UFGS 01 75 00
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 14r0015_amend_0005.PDF | ||
| FINAL_PTO_0001_042114.xlsx | XLSX spreadsheet | |
| 14r0015_amend_0004.PDF | ||
| PTO_0001_rev_041814.xlsx | XLSX spreadsheet | |
| 14r0015_amend_0003.PDF | ||
| 14r0015_amend_0002.PDF | ||
| 14r0015_amend_0001.PDF | ||
| PTO_0001.xlsx | XLSX spreadsheet | |
| UFGS_01_30_00.pdf | ||
| UFGS_01_33_00.pdf | ||
| UFGS_01_14_00.pdf | ||
| UFGS_01_42_00.pdf | ||
| EXHIBIT_H_COMB_DAILY_QC1.PDF | ||
| UFGS_01_57_19.pdf | ||
| UFGS_01_45_00.pdf | ||
| Exhibit_E_Surety_Form.pdf | ||
| EXHIBIT_I_DBA_WD_FOR_METRO_SD_JOC.pdf | ||
| Exhibit_F_RFI_Form.pdf | ||
| Exhibit_D_-_Financial_Questionnaire.pdf | ||
| Exhibit_B_-_PPQ.pdf | ||
| UFGS_01_78_00.pdf | ||
| Exhibit_A_-_Experience_-_Offeror.pdf | ||
| Exhibit_C_-_Safety_Data_ _Narrative.pdf | ||
| UFGS_01_62_35.pdf | ||
| UFGS_01_78_23.pdf | ||
| EXHIBIT_J_-_PTO_0001.pdf | ||
| UFGS_01_20_00.pdf | ||
| UFGS_01_35_26.pdf | ||
| EXHIBIT_G_-_FAR_52_209-7_AND_DFARS_252_209-7999.pdf | ||
| UFGS_01_50_00.pdf | ||
| UFGS_01_57_23.pdf | ||
| N62473-14-R-0015.pdf |
Show all 32
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
UFGS 01 75 00
SECTION 01 75 00
STARTING AND ADJUSTING
05/12
1 PART 1 GENERAL
1.1 SUMMARY
Requirements of this Section apply to, and are a component part of, each section of the specifications.
1.2 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for Contractor Quality Control approval. Submit the following in accordance with Section 01 33 00
SUBMITTAL PROCEDURES:
SD-01 Preconstruction Submittals
Verification of Prior Experience; G
Documentation of Manufacturer's Prior Experience; G
Quality Control Plan; G
Manufacturer's Sample Warranty; G
Operation and Maintenance Data; G
Provide Evidence; G
SD-02 Shop Drawings
Drawings, Diagrams and Schedules; G
Diagrams and Instructions; G
Coordination Drawings; G
SD-03 Product Data
Catalog Cuts; G
Samples of Warranty Language; G
SD-05 Design Data file:///D:/Documents%20and%20Settings/bradley.CRAWFORD/My%20Documents/01%2033%2000.doc
Design Calculations; G
SD-06 Test Reports
Factory Tests; G
Functional Field Test; G
Final Acceptance Test; G
Test Procedures; G
SD-07 Certificates
Qualification of Manufacturer; G
Qualification of Installer; G
SD-08 Manufacturer's Instructions
Manufacturer's Administrative Requirements; G
Demonstration and Training Information; G
Manufacturer's Procedural Requirements; G
SD-09 Manufacturer's Field Reports
Documentation of the Testing and Verification Actions; G
SD-10 Operation and Maintenance Data
Operation and Maintenance Data; G
Safety and Security Data or Posters; G
1.2.1 Preconstruction and Pre-Testing Requirements
Deliver equipment and services to meet the requirements and specifications of their respective contract. Ensure all equipment is free of latent manufacturing and installation defects. The Government reserves the option to elect performance of acceptance testing by internal personnel, or a designated third party. Regardless of who performs the acceptance testing, ensure the requirements of acceptance are.
Submit the following for review and approval prior to the commencement of work and any testing, whether such testing is on site or elsewhere:
a. Verification of prior experience and expertise with similar project scope
b. Documentation of manufacturer's prior experience and expertise with similar project materials and systems
c. Quality control plan
d. Manufacturer's sample warranty and operation and maintenance data, with details regarding start-up procedures
e. Manufacturer's administrative requirements
f. Manufacturer's procedural requirements
g. Demonstration and training information
Submit the following certifications:
a. Provide evidence that products used within this specification are manufactured in the United States.
b. Qualification of manufacturer, including current licenses and insurance.
c. Qualification of [applicator][installer], including licenses and insurance.
1.2.2 Shop Drawings and Diagrams
Submit the following shop drawings, record drawings, and diagrams as required to correctly execute the installation of the work:
a. Diagrams and instructions from a manufacturer or fabricator for use in producing the product and as aids to the Contractor for integrating the product or system into the project;
b. Coordination drawings prepared by or for the Contractor to show how multiple systems and interdisciplinary work will be coordinated.
1.2.3 Product and Design Data
Submit all product data and any design calculations, mix designs, analyses or other data pertaining to the work to ensure a complete functional installation; including, but not limited to:
a. Catalog cuts, illustrations, schedules, diagrams, performance charts, instructions and brochures illustrating size, physical appearance and other characteristics of materials, systems or equipment for some portion of the work
b. Samples of warranty language when the contract requires [extended][no dollar limit] product warranties
c. Operation and maintenance data provided by the manufacturer to ensure the safe and efficient operation, maintenance and repair of the system or equipment provided
d. Safety and security data or posters provided by the manufacturer to be posted in a conspicuous visible location for operational and maintenance personnel
1.2.4 Tests Required
Perform tests to verify proper functioning of fire protection, fire suppression, HVAC, compressed air, electrical switchgear, protective relaying, fluid and gas systems, pump/motor combinations, boiler systems, hydraulic and pneumatic control, condition/performance monitoring systems, energy control and monitoring systems, and other assemblies and components that need to be tested as an interrelated whole.
1.2.4.1 Factory Tests
Submit certified copies of required tests performed at the factory to verify proper build. These test results will be used in the "Final Acceptance
Test" section to verify no shipping damage and proper installation.
1.2.4.2 Functional Field Test
Perform functional field tests test to verify that the system and components have been properly installed and are functioning properly. Perform test(s) in the presence of the Contracting Officer. Acceptance will be issued when system has performed per other sections and referenced industry standards.
Coordinate and submit documentation of the testing and verification actions taken by manufacturer's representative at the job site, in the vicinity of the job site, or on a sample taken from the job site to confirm compliance with manufacturer's standards or instructions.
1.2.4.3 Final Acceptance Test
Perform a formal test with full documentation using the approved recording form. Contracting Officer will witness this test and issue a written final acceptance. Provide final test data to the Contracting Officer with a cover letter clearly marked with the system name, date, and the words "Final Test
Data - Forward to the Systems Engineer/Condition Monitoring
Office/Predictive Testing Group for inclusion in the Maintenance Database."
1.2.4.4 Test Procedures
Submit test procedure and recording forms that document the test steps for approval to the Contracting Officer 21 calendar days prior to the proposed test date. Ensure procedures clearly state step by step instruction to verify system parameters, components, and functions.
2 PART 2 PRODUCTS
Not Used
3 PART 3 EXECUTION
Not Used
-- End of Section --