Attachment_G_IDIQ_Paint_Bid_Schedule_-_Camp_Pen.xls
XLS spreadsheet 159 KB Posted
- Solicitation number
- N6247315R4405
About this file
IDIQ Paint Bid Schedule
View the file
Other files
| File | Type | Posted |
|---|---|---|
| AMD_0001.pdf | ||
| Attachment_G_IDIQ_Paint_Bid_Schedule_-_Seal_Beach_Norco.xls | XLS spreadsheet | |
| N6247314R4405FINAL_RFP.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SUMMARY
| SUMMARY | |
| PROVIDE IDIQ PRICES TO PERFORM EXTERIOR/INTERIOR PAINTING, LEAD PAINT REMOVAL, AND MOLD REMEDIATION IN ACCORDANCE WITH CONTRACT REQUIREMENTS AND SPECIFICATIONS. | |
| BASE YEAR | $ 50,000.00 |
| 1ST OPTION YEAR | $ 50,000.00 |
| 2ND OPTION YEAR | $ 50,000.00 |
| 3RD OPTION YEAR | $ 50,000.00 |
| 4TH OPTION YEAR | $ 50,000.00 |
| TOTAL ALL YEARS | $ 250,000.00 |
BASE - EXHIBIT A IDIQ
| EXHIBIT LINE ITEM NUMBERS SOLICITATION/CONTRACT NUMBER N62473-15-R- XXXX CAMP PENDLETON | |||||
| PROVIDE IDIQ PRICES TO PERFORM EXTERIOR/INTERIOR PAINTING, LEAD PAINT REMOVAL, AND MOLD REMEDIATION IN ACCORDANCE WITH CONTRACT REQUIREMENTS AND SPECIFICATIONS. | |||||
| The Contractor shall populate the "Unit Price" column and the extended "Total Amount" column for each of the IDIQ ELIN below. All work shall be performed in strict accordance with sections of this contract. | |||||
| CLIENT | UNIT OF | UNIT | TOTAL | ||
| ELIN | DESCRIPTION | QTY | ISSUE | PRICE | AMOUNT |
| A001 | EXTERIOR PAINTING | ||||
| A001AA | Exterior surface preparation on wood, metal, masonry and concrete substrates and components, to include sanding and scraping of loose and flakey non-Lead Based Paint, and the minor repairs specified in Section 09 99 00 "Painting and Coatings." | 200,000 | SF | $ - 0 | |
| A001AB | Remove deteriorated or old caulk or sealant from cracks, joints and seams. Apply caulk or sealant on cracks, joints and seams. Apply weatherproofing around doors and windows in accordance with Section 07 92 00 00 "Joint Sealants" and Section 09 99 00 "Paint and Coatings." Includes all types of caulks and sealants. | 10,000 | LF | $ - 0 | |
| A001AC | Install backer rod to 3/4" diameter. | 200 | LF | $ - 0 | |
| A001AD | Remove deteriorated or old exterior or interior window putty. Re-putty. | 4,000 | LF | $ - 0 | |
| A001AE | Pressure wash exterior substrates, includes all substrates types and sports courts. | 250,000 | SF | $ - 0 | |
| A001AF | Patch stucco; over 10% of the substrate surface in accordance with Section 09 99 00 "Paint and Coatings." | 1,000 | SF | $ - 0 | |
| A001AG | Masking of doors, windows and other components; Exterior or interior. | 45,000 | SF | $ - 0 | |
| A002 | EXTERIOR PAINTING | ||||
| A002AA | Prime all exterior substrates (to include exposed eaves) in accordance with Section 09 99 00 "Paint and Coatings." Apply one coat. | 200,000 | SF | $ - 0 | |
| A002AB | Prime exterior trim, to include casings and fascia in accordance with Section 09 99 00 "Paint and Coatings." Apply one coat. Measure the width of a trim's exposed surfaces and multiply the total width in inches by the length and divide by 12 to sum up the SF. | 5,000 | SF | $ - 0 | |
| A002AC | Paint wood substrates (to include exposed eaves, but not to include trim) in accordance with Section 09 99 00 "Paint and Coatings.". Includes painting of all electrical conduit and other surface mounted appendages. Apply 1 intermediate coat and 1 top coat. | 10,000 | SF | $ - 0 | |
| A002AD | Paint stucco, masonry and concrete substrates, not to include trim, in accordance with Section 09 99 00 "Paint and Coatings.". Includes painting of all electrical conduit and other surface mounted appendages. Apply 1 intermediate coat and 1 top coat. | 300,000 | SF | $ - 0 | |
| A002AE | Paint metal siding panels (to include sliding and roll-up doors, and eaves, but not to include trim) in accordance with Section 09 99 00 "Paint and Coatings.". Includes painting of all electrical conduit and other surface mounted appendages. Apply 1 intermediate coat and 1 top coat. | 200,000 | SF | $ - 0 | |
| A002AF | Apply an elastomeric coating on stucco, masonry and concrete substrates, not to include trim, in accordance with Section 09 99 00 "Paint and Coatings.". Includes painting of all electrical conduit and other surface mounted appendages. Apply 1 intermediate coat and 1 top coat. | 100,000 | SF | $ - 0 | |
| A002AG | Apply waterproof sealer on masonry and concrete substrates in accordance with Section 09 99 00 "Paint and Coatings.". Apply 2 coats. | 200,000 | SF | $ - 0 | |
| A002AH | Paint out-board side of fascia.; to 2" x 12." Apply 1 intermediate coat and 1 top coat. | 15,000 | LF | $ - 0 | |
| A002AJ | Prep and paint metal, wood or concrete stairs; Includes risers, treads, stringers, one landing, supports, and railing for stairs up to 8' wide by 4-steps. Spot prime and apply 1 intermediate coat and 1 top coat. | 25 | EA | $ - 0 | |
| A002AK | Prep and paint metal, wood or concrete stairs; Includes risers, treads, stringers, one landing, supports, and railing for stairs up to 8' wide by 5-steps to 8-steps. Applies to single and multi-story buildings. Spot prime and apply 1 intermediate coat and 1 top coat. | 25 | EA | $ - 0 | |
| A002AL | Prep and paint metal, wood or concrete stairs; Includes risers, treads, stringers, one landing, supports, and railing for stairs up to 8' wide by 9-steps to 12-steps. Applies to single and multi-story buildings. Spot prime and apply 1 intermediate coat and 1 top coat. | 25 | EA | $ - 0 | |
| A002AM | Prep and paint entrance/exit wood or metal exterior doors; both sides to include painting of louvers, vision lite frame, door frame and trim. Prime and apply 1 intermediate coat and 1 top coat. Door size to 3'-0" x 7'-0". Prime and apply 1 intermediate coat and 1 top coat. | 200 | EA | $ - 0 | |
| A002AN | Prep and paint entrance/exit wood or metal exterior doors; both sides, to include painting of louvers, vision lite frame, door frame and trim. Prime and apply 1 intermediate coat and 1 top coat. Door sizes over 3'-0" x 7'-0" to 4'-0" x 7'-0" (Apply 1 intermediate coat and 1 top coat) | 26 | EA | $ - 0 | |
| A002AP | Prep and paint exterior side of window, includes frame, header, sill, sashes, mullions and other associated trim. Prime and apply 1 intermediate coat and 1 top coat). Note: Painting may have to be performed with security bars in place. | 10,000 | SF | $ - 0 | |
| A002AQ | Prep and paint gutter and downspout, includes all associated appurtenances. Prime and apply 1 intermediate coat and 1 top coat. | 2,400 | LF | $ - 0 | |
| A002AR | Prep and paint metal security bars or screens in place. Prime and apply 1 intermediate coat and 1 top coat. | 1,200 | SF | $ - 0 | |
