group Sheet)
2 calendar days prior to beginning the treatment.
KO 2 As required
1503020/3, 4 N/A Tick Survey Report
(per the appropriate
Pest Group Sheet)
Within 1 day of the survey.
KO 2 As required
1503020/3, 4 N/A Mole Cricket Survey
Report (per the appropriate Pest
Group Sheet)
Within 1 day of the survey.
KO 2 As required
1503020/3.3 J-1503020-14 Report of Pest
Management
Operations
Electronically within 1 day of each pest management operation.
KO 2 As required
1503020/3.3 J-1503020-14 Report of Pest
Management
Operations
Electronically once per month by the
15th of the following month
(Example:
July data must be submitted by August
15).
Instructions for Contractor's Work Plan
The CWP shall adhere to applicable publications and directives contained in J-1503020-03 (Applicable Publications and Directives). The CWP will require approval by the Contracting Officer (KO). The CWP shall establish the strategy and methods for conducting a safe, effective, and environmentally sound pest management program in compliance with these specifications. Prospective contractors may review the installation’s historical records of pest activity and abatement actions, survey facilities and grounds, and consult with the Installation PMC in development of a plan. The CWP shall address continuous monitoring, pest response and removal procedures, record keeping, warranties, education and communication to installation personnel to prevent pests and disease vectors, bird control on applicable airfields and in hangars, etc. The IPM approach should use targeted (i.e., effective, environmentally sound) methods including habitat/facility modification, biological/genetic/cultural control, mechanical/physical control, and where necessary, the judicious use of least hazardous pesticides. The CWP shall include labels, MSDS sheets, and planned pesticide use sheets and comply with all applicable local, state, and Federal regulations, and the
IPMP.
Instructions for Field Pest Management Record Form
The Contractor shall use the NAVFAC PPMC approved/provided on-line reporting system to provide a summary printout electronic copy of the data. The website is: https://clients.emainc.com/dcs/ pestmanagement/PesticideLogon.asp. The regional NAVFAC Applied Biology Center should be contacted to obtain a password and instructions to use the system. The report shall include individual daily records of all pest control operations, both chemical and non-chemical, including surveys. Records should be electronically submitted on a monthly basis to the KO by the 15 th day of the month in Microsoft Excel (1997 or later version) via diskette, e-mail attachment, etc. J-1503020-15 (Field Pest Management Record Form) may be used as a field data entry sheet at the contractor’s discretion.
https://clients.emainc.com/dcs/
1503040 – Other (Training Pools)
Spec
Item
Form
Attachment
Number Deliverable Title
Date (s) of
Submission
Distribution
Frequency Original
Copies
(including original)
1503040/
2.2.1
N/A Certifications and
Training
Within 15 days after award or as requested by the KO
KO 1 Once for initial submittal, then as requested
1503040/
3.1.1
N/A Water Analysis
Report
First work day of each
KO 1 Monthly
1503050 – Facility Investment
Spec Item
Form
Attachment
Number
Deliverable
Title
Date (s) of
Submission
Distribution
Frequency
Original/
Copies
Number of Copies
(including original)
1503050 /
2.3.7.1
N/A Water
Conservation
Plan
As specified
KO 2 15 days after award/Annually
1503050 / 3 J-1503050-05 Recycling
Report Form
As specified
KO 3 With each invoice
1503050 / 3 N/A MSDS sheets and catalog cut sheets or samples for fertilizer and mulch
As specified
KO 2 As required
1503050 /
3.1
N/A Soil Analysis test results and proposed fertilizer
As specified
KO 2 15 days after receipt of the test results by the Contractor
1503050 /
3.1.2, 3.2.3, 3.3.1
N/A Vegetation
Control
Schedule
As specified
KO 2 15 days after award/Annually
1503050 /
3.1.4
N/A Debris Removal
Schedule
As specified
KO 2 15 days after award/Annually
1503050 /
3.1.9
N/A Artificial Turf
Maintenance
As specified
KO 2 15 days after award/Annually
1503050 /
3.1.10
N/A Maintenance of
Xeriscape Areas
As specified
KO 2 15 days after award/Annually
1503060 – Pavement Clearance
Spec Item
Form
Attachment
Number Deliverable Title
Date (s) of
Submission
Distribution
Frequency
Original/
Copies
Number of Copies
(including original)
1503060 /
3.1.1
N/A Pavement
Sweeping
Schedule
15 working days after award and
15 working days after the start of each option year
KO 4 Annually
<<Note to Spec Writer:
1. Prepare a Deliverable Report Preparation Instruction for each deliverable requirement. Specify information that should be included in the report. Instructions should be meaningful, complete, and clear. If another document provides instructions, reference the instruction paragraph and state where/how the Contractor may obtain the referenced document (e.g., Existing permit is on file in the Technical Library.”). If no specific format is required, state that Contractor’s format is acceptable. If specific Government forms are to be used by the Contractor, prepare and insert the blank forms into Section J. Only insert forms that are required for Contractor use. If a Contractor-
Check “yes” if you want the Contractor to submit a “draft” document for Government approval, before a
Check “no” if you do not need the Contractor to submit a “draft” document for Government approval before a “final” document is submitted, or if Government approval is not required even for a “draft”.
