AMD_0001.pdf

PDF 41 KB Posted

Attached to
IDIQ PAINT MCB and MCAS CAMP PENDLETON, NWS SEAL BEACH, FALLBROOK and NORCO.
Solicitation number
N6247315R4405
Issued by

About this file

AMD 0001

View the file

Other files

File Type Posted
Attachment_G_IDIQ_Paint_Bid_Schedule_-_Seal_Beach_Norco.xls XLS spreadsheet
N6247314R4405FINAL_RFP.pdf PDF
Attachment_G_IDIQ_Paint_Bid_Schedule_-_Camp_Pen.xls XLS spreadsheet

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this section is to incorporate the answ ers to the RFIs into the solicitation in order to revise and/or clarify the contractual requirements.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 4

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 16-Jun-2015

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N62473-15-R-4405

X 9B. DATED (SEE ITEM 11)

27-May-2015

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

16-Jun-2015

CODE

NAVFAC SOUTHWEST

CAMP PENDLETON ROICC/CODE ROPCN

MARINE CORPS BASE CAMP PENDLETON

PO BOX 555229 BLDG 22101

CAMP PENDLETON CA 92055-5229

N62473 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

N62473-15-R-4405

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

AMD 0001

16 June 2015

SUBJ: AMENDMENT NO. 0001 FOR SDVOSB SET-ASIDE FOR INDEFINITE DELIVERY

INDEFINITE QUANTITY (IDIQ) CONTRACT FOR PAINTING CONSTRUCTION

PROJECTS ABOARD MCB CAMP PENDLETON, NWS SEAL BEACH, NWS SEAL BEACH

FALLBROOK DETACHMENT AND NORCO, CA.

I. The purpose of this section is to incorporate the answers to the RFIs into the solicitation in order to revise and/or clarify the contractual requirements.

1. Question: In Part 1, Section 00210, paragraph 4.A, it states that the Offeror shall submit their prices using the MS Excel ELIN Price Schedule included in the solicitation as Attachment G.

However the attached price schedule is in PDF. Please provide the ELIN Price Schedule in MS Excel.

Government Response: Please use the attached Bid Schedule provided in excel to submit your proposals.

2. Question: Does this IDIQ include base housing?

Government Response: No

3. Question: Is a bid bond required? If so, what is the amount for this bid bond/guarantee?

Government Response: Yes, please review FAR clause 52.228-1 BID GUARANTEE (SEP 1996) of the RFP.

4. Question: What is the annual aggregate bonding amount that is required for the bondability letter? What is the per project amount?

Government Response: As stated under factor 3, the Offeror shall provide a bondability letter from the surety company to demonstrate the minimum single project bonding capacity and aggregate bonding capacity of at least $10,000,000 for the management of multiple concurrent projects at the higher dollar magnitude within the task order range. The Task Order Range is $2,000 to $750,000.

5. Question: If a site has potential lead base paint, will the painting contractor be responsible for the lead testing or will testing be conducted prior to award of task orders?

Government Response: A Lead-Based Paint (LBP) assessment will be performed by another government contract prior to issuance of a contract task order. The contractor will be provided with building specific LBP analytical report as part of the awarded task order.

6. Question: During lead work, is air monitoring required? If so, for how long?

Government Response: Yes, at all times while work is in progress.

7. Question: Should we add the air monitoring expense to the lead base paint ELINS item cost?

Government Response: Yes.

8. Question: Can the quality control manager, SSHO and site supervisor be the same person or do they each have to be a separate person?

Government Response: All key personnel, i.e. the Project Manager (PM), Quality Control Manager (QCM), Site Safety and Health Officer (SSHO) and the Site Superintendent, are separate persons. Please see contract Section 01 33 00 “Administrative Requirements” for the requirements. Clarification: The contract does not refer to a supervisor as one of the key personnel.

9. Question: Does each task order require its own QCM, SSHO and supervisor?

Government Response: No. The assigned QCM(s) and Site Superintendent(s) may roam from one project site to another while work is in progress.

10. Question: Are these key personnel going to be listed as a separate line item on the ELINS or do we need to add money to cover the wages of these people to the base bid?

Government Response: The associated costs for key personnel shall be factored into the ELINs.

11. Question: What pay scale should we use to pay the QCM, SSHO and supervisor?

Government Response: There are no Davis-Bacon Act regulations for professional personnel, i.e.

key personnel. Salary for key personnel is left up to the contractor to decide.

12. Question: What certifications are required for each, QCM, SSHO and the supervisor?

Government Response: See contract Section 01 35 26 “Governmental Safety requirements” for the safety requirements for the SSHO and QCM. See contract Section 01 45 00.01 20 “Quality Control for Minor Construction” for the quality control requirements for the QCM.

13. Question: What percentage of work must be self performed?

Government Response: Per FAR clause 52.219-14, For general construction: the contractor will self perform at least 15 percent of the cost of the contract, not including the cost of materials.

II. The Issued By organization is:

NAVFAC SOUTHWEST

CAMP PENDLETON ROICC/CODE ROPCN

MARINE CORPS BASE CAMP PENDLETON

PO BOX 555229 BLDG 22101

CAMP PENDLETON CA 92055-5229

Disregard the following, “SECTION 00010 - SOLICITATION CONTRACT FORM”

SECTION 00010 - SOLICITATION CONTRACT FORM

The Issued By organization has changed from

NAVFAC SOUTHWEST

ENVIRONMENTAL CONTRACTS CORE - BRAC

CODE R06B2

1455 FRAZEE ROAD

SAN DIEGO CA 92108-4310

to

NAVFAC SOUTHWEST

ENVIRONMENTAL CONTRACTS CORE - BRAC

33000 NIXIE WAY

BLDG 50

SAN DIEGO CA 92147

(End of Summary of Changes)

File details come from the government source that posted it. Updated .