| A002AS | Prep and paint roof mounted equipment. Prime and apply 1 intermediate coat and 1 topcoat. | 50 | EA | $ - 0 | |
| A003 | MECHANICAL | ||||
| A003AA | Prep and paint metal pipe surfaces to 4-inches in diameter; Includes identification and directional labels/markings. Spot prime and apply 1 intermediate coat and 1 topcoat. | 4,000 | LF | $ - 0 | |
| A003AB | Prep and paint metal pipe surfaces from 4-plus inches in diameter to 12-inches in diameter; Includes identification and directional labels/markings. Spot prime and apply 1 intermediate coat and 1 topcoat. | 2,000 | LF | $ - 0 | |
| A003AC | Prep and paint metal pipe surfaces from 12-plus inches in diameter to 18-inches in diameter; Includes identification and directional labels/markings. Spot prime and apply 1 intermediate coat and 1 top coat. | 2,000 | LF | $ - 0 | |
| A003AD | Unit price for surface preparation and painting of linear measured metal pipe surfaces from 18-plus inches in diameter to 24-inches in diameter; Includes identification and directional markings. (Apply spot primer, 1 intermediate coat and 1 top coat). | 2,000 | LF | $ - 0 | |
| A003AE | Prep and paint metal pipe surfaces over 24-inches in diameter; Includes identification and directional labels/markings. Spot prime and apply 1 intermediate coat and 1 topcoat. | 2,000 | SF | $ - 0 | |
| A004 | ELASTOMERIC COATING | ||||
| A004AA | Prep metal roof surface, to include pressure washing, clean, application of sealant on fasteners, seal/tape all joints, repair/patch holes and damaged roof areas to 2-sqaure feet each (unlimited quantity), and apply acrylic elastomeric weatherproof coating in accordance with Section 07 67 00 "Metal Roof Restoration" and the manufacturer's install instructions. Repairs are defined as multiple areas over the entire surface. Tint the acrylic elastomeric weatherproof coating to match MCB Camp Pendleton’s Base Architectural Plan. Submit a 5-Year Warranty workmanship warranty at the time of the final inspection. | 4,000 | SY | $ - 0 | |
| A005 | SPORTS COURT RESURFACING ON CONCRETE OR ASPHALT | ||||
| A005AA | Prep and apply Sport Surface Coating on Basketball, Tennis, Volleyball, Racquetball, and other sports courts in accordance with the manufacturer's installation instructions; Includes pressure washing, sealing cracks, application of herbicide, surface preparation and minor repair of asphalt or concrete surfaces, application of base coat, application of multi-colors, and layout and placement of game lines. Submit a 5-Year workmanship warranty at the time of the final inspection. | 720 | SY | $ - 0 | |
| A006 | FLAG POLES | ||||
| A006AA | Prep and paint flag pole surfaces to 40-feet high. Includes personnel lift, personal protective equipment, and precautions to protect applicable lawn surfaces. Spot prime and apply 1-intermediate coat and 1-top coat. | 12 | EA | $ - 0 | |
| A006AB | Prep and paint flag pole surfaces from 40+ feet to 60-feet high. Includes personnel lift, personal protective equipment, and precautions to protect applicable lawn surfaces. Spot prime and apply 1-intermediate coat and 1-top coat. | 12 | EA | $ - 0 | |
| A006AC | Prep and paint flag pole surfaces from 60+ feet to 80-feet high. Includes personnel lift, personal protective equipment, and precautions to protect applicable lawn surfaces. Spot prime and apply 1-intermediate coat and 1-top coat. | 6 | EA | $ - 0 | |
| A007 | INTERIOR PAINTING COATINGS | ||||
| A007AA | Prime all interior substrates in accordance with Section 09 99 00 "Paint and Coatings." Apply one coat. | 150,000 | SF | $ - 0 | |
| A007AB | Prep and paint drywall, plaster, wood, concrete, or masonry walls and ceilings. Includes painting of all electrical conduit, wire mold and other surface mounted appendages. Apply 1 intermediate coat and 1 top coat. | 150,000 | SF | $ - 0 | |
| A007AC | Prep and paint interior wood or metal doors. Door sizes up to 3'-0" x 7'-0"; both sides, to include painting of louvers, vision lite frame, door frame and trim. Prime and apply 1 intermediate coat and 1 top coat. | 100 | EA | $ - 0 | |
| A007AD | Prep and paint interior wood or metal doors. Door sizes over 3'-0" x 7'-0" to 4'-0" x 7'-0"; two-sides, to include painting of louvers, vision lite frame, door frame and trim. Prime and apply 1 intermediate coat and 1 top coat. | 50 | EA | $ - 0 | |
| A007AE | Prep and paint interior trim work to include baseboard or molding up to 8-inches in wide. Spot prime and apply 1 intermediate coat and 1 top coat. | 6,000 | LF | $ - 0 | |
| A007AF | Prep and paint interior side of window; Includes jamb, header, sill, sashes, mullions and trim. Spot prime and apply 1 intermediate coat and 1 topcoat. | 4,000 | SF | $ - 0 | |
| A007AG | Repair of plaster or gypsum substrate that exceeds the limit of "Existing Coated Surfaces with Minor Defects" found in Section 09 99 00, "Paint and Coating." Includes texturing to match the existing substrate texture and spot priming. | 1,000 | SF | $ - 0 | |
| A007AH | Apply splatter or knock-down texture to walls or ceilings. | 2,000 | SF | $ - 0 | |
| A007AJ | Apply acoustical ceiling texture. | 1,000 | SF | $ - 0 | |
| A008 | INTERIOR EPOXY COATINGS | ||||
| A008AA | Prep wall and floor surfaces, install cant strips at floor/wall intersection where applicable, and apply epoxy coating system in accordance with Section 09 99 00 "Paint and Coatings" and in accordance with the approved manufacturer's application instructions. Submit a 5-Year workmanship warranty at the time of the final acceptance inspection. | 4,000 | SF | $ - 0 | |
| A009 | LBP ABATEMENT AND MOLD REMDIATION | ||||
| The abatement ELINs shall include all associated direct and indirect costs, supervision, quality control, labor, and engineering controls to include third party industrial hygienist, air monitoring/sampling, LBP/Mold Remediation Plan, signage, containment, personnel protection equipment, collection and disposal to include all fees, and all supporting documentation. The Government will provide the contractor with analytical reports for LBP . | |||||
| A009AA | Abate loose and flaky LBP to the point where the LBP is determined to be locked on to the substrate. | 15,000 | SF | $ - 0 | |
| A009AB | Chemical removal and disposal of LBP. Applies to chemical stripping method to include neutralizing. | 500 | SF | $ - 0 | |
| A009AC | Mold Remediation | 2,000 | SF | $ - 0 | |
| A010 | RENTAL EQUIPMENT | ||||
| The boom lift shall be used for painting and repair of multi-story facilities that exceeds 15-feet measured from the finished elevation. Exception: This ELIN shall not be used in conjunction with ELIN A006 "Flag Poles.". | |||||