For check mark use capitalized “X”, bold, italic, and underlined. Delete extraneous underline markings.
Check the type(s) of document you want the Contractor to submit (hard copy, electronic and/or direct input into a system). For check mark use capitalized “X”, bold, italic, and underlined. Delete extraneous underline markings.
For “Electronic” specify in the preparation instructions if you want the report by e-mail, diskette or CD.
Direct system input means inputting the information into an established Government system such as
DCPDS or MODERN (for HRO) and SPM. It does not mean inputting into an Access or Excel
Include any other special instructions or information the Contractor needs to prepare the deliverable (e.g., data must be input into a specific system).
If report is required electronically, note if the report should be e-mailed or submitted on CD or diskette (3.5 diskette, 100MB or 250MB zip disk). If applicable, specify the required file format (i.e. Excel, Word, Access, etc.).
Include description of approval chain (if required).
An example of unclear instructions: “As determined by the Contractor to include all applicable regulatory
Report Preparation Instruction
Report Title: Maintenance Summary Report
Form Attachment No.: J-1503050-XX
Government Approval Required: __ Yes __ No
Media:
__ Hard Copy __ Electronic __ Direct System Input
Preparation Instructions:
<<Note to Spec Writer: Specify information that should be included in the report. Instructions should be meaningful, complete, and clear. If another document provides instructions, reference the instruction paragraph and state where/how the Contractor may obtain the referenced document (e.g., Existing permit is on file in the
Technical Library.”). If no specific format is required, state that Contractor’s format is acceptable.
An example of good instructions:
“The report shall be prepared using Microsoft Office software.
The report shall include each soil batch number and the associated quantity of waste, source of waste, and analytical test results.
Submit an initial, electronic draft copy via email to recipients on the distribution list for Government review and comment.
1. If PWD Environmental accepts this draft version as final, the Government shall notify the Contractor of Government acceptance.
2. If PWD Environmental responds to this draft version with review comments, then incorporate the
Government’s comments and resubmit the revised draft version via email to recipients on the distribution list. Continue this cycle until the Government notifies the Contractor of Government acceptance.
PWD Environmental will forward a hard copy version of the final to GEPA.”
An example of unclear instructions:
“As determined by the Contractor to include all applicable regulatory information.”
Do not include contract performance requirements here (that belongs in the PWS!)
Include any other special instructions or information the Contractor needs to prepare the report (e.g., data must be input into a specific system).
If report is required electronically, note if the report should be e-mailed or submitted on CD or DVD.
If applicable, specify the required file format (i.e. Excel, Word, Access, etc.).
Include description of approval chain (if required).>>
1602000 – Electrical Power Generation, Transmission and Distribution
Annex/Spec Item
Form
Attachment
Number
Deliverable
Title
Date (s) of
Submission
Distribution
Frequency
Original/
Copies
Number of Copies
(including original)
1602000 / 3 N/A Critical Spare
Parts Inventory
15 days after award
KO 4 Once. Update if the requirements change.