| A010AA | Boom lift to reach up to 60-fee high, rental per week. | 30 | EA | $ - 0 | |
| A010AB | Boom lift to reach above 61-feet to 80-feet, rental per week. | 6 | EA | $ - 0 | |
| A010AC | Boom lift to reach above 81-feet to 100-feet, rental per week. | 6 | EA | $ - 0 | |
| A011 | LABOR FOR NORMAL WORKING HOURS: NEGOTIATED | ||||
| The unit price bid by the Contractor to perform one hour of work-in-place. The unit price includes all indirect and direct costs associated with performing work. The price includes the Contractor’s hourly composite trade wage, adjusted to allow for workforce productivity; costs for union agreements, crew sizes, hand tools, payroll burdens and fringes, overtime, job (field) overhead (including clerical support, supervision, inspection, fees, taxes, licenses, permits, and insurance), general and administrative (home office) overhead, and profit. Additionally, time for job preparation, safety standby personnel, and similar indirect labor elements are included. | |||||
| A011AA | Laborer (DBA): The unit price bid by the Contractor to provide one performance standard hour of work-in-place per laborer at the worksite in support of requirements as specified in the task order. This ELIN may be used provide labor to move excess quantities furniture as defined by the Government, furniture in excess of 150 pounds, large pieces of equipment and appliances as defined by the Government. | 80 | HR | $ - 0 | |
| A011AB | Carpenter (DBA): The unit price bid by the Contractor to provide one performance standard hour of work-in-place per carpenter at the worksite in support of requirements as specified in the task order. | 80 | HR | $ - 0 | |
| A011AC | Electrician (DBA): The unit price bid by the Contractor to provide one performance standard hour of work-in-place per electrician at the worksite in support of requirements as specified in the task order. | 80 | HR | $ - 0 | |
| A011AD | Plumber(DBA): The unit price bid by the Contractor to provide one performance standard hour of work-in-place per plumber at the worksite in support of requirements as specified in the task order. | 80 | HR | $ - 0 | |
| A011AE | Sheetmetal Mechanic (DBA): The unit price bid by the Contractor to provide one performance standard hour of work-in-place per sheetmetal mechanic at the worksite in support of requirements as specified in the task order. | 80 | HR | $ - 0 | |
| A011AF | Roofer (DBA): The unit price bid by the Contractor to provide one performance standard hour of work-in-place per roofer at the worksite in support of requirements as specified in the task order. | 80 | HR | $ - 0 | |
| LABOR FOR OVERTIME WORKING HOURS: NEGOTIATED | |||||
| A012 | The unit price bid by the Contractor to perform one hour of overtime work-in-place. The unit price includes all indirect and direct costs associated with performing work. The price includes the Contractor’s hourly composite trade wage, adjusted to allow for workforce productivity; costs for union agreements, crew sizes, hand tools, payroll burdens and fringes, overtime, job (field) overhead (including clerical support, supervision, inspection, fees, taxes, licenses, permits, and insurance), general and administrative (home office) overhead, and profit. Additionally, time for job preparation, safety standby personnel, and similar indirect labor elements are included. | ||||
| A012AA | Laborer (DBA) | 40 | HR | $ - 0 | |
| A012AB | Carpenter (DBA) | 40 | HR | $ - 0 | |
| A012AC | Electrician (DBA) | 40 | HR | $ - 0 | |
| A012AD | Plumber(DBA) | 40 | HR | $ - 0 | |
| A012AE | Sheetmetal Mechanic (DBA) | 40 | HR | $ - 0 | |
| A012AF | Roofer (DBA) | 40 | HR | $ - 0 | |
| A012AG | Painter (DBA): Use this ELIN for all work to be performed outside of normal working hours. Note to Contractor: All prepriced ELINs have the labor factored into the "Unit Price". The proposed pricing for this ELIN must be fair and reasonable. | 360 | HR | $ - 0 | |
| MATERIALS AND EQUIPMENT: NEGOTIATED | |||||
| A013 | Materials and equipment in support of Composite Hour Labor Rate. Materials, equipment and rental prices shall be the lowest prices available considering the availability and time constraints of the job, and shall include any discounts and/or rebates accrued to or for the Contractor. The Contractor shall provide quotations from a minimum of two suppliers of the required material/equipment. Reasonable costs for shipping may be included. Materials handling costs shall be built in the Composite Hourly Labor Rate. The direct material/equipment costs will be multiplied by the Contractors Fixed Burden Rate (FBR) to determine the total burden material/equipment cost for the job. Example: $35,000.00 (Est. Qty) +( $35,000.00 (Est. Qty) x 2% (FBR%) = $42,000.00 (total material/equipment cost.) | $ 50,000.00 | % | $ 50,000.00 | |
| The Contractor's FBR is the sum of the prime contractor's markup plus the mark of the subcontractor. Note: The Contractor must put a percentage value in Cell E101 before submitting their proposal. | |||||
| TOTAL BASE YEAR ELINS A001 THROUGH A013 | TOTAL | $ 50,000.00 | |||
| Inches to Decimal Conversion | |||||
| EA = Each | 1" = 0.08 inches | 6" = 0.50 inches | |||
| HR = Hour | 2" = 0.17 inches | 7" = 0.58 inches | |||
| LF = Linear Feet | 3" = 0.25 inches | 8" = 0.67 inches | |||
| SF = Square Feet | 4" = 0.33 inches | 9" = 0.75 inches | |||
| FBR = Fixed-Burden rate | 5" = 0.42 inches | 10" = 0.83 inches | |||
| 11" = 0.92 inches |
1ST OPT - EXHIBIT B IDIQ
| EXHIBIT LINE ITEM NUMBERS SOLICITATION/CONTRACT NUMBER N62473-15-R- XXXX CAMP PENDLETON | |||||
| PROVIDE IDIQ PRICES TO PERFORM EXTERIOR/INTERIOR PAINTING, LEAD PAINT REMOVAL, AND MOLD REMEDIATION IN ACCORDANCE WITH CONTRACT REQUIREMENTS AND SPECIFICATIONS. | |||||
| The Contractor shall populate the "Unit Price" column and the extended "Total Amount" column for each of the IDIQ ELIN below. All work shall be performed in strict accordance with sections of this contract. | |||||
| CLIENT | UNIT OF | UNIT | TOTAL | ||
| ELIN | DESCRIPTION | QTY | ISSUE | PRICE | AMOUNT |
| B001 | EXTERIOR PAINTING | ||||
| B001AA | Exterior surface preparation on wood, metal, masonry and concrete substrates and components, to include sanding and scraping of loose and flakey non-Lead Based Paint, and the minor repairs specified in Section 09 99 00 "Painting and Coatings." | 200,000 | SF | $ - 0 | |
| B001AB | Remove deteriorated or old caulk or sealant from cracks, joints and seams. Apply caulk or sealant on cracks, joints and seams. Apply weatherproofing around doors and windows in accordance with Section 07 92 00 00 "Joint Sealants" and Section 09 99 00 "Paint and Coatings." Includes all types of caulks and sealants. | 10,000 | LF | $ - 0 | |
| B001AC | Install backer rod to 3/4" diameter. | 200 | LF | $ - 0 | |
| B001AD | Remove deteriorated or old exterior or interior window putty. Re-putty. | 4,000 | LF | $ - 0 | |
| B001AE | Pressure wash exterior substrates, includes all substrates types and sports courts. | 250,000 | SF | $ - 0 | |
| B001AF | Patch stucco; over 10% of the substrate surface in accordance with Section 09 99 00 "Paint and Coatings." | 1,000 | SF | $ - 0 | |
| B001AG | Masking of doors, windows and other components; Exterior or interior. | 45,000 | SF | $ - 0 | |
| B002 | EXTERIOR PAINTING | ||||
| B002AA | Prime all exterior substrates (to include exposed eaves) in accordance with Section 09 99 00 "Paint and Coatings." Apply one coat. | 200,000 | SF | $ - 0 | |
| B002AB | Prime exterior trim, to include casings and fascia in accordance with Section 09 99 00 "Paint and Coatings." Apply one coat. Measure the width of a trim's exposed surfaces and multiply the total width in inches by the length and divide by 12 to sum up the SF. | 5,000 | SF | $ - 0 | |
| B002AC | Paint wood substrates (to include exposed eaves, but not to include trim) in accordance with Section 09 99 00 "Paint and Coatings.". Includes painting of all electrical conduit and other surface mounted appendages. Apply 1 intermediate coat and 1 top coat. | 10,000 | SF | $ - 0 | |
| B002AD | Paint stucco, masonry and concrete substrates, not to include trim, in accordance with Section 09 99 00 "Paint and Coatings.". Includes painting of all electrical conduit and other surface mounted appendages. Apply 1 intermediate coat and 1 top coat. | 300,000 | SF | $ - 0 | |
| B002AE | Paint metal siding panels (to include sliding and roll-up doors, and eaves, but not to include trim) in accordance with Section 09 99 00 "Paint and Coatings.". Includes painting of all electrical conduit and other surface mounted appendages. Apply 1 intermediate coat and 1 top coat. | 200,000 | SF | $ - 0 | |
| B002AF | Apply an elastomeric coating on stucco, masonry and concrete substrates, not to include trim, in accordance with Section 09 99 00 "Paint and Coatings.". Includes painting of all electrical conduit and other surface mounted appendages. Apply 1 intermediate coat and 1 top coat. | 100,000 | SF | $ - 0 | |
| B002AG | Apply waterproof sealer on masonry and concrete substrates in accordance with Section 09 99 00 "Paint and Coatings.". Apply 2 coats. | 200,000 | SF | $ - 0 | |
| B002AH | Paint out-board side of fascia.; to 2" x 12." Apply 1 intermediate coat and 1 top coat. | 15,000 | LF | $ - 0 | |
| B002AJ | Prep and paint metal, wood or concrete stairs; Includes risers, treads, stringers, one landing, supports, and railing for stairs up to 8' wide by 4-steps. Spot prime and apply 1 intermediate coat and 1 top coat. | 25 | EA | $ - 0 | |
| B002AK | Prep and paint metal, wood or concrete stairs; Includes risers, treads, stringers, one landing, supports, and railing for stairs up to 8' wide by 5-steps to 8-steps. Applies to single and multi-story buildings. Spot prime and apply 1 intermediate coat and 1 top coat. | 25 | EA | $ - 0 | |
| B002AL | Prep and paint metal, wood or concrete stairs; Includes risers, treads, stringers, one landing, supports, and railing for stairs up to 8' wide by 9-steps to 12-steps. Applies to single and multi-story buildings. Spot prime and apply 1 intermediate coat and 1 top coat. | 25 | EA | $ - 0 | |
| B002AM | Prep and paint entrance/exit wood or metal exterior doors; both sides to include painting of louvers, vision lite frame, door frame and trim. Prime and apply 1 intermediate coat and 1 top coat. Door size to 3'-0" x 7'-0". Prime and apply 1 intermediate coat and 1 top coat. | 200 | EA | $ - 0 | |
| B002AN | Prep and paint entrance/exit wood or metal exterior doors; both sides, to include painting of louvers, vision lite frame, door frame and trim. Prime and apply 1 intermediate coat and 1 top coat. Door sizes over 3'-0" x 7'-0" to 4'-0" x 7'-0" (Apply 1 intermediate coat and 1 top coat) | 26 | EA | $ - 0 | |
| B002AP | Prep and paint exterior side of window, includes frame, header, sill, sashes, mullions and other associated trim. Prime and apply 1 intermediate coat and 1 top coat). Note: Painting may have to be performed with security bars in place. | 10,000 | SF | $ - 0 | |
| B002AQ | Prep and paint gutter and downspout, includes all associated appurtenances. Prime and apply 1 intermediate coat and 1 top coat. | 2,400 | LF | $ - 0 | |
| B002AR | Prep and paint metal security bars or screens in place. Prime and apply 1 intermediate coat and 1 top coat. | 1,200 | SF | $ - 0 | |
| B002AS | Prep and paint roof mounted equipment. Prime and apply 1 intermediate coat and 1 topcoat. | 50 | EA | $ - 0 | |
| B003 | MECHANICAL | ||||
| B003AA | Prep and paint metal pipe surfaces to 4-inches in diameter; Includes identification and directional labels/markings. Spot prime and apply 1 intermediate coat and 1 topcoat. | 4,000 | LF | $ - 0 | |
| B003AB | Prep and paint metal pipe surfaces from 4-plus inches in diameter to 12-inches in diameter; Includes identification and directional labels/markings. Spot prime and apply 1 intermediate coat and 1 topcoat. | 2,000 | LF | $ - 0 | |
| B003AC | Prep and paint metal pipe surfaces from 12-plus inches in diameter to 18-inches in diameter; Includes identification and directional labels/markings. Spot prime and apply 1 intermediate coat and 1 top coat. | 2,000 | LF | $ - 0 | |
| B003AD | Unit price for surface preparation and painting of linear measured metal pipe surfaces from 18-plus inches in diameter to 24-inches in diameter; Includes identification and directional markings. (Apply spot primer, 1 intermediate coat and 1 top coat). | 2,000 | LF | $ - 0 | |
| B003AE | Prep and paint metal pipe surfaces over 24-inches in diameter; Includes identification and directional labels/markings. Spot prime and apply 1 intermediate coat and 1 topcoat. | 2,000 | SF | $ - 0 | |
| B004 | ELASTOMERIC COATING | ||||
| B004AA | Prep metal roof surface, to include pressure washing, clean, application of sealant on fasteners, seal/tape all joints, repair/patch holes and damaged roof areas to 2-sqaure feet each (unlimited quantity), and apply acrylic elastomeric weatherproof coating in accordance with Section 07 67 00 "Metal Roof Restoration" and the manufacturer's install instructions. Repairs are defined as multiple areas over the entire surface. Tint the acrylic elastomeric weatherproof coating to match MCB Camp Pendleton’s Base Architectural Plan. Submit a 5-Year Warranty workmanship warranty at the time of the final inspection. | 4,000 | SY | $ - 0 | |