1602000 / 3.1 N/A Standard
Operation
Procedures
Within 30 days after contract start and within five days of any changes
KO 4 Once. Update if the requirements change.
1602000 / 3.5 N/A Summary of maintenance and repair accomplished under the various maintenance programs report
3 days after following the end of the month
KO 4 Monthly
1602000 / 3.6 N/A Integrated
Maintenance
Program (IMP)
15 days after award
KO 4 Annually and any time a change is made to the schedule
1602000 / 3.6 N/A Monthly IMP schedule
By the 25 th day of each
KO 4 Monthly
1602000 / 3.6 N/A Unaccomplished maintenance report
3 days after following the end of the month
KO 4 Monthly
1602000 / 3.6 N/A Repair status report
3 days after following the end of the month
KO 4 Monthly
1602000 / 3.6 N/A Summary of maintenance and repair accomplished under the IMP report
3 days after following the end of the month
KO 4 Monthly
1602000 / 3.8.1 N/A Monthly meter reading report day of each
KO 4 Monthly
1603000 – Natural Gas Generation Plant and Distribution System
Spec Item
Form
Attachment
Number Deliverable Title
Date (s) of
Submission
Distribution
Frequency/
Media/
Approval?
Original/
Copies
Number of
Copies
(including original)
1603000/3 N/A Natural Gas
Generation Plant and Distribution
System Inventory, and Drawings
Within 15 days of a change in system description, inventory and drawings
KO 4 As Specified
1603000/3 N/A Critical Spare
Parts Inventory
15 days after award KO 4 As Specified
1603000/3.1 N/A Notification of
Unsafe Conditions
Within 24 hours of occurrence
KO 1 ea per occurrence
As Specified
1603000/3.1 N/A Standard
Operating
Procedures
15 days after award and 5 days after changes
KO &
On-Site
As Specified
1603000/3.1.3 N/A Operating
Records, Logs and
Reports
By the 3 rd day of the preceding month
KO 4
As Specified
1603000/3.3 N/A Integrated
Maintenance
Program (IMP)
15 days after award KO 4 As Specified
1603000/3.4.1 N/A Natural Gas Meter
Inventory, Locations and
Schedule of
Readings Report
By the 10 th day of the preceding month
KO 4 As Specified
1603000/3.4.2 N/A Survey Annually KO 1 Annually
<<Note to Spec Writer:
1. Prepare a Deliverable Report Preparation Instruction for each deliverable requirement. Specify information that should be included in the report. Instructions should be meaningful, complete, and clear. If another document provides instructions, reference the instruction paragraph and state where/how the Contractor may obtain the referenced document (e.g., Existing permit is on file in the Technical Library.”). If no specific format is required, state that Contractor’s format is acceptable. If specific Government forms are to be used by the Contractor, prepare and insert the blank forms into Section J. Only insert forms that are required for Contractor use. If a Contractor-
Check “yes” if you want the Contractor to submit a “draft” document for Government approval, before a
Check “no” if you do not need the Contractor to submit a “draft” document for Government approval before a “final” document is submitted, or if Government approval is not required even for a “draft”.
For check mark use capitalized “X”, bold, italic, and underlined. Delete extraneous underline markings.
Check the type(s) of document you want the Contractor to submit (hard copy, electronic and/or direct input into a system). For check mark use capitalized “X”, bold, italic, and underlined. Delete extraneous underline markings.
For “Electronic” specify in the preparation instructions if you want the report by e-mail, diskette or CD.
Direct system input means inputting the information into an established Government system such as
DCPDS or MODERN (for HRO) and SPM. It does not mean inputting into an Access or Excel
Include any other special instructions or information the Contractor needs to prepare the deliverable (e.g., data must be input into a specific system).
If report is required electronically, note if the report should be e-mailed or submitted on CD or diskette (3.5 diskette, 100MB or 250MB zip disk). If applicable, specify the required file format (i.e. Excel, Word, Access, etc.).
Include description of approval chain (if required).
An example of unclear instructions: “As determined by the Contractor to include all applicable regulatory
Deliverable Title: Trouble Call Summary Report_
Form Attachment No.: J-1603000-XX
Government Approval Required: _Y_ Yes __ No
Media:
__ Hard Copy _Y_ Electronic __ Direct System Input
The report shall be prepared using Microsoft Office Word software.
The Trouble Call Summary Report shall be a compilation of the previous months trouble call reports with the following information:
a. Detailed description of work actually completed, problems encountered and recommended follow-up actions required.
b. Brief description of material and parts used, including quantities and cost.
c. Date and time work began.
d. Date and time work was completed.
e. Total hours of labor (by craft) expended, including travel time.
f. Name of person accepting the work and any comments written on the trouble ticket.
g. Last name and first initial of the Contractor employee(s) performing the work.
Submit a copy of the summary report via email to KO for Government review and comment.
1604000 – Wastewater
Item
Form
Attachment
Number
Deliverable
Title
Date (s) of
Submission
Distribution Frequency
Original/
Copies
Number of Copies
(including original)
1604000 / 3 N/A Critical Spare
Parts Inventory
15 days after award
KO 4 Once. Update if the requirements change.
1604000 / 3.1 N/A Standard
Operation
Procedures
Within 30 days after contract start and within five days after making changes to any plant operating procedure, equipment or component.
KO and
Onsite
4 Once. Update if the requirements change.
1604000 / 3.1.1 N/A Laboratory
Analysis of
Wastewater
Effluent Report
Within 2 days of discovery when found non-compliant.
4 days after the end of the month if compliant.
KO 4 Monthly or within 2 days if found non-compliant
1604000 / 3.1.2 N/A Schedule of
Operator
Attendance
7 prior to the start of work
Within 2 days of Request
KO 4 7 prior to the start of work and as requested
1604000 / 3.1.3 N/A Wastewater
Treatment
Operating
Records, Logs and Reports
3 days after the end of the month during which work is performed
1604000 / 3.3 N/A Warranty
Information
3 days after the end of the month during which work is performed
1604000 / 3.3 N/A Pre-repair and
Post-repair
Reports on Wet
Wells
3 days after the end of the month during which work is performed
KO 4 Monthly
1604000 / 3.3 N/A Integrated
Maintenance
Program (IMP)
15 days after award
KO 4 Annually and any time a change is made.
Item
Form
Attachment
Number
Deliverable
Title
Date (s) of
Submission
Distribution Frequency
Original/
Copies
Number of Copies
(including original)
1604000 / 3.3 N/A Monthly IMP
Schedule
By the 25 th day of each month
KO 4 Monthly
1604000 / 3.3 N/A IMP
Maintenance and Repair
Status Report
3 days after following the end of the month
KO 4 Monthly
1604000 / 3.3.1 N/A Schedule to
Replace
Expendable
Components
15 days after award
KO 4 Annually and any time a change is made.
1604000 / 3.4 N/A Inspection
Program and
Schedule
15 days after award
KO 4 Annually and any time a change is made.
1604000 / 3.4 N/A Inspection
Reports and
CCTV Footage
15 days after performance of the work
KO 4 As required
1604000 / 3.4.2 N/A Manhole
Photographs and Reports
15 days after performance of the work
KO 4 As required
1604000 / 3.4.3 N/A Wet Well
Photographs and Reports
15 days after performance of the work
KO 4 As required
1604000/3.5.1 N/A Pipeline
Cleaning
Schedule
15 days after award
KO 4 Annually and any time a change is made.
1604000/3.5.1 N/A Sampling
Records
Within 2 days of sampling
KO 2 As required
1604000/3.5.2 N/A Schedule of
Wet Well
Services
15 days after award
KO 4 Annually and any time a change is made.
1604000/3.5.2.1 N/A Wet Well
Volume Report
10 days after the end of each fiscal year.
KO 2 Annually
1604000/3.5.2.2 N/A Wet Well
Cleaning
Report
15 days after performance of the work
KO 4 As required
1606000 – Water
Spec Item
Form
Attachment
Number Deliverable Title
Date (s) of
Submissio n
Distribution
Frequency
Original/
Copies
Number of
Copies
(including original)
1606000/2.2.1 N/A Proof of all
Certification, Training, and
Licensing
Requirements
Within 30 days following award
KO 2 Once. Update as changes occur.