| B005 | SPORTS COURT RESURFACING ON CONCRETE OR ASPHALT | ||||
| B005AA | Prep and apply Sport Surface Coating on Basketball, Tennis, Volleyball, Racquetball, and other sports courts in accordance with the manufacturer's installation instructions; Includes pressure washing, sealing cracks, application of herbicide, surface preparation and minor repair of asphalt or concrete surfaces, application of base coat, application of multi-colors, and layout and placement of game lines. Submit a 5-Year workmanship warranty at the time of the final inspection. | 720 | SY | $ - 0 | |
| B006 | FLAG POLES | ||||
| B006AA | Prep and paint flag pole surfaces to 40-feet high. Includes personnel lift, personal protective equipment, and precautions to protect applicable lawn surfaces. Spot prime and apply 1-intermediate coat and 1-top coat. | 12 | EA | $ - 0 | |
| B006AB | Prep and paint flag pole surfaces from 40+ feet to 60-feet high. Includes personnel lift, personal protective equipment, and precautions to protect applicable lawn surfaces. Spot prime and apply 1-intermediate coat and 1-top coat. | 12 | EA | $ - 0 | |
| B006AC | Prep and paint flag pole surfaces from 60+ feet to 80-feet high. Includes personnel lift, personal protective equipment, and precautions to protect applicable lawn surfaces. Spot prime and apply 1-intermediate coat and 1-top coat. | 6 | EA | $ - 0 | |
| B007 | INTERIOR PAINTING COATINGS | ||||
| B007AA | Prime all interior substrates in accordance with Section 09 99 00 "Paint and Coatings." Apply one coat. | 150,000 | SF | $ - 0 | |
| B007AB | Prep and paint drywall, plaster, wood, concrete, or masonry walls and ceilings. Includes painting of all electrical conduit, wire mold and other surface mounted appendages. Apply 1 intermediate coat and 1 top coat. | 150,000 | SF | $ - 0 | |
| B007AC | Prep and paint interior wood or metal doors. Door sizes up to 3'-0" x 7'-0"; both sides, to include painting of louvers, vision lite frame, door frame and trim. Prime and apply 1 intermediate coat and 1 top coat. | 100 | EA | $ - 0 | |
| B007AD | Prep and paint interior wood or metal doors. Door sizes over 3'-0" x 7'-0" to 4'-0" x 7'-0"; two-sides, to include painting of louvers, vision lite frame, door frame and trim. Prime and apply 1 intermediate coat and 1 top coat. | 50 | EA | $ - 0 | |
| B007AE | Prep and paint interior trim work to include baseboard or molding up to 8-inches in wide. Spot prime and apply 1 intermediate coat and 1 top coat. | 6,000 | LF | $ - 0 | |
| B007AF | Prep and paint interior side of window; Includes jamb, header, sill, sashes, mullions and trim. Spot prime and apply 1 intermediate coat and 1 topcoat. | 4,000 | SF | $ - 0 | |
| B007AG | Repair of plaster or gypsum substrate that exceeds the limit of "Existing Coated Surfaces with Minor Defects" found in Section 09 99 00, "Paint and Coating." Includes texturing to match the existing substrate texture and spot priming. | 1,000 | SF | $ - 0 | |
| B007AH | Apply splatter or knock-down texture to walls or ceilings. | 2,000 | SF | $ - 0 | |
| B007AJ | Apply acoustical ceiling texture. | 1,000 | SF | $ - 0 | |
| B008 | INTERIOR EPOXY COATINGS | ||||
| B008AA | Prep wall and floor surfaces, install cant strips at floor/wall intersection where applicable, and apply epoxy coating system in accordance with Section 09 99 00 "Paint and Coatings" and in accordance with the approved manufacturer's application instructions. Submit a 5-Year workmanship warranty at the time of the final acceptance inspection. | 4,000 | SF | $ - 0 | |
| B009 | LBP ABATEMENT AND MOLD REMDIATION | ||||
| The abatement ELINs shall include all associated direct and indirect costs, supervision, quality control, labor, and engineering controls to include third party industrial hygienist, air monitoring/sampling, LBP/Mold Remediation Plan, signage, containment, personnel protection equipment, collection and disposal to include all fees, and all supporting documentation. The Government will provide the contractor with analytical reports for LBP . | |||||
| B009AA | Abate loose and flaky LBP to the point where the LBP is determined to be locked on to the substrate. | 15,000 | SF | $ - 0 | |
| B009AB | Chemical removal and disposal of LBP. Applies to chemical stripping method to include neutralizing. | 500 | SF | $ - 0 | |
| B009AC | Mold Remediation | 2,000 | SF | $ - 0 | |
| B010 | RENTAL EQUIPMENT | ||||
| The boom lift shall be used for painting and repair of multi-story facilities that exceeds 15-feet measured from the finished elevation. Exception: This ELIN shall not be used in conjunction with ELIN B006 "Flag Poles.". | |||||
| B010AA | Boom lift to reach up to 60-fee high, rental per week. | 30 | EA | $ - 0 | |
| B010AB | Boom lift to reach above 61-feet to 80-feet, rental per week. | 6 | EA | $ - 0 | |
| B010AC | Boom lift to reach above 81-feet to 100-feet, rental per week. | 6 | EA | $ - 0 | |
| B011 | LABOR FOR NORMAL WORKING HOURS: NEGOTIATED | ||||
| The unit price bid by the Contractor to perform one hour of work-in-place. The unit price includes all indirect and direct costs associated with performing work. The price includes the Contractor’s hourly composite trade wage, adjusted to allow for workforce productivity; costs for union agreements, crew sizes, hand tools, payroll burdens and fringes, overtime, job (field) overhead (including clerical support, supervision, inspection, fees, taxes, licenses, permits, and insurance), general and administrative (home office) overhead, and profit. Additionally, time for job preparation, safety standby personnel, and similar indirect labor elements are included. | |||||
| B011AA | Laborer (DBA): The unit price bid by the Contractor to provide one performance standard hour of work-in-place per laborer at the worksite in support of requirements as specified in the task order. This ELIN may be used provide labor to move excess quantities furniture as defined by the Government, furniture in excess of 150 pounds, large pieces of equipment and appliances as defined by the Government. | 80 | HR | $ - 0 | |
| B011AB | Carpenter (DBA): The unit price bid by the Contractor to provide one performance standard hour of work-in-place per carpenter at the worksite in support of requirements as specified in the task order. | 80 | HR | $ - 0 | |
| B011AC | Electrician (DBA): The unit price bid by the Contractor to provide one performance standard hour of work-in-place per electrician at the worksite in support of requirements as specified in the task order. | 80 | HR | $ - 0 | |
| B011AD | Plumber(DBA): The unit price bid by the Contractor to provide one performance standard hour of work-in-place per plumber at the worksite in support of requirements as specified in the task order. | 80 | HR | $ - 0 | |
| B011AE | Sheetmetal Mechanic (DBA): The unit price bid by the Contractor to provide one performance standard hour of work-in-place per sheetmetal mechanic at the worksite in support of requirements as specified in the task order. | 80 | HR | $ - 0 | |
| B011AF | Roofer (DBA): The unit price bid by the Contractor to provide one performance standard hour of work-in-place per roofer at the worksite in support of requirements as specified in the task order. | 80 | HR | $ - 0 | |
| LABOR FOR OVERTIME WORKING HOURS: NEGOTIATED | |||||
| B012 | The unit price bid by the Contractor to perform one hour of overtime work-in-place. The unit price includes all indirect and direct costs associated with performing work. The price includes the Contractor’s hourly composite trade wage, adjusted to allow for workforce productivity; costs for union agreements, crew sizes, hand tools, payroll burdens and fringes, overtime, job (field) overhead (including clerical support, supervision, inspection, fees, taxes, licenses, permits, and insurance), general and administrative (home office) overhead, and profit. Additionally, time for job preparation, safety standby personnel, and similar indirect labor elements are included. | ||||
| B012AA | Laborer (DBA) | 40 | HR | $ - 0 | |
| B012AB | Carpenter (DBA) | 40 | HR | $ - 0 | |
| B012AC | Electrician (DBA) | 40 | HR | $ - 0 | |
| B012AD | Plumber(DBA) | 40 | HR | $ - 0 | |
| B012AE | Sheetmetal Mechanic (DBA) | 40 | HR | $ - 0 | |
| B012AF | Roofer (DBA) | 40 | HR | $ - 0 | |
| B012AG | Painter (DBA): Use this ELIN for all work to be performed outside of normal working hours. Note to Contractor: All prepriced ELINs have the labor factored into the "Unit Price". The proposed pricing for this ELIN must be fair and reasonable. | 360 | HR | $ - 0 | |
| MATERIALS AND EQUIPMENT: NEGOTIATED | |||||
| B013 | Materials and equipment in support of Composite Hour Labor Rate. Materials, equipment and rental prices shall be the lowest prices available considering the availability and time constraints of the job, and shall include any discounts and/or rebates accrued to or for the Contractor. The Contractor shall provide quotations from a minimum of two suppliers of the required material/equipment. Reasonable costs for shipping may be included. Materials handling costs shall be built in the Composite Hourly Labor Rate. The direct material/equipment costs will be multiplied by the Contractors Fixed Burden Rate (FBR) to determine the total burden material/equipment cost for the job. Example: $35,000.00 (Est. Qty) +( $35,000.00 (Est. Qty) x 2% (FBR%) = $42,000.00 (total material/equipment cost.) | $ 50,000.00 | % | $ 50,000.00 | |
| The Contractor's FBR is the sum of the prime contractor's markup plus the mark of the subcontractor. Note: The Contractor must put a percentage value in Cell E101 before submitting their proposal. | |||||
| TOTAL 1ST OPTION YEAR ELINS B001 THROUGH B013 | TOTAL | $ 50,000.00 | |||
| Inches to Decimal Conversion | |||||
| EA = Each | 1" = 0.08 inches | 6" = 0.50 inches | |||
| HR = Hour | 2" = 0.17 inches | 7" = 0.58 inches | |||
| LF = Linear Feet | 3" = 0.25 inches | 8" = 0.67 inches | |||
| SF = Square Feet | 4" = 0.33 inches | 9" = 0.75 inches | |||
| FBR = Fixed-Burden rate | 5" = 0.42 inches | 10" = 0.83 inches | |||
| 11" = 0.92 inches |
2ND OPT - EXHIBIT C IDIQ
| EXHIBIT LINE ITEM NUMBERS SOLICITATION/CONTRACT NUMBER N62473-15-R- XXXX CAMP PENDLETON | |||||
| PROVIDE IDIQ PRICES TO PERFORM EXTERIOR/INTERIOR PAINTING, LEAD PAINT REMOVAL, AND MOLD REMEDIATION IN ACCORDANCE WITH CONTRACT REQUIREMENTS AND SPECIFICATIONS. | |||||
| The Contractor shall populate the "Unit Price" column and the extended "Total Amount" column for each of the IDIQ ELIN below. All work shall be performed in strict accordance with sections of this contract. | |||||
| CLIENT | UNIT OF | UNIT | TOTAL | ||
| ELIN | DESCRIPTION | QTY | ISSUE | PRICE | AMOUNT |
| C001 | EXTERIOR PAINTING | ||||
| C001AA | Exterior surface preparation on wood, metal, masonry and concrete substrates and components, to include sanding and scraping of loose and flakey non-Lead Based Paint, and the minor repairs specified in Section 09 99 00 "Painting and Coatings." | 200,000 | SF | $ - 0 | |
| C001AB | Remove deteriorated or old caulk or sealant from cracks, joints and seams. Apply caulk or sealant on cracks, joints and seams. Apply weatherproofing around doors and windows in accordance with Section 07 92 00 00 "Joint Sealants" and Section 09 99 00 "Paint and Coatings." Includes all types of caulks and sealants. | 10,000 | LF | $ - 0 | |
| C001AC | Install backer rod to 3/4" diameter. | 200 | LF | $ - 0 | |
| C001AD | Remove deteriorated or old exterior or interior window putty. Re-putty. | 4,000 | LF | $ - 0 | |
| C001AE | Pressure wash exterior substrates, includes all substrates types and sports courts. | 250,000 | SF | $ - 0 | |
| C001AF | Patch stucco; over 10% of the substrate surface in accordance with Section 09 99 00 "Paint and Coatings." | 1,000 | SF | $ - 0 | |
| C001AG | Masking of doors, windows and other components; Exterior or interior. | 45,000 | SF | $ - 0 | |
| C002 | EXTERIOR PAINTING | ||||
| C002AA | Prime all exterior substrates (to include exposed eaves) in accordance with Section 09 99 00 "Paint and Coatings." Apply one coat. | 200,000 | SF | $ - 0 | |
| C002AB | Prime exterior trim, to include casings and fascia in accordance with Section 09 99 00 "Paint and Coatings." Apply one coat. Measure the width of a trim's exposed surfaces and multiply the total width in inches by the length and divide by 12 to sum up the SF. | 5,000 | SF | $ - 0 | |
| C002AC | Paint wood substrates (to include exposed eaves, but not to include trim) in accordance with Section 09 99 00 "Paint and Coatings.". Includes painting of all electrical conduit and other surface mounted appendages. Apply 1 intermediate coat and 1 top coat. | 10,000 | SF | $ - 0 | |
| C002AD | Paint stucco, masonry and concrete substrates, not to include trim, in accordance with Section 09 99 00 "Paint and Coatings.". Includes painting of all electrical conduit and other surface mounted appendages. Apply 1 intermediate coat and 1 top coat. | 300,000 | SF | $ - 0 | |
| C002AE | Paint metal siding panels (to include sliding and roll-up doors, and eaves, but not to include trim) in accordance with Section 09 99 00 "Paint and Coatings.". Includes painting of all electrical conduit and other surface mounted appendages. Apply 1 intermediate coat and 1 top coat. | 200,000 | SF | $ - 0 | |