1606000/3 N/A Critical Spare
Parts Inventory
Within 30 days following award
KO 4 Once. Update if the requirements change.
1606000/3.1 N/A Standard
Operating
Procedures
15 days after award and
5 days after changes
KO 4 As required
1603000/3.1 N/A Notification of
Unsafe
Conditions Report
Within 24 hours of occurrence
KO 4 ea per occurrence
As Specified
1606000/3.1.3 J-1606000-07 Operating
Records, Logs, and Reports
3 days following the end of the month
1606000/3.3 N/A Integrated
Program (IMP)
Within 15 days following
KO 4 As specified
1606000/3.3 N/A Monthly IMP
Schedule and IMP
Maintenance and
Repair Status
Report
3 days following the end of the month
KO 4 Monthly
1606000/3.4 N/A Inspection, Testing and
Certification
Program and
Schedule
Within 30 days following award
KO 4 As Specified
1606000/3.4 N/A Inspection, Testing, and
Certification
Program
Summary Report
As specified
KO 4 As specified
1606000 /
3.5.1
N/A Monthly meter reading report day of each
1606000 /
3.5.3
N/A Consumer
Confidence
Report
By the end of the calendar year
Environ mental
Office
2 Annually
1606000 /
3.5.4
N/A Cross Connection
Report
NLT 15
January for prior year
Environ mental
Office
2 Annually
Deliverable Title: Trouble Call Summary Report
Form Attachment No.: J-1606000-XX
Government Approval Required: X Yes ___ No
Media: Hard Copy X Electronic ___ Direct System Input
Instructions:
The report shall be prepared using Microsoft Office Word software.
The Trouble Call Summary Report shall be a compilation of the previous months trouble call reports with the following information:
h. Detailed description of work actually completed, problems encountered and recommended follow-up actions required.
i. Brief description of material and parts used, including quantities and cost.
j. Date and time work began.
k. Date and time work was completed.
l. Total hours of labor (by craft) expended, including travel time.
m. Name of person accepting the work and any comments written on the trouble ticket.
n. Last name and first initial of the Contractor employee(s) performing the work.
Submit a copy of the summary report via email to KO for Government review and comment.
1700000 – Base Support Vehicles and Equipment
Spec Item
Form
Attachment
Number
Report Title Date (s) of
Submission
Distribution Frequency
Original/
Copies
Number of
Copies
(including original)
2.3.5.4 N/A Temporary
Suspension of
Downtime
Accumulation
Within two hours of notice to the
Contractor that the material delays will cause the downtime standard to be missed.
KO 2 As required
3.1.1 N/A Monthly "C" Pool or
U-Drive-It Billing
Monthly KO 4 Monthly
3.1.1 N/A Monthly “A” and “B”
Vehicle/Equipment
Rental Billing
Monthly KO 4 Monthly
3.1.1 N/A Navy Monthly Fuel
(Gasoline/Diesel)
Billing
Monthly KO 4 Monthly
3.1.6 N/A Fuel Delivery and
Fuel Accountability
Reports
Monthly KO 2 By the 25 th day of the preceding month
3.2.5.1 N/A GSA Mileage and
Fuel Usage Report
Monthly KO 2 As required by the rental agreement
3.3 N/A Maintenance Schedule Monthly KO 2 By the 25
th day of the preceding month
3.3.1 N/A Vehicle Accident
Reports
Monthly KO 4 Within five calendar days of the start of the month
3.3.1.2 N/A Schedule for Testing
and Certification
As required KO 4 Annually and as required after repairs
3.3.1.3 N/A Preventive
Maintenance Schedule
Annually KO 4 15 calendar days prior to the start of work and annually.
1800000 - Environmental
Spec Item
Form
Attachment
Number
Deliverable
Title
Date (s) of
Submission
Distribution
Frequency
Original/
Copies
Number of Copies
(including original)
1800000/2.2.1 N/A Training Plan 15 days after award/
Annually
KO 1 Annually
1800000/2.2.1 N/A Training
Documentation
15 days after award/
Annually
KO 1 Once
1800000/3.1 N/A Sampling Plan 15 days after award/
Annually
KO/
Installation
Environmental
Office
2 When any changes to the plan occur
1800000/3.1.1 N/A Sample
Collection Logs
7 days after sampling
KO/
Installation
Environmental
Office
2 As Required
1800000/3.1.2 N/A Field Testing
Reports
7 days after testing
KO/
Installation
Environmental
Office
2 As Required
1800000/3.1.3 N/A Laboratory
Analysis
Reports
14 days after receipt of sample
KO/
Installation
Environmental
Office
2 As Required
1800000/3.2.2 J-1800000-
07/08
Used Oil
Disposal and
Recycling
Summary
Report
10 days after the end of the reporting period
KO/
Installation
Environmental
Office
2 Annually
1800000/3.3.4 J-1800000-
Hazardous
Waste Disposal
Report
10 days after the end of the reporting period
KO/
Installation
Environmental
Office
2 Annually
1800000/3.3.4 N/A Waste Profile
Record
With shipment
KO/
Installation
Environmental
Office
2 As Required
1800000/3.4.3 N/A Spill
Documentation
Within 5 days of completing spill response
KO/
Installation
Environmental
Office
2 As Required
1800000/3.5 N/A Groundwater
Monitoring
Report
10 days after the end of the reporting period
KO/
Installation
Environmental
2 Annually
Spec Item
Form
Attachment
Number
Deliverable
Title
Date (s) of
Submission
Distribution
Frequency
Original/
Copies
Number of Copies
(including original)
1800000/3.6 N/A Storm Water
Monitoring
Report
10 days after the end of the reporting period
KO/
Installation
Environmental
2 Quarterly
RECORDS
1. The Contractor shall maintain Sampling, Testing and Laboratory Services records for a period of 8 years. Such records shall include, but are not limited to, the following:
a. Sampling, field testing and laboratory personnel training and certifications
b. Sampling and field testing records
c. Laboratory analysis records
2. The Contractor shall maintain a database of all hazardous materials (HM) and hazardous wastes (HW) handled for a period of 8 years. Database records shall include, but are not limited to, the following:
a. Date, location and from which activity the HM/HW was received
b. Classification of HM/HW material
c. Facility the HM/HW was transported to
d. Date when the HM/HW material was segregated or consolidated and into which container
e. Date when the container is transported again and to which facility or activity
3. The Contractor shall maintain a HM/HW Collection Log for a period of 8 years. Database records shall include, but are not limited to, the following:
a. Date, time, name of requester
b. Specific service requested
c. Completion time
4. The Contractor shall maintain a HM/HW Transportation Log for a period of 8 years. Such records shall include, but are not limited to, the following:
a. Date and time of transportation of HM/HW
b. Route or segment of public highway used to transport HM/HW
c. Classifications of all HM/HW transported
5. The Contractor shall maintain a Groundwater Monitoring Field Logbook for a period of 8 years. Such records shall include, but are not limited to, the following:
a. Date and time of inspection and sampling
b. Type of inspection and sampling
c. Locations of monitoring wells
d. All inspection and sampling data
e. Name of person conducted the inspection and sampling
6. The Contractor shall maintain a Storm Water Monitoring Field Logbook for a period of 8 years. Such records shall include, but are not limited to, the following:
a. Date and time of inspection and sampling
b. Date of sample analysis
c. Locations of the monitoring points
d. All inspection, sampling and analysis data
e. Name of person conducted the inspection and sampling
7. The Contractor shall maintain any Compliance Testing records for a minimum period as specified by regulatory requirements. Such records shall include, but are not limited to, the following:
a. Precision testing records and monthly inspection forms for all storage vessels
b. Corrosion Protection records as applicable
c. Any other records required by local, state, federal or Navy requirements as listed in the facilities Storage
Tank Management Plan, Spill Prevention, Countermeasures, and Control Plan (SPCC), Facility Response
Plan, or other similar document.