| C002AF | Apply an elastomeric coating on stucco, masonry and concrete substrates, not to include trim, in accordance with Section 09 99 00 "Paint and Coatings.". Includes painting of all electrical conduit and other surface mounted appendages. Apply 1 intermediate coat and 1 top coat. | 100,000 | SF | $ - 0 | |
| C002AG | Apply waterproof sealer on masonry and concrete substrates in accordance with Section 09 99 00 "Paint and Coatings.". Apply 2 coats. | 200,000 | SF | $ - 0 | |
| C002AH | Paint out-board side of fascia.; to 2" x 12." Apply 1 intermediate coat and 1 top coat. | 15,000 | LF | $ - 0 | |
| C002AJ | Prep and paint metal, wood or concrete stairs; Includes risers, treads, stringers, one landing, supports, and railing for stairs up to 8' wide by 4-steps. Spot prime and apply 1 intermediate coat and 1 top coat. | 25 | EA | $ - 0 | |
| C002AK | Prep and paint metal, wood or concrete stairs; Includes risers, treads, stringers, one landing, supports, and railing for stairs up to 8' wide by 5-steps to 8-steps. Applies to single and multi-story buildings. Spot prime and apply 1 intermediate coat and 1 top coat. | 25 | EA | $ - 0 | |
| C002AL | Prep and paint metal, wood or concrete stairs; Includes risers, treads, stringers, one landing, supports, and railing for stairs up to 8' wide by 9-steps to 12-steps. Applies to single and multi-story buildings. Spot prime and apply 1 intermediate coat and 1 top coat. | 25 | EA | $ - 0 | |
| C002AM | Prep and paint entrance/exit wood or metal exterior doors; both sides to include painting of louvers, vision lite frame, door frame and trim. Prime and apply 1 intermediate coat and 1 top coat. Door size to 3'-0" x 7'-0". Prime and apply 1 intermediate coat and 1 top coat. | 200 | EA | $ - 0 | |
| C002AN | Prep and paint entrance/exit wood or metal exterior doors; both sides, to include painting of louvers, vision lite frame, door frame and trim. Prime and apply 1 intermediate coat and 1 top coat. Door sizes over 3'-0" x 7'-0" to 4'-0" x 7'-0" (Apply 1 intermediate coat and 1 top coat) | 26 | EA | $ - 0 | |
| C002AP | Prep and paint exterior side of window, includes frame, header, sill, sashes, mullions and other associated trim. Prime and apply 1 intermediate coat and 1 top coat). Note: Painting may have to be performed with security bars in place. | 10,000 | SF | $ - 0 | |
| C002AQ | Prep and paint gutter and downspout, includes all associated appurtenances. Prime and apply 1 intermediate coat and 1 top coat. | 2,400 | LF | $ - 0 | |
| C002AR | Prep and paint metal security bars or screens in place. Prime and apply 1 intermediate coat and 1 top coat. | 1,200 | SF | $ - 0 | |
| C002AS | Prep and paint roof mounted equipment. Prime and apply 1 intermediate coat and 1 topcoat. | 50 | EA | $ - 0 | |
| C003 | MECHANICAL | ||||
| C003AA | Prep and paint metal pipe surfaces to 4-inches in diameter; Includes identification and directional labels/markings. Spot prime and apply 1 intermediate coat and 1 topcoat. | 4,000 | LF | $ - 0 | |
| C003AB | Prep and paint metal pipe surfaces from 4-plus inches in diameter to 12-inches in diameter; Includes identification and directional labels/markings. Spot prime and apply 1 intermediate coat and 1 topcoat. | 2,000 | LF | $ - 0 | |
| C003AC | Prep and paint metal pipe surfaces from 12-plus inches in diameter to 18-inches in diameter; Includes identification and directional labels/markings. Spot prime and apply 1 intermediate coat and 1 top coat. | 2,000 | LF | $ - 0 | |
| C003AD | Unit price for surface preparation and painting of linear measured metal pipe surfaces from 18-plus inches in diameter to 24-inches in diameter; Includes identification and directional markings. (Apply spot primer, 1 intermediate coat and 1 top coat). | 2,000 | LF | $ - 0 | |
| C003AE | Prep and paint metal pipe surfaces over 24-inches in diameter; Includes identification and directional labels/markings. Spot prime and apply 1 intermediate coat and 1 topcoat. | 2,000 | SF | $ - 0 | |
| C004 | ELASTOMERIC COATING | ||||
| C004AA | Prep metal roof surface, to include pressure washing, clean, application of sealant on fasteners, seal/tape all joints, repair/patch holes and damaged roof areas to 2-sqaure feet each (unlimited quantity), and apply acrylic elastomeric weatherproof coating in accordance with Section 07 67 00 "Metal Roof Restoration" and the manufacturer's install instructions. Repairs are defined as multiple areas over the entire surface. Tint the acrylic elastomeric weatherproof coating to match MCB Camp Pendleton’s Base Architectural Plan. Submit a 5-Year Warranty workmanship warranty at the time of the final inspection. | 4,000 | SY | $ - 0 | |
| C005 | SPORTS COURT RESURFACING ON CONCRETE OR ASPHALT | ||||
| C005AA | Prep and apply Sport Surface Coating on Basketball, Tennis, Volleyball, Racquetball, and other sports courts in accordance with the manufacturer's installation instructions; Includes pressure washing, sealing cracks, application of herbicide, surface preparation and minor repair of asphalt or concrete surfaces, application of base coat, application of multi-colors, and layout and placement of game lines. Submit a 5-Year workmanship warranty at the time of the final inspection. | 720 | SY | $ - 0 | |
| C006 | FLAG POLES | ||||
| C006AA | Prep and paint flag pole surfaces to 40-feet high. Includes personnel lift, personal protective equipment, and precautions to protect applicable lawn surfaces. Spot prime and apply 1-intermediate coat and 1-top coat. | 12 | EA | $ - 0 | |
| C006AB | Prep and paint flag pole surfaces from 40+ feet to 60-feet high. Includes personnel lift, personal protective equipment, and precautions to protect applicable lawn surfaces. Spot prime and apply 1-intermediate coat and 1-top coat. | 12 | EA | $ - 0 | |
| C006AC | Prep and paint flag pole surfaces from 60+ feet to 80-feet high. Includes personnel lift, personal protective equipment, and precautions to protect applicable lawn surfaces. Spot prime and apply 1-intermediate coat and 1-top coat. | 6 | EA | $ - 0 | |
| C007 | INTERIOR PAINTING COATINGS | ||||
| C007AA | Prime all interior substrates in accordance with Section 09 99 00 "Paint and Coatings." Apply one coat. | 150,000 | SF | $ - 0 | |
| C007AB | Prep and paint drywall, plaster, wood, concrete, or masonry walls and ceilings. Includes painting of all electrical conduit, wire mold and other surface mounted appendages. Apply 1 intermediate coat and 1 top coat. | 150,000 | SF | $ - 0 | |
| C007AC | Prep and paint interior wood or metal doors. Door sizes up to 3'-0" x 7'-0"; both sides, to include painting of louvers, vision lite frame, door frame and trim. Prime and apply 1 intermediate coat and 1 top coat. | 100 | EA | $ - 0 | |
| C007AD | Prep and paint interior wood or metal doors. Door sizes over 3'-0" x 7'-0" to 4'-0" x 7'-0"; two-sides, to include painting of louvers, vision lite frame, door frame and trim. Prime and apply 1 intermediate coat and 1 top coat. | 50 | EA | $ - 0 | |
| C007AE | Prep and paint interior trim work to include baseboard or molding up to 8-inches in wide. Spot prime and apply 1 intermediate coat and 1 top coat. | 6,000 | LF | $ - 0 | |
| C007AF | Prep and paint interior side of window; Includes jamb, header, sill, sashes, mullions and trim. Spot prime and apply 1 intermediate coat and 1 topcoat. | 4,000 | SF | $ - 0 | |
| C007AG | Repair of plaster or gypsum substrate that exceeds the limit of "Existing Coated Surfaces with Minor Defects" found in Section 09 99 00, "Paint and Coating." Includes texturing to match the existing substrate texture and spot priming. | 1,000 | SF | $ - 0 | |
| C007AH | Apply splatter or knock-down texture to walls or ceilings. | 2,000 | SF | $ - 0 | |
| C007AJ | Apply acoustical ceiling texture. | 1,000 | SF | $ - 0 | |
| C008 | INTERIOR EPOXY COATINGS | ||||
| C008AA | Prep wall and floor surfaces, install cant strips at floor/wall intersection where applicable, and apply epoxy coating system in accordance with Section 09 99 00 "Paint and Coatings" and in accordance with the approved manufacturer's application instructions. Submit a 5-Year workmanship warranty at the time of the final acceptance inspection. | 4,000 | SF | $ - 0 | |
| C009 | LBP ABATEMENT AND MOLD REMDIATION | ||||
| The abatement ELINs shall include all associated direct and indirect costs, supervision, quality control, labor, and engineering controls to include third party industrial hygienist, air monitoring/sampling, LBP/Mold Remediation Plan, signage, containment, personnel protection equipment, collection and disposal to include all fees, and all supporting documentation. The Government will provide the contractor with analytical reports for LBP . | |||||
| C009AA | Abate loose and flaky LBP to the point where the LBP is determined to be locked on to the substrate. | 15,000 | SF | $ - 0 | |
| C009AB | Chemical removal and disposal of LBP. Applies to chemical stripping method to include neutralizing. | 500 | SF | $ - 0 | |
| C009AC | Mold Remediation | 2,000 | SF | $ - 0 | |
| C010 | RENTAL EQUIPMENT | ||||
| The boom lift shall be used for painting and repair of multi-story facilities that exceeds 15-feet measured from the finished elevation. Exception: This ELIN shall not be used in conjunction with ELIN C006 "Flag Poles.". | |||||
| C010AA | Boom lift to reach up to 60-fee high, rental per week. | 30 | EA | $ - 0 | |
| C010AB | Boom lift to reach above 61-feet to 80-feet, rental per week. | 6 | EA | $ - 0 | |
| C010AC | Boom lift to reach above 81-feet to 100-feet, rental per week. | 6 | EA | $ - 0 | |
| C011 | LABOR FOR NORMAL WORKING HOURS: NEGOTIATED | ||||
| The unit price bid by the Contractor to perform one hour of work-in-place. The unit price includes all indirect and direct costs associated with performing work. The price includes the Contractor’s hourly composite trade wage, adjusted to allow for workforce productivity; costs for union agreements, crew sizes, hand tools, payroll burdens and fringes, overtime, job (field) overhead (including clerical support, supervision, inspection, fees, taxes, licenses, permits, and insurance), general and administrative (home office) overhead, and profit. Additionally, time for job preparation, safety standby personnel, and similar indirect labor elements are included. | |||||
| C011AA | Laborer (DBA): The unit price bid by the Contractor to provide one performance standard hour of work-in-place per laborer at the worksite in support of requirements as specified in the task order. This ELIN may be used provide labor to move excess quantities furniture as defined by the Government, furniture in excess of 150 pounds, large pieces of equipment and appliances as defined by the Government. | 80 | HR | $ - 0 | |
| C011AB | Carpenter (DBA): The unit price bid by the Contractor to provide one performance standard hour of work-in-place per carpenter at the worksite in support of requirements as specified in the task order. | 80 | HR | $ - 0 | |
| C011AC | Electrician (DBA): The unit price bid by the Contractor to provide one performance standard hour of work-in-place per electrician at the worksite in support of requirements as specified in the task order. | 80 | HR | $ - 0 | |
| C011AD | Plumber(DBA): The unit price bid by the Contractor to provide one performance standard hour of work-in-place per plumber at the worksite in support of requirements as specified in the task order. | 80 | HR | $ - 0 | |
| C011AE | Sheetmetal Mechanic (DBA): The unit price bid by the Contractor to provide one performance standard hour of work-in-place per sheetmetal mechanic at the worksite in support of requirements as specified in the task order. | 80 | HR | $ - 0 | |
| C011AF | Roofer (DBA): The unit price bid by the Contractor to provide one performance standard hour of work-in-place per roofer at the worksite in support of requirements as specified in the task order. | 80 | HR | $ - 0 | |
| LABOR FOR OVERTIME WORKING HOURS: NEGOTIATED | |||||
| C012 | The unit price bid by the Contractor to perform one hour of overtime work-in-place. The unit price includes all indirect and direct costs associated with performing work. The price includes the Contractor’s hourly composite trade wage, adjusted to allow for workforce productivity; costs for union agreements, crew sizes, hand tools, payroll burdens and fringes, overtime, job (field) overhead (including clerical support, supervision, inspection, fees, taxes, licenses, permits, and insurance), general and administrative (home office) overhead, and profit. Additionally, time for job preparation, safety standby personnel, and similar indirect labor elements are included. | ||||
| C012AA | Laborer (DBA) | 40 | HR | $ - 0 | |
| C012AB | Carpenter (DBA) | 40 | HR | $ - 0 | |
| C012AC | Electrician (DBA) | 40 | HR | $ - 0 | |
| C012AD | Plumber(DBA) | 40 | HR | $ - 0 | |
| C012AE | Sheetmetal Mechanic (DBA) | 40 | HR | $ - 0 | |
| C012AF | Roofer (DBA) | 40 | HR | $ - 0 | |
| C012AG | Painter (DBA): Use this ELIN for all work to be performed outside of normal working hours. Note to Contractor: All prepriced ELINs have the labor factored into the "Unit Price". The proposed pricing for this ELIN must be fair and reasonable. | 360 | HR | $ - 0 | |
| MATERIALS AND EQUIPMENT: NEGOTIATED |
